CN106896765A - A kind of building equipment monitoring system and device - Google Patents

A kind of building equipment monitoring system and device Download PDF

Info

Publication number
CN106896765A
CN106896765A CN201710087821.7A CN201710087821A CN106896765A CN 106896765 A CN106896765 A CN 106896765A CN 201710087821 A CN201710087821 A CN 201710087821A CN 106896765 A CN106896765 A CN 106896765A
Authority
CN
China
Prior art keywords
sensor
monitoring
actuator assembly
lighting
hvac
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710087821.7A
Other languages
Chinese (zh)
Inventor
邹迎辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eastern Liaoning University
Original Assignee
Eastern Liaoning University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eastern Liaoning University filed Critical Eastern Liaoning University
Priority to CN201710087821.7A priority Critical patent/CN106896765A/en
Publication of CN106896765A publication Critical patent/CN106896765A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2614HVAC, heating, ventillation, climate control

Abstract

The invention discloses a kind of building equipment monitoring system and device of Architectural Equipment technical field, including monitoring main frame, the right-hand member of the monitoring main frame is connected with field controller by wire, the right-hand member of the field controller is connected with execution controller by wire, the right-hand member for performing controller is connected to HVAC actuator assembly by wire, electrical distribution and lighting actuator assembly and water supply and drainage actuator assembly, the bottom of the field controller is connected with monitoring device by wire, this kind of building equipment monitoring system and device, it is reasonable in design, the global service function and estate management efficiency of mansion can be improved, with reliable monitoring, control and execution system, high degree of automation, reduce the wasting of resources, and when monitoring that data are problematic, can be with alarm and reminding, notify that maintainer overhauls.

