CN107558339A - A kind of high road pavement construction method - Google Patents

A kind of high road pavement construction method Download PDF

Info

Publication number
CN107558339A
CN107558339A CN201710859714.1A CN201710859714A CN107558339A CN 107558339 A CN107558339 A CN 107558339A CN 201710859714 A CN201710859714 A CN 201710859714A CN 107558339 A CN107558339 A CN 107558339A
Authority
CN
China
Prior art keywords
construction method
roadbed
road pavement
pavement construction
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710859714.1A
Other languages
Chinese (zh)
Inventor
刘福明
曹细春
杨志平
王瑜
徐文光
熊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Institute of Technology
Original Assignee
Nanchang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Institute of Technology filed Critical Nanchang Institute of Technology
Priority to CN201710859714.1A priority Critical patent/CN107558339A/en
Priority to CN202210561480.3A priority patent/CN115045163A/en
Publication of CN107558339A publication Critical patent/CN107558339A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/06Aluminous cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/02Concrete base for bituminous paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders

Abstract

The invention discloses a kind of high road pavement construction method, comprise the following steps:First pressing is carried out to roadbed using vibrated roller, then completes the repairing of roadbed, removes all crowded broken, protuberances, hollowing;Homemade rendzinas is laid on roadbed, forms bed course;In the top of the bed course, pellet is first dispensed according to preset width, thickness layering using road-metal spreading machine, and the metalling of laying is fully rolled using rolling apparatus, flattened using land leveller after the completion of rolling, uniformly dispensed steel fibre self-compaction cement on metalling by predetermined close using powder truck spreader;Mix is carried out using cold regenerative machine, forms sub-surface;One layer of sealing of construction, then lays top course on sub-surface.Short construction period of the present invention, the pollution to environment is reduced while reducing manpower, and ensure the density of load, fatigue resistance, compression strength, impact strength and the stability on road surface.

