CN107580041A - Construction site electrical equipment monitoring method - Google Patents

Construction site electrical equipment monitoring method Download PDF

Info

Publication number
CN107580041A
CN107580041A CN201710760889.7A CN201710760889A CN107580041A CN 107580041 A CN107580041 A CN 107580041A CN 201710760889 A CN201710760889 A CN 201710760889A CN 107580041 A CN107580041 A CN 107580041A
Authority
CN
China
Prior art keywords
electrical equipment
monitor terminal
remote control
data acquisition
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710760889.7A
Other languages
Chinese (zh)
Inventor
罗欢畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yi Lianzhi Road Technology Co Ltd
Original Assignee
Shenzhen Yi Lianzhi Road Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yi Lianzhi Road Technology Co Ltd filed Critical Shenzhen Yi Lianzhi Road Technology Co Ltd
Priority to CN201710760889.7A priority Critical patent/CN107580041A/en
Publication of CN107580041A publication Critical patent/CN107580041A/en
Pending legal-status Critical Current

Links

Abstract

A kind of construction site electrical equipment monitoring method, this method include:A, the performance parameter of each electrical equipment is gathered in real time by the multiple data acquisition modules being arranged in all electrical equipments in construction site, each data acquisition module is connected with the remote control module being arranged on monitor terminal respectively by optical fiber or wireless network, and the performance parameter of the electrical equipment gathered is sent into the monitor terminal;B, monitor terminal carries out remote control by the remote control module according to the performance parameter of data collecting module collected to each electrical equipment;C, monitor terminal forms equipment life according to the real-time performance supplemental characteristic of data collecting module collected and aging analysis is reported, and reparation or more exchange device accordingly.All electrical equipments in construction site can be monitored and controlled in real time by the present invention, to find and to fix a breakdown in time, and eliminate various potential safety hazards, to ensure the normal operation of equipment and construction quality.