Description

A kind of building equipment monitoring system and device
Technical field
The present invention relates to Architectural Equipment technical field, specially a kind of building equipment monitoring system and device.
Background technology
Building is generally mansion skyscraper at present, and is provided with heating air-conditioner system, illuminator and feedwater more the mansion Drainage system etc., and people less pay close attention to the reasonable employment to heating air-conditioner system, illuminator and water supply and sewerage system, lead The substantial amounts of wasting of resources is caused, such as after opening heating air-conditioner system, forgets to close, then cause the wasting of resources, it is therefore desirable to invent A kind of building equipment monitoring system and device, to reduce the wasting of resources, improve service efficiency, estate management efficiency.
The content of the invention
It is an object of the invention to provide a kind of building equipment monitoring system and device, to solve to be carried in above-mentioned background technology The existing market for going out does not have rational building equipment monitoring system and device, causes the wasting of resources, and estate management efficiency is low to ask Topic.
To achieve the above object, the present invention provides following technical scheme:A kind of construction equipment monitoring device, including monitoring master Machine, the right-hand member of the monitoring main frame is connected with field controller by wire, and the right-hand member of the field controller is connected by wire Execution controller is connected to, the right-hand member of the execution controller is connected to HVAC actuator assembly, distribution by wire Illumination actuator assembly and water supply and drainage actuator assembly, the bottom of the field controller are connected with monitoring dress by wire Put, the bottom of the monitoring device is connected to HVAC sensor cluster, electrical distribution and lighting sensor cluster by wire With water supply and drainage sensor cluster.
Preferably, the outer wall of the field controller, execution controller and monitoring device is provided with mounting hole.
A kind of building equipment monitoring system, including:Monitoring main frame, control process system, Data monitoring subsystem and execution Subsystem;
The monitoring main frame is used to obtain in automatic monitor system the running status of every equipment and the operational factor of system, It is set to be worked in the state of rationalization, to equipment fault and anomaly parameter and alarm and automatic record, and note down automatically, Storage and query history service data etc.;
The control process system is used to receive instruction or works independently, output control signal and processing data information etc.;
The Data monitoring subsystem includes that performing processor, data storage cell, A/D converting units, signal amplifies single Unit, signal gathering unit, HVAC sensor cluster, electrical distribution and lighting sensor cluster and water supply and drainage sensor cluster, institute State HVAC sensor cluster collection HVAC parameter information, the electrical distribution and lighting sensor cluster collection electrical distribution and lighting ginseng Number information, the water supply and drainage sensor cluster gathers water supply and drainage parameter information, the HVAC sensor cluster, distribution The parameter information of collection is sent to signal gathering unit, the letter by illumination sensor component and water supply and drainage sensor cluster The parameter information of reception is sent to signal amplification unit by number collecting unit, after the signal amplification unit amplifies to signal, hair A/D converting units are given, the analog signal of parameter information is converted into data signal and is sent at execution by the A/D converting units Reason device, after the execution processor is to the information analysis and computing of reception, is sent to data storage cell, the data storage list First data information memory to receiving, the data storage cell is connected with control process system;
The executive subsystem includes performing processor, instruction reception unit, multi-channel control circuit, HVAC actuator Component, electrical distribution and lighting actuator assembly and water supply and drainage actuator assembly, the instruction reception unit receive instruction, and will instruction Information is sent to execution processor, after the execution processor is to the instruction analysis of reception, sends corresponding to multi-channel control circuit Execution order, the corresponding on-off circuit of multi-channel control closing of circuit, control HVAC actuator assembly or electrical distribution and lighting The a certain performer work of actuator assembly or water supply and drainage actuator assembly.
Preferably, the HVAC sensor cluster includes air conditioner wind speed sensor, air conditioner temperature sensor and air-conditioning Humidity sensor etc., the electrical distribution and lighting sensor cluster includes luminance sensor, current sensor, voltage sensor and generating Machine speed probe etc., the water supply and drainage sensor cluster is including level sensor, cooling-water temperature sensor, hydraulic pressure sensor etc..
Preferably, the HVAC actuator assembly includes air conditioner motor and air-conditioning condenser etc., the electrical distribution and lighting Actuator assembly includes bulb and generator etc., and the water supply and drainage actuator assembly includes electric butterfly valve and magnetic valve etc..
Compared with prior art, the beneficial effects of the invention are as follows:This kind of building equipment monitoring system and device, design are closed Reason, can improve the global service function and estate management efficiency of mansion, with reliable monitoring, control and execution system, from Dynamicization degree is high, reduces the wasting of resources, and when monitoring that data are problematic, can notify maintainer with alarm and reminding Maintenance.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is present system theory diagram;
Fig. 3 is Data Control Subsystem Based block diagram of the present invention;
Fig. 4 is executive subsystem block diagram of the present invention.