Description

A kind of high road pavement construction method
Technical field
The present invention relates to a kind of construction method, and in particular to a kind of high road pavement construction method.
Background technology
Highway is the important component of whole communications and transportation, and highway can be used as feed service with more in short-distance transport Railway, water transport and the deficiency of air transport are mended, plays a part of main line again in long-distance transport.Highway is to people's lives, national economy All play great effect.But in many areas, particularly rural area, the place for laying highway be mostly agricultural land used, Power supply for construction is difficult, transportation range farther out, compound is mixing and stirring, transport, discharging, is being also easy to produce isolation, surface mistake in paving process The defects of water is serious, also, procedures can not be easily completed in jelling time, mostly using artificial spreading cement Mode, not only need a large amount of manual labors, cause a large amount of dust, and cement dose is difficult to accurately control, mix effect also compared with Difference, while also generally existing easily ftractures on existing road surface, sagging situation.
The content of the invention
To solve the above problems, the invention provides a kind of high road pavement construction method, short construction period, manpower is reduced Reduce pollution to environment simultaneously, and ensure the density of load on road surface, fatigue resistance, compression strength, impact strength and Stability.
To achieve the above object, the technical scheme taken of the present invention is:
A kind of high road pavement construction method, comprises the following steps:
S1, first pressing carried out to roadbed using vibrated roller, then complete the repairing of roadbed, remove all crowded broken, grand Rise, hollowing;
S2, homemade rendzinas is laid on roadbed after roadbed acceptance(check), forms bed course;
S3, in the top of the bed course, pellet is first dispensed according to preset width, thickness layering using road-metal spreading machine, and The metalling of laying is fully rolled using rolling apparatus, is flattened using land leveller after the completion of rolling, is dispensed using powder Car is uniformly dispensed steel fibre self-compaction cement on metalling by predetermined close;
S4, using cold regenerative machine the steel fibre self-compaction cement of spreading is carried out according to predetermined water-carrying capacity and gait of march Mix, form sub-surface;
S5, one layer of sealing of being constructed on sub-surface, then using bituminous concrete, bituminous concrete moxture, tar sand Form top course.
Preferably, the self-control rendzinas is prepared by the raw material of following parts by weight:
12% rendzinas 70-80 parts, polypropylene fibre 10-20 parts, chemicals-resistant modifying agent 15-10 parts, rubber powder 3-6 Part.
Preferably, the chemicals-resistant modifying agent is the acrylic acid series additive of perfluoroalkyl.
Preferably, the depth of mix reaches 0.5cm~1cm below the upper surface of the bed course in the step S4, described Cold regenerative machine is adjacent mix and stir twice between longitudinal overlap 25cm~30cm, lateral overlap 55cm~85cm.
Preferably, steel fibre self-compaction cement is prepared from the following components:
Portland cement 415kg/m3, water 285kg/m3, steel fibre 15kg/m3, sulfoaluminate clinker 25kg/m3, carbon fiber 16kg/m3, silicon nanoparticle 5.5kg/m3, nano-calcium carbonate 10kg/m3, acrylic emulsion 25kg/m3
Preferably, the length of steel fiber is 30-40mm, a diameter of 0.5-0.9mm.
Preferably, the thickness of the bed course is 15cm~20cm, and the thickness of the sub-surface is 25cm~35cm, The thickness of the sealing is 1cm;The thickness of the top course is 4cm~15cm.
The invention has the advantages that:
Pellet is first dispensed using road-metal spreading machine, then rolled pellet, and is flattened using land leveller, then using powder Material truck spreader is uniformly dispensed cement by predetermined close on pellet, is completed to mix and stir by cold regenerative machine, is formed basic unit, mechanization Degree is high, is easy to scene manipulation, avoids pellet Secondary Transport, reduces the pollution to environment, while by first pressing and to broken Rock layers roll the mode being combined, and avoid the problem of occurring to settle in the future because of compacting deficiency;By make by oneself rendzinas with And the optimization of fiber self-dense cement formula, it ensure that the density of load on road surface, fatigue resistance, compression strength, impact resistance are strong Degree and stability.
Embodiment
In order that objects and advantages of the present invention are more clearly understood, the present invention is carried out with reference to embodiments further Describe in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit this hair It is bright.
Self-control rendzinas used in following examples is prepared by the raw material of following parts by weight:
12% rendzinas 70-80 parts, polypropylene fibre 10-20 parts, chemicals-resistant modifying agent 15-10 parts, rubber powder 3-6 Part, the chemicals-resistant modifying agent is the acrylic acid series additive of perfluoroalkyl.
The steel fibre self-compaction cement is prepared from the following components:
Portland cement 415kg/m3, water 285kg/m3, steel fibre 15kg/m3, sulfoaluminate clinker 25kg/m3, carbon fiber 16kg/m3, silicon nanoparticle 5.5kg/m3, nano-calcium carbonate 10kg/m3, acrylic emulsion 25kg/m3, the length of steel fiber For 30-40mm, a diameter of 0.5-0.9mm.
Embodiment 1
A kind of high road pavement construction method, comprises the following steps:
S1, first pressing carried out to roadbed using vibrated roller, then complete the repairing of roadbed, remove all crowded broken, grand Rise, hollowing;
S2, homemade rendzinas is laid on roadbed after roadbed acceptance(check), forms bed course;
S3, in the top of the bed course, pellet is first dispensed according to preset width, thickness layering using road-metal spreading machine, and The metalling of laying is fully rolled using rolling apparatus, is flattened using land leveller after the completion of rolling, is dispensed using powder Car is uniformly dispensed steel fibre self-compaction cement on metalling by predetermined close;
S4, using cold regenerative machine the steel fibre self-compaction cement of spreading is carried out according to predetermined water-carrying capacity and gait of march Mix, form sub-surface;The depth of mix reaches 0.5cm~1cm below the upper surface of the bed course, the cold regenerative machine phase Longitudinal overlap 25cm~30cm, lateral overlap 55cm~85cm between neighbour mixes and stirs twice.
S5, on sub-surface construct one layer of sealing, then using bituminous concrete, bituminous concrete moxture, tar sand, Any of the gravel of soil and the compound of rubble are mixed, forms top course.
The thickness of the bed course is 15cm, and the thickness of the sub-surface is 25cm, and the thickness of the sealing is 1cm;The thickness of the top course is 4cm.
Embodiment 2
A kind of high road pavement construction method, comprises the following steps:
S1, first pressing carried out to roadbed using vibrated roller, then complete the repairing of roadbed, remove all crowded broken, grand Rise, hollowing;
S2, homemade rendzinas is laid on roadbed after roadbed acceptance(check), forms bed course;
S3, in the top of the bed course, pellet is first dispensed according to preset width, thickness layering using road-metal spreading machine, and The metalling of laying is fully rolled using rolling apparatus, is flattened using land leveller after the completion of rolling, is dispensed using powder Car is uniformly dispensed steel fibre self-compaction cement on metalling by predetermined close;
S4, using cold regenerative machine the steel fibre self-compaction cement of spreading is carried out according to predetermined water-carrying capacity and gait of march Mix, form sub-surface;The depth of mix reaches 0.5cm~1cm below the upper surface of the bed course, the cold regenerative machine phase Longitudinal overlap 25cm~30cm, lateral overlap 55cm~85cm between neighbour mixes and stirs twice.
S5, on sub-surface construct one layer of sealing, then using bituminous concrete, bituminous concrete moxture, tar sand, Any of the gravel of soil and the compound of rubble are mixed, forms top course.
The thickness of the bed course is 20cm, and the thickness of the sub-surface is 35cm, and the thickness of the sealing is 1cm;The thickness of the top course is 9.5cm.
Embodiment 3
A kind of high road pavement construction method, comprises the following steps:
S1, first pressing carried out to roadbed using vibrated roller, then complete the repairing of roadbed, remove all crowded broken, grand Rise, hollowing;
S2, homemade rendzinas is laid on roadbed after roadbed acceptance(check), forms bed course;
S3, in the top of the bed course, pellet is first dispensed according to preset width, thickness layering using road-metal spreading machine, and The metalling of laying is fully rolled using rolling apparatus, is flattened using land leveller after the completion of rolling, is dispensed using powder Car is uniformly dispensed steel fibre self-compaction cement on metalling by predetermined close;
S4, using cold regenerative machine the steel fibre self-compaction cement of spreading is carried out according to predetermined water-carrying capacity and gait of march Mix, form sub-surface;The depth of mix reaches 0.5cm~1cm below the upper surface of the bed course, the cold regenerative machine phase Longitudinal overlap 25cm~30cm, lateral overlap 55cm~85cm between neighbour mixes and stirs twice.
S5, on sub-surface construct one layer of sealing, then using bituminous concrete, bituminous concrete moxture, tar sand, Any of the gravel of soil and the compound of rubble are mixed, forms top course.
The thickness of the bed course is 17.5cm, and the thickness of the sub-surface is 30cm, and the thickness of the sealing is 1cm;The thickness of the top course is 15cm.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