Description

Construction site electrical equipment monitoring method
【Technical field】
The present invention relates to safety techniques for construction field, and all electrical equipments in construction site can be entered more particularly to a kind of The construction site electrical equipment monitoring method that row is monitored and controlled in real time.
【Background technology】
At present, with industrialization, the quickening of urbanization process, the construction of building is into normality.People are paying close attention to Also the quality of building and the safety of construction are focused more on while the scale and speed of construction.However, actual conditions are but not It is fully up to expectations.As is known, it is not in place due to technology, management etc. in some architectural engineerings, cause construction quality Difference, potential safety hazard be more and Frequent Accidents, necessary due to lacking especially for the substantial amounts of electrical equipment for being dispersed throughout construction site Scientific monitor means, cause the failure of electrical equipment cannot find and control and generation electrification in time, especially when Electrical equipment service life or load are exceeded when cannot get timely early warning, are more easy to cause the accident.Such issues that gently can then damage Bad electrical equipment, it is heavy then can make equipment damage in addition trigger fire, and electrical equipment failure or damage not only can influence equipment just Often use, can also directly affect project progress and duration, and can also influence construction quality.
【The content of the invention】
Present invention seek to address that above mentioned problem, and provide a kind of can be supervised in real time to all electrical equipments in construction site Survey and control, to find and to fix a breakdown in time, and various potential safety hazards are eliminated, to ensure the normal operation of equipment and engineering The construction site electrical equipment monitoring method of quality.
To achieve the above object, the present invention provides a kind of construction site electrical equipment monitoring method, and this method includes:
A, each electricity consumption is gathered in real time by the multiple data acquisition modules being arranged in all electrical equipments in construction site The performance parameter of equipment, each data acquisition module pass through optical fiber or the wireless network long-range control with being arranged on monitor terminal respectively Molding block is connected, and the performance parameter of the electrical equipment gathered is sent into the monitor terminal;
B, monitor terminal according to the performance parameter of data collecting module collected by the remote control module to each electricity consumption Equipment carries out remote control;
C, monitor terminal forms equipment life and aging point according to the real-time performance supplemental characteristic of data collecting module collected Analysis report, and reparation or more exchange device accordingly.
In step a, the electrical equipment include lighting apparatus, tower crane, construction elevator, climbing frame, immersible pump, reinforcing bar equipment and Accommodation electricity usage equipment.
In step a, the multiple electricity consumption acquisition module is connected to the power input of each electrical equipment, and with The remote control module is connected by optical fiber or wireless network.
In step a, the performance parameter of the electrical equipment is including the use of duration, frequency of use, electric current and voltage.
In step a, the monitor terminal includes the PC terminals located at Surveillance center and the mobile terminal of administrative staff, and it is logical Optical fiber or wireless network is crossed to be connected and communicate with the data acquisition module.
The performance parameter for each electrical equipment that the data acquisition module gathers in real time can be in the PC terminals and custodian Real-time display on the mobile terminal of member.
In step b, the remote control is that then monitor terminal passes through the remote control when certain electrical equipment breaks down Module cuts off device power supply (DPS) in time, and notifies that maintenance personal fixes a breakdown or more exchange device;If certain electrical equipment service life Or load is exceeded, then monitor terminal can send early warning in real time or notify that maintenance personal fixes a breakdown or more exchange device.
The remote control module is the control APP on monitor terminal, and it connects with the multiple data acquisition module Connect and communicate.
The contribution of the present invention is that it is efficiently solved in existing building construction due to a lack of the real-time monitoring to electrical equipment Problems caused by means.The device of the present invention can be monitored in real time to all electrical equipments in construction site, and be supervised Control terminal can real-time display monitoring data, therefore monitoring efficiency is high, can grasp most accurate monitoring data by monitoring in real time, make The exception that occurs of electrical equipment and failure can find and exclude in time, thus various potential safety hazards can be eliminated in time, protected Demonstrate,prove the normal operation and construction quality of electrical equipment.Simultaneously as the remote control module of the present invention can be implemented to electrical equipment Remote control so that administrative staff can carry out remote monitoring by mobile terminal to electrical equipment, thus can save cost, The time is saved, and saves the operation maintenance cost in later stage.
【Brief description of the drawings】
Fig. 1 is flow chart of the method for the present invention.
Fig. 2 is the system structure diagram for realizing the inventive method.
【Embodiment】
The following example is further explanation of the present invention, and the present invention is not limited in any way.
The construction site electrical equipment monitoring method of the present invention is in a kind of architectural engineering applied to hot work in progress, to building All electrical equipments for building building site are monitored in real time, to find in time and eliminate various potential safety hazards, ensure that equipment is normally transported Capable and construction quality method, it is related to oneself of the data acquisition of electrical equipment, the remote control of electrical equipment and monitoring form Dynamic generation.
Refering to Fig. 1, Fig. 2, method of the invention includes:
S10:Gathered in real time by the multiple data acquisition modules 11 being arranged in all electrical equipments 10 in construction site The performance parameter of each electrical equipment 10, the performance parameter include but is not limited to use duration, frequency of use, electric current and voltage.Respectively Data acquisition module 11 is connected with the remote control module 21 being arranged on monitor terminal 20 respectively by optical fiber or wireless network And communication, and the performance parameter of the electrical equipment 10 gathered is sent to the monitor terminal 20 in real time.Specifically, as Fig. 1, Shown in Fig. 2, the electrical equipment 10 includes but is not limited to lighting apparatus 11, tower crane 12, construction elevator 13, climbing frame 14, immersible pump 15th, reinforcing bar equipment 16 and accommodation electricity usage equipment 17, wherein, lighting apparatus 11 includes all lighting apparatus in construction site.Wherein, The tower crane 12 is the abbreviation of " derrick crane ", and also known as " tower crane ", it is the crane gear in construction, and it is included from liter Formula tower crane, inner climbing type tower crane, flat-top tower crane, movable arm type tower crane, ready-package tower crane etc., the safety of the performance of tower crane to construction Property has the function that important.The construction elevator 13 commonly referred to as building hoist, including construction platform, it is in architectural engineering The manned cargo-carrying construction machinery being commonly used, typically tower crane are used cooperatively.The climbing frame of climbing frame 14 is also known as hoisting frame, and it is near The new type scaffold system developed over year, is mainly used in high-layer shear force wall formula building.The immersible pump 15 is that deep-well water lift is used Equipment, whole unit is pulled the plug work during use, and underground water is extracted earth's surface.The reinforcing bar equipment 16 is by wire rod reinforcing bar Setting for length dimension required for architectural engineering installation, curved shape or mounting assembly is processed into straight steel bar Standby, it mainly includes the equipment such as reinforcing, straightening, bending hoop, cut-out, bending, assembly forming and steel bar joining.Accommodation electricity usage equipment 17 The equipment such as the cooking, illumination, air-conditioning for dormitory life.Described multiple electricity consumption acquisition modules 11 can be known with logical The three-phase power data acquisition module of telecommunication function, it can be used for carrying out electrical equipment comprehensive parameters, such as using duration, use frequency Rate, electric current and voltage etc. measure.Each data acquisition module 11 is connected to lighting apparatus 11, tower crane 12, construction elevator 13rd, the power input of climbing frame 14, immersible pump 15, reinforcing bar equipment 16 and accommodation electricity usage equipment 17.In the present embodiment, each data are adopted Collection module 11 be connected respectively with being connected to the relay of power input, and with the monitor terminal 20 and remote control module 21 wirelessly or non-wirelessly connect and communicate.In the present embodiment, data acquisition module 11 is connected with remote control module 21 by LAN Connect and communicate, be arranged on current use duration of the data acquisition module 11 by each electrical equipment of each electrical equipment, using frequency The data such as rate, electric current and voltage upload to monitor terminal 20, and the monitor terminal 20 includes the He of PC terminals 22 located at Surveillance center The mobile terminal 23 of administrative staff, it is connected and communicated with the data acquisition module 11 by optical fiber or wireless network, from more Individual data acquisition module 11 obtains monitoring data, and in real time in the giant-screen of PC terminals 22 or the display screen display of mobile terminal 23 Show.The remote control module 21 is the control APP on monitor terminal 20, and it connects with the multiple data acquisition module 11 Connect and communicate.
S20:The performance parameter that monitor terminal 20 gathers to data acquisition module 11 is analyzed, if each item data is just In normal scope, then store and form data sheet.If performance parameter is abnormal, by the remote control module 21 to each Electrical equipment 10 carries out remote control.The real-time performance supplemental characteristic that monitor terminal 20 gathers according to data acquisition module 11 is automatic Form equipment life and aging analysis report, and reparation or more exchange device accordingly.
S30:When carrying out remote control, if the performance parameter that monitor terminal 20 gathers according to data acquisition module 11 is sentenced Certain electrical equipment of breaking is broken down, then monitor terminal 20 is disconnected by the remote control module 21 and inputted in electrical equipment The relay at end, so as to cutting off the power supply of the faulty equipment in time, and notify that maintenance personal fixes a breakdown or more exchange device.If The performance parameter that monitor terminal 20 gathers according to data acquisition module 11 judges that certain electrical equipment service life or load are exceeded, then Monitor terminal 20 can send early warning in real time or notify that maintenance personal fixes a breakdown or more exchange device, the early warning can be displayed in PC The giant-screen of terminal 22 or the display screen of mobile terminal 23.
The administrative staff of electrical equipment can monitor all electricity consumptions in construction site in real time by PC terminals 22 or mobile terminal 23 The behaviour in service of equipment, and be controlled by by remote control module 21.
Take this, it is of the invention by the way that the various electrical equipments involved by construction are monitored and controlled in real time, thus It can find and fix a breakdown in time, and eliminate various potential safety hazards, ensure the normal operation and construction quality of equipment with this.
Although being disclosed by above example to the present invention, protection scope of the present invention is not limited thereto, Under conditions of without departing from present inventive concept, each component is done to more than deformation, replacements etc. will fall into right of the invention In claimed range.