In figure:1 monitoring main frame, 2 field controllers, 3 perform controller, 4 HVAC actuator assemblies, 5 electrical distribution and lightings Actuator assembly, 6 water supply and drainage actuator assemblies, 7 monitoring devices, 8 HVAC sensor clusters, 9 electrical distribution and lighting sensors Component, 10 water supply and drainage sensor clusters, 11 control process systems, 12 Data monitoring subsystems, 121 data monitoring processors, 122 data storage cells, 123A/D converting units, 124 signal amplification units, 125 signal gathering units, 13 executive subsystems, 131 perform processor, 132 instruction reception units, 133 multi-channel control circuits.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1-4 are referred to, the present invention provides a kind of technical scheme:A kind of construction equipment monitoring device, including monitoring main frame 1, the right-hand member of the monitoring main frame 1 is connected with field controller 2 by wire, and the right-hand member of the field controller 2 passes through wire Be connected with execution controller 3, it is described perform controller 3 right-hand member by wire be connected to HVAC actuator assembly 4, Electrical distribution and lighting actuator assembly 5 and water supply and drainage actuator assembly 6, the bottom of the field controller 2 is connected with by wire Monitoring device 7, the bottom of the monitoring device 7 is connected to HVAC sensor cluster 8, electrical distribution and lighting and passes by wire Sensor component 9 and water supply and drainage sensor cluster 10.
Wherein, the outer wall of the field controller 2, execution controller 3 and monitoring device 7 is provided with mounting hole.
A kind of building equipment monitoring system, including:Monitoring main frame 1, control process system 11, the and of Data monitoring subsystem 12 Executive subsystem 13;
The operation that the monitoring main frame 1 is used to obtain every the running status and system of equipment in automatic monitor system is joined Number, makes it be worked in the state of rationalization, to equipment fault and anomaly parameter and alarm and automatic record, and records automatically Record, storage and query history service data etc.;
The control process system 11 is used to receive instruction or autonomous working, output control signal and processing data information Deng;
The Data monitoring subsystem 12 includes data monitoring processor 121, data storage cell 122, A/D converting units 123rd, signal amplification unit 124, signal gathering unit 125, HVAC sensor cluster 8, the and of electrical distribution and lighting sensor cluster 9 Water supply and drainage sensor cluster 10, the HVAC sensor cluster 8 gathers HVAC parameter information, the electrical distribution and lighting Sensor cluster 9 gathers electrical distribution and lighting parameter information, and the water supply and drainage sensor cluster 10 gathers water supply and drainage parameter information, The ginseng that the HVAC sensor cluster 8, electrical distribution and lighting sensor cluster 9 and water supply and drainage sensor cluster 10 will be gathered Number information is sent to signal gathering unit 125, and the parameter information of reception is sent to signal and amplified by the signal gathering unit 125 Unit 124, after the signal amplification unit 124 amplifies to signal, is sent to A/D converting units 123, the A/D converting units The analog signal of parameter information is converted into data signal by 123 is sent to data monitoring processor 121, the data monitoring treatment After the information analysis and computing of 121 pairs of receptions of device, data storage cell 122,122 pairs of receptions of the data storage cell are sent to Data information memory, the data storage cell 122 is connected with control process system 11;
The executive subsystem 13 includes performing processor 131, instruction reception unit 132, multi-channel control circuit 133, warm Logical Actuator Of The Air Conditioner component 4, electrical distribution and lighting actuator assembly 5 and water supply and drainage actuator assembly 6, the instruction reception unit 132 receive instruction, and command information is sent into execution processor 131, described to perform 131 pairs of instruction analysis of reception of processor Afterwards, sent to multi-channel control circuit 133 and perform order accordingly, multi-channel control circuit 133 closes corresponding on-off circuit, controlled The a certain actuator of HVAC actuator assembly 4 or electrical distribution and lighting actuator assembly 5 or water supply and drainage actuator assembly 6 Part works, and the HVAC sensor cluster 8 includes air conditioner wind speed sensor, air conditioner temperature sensor and air-conditioning humidity sensor Device etc., the electrical distribution and lighting sensor cluster 9 includes luminance sensor, current sensor, voltage sensor and generator speed Sensor etc., the water supply and drainage sensor cluster 10 is described including level sensor, cooling-water temperature sensor, hydraulic pressure sensor etc. HVAC actuator assembly 4 includes air conditioner motor and air-conditioning condenser etc., and the electrical distribution and lighting actuator assembly 5 includes bulb With generator etc., the water supply and drainage actuator assembly 6 includes electric butterfly valve and magnetic valve etc..
Operation principle:The parameter information such as wind speed, temperature and speed during the collection operation of air conditioner of HVAC sensor cluster 8, The parameter informations, water supply and drainage sensor group such as the collection of electrical distribution and lighting sensor cluster 9 lighting brightness, electric current, the voltage for passing through The collection of part 10 water level information, water temperature information and hydraulic pressure information etc., and transmit a signal to signal gathering unit 125, signal acquisition Unit 125 transmits a signal to signal amplification unit 124, and signal amplification unit 124 is transferred to A/D conversions after signal is amplified single After 123, A/D of unit converting units 123 convert analog signals into data signal, data monitoring processor 121, data prison are sent to Survey processor 121 and transmit a signal to data storage cell 122, the control process system 11 in field controller 2 is obtained afterwards After storing the data message in data storage cell 122, and analysis and treatment, data message is sent respectively to monitoring master Machine 1 and executive subsystem 13,1 pair of information Store of collection of monitoring main frame, analyze the data for obtaining, if finding data exception, Monitoring main frame 1 can occur alarm, remind staff's maintenance, and the instruction reception unit 132 in executive subsystem 13 obtains instruction After information, execution processor 131 is sent to, performs the closing of circuit of the correlation of the control multi-channel control of processor 131 circuit 133, control The a certain execution of the logical Actuator Of The Air Conditioner component 4 of heating or electrical distribution and lighting actuator assembly 5 or water supply and drainage actuator assembly 6 Device works.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention And modification, the scope of the present invention be defined by the appended.