  1. A kind of 1. high road pavement construction method, it is characterised in that comprise the following steps:
    S1, first pressing carried out to roadbed using vibrated roller, then complete the repairing of roadbed, remove all crowded broken, protuberances, sky Drum;
    S2, homemade rendzinas is laid on roadbed after roadbed acceptance(check), forms bed course;
    S3, in the top of the bed course, first dispense pellet according to preset width, thickness layering using road-metal spreading machine, and use Rolling apparatus is fully rolled to the metalling of laying, is flattened after the completion of rolling using land leveller, will using powder truck spreader Steel fibre self-compaction cement is uniformly dispensed on metalling by predetermined close;
    S4, using cold regenerative machine the steel fibre self-compaction cement of spreading is mixed according to predetermined water-carrying capacity and gait of march Close, form sub-surface;
    S5, one layer of sealing of being constructed on sub-surface, are then formed using bituminous concrete, bituminous concrete moxture, tar sand Top course.
  2. 2. a kind of high road pavement construction method as claimed in claim 1, it is characterised in that the self-control rendzinas is by following heavy The raw material of amount part is prepared:
    12% rendzinas 70-80 parts, polypropylene fibre 10-20 parts, chemicals-resistant modifying agent 15-10 parts, rubber powder 3-6 parts.
  3. 3. a kind of high road pavement construction method as claimed in claim 2, it is characterised in that the chemicals-resistant modifying agent is complete The acrylic acid series additive of fluoroalkyl.
  4. A kind of 4. high road pavement construction method as claimed in claim 1, it is characterised in that the depth of mix in the step S4 Reach 0.5cm~1cm below the upper surface of the bed course, the cold regenerative machine is adjacent mix and stir twice between longitudinal overlap 25cm~ 30cm, lateral overlap 55cm~85cm.
  5. 5. a kind of high road pavement construction method as claimed in claim 1, it is characterised in that steel fibre self-compaction cement is by following Component is prepared:
    Portland cement 415kg/m3, water 285kg/m3, steel fibre 15kg/m3, sulfoaluminate clinker 25kg/m3, carbon fiber 16kg/ m3, silicon nanoparticle 5.5kg/m3, nano-calcium carbonate 10kg/m3, acrylic emulsion 25kg/m3
  6. 6. a kind of high road pavement construction method as claimed in claim 1 as claimed in claim 5, it is characterised in that described Length of steel fiber is 30-40mm, a diameter of 0.5-0.9mm.
  7. 7. a kind of high road pavement construction method as claimed in claim 1 as claimed in claim 5, it is characterised in that described The thickness of bed course is 15cm~20cm, and the thickness of the sub-surface is 25cm~35cm, and the thickness of the sealing is 1cm;The thickness of the top course is 4cm~15cm.
CN201710859714.1A 2017-09-21 2017-09-21 A kind of high road pavement construction method Pending CN107558339A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710859714.1A CN107558339A (en) 2017-09-21 2017-09-21 A kind of high road pavement construction method
CN202210561480.3A CN115045163A (en) 2017-09-21 2017-09-21 Steel fiber self-compacting cement and application thereof, highway pavement and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710859714.1A CN107558339A (en) 2017-09-21 2017-09-21 A kind of high road pavement construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210561480.3A Division CN115045163A (en) 2017-09-21 2017-09-21 Steel fiber self-compacting cement and application thereof, highway pavement and construction method thereof