Claims (8)

1. a kind of construction site electrical equipment monitoring method, it is characterised in that this method includes:
A, gathered in real time by the multiple data acquisition modules (11) being arranged in all electrical equipments (10) in construction site each The performance parameter of electrical equipment (10), each data acquisition module (11) is by optical fiber or wireless network respectively with being arranged on monitoring eventually Remote control module (21) on end (20) is connected, and the performance parameter of the electrical equipment gathered (10) is sent to described Monitor terminal (20);
B, monitor terminal (20) passes through the remote control module (21) according to the performance parameter that data acquisition module (11) gathers Remote control is carried out to each electrical equipment (10);
C, the real-time performance supplemental characteristic that monitor terminal (20) is gathered according to data acquisition module (11) forms equipment life and old Change analysis report, and reparation or more exchange device accordingly.
2. the method as described in claim 1, it is characterised in that in step a, the electrical equipment (10) includes lighting apparatus (11), tower crane (12), construction elevator (13), climbing frame (14), immersible pump (15), reinforcing bar equipment (16) and accommodation electricity usage equipment (17)。
3. the method as described in claim 1, it is characterised in that in step a, the multiple electricity consumption acquisition module (11) connects respectively The power input of each electrical equipment (10) is connected on, and passes through optical fiber or wireless network with the remote control module (21) It is connected.
4. the method as described in claim 1, it is characterised in that in step a, the performance parameter of the electrical equipment (10) includes Use duration, frequency of use, electric current and voltage.
5. the method as described in claim 1, it is characterised in that in step a, the monitor terminal (20) is included in monitoring The PC terminals (22) of the heart and the mobile terminal (23) of administrative staff, it passes through optical fiber or wireless network and the data acquisition module (11) connect and communicate.
6. method as claimed in claim 5, it is characterised in that each electricity consumption that the data acquisition module (11) gathers in real time is set The performance parameter of standby (10) can be in real-time display on the mobile terminal (23) of the PC terminals (22) and administrative staff.
7. the method as described in claim 1, it is characterised in that in step b, the remote control is when certain electrical equipment occurs Failure, then monitor terminal (20) cuts off device power supply (DPS) in time by the remote control module (21), and notifies maintenance personal to arrange Except failure or more exchange device;If certain electrical equipment service life or load are exceeded, monitor terminal (20) can send pre- in real time It is alert or notify that maintenance personal fixes a breakdown or more exchange device.
8. electrical equipment monitoring method in construction site as claimed in claim 7, it is characterised in that the remote control module (21) it is the control APP on monitor terminal (20), it is connected and communicated with the multiple data acquisition module (11).
CN201710760889.7A 2017-08-30 2017-08-30 Construction site electrical equipment monitoring method Pending CN107580041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710760889.7A CN107580041A (en) 2017-08-30 2017-08-30 Construction site electrical equipment monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710760889.7A CN107580041A (en) 2017-08-30 2017-08-30 Construction site electrical equipment monitoring method

