CN108914735A - A kind of road construction method - Google Patents
A kind of road construction method Download PDFInfo
- Publication number
- CN108914735A CN108914735A CN201810826834.6A CN201810826834A CN108914735A CN 108914735 A CN108914735 A CN 108914735A CN 201810826834 A CN201810826834 A CN 201810826834A CN 108914735 A CN108914735 A CN 108914735A
- Authority
- CN
- China
- Prior art keywords
- road
- asphalt
- construction method
- bed course
- road construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/22—Binder incorporated in hot state, e.g. heated bitumen
Abstract
The present invention relates to technical field of road construction, and disclose a kind of road construction method, including following construction procedure:Preparation of construction work, and the ground of smooth road to be onstructed, form roadbed, one layer of bed course is laid on roadbed, the mix of bituminous concrete and its transport, asphalt paving and rolling, road surface cleaning, road test simultaneously records, preparation includes mix asphalt concrete, and thickness used in bituminous concrete gathers materials, filler and pitch, kerbstone, Lu Gou, inspection shaft and other structures object contact surface on should be uniformly coated with a thin layer pitch, check two sides kerbstone fine status, position elevation, which is not inconsistent requirement, to be corrected.The road construction method can make ground surface material heat preservation dry not yet, ensure Forming Quality, a possibility that reducing the drying shrinkage and cracking of asphalt roads, improves intensity, while it also has flame retardant property, and the waste rate for effectively reducing material, uses convenient for people.
Description
Technical field
The present invention relates to technical field of road construction, specially a kind of road construction method.
Background technique
Road construction frequently with ground surface material be cement, sandy soil etc. and water mixture, be 5 DEG C below low in temperature
Generally stop ground surface material construction under the conditions of temperature, because the water in ground surface material and sandy soil material are easy condensation in this case,
Although increasing the compression strength and stretch capability of ground surface material to a certain extent, once temperature recovery, therein
Condensation is dissipated, so that the intensity of ground surface material is substantially reduced.
With the development of economy, construction project rapidly increases, but the various severe geological conditions in process of construction
It not can avoid, urban operating mechanism or road are built on soft soil foundation, soft base is not punished or dealt with improperly, frequently can lead to
Basic unstability or Excessive Settlement cause building facility to destroy or be unable to normal use.
Existing asphalt road or bituminous concrete road are handing over fork in the road etc. more crowded through use after a period of time
Section, temperature is excessively high so that pitch softens, and in long-time excess load in use, especially in the case where weak subgrade, is easy
Pavement crack is caused, accelerates the damage on road surface, influences road life, so it is above-mentioned to solve to propose a kind of road construction method
The problem of proposed.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of road construction method, have the advantages that long service life,
Existing asphalt road or bituminous concrete road are solved through use after a period of time, in friendship fork in the road etc. than more crowded
Section, temperature is excessively high so that pitch softens, and in long-time excess load in use, especially in the case where weak subgrade, is easy to make
At pavement crack, the problem of accelerating the damage on road surface, influence road life.
(2) technical solution
To realize that above-mentioned long service life purpose, the present invention provide the following technical solutions:A kind of road construction method, including
Following construction procedure:
(1) preparation of construction works, and the ground of smooth road to be onstructed, forms roadbed.
(2) one layer of bed course is laid on roadbed.
(3) mix of bituminous concrete and its transport.
(4) asphalt paving and rolls.
(5) road surface is cleared up.
(6) it road test and records.
Preferably, in the step (1), preparation includes mix asphalt concrete, thickness collection used in bituminous concrete
Material, filler and pitch, kerbstone, Lu Gou, inspection shaft and other structures object contact surface on should be uniformly coated with a thin layer drip
Blueness will check two sides kerbstone fine status, and position elevation, which is not inconsistent requirement, to be corrected, and must replace in time if any disturbance or damage,
Especially it is noted that situation is tamped at the back side, guarantees in decking and rolling, be not extruded, move, and while forming roadbed, if
Gutter is set.