Publications (1)

Publication Number Publication Date
CN107558339A true CN107558339A (en) 2018-01-09

Family

ID=60982471

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710859714.1A Pending CN107558339A (en) 2017-09-21 2017-09-21 A kind of high road pavement construction method
CN202210561480.3A Pending CN115045163A (en) 2017-09-21 2017-09-21 Steel fiber self-compacting cement and application thereof, highway pavement and construction method thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202210561480.3A Pending CN115045163A (en) 2017-09-21 2017-09-21 Steel fiber self-compacting cement and application thereof, highway pavement and construction method thereof

Country Status (1)

Country Link
CN (2) CN107558339A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021174A (en) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 Construction method of urban road
WO2020199781A1 (en) * 2019-04-04 2020-10-08 佛山市交通科技有限公司 Method for paving combined base course asphalt road surface

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730841A (en) * 2005-08-05 2006-02-08 贾燎 Slope support method by compacting soil-lime to form cushion solid
CN1932167A (en) * 2006-07-25 2007-03-21 南京大学 Chopped fiber reinforced rendzinas ground treatment method
CN101323516A (en) * 2008-07-14 2008-12-17 北京航空航天大学 Rubber modified solidified soil, and preparing and construction method
CN104446264A (en) * 2014-12-19 2015-03-25 湖南明湘科技发展有限公司 Cement-based nanocomposite material and preparation method thereof
CN105155378A (en) * 2015-09-02 2015-12-16 湖州浩诚环境工程有限公司 Limestone soil road bed construction process
CN105256683A (en) * 2015-09-10 2016-01-20 东南大学 Permafrost region roadbed thermal insulation construction method
CN105347755A (en) * 2015-11-11 2016-02-24 浙江大学宁波理工学院 Cement-based composite cementing material with high endurance
CN105906257A (en) * 2016-04-03 2016-08-31 黄河水利职业技术学院 Building material
CN106192660A (en) * 2016-07-13 2016-12-07 鄂尔多斯市路泰公路工程有限责任公司 Highway Pavement Structures and construction method thereof
CN106946480A (en) * 2017-03-20 2017-07-14 郑州科技学院 A kind of high-performance building cement and preparation method thereof
CN106120524B (en) * 2016-07-02 2018-07-17 天鸿建设集团有限公司 A kind of road construction method on pavement and non-motorized lane intersection