Publications (1)

Publication Number Publication Date
CN107580041A true CN107580041A (en) 2018-01-12

Family

ID=61030097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710760889.7A Pending CN107580041A (en) 2017-08-30 2017-08-30 Construction site electrical equipment monitoring method

Country Status (1)

Country Link
CN (1) CN107580041A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110146317A (en) * 2019-04-29 2019-08-20 北京和欣运达科技有限公司 A kind of diagnostic method and device of building electromechanical equipment health status
CN113191635A (en) * 2021-04-30 2021-07-30 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1409181A (en) * 2002-08-16 2003-04-09 三一重工股份有限公司 Remote monitoring system for engineering machinery
CN204496241U (en) * 2015-01-04 2015-07-22 湖南华辰智通科技有限公司 Based on the PLC long distance control system in high in the clouds
CN205050191U (en) * 2015-09-30 2016-02-24 天津辰达科技发展有限公司 A information system for supervising engineering job site
CN105871627A (en) * 2016-05-27 2016-08-17 江苏国贸酝领智能科技股份有限公司 Unified monitoring method applicable to intelligent architectural equipment
CN106896765A (en) * 2017-02-18 2017-06-27 辽东学院 A kind of building equipment monitoring system and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1409181A (en) * 2002-08-16 2003-04-09 三一重工股份有限公司 Remote monitoring system for engineering machinery
CN204496241U (en) * 2015-01-04 2015-07-22 湖南华辰智通科技有限公司 Based on the PLC long distance control system in high in the clouds
CN205050191U (en) * 2015-09-30 2016-02-24 天津辰达科技发展有限公司 A information system for supervising engineering job site
CN105871627A (en) * 2016-05-27 2016-08-17 江苏国贸酝领智能科技股份有限公司 Unified monitoring method applicable to intelligent architectural equipment
CN106896765A (en) * 2017-02-18 2017-06-27 辽东学院 A kind of building equipment monitoring system and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110146317A (en) * 2019-04-29 2019-08-20 北京和欣运达科技有限公司 A kind of diagnostic method and device of building electromechanical equipment health status
CN110146317B (en) * 2019-04-29 2021-11-12 北京和欣运达科技有限公司 Method and device for diagnosing health state of building electromechanical equipment
CN113191635A (en) * 2021-04-30 2021-07-30 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site
CN113191635B (en) * 2021-04-30 2022-02-25 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site

Similar Documents

Publication Publication Date Title
CN102830673A (en) GPRS (General Packet Radio Service) communication-based remote online monitoring system and method for sewage treatment equipment
CN103337150A (en) Long-distance intelligent monitoring system of grinding machines
CN107580041A (en) Construction site electrical equipment monitoring method
CN204496241U (en) Based on the PLC long distance control system in high in the clouds
CN113570829B (en) Wireless gas detection alarm system
CN203179221U (en) Transformer high/low voltage fuse burn-out remote alarm device
CN207717906U (en) A kind of power cable fault on-line monitoring terminal based on LORA
CN203643128U (en) Fiber protective channel online monitoring system
CN203455712U (en) Transformer station equipment centralized control and inspection tour online-monitoring system
CN106059091A (en) Transformer station remote maintenance system and method
CN203465826U (en) Remote intelligent monitoring system for flour mill
CN109828554A (en) One kind brining Matching Model together based on the polygon market purchase sale of electricity of electric power
KR101564603B1 (en) The center concentration remote monitoring and control system of the mine equipment
CN115238957A (en) Early warning method and system for power transmission line corridor
CN103616160A (en) Optical fiber protecting channel on-line monitoring system
CN202143082U (en) Automatic alarm device of information operation and maintenance comprehensive monitoring system
CN207396624U (en) Construction site electrical equipment monitoring device based on safety
CN104143858A (en) Electric power environment online monitoring system
CN212060928U (en) Electric power warning information display system
CN113098046A (en) Offshore shore power flexible direct current converter valve monitoring system
KR20110129097A (en) Crane state monitoring system
CN112564282A (en) Integrated monitoring alarm device and monitoring method for relay protection device
CN207366967U (en) A kind of maintenance system of equipment
CN214850626U (en) Intelligent online monitoring system for distribution room
CN104833892A (en) 35kV power substation inlet wire live-line state alarm monitor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112

RJ01 Rejection of invention patent application after publication