Claims (5)

1. a kind of construction equipment monitoring device, including monitoring main frame (1), it is characterised in that:The right-hand member of monitoring main frame (1) leads to Cross wire and be connected with field controller (2), the right-hand member of the field controller (2) is connected with execution controller (3) by wire, The right-hand member for performing controller (3) is connected to HVAC actuator assembly (4), electrical distribution and lighting actuator by wire Component (5) and water supply and drainage actuator assembly (6), the bottom of the field controller (2) are connected with monitoring device by wire (7), the bottom of the monitoring device (7) is connected to HVAC sensor cluster (8), electrical distribution and lighting and senses by wire Device assembly (9) and water supply and drainage sensor cluster (10).
2. a kind of construction equipment monitoring device according to claim 1, it is characterised in that:The field controller (2), hold The outer wall of line control unit (3) and monitoring device (7) is provided with mounting hole.
3. a kind of building equipment monitoring system, it is characterised in that including:Monitoring main frame (1), control process system (11), data Monitoring subsystem (12) and executive subsystem (13);
Monitoring main frame (1) for obtaining in automatic monitor system the running status of every equipment and the operational factor of system, It is set to be worked in the state of rationalization, to equipment fault and anomaly parameter and alarm and automatic record, and note down automatically, Storage and query history service data etc.;
The control process system (11) is for receiving instruction or autonomous working, output control signal and processing data information etc.;
The Data monitoring subsystem (12) is single including data monitoring processor (121), data storage cell (122), A/D conversions First (123), signal amplification unit (124), signal gathering unit (125), HVAC sensor cluster (8), electrical distribution and lighting are passed Sensor component (9) and water supply and drainage sensor cluster (10), the HVAC sensor cluster (8) gather HVAC parameter Information, the electrical distribution and lighting sensor cluster (9) gathers electrical distribution and lighting parameter information, the water supply and drainage sensor cluster (10) Collection water supply and drainage parameter information, the HVAC sensor cluster (8), electrical distribution and lighting sensor cluster (9) and feedwater row The parameter information of collection is sent to signal gathering unit (125), the signal gathering unit by water sensor component (10) (125) parameter information of reception is sent to signal amplification unit (124), the signal amplification unit (124) is amplified to signal Afterwards, A/D converting units (123) are sent to, the analog signal of parameter information is converted into numeral by the A/D converting units (123) Signal is sent to data monitoring processor (121), information analysis and computing of the data monitoring processor (121) to receiving Afterwards, it is sent to data storage cell (122), the data storage cell (122) is to the data information memory that receives, the data Memory cell (122) is connected with control process system (11);
The executive subsystem (13) is including performing processor (131), instruction reception unit (132), multi-channel control circuit (133), HVAC actuator assembly (4), electrical distribution and lighting actuator assembly (5) and water supply and drainage actuator assembly (6), described Instruction reception unit (132) receives instruction, and command information is sent into execution processor (131), the execution processor (131) after to the instruction analysis of reception, sent to multi-channel control circuit (133) and perform order, multi-channel control circuit accordingly (133) close corresponding on-off circuit, control HVAC actuator assembly (4) or electrical distribution and lighting actuator assembly (5) or The a certain performer work of person's water supply and drainage actuator assembly (6).
4. a kind of building equipment monitoring system according to claim 3, it is characterised in that:The HVAC sensor group Part (8) including air conditioner wind speed sensor, air conditioner temperature sensor and air-conditioning humidity sensor etc., the electrical distribution and lighting sensor group Including luminance sensor, current sensor, voltage sensor and generator speed sensor etc., the water supply and drainage is passed part (9) Sensor component (10) is including level sensor, cooling-water temperature sensor, hydraulic pressure sensor etc..
5. a kind of building equipment monitoring system according to claim 3, it is characterised in that:The HVAC actuator group Part (4) including air conditioner motor and air-conditioning condenser etc., the electrical distribution and lighting actuator assembly (5) including bulb and generator etc., The water supply and drainage actuator assembly (6) is including electric butterfly valve and magnetic valve etc..
CN201710087821.7A 2017-02-18 2017-02-18 A kind of building equipment monitoring system and device Pending CN106896765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710087821.7A CN106896765A (en) 2017-02-18 2017-02-18 A kind of building equipment monitoring system and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710087821.7A CN106896765A (en) 2017-02-18 2017-02-18 A kind of building equipment monitoring system and device

Publications (1)

Publication Number Publication Date
CN106896765A true CN106896765A (en) 2017-06-27

Family

ID=59184291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710087821.7A Pending CN106896765A (en) 2017-02-18 2017-02-18 A kind of building equipment monitoring system and device

Country Status (1)