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1948622B (en) * 2006-10-31 2012-04-18 易志坚 Polymer modified cement hole concrete road surface structure and construction method
CN101806028B (en) * 2010-03-16 2011-12-14 武汉理工大学 Layered steel fiber conductive bituminous concrete

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730841A (en) * 2005-08-05 2006-02-08 贾燎 Slope support method by compacting soil-lime to form cushion solid
CN1932167A (en) * 2006-07-25 2007-03-21 南京大学 Chopped fiber reinforced rendzinas ground treatment method
CN101323516A (en) * 2008-07-14 2008-12-17 北京航空航天大学 Rubber modified solidified soil, and preparing and construction method
CN104446264A (en) * 2014-12-19 2015-03-25 湖南明湘科技发展有限公司 Cement-based nanocomposite material and preparation method thereof
CN105155378A (en) * 2015-09-02 2015-12-16 湖州浩诚环境工程有限公司 Limestone soil road bed construction process
CN105256683A (en) * 2015-09-10 2016-01-20 东南大学 Permafrost region roadbed thermal insulation construction method
CN105347755A (en) * 2015-11-11 2016-02-24 浙江大学宁波理工学院 Cement-based composite cementing material with high endurance
CN105906257A (en) * 2016-04-03 2016-08-31 黄河水利职业技术学院 Building material
CN106120524B (en) * 2016-07-02 2018-07-17 天鸿建设集团有限公司 A kind of road construction method on pavement and non-motorized lane intersection
CN106192660A (en) * 2016-07-13 2016-12-07 鄂尔多斯市路泰公路工程有限责任公司 Highway Pavement Structures and construction method thereof
CN106946480A (en) * 2017-03-20 2017-07-14 郑州科技学院 A kind of high-performance building cement and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020199781A1 (en) * 2019-04-04 2020-10-08 佛山市交通科技有限公司 Method for paving combined base course asphalt road surface
CN111021174A (en) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 Construction method of urban road

Also Published As

Publication number Publication date
CN115045163A (en) 2022-09-13

Similar Documents

Publication Publication Date Title
CN106192660B (en) The construction method of Highway Pavement Structures
CN106587835B (en) A kind of cold mixing formula Cement emulsified asphalt concrete and its method for paving
CN107338686A (en) A kind of Subgrade Filled Soil in High Speed Railway construction method
CN104264570B (en) Emulsified bitumen slurry mixture penetrated asphalt pavement construction technique
CN106868972A (en) A kind of asphalt pavement structure and its construction method suitable for Qinghai-xizang Plateau Region
CN101974898B (en) Roller compacted concrete cushion changing and filling method
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
Hashemian et al. Application of foam bitumen in cold recycling and hydrated lime in airport pavement strengthening
CN108978389A (en) A kind of construction method of bituminous pavement
CN108914735A (en) A kind of road construction method
CN106120524A (en) A kind of road construction method
CN112211198A (en) Municipal road engineering pavement construction technology
CN109680586A (en) A kind of pavement asphalt laying method
CN107386028A (en) Road three-hybrid system cold in place recycling engineering method
CN107558339A (en) A kind of high road pavement construction method
CN107503256A (en) A kind of sandy soil improves filling roadbed construction method
CN105369721A (en) Cement-stabilized coral reef sand construction process
CN111455770A (en) Asphalt pavement splicing structure based on recycled materials and construction method thereof
CN108570897A (en) A kind of paving method of pavement of road base
CN110184871A (en) Exempt from the inorganic combination old material situ regeneration base technique of health road and road structure
CN104631266B (en) Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology
CN107675577A (en) A kind of Soft Soil Districts road foundation closing cushion layer structure and its construction method
CN207846123U (en) Reinforced structure complex
CN107447617A (en) A kind of dust-proof curing process of temporary construction road
CN103422407A (en) Construction process using cement diatomite to stabilize desert sand mixture to build Niger desert road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180109