Preferably, in the step (2), when being laid with bed course, bed course use thin sand, thin sand by 51% it is broken
Stone, 25% clinker, 24% rendzinas are constituted, and the particle size of rubble is the rubble of 2-10mm, and the partial size of clinker is 3-
6mm, the thickness of bed course is not less than 5cm, and is compacted using road roller, need to also be on road shoulder and road surface after being compacted road surface
Sealing material is filled at gap and at construction joint, the height of sealing material is lower than the height on road surface, and sealing material has and gap
The property that side is securely connected.
Preferably, in the step (3), when the hot-mix asphalt mixture mixed is without making immediately, heat preservation can be put into
The storage of finished product storage bin, storage time must not exceed 72h, and when storage bin is without heat-preserving equipment, the storing time of permission should be to meet
Subject to paving material requires, the transport of green mixture is transported using dumper, when from mixing equipment to dumper blowing, for reduction
The segregation phenomenon that thickness is gathered materials often unloads a pipeful of mixture and moves automobile position, when haul, the covering of self-unloading vehicle tarpaulin.
Preferably, in the step (4), on bed course be laid with one layer of rubber asphalt, will be laid with rubber asphalt after described in
Bed course be compacted using road roller, it is 2Kg/m that the laying amount of rubber asphalt, which is no less than, is uniformly spread on the pitch of compacting
If the emulsified asphalt of one layer of melting, when paving, asphalt must slowly, pave uniformly and uninterruptedly, must not be with
Meaning conversion rate stops over, and the height of the mixture in paver screw feed appliance keeps being not less than the three of feed appliance height
/ bis-, and guarantee not isolate on paver full duration section.
Preferably, in the step (5), the transverse joint between upper layer and lower layer should be staggered 60cm or more, and in machinery
The place that cannot be paved and rebuild can use Manual and trimming after obtaining supervising engineer and agreeing to, and complete cleaning work.
Preferably, in the step (6) in the paving process of test section, analysis is conscientiously made a record, is actively received
The construction quality of supervising engineer or the supervision of engineering quality supervision department, checkout facility section, determines related achievement, making terminates
Afterwards, just every content of the test proposes test summary report in time, reports supervising engineer to examine, as manufacture bases.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of road construction methods, have following beneficial effect:
Roof insulating heating and thermal insulation, ground surface material stirring and construction are installed in the section for needing to construct by the road construction method
It is carried out all in roof insulating, guarantee rolls temperature, the porosity and infiltration coefficient of ground surface material is reduced, to mitigate ground surface material
Compacting difficulty, be laid on road after construction with plastic foil, then cover insulating layer, road surface material dry not yet can be made
Material heat preservation improves intensity, while it also has resistance a possibility that ensureing Forming Quality, reduce the drying shrinkage and cracking of asphalt roads
Performance is fired, and effectively reduces the waste rate of material, has saved cost, is very suitable to road surface and the weak subgrade of high quality
Pavement usage can greatly improve the service life on road surface.
Detailed description of the invention
Fig. 1 is a kind of road construction method flow chart proposed by the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of road construction method, including following construction procedure:
(1) preparation of construction works, and the ground of smooth road to be onstructed, forms roadbed.
(2) one layer of bed course is laid on roadbed.
(3) mix of bituminous concrete and its transport.
(4) asphalt paving and rolls.
(5) road surface is cleared up.
(6) it road test and records.
When in use, first need to be ready work, preparation includes mix asphalt concrete, used in bituminous concrete
Thickness gathers materials, filler and pitch, kerbstone, Lu Gou, inspection shaft and other structures object contact surface on should be uniformly coated with one
It is thin-layer bituminous, to check two sides kerbstone fine status, position elevation, which is not inconsistent requirement, to be corrected, must be in time if any disturbance or damage
Replacement guarantees in decking and rolling especially it is noted that situation is tamped at the back side, is not extruded, moves, and is forming the same of roadbed
When, gutter is set, when being laid with bed course, bed course uses thin sand, and thin sand