Country Link
CN (1) CN106896765A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580041A (en) * 2017-08-30 2018-01-12 深圳市易联智道科技有限公司 Construction site electrical equipment monitoring method
CN109490613A (en) * 2018-12-11 2019-03-19 合肥市英泰立特智能技术有限责任公司 Build electromechanical equipment automatic running cruising inspection system
CN113985749A (en) * 2021-09-30 2022-01-28 青岛城建集团有限公司 Construction equipment management system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060142968A1 (en) * 2004-12-29 2006-06-29 Samsung Electronics Co., Ltd. Home control system using galvanic skin response and heart rate and method thereof
CN103676912A (en) * 2013-12-26 2014-03-26 贵阳供电局 Intelligent home system
CN203720631U (en) * 2014-01-25 2014-07-16 济南诺辉节能技术开发有限公司 Indoor energy efficiency management system
CN204790344U (en) * 2015-06-08 2015-11-18 山东沣瑞置业发展有限公司 Monitored control system of wisdom community
CN204989957U (en) * 2015-10-19 2016-01-20 郑州汇科企业孵化器有限公司 Production line intelligence energy consumption monitored control system
CN205318221U (en) * 2016-01-08 2016-06-15 寿光百盛生物工程有限公司 Intelligent greenhouse monitored control system based on internet of things

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060142968A1 (en) * 2004-12-29 2006-06-29 Samsung Electronics Co., Ltd. Home control system using galvanic skin response and heart rate and method thereof
CN103676912A (en) * 2013-12-26 2014-03-26 贵阳供电局 Intelligent home system
CN203720631U (en) * 2014-01-25 2014-07-16 济南诺辉节能技术开发有限公司 Indoor energy efficiency management system
CN204790344U (en) * 2015-06-08 2015-11-18 山东沣瑞置业发展有限公司 Monitored control system of wisdom community
CN204989957U (en) * 2015-10-19 2016-01-20 郑州汇科企业孵化器有限公司 Production line intelligence energy consumption monitored control system
CN205318221U (en) * 2016-01-08 2016-06-15 寿光百盛生物工程有限公司 Intelligent greenhouse monitored control system based on internet of things

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580041A (en) * 2017-08-30 2018-01-12 深圳市易联智道科技有限公司 Construction site electrical equipment monitoring method
CN109490613A (en) * 2018-12-11 2019-03-19 合肥市英泰立特智能技术有限责任公司 Build electromechanical equipment automatic running cruising inspection system
CN113985749A (en) * 2021-09-30 2022-01-28 青岛城建集团有限公司 Construction equipment management system

Similar Documents

Publication Publication Date Title
CN100498098C (en) Long-distance monitoring optimized energy-saving controller and controlling method for central air-conditioner system
CN103453941A (en) Real-time monitor system for box-type substation
CN106896765A (en) A kind of building equipment monitoring system and device
CN103472875A (en) Ring main unit damp-proof temperature control system and method based on GPRS
CN110673673A (en) BIM operation and maintenance platform-based monitoring management system for high-rise ultralow-energy-consumption residence
CN106949042A (en) A kind of intelligence control system for air compressor machine
CN102393716A (en) Energy-saving building monitoring system based on wireless sensing network
CN201992762U (en) Energy-saving control system of central air-conditioner based on power line carriers
CN116668482A (en) Intelligent building two-bus monitoring system and method based on artificial intelligence
CN218033605U (en) Intelligent control system for energy conservation of central air conditioner
CN103529771B (en) A kind of home intelligent energy consumption regulator control system based on data analysis
CN113743647A (en) Data center energy consumption control system
CN211956186U (en) Intelligent energy control system of 5G base station
CN112161385A (en) Central air-conditioning centralized control system
CN204082446U (en) Based on the offshore wind farm unit comprehensive monitoring system of 6LoWPAN radio sensing network
CN203376232U (en) Online detecting system for hydrophobicity of composite insulator of power transmission line
CN112579389A (en) Method and system with fault detection and autonomous control functions
CN113587203A (en) Multi-module combined control solar-heat pump composite heat collection system based on PLC
CN107290999A (en) A kind of substation equipment monitoring system based on Internet of Things
CN104914836A (en) Building automation system based on CAN bus
CN112344527A (en) Intelligent thermal control service system based on Internet of things
CN111880455A (en) Base station intelligent management and control system
CN106705207A (en) Remote wireless monitoring solar energy and heat pump centralized hot water supplying system
CN215452987U (en) Large-scale public building energy consumption monitoring system based on intelligent gateway
CN205448125U (en) Air conditioning and heat pipe intelligent linkage control system of computer room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627

RJ01 Rejection of invention patent application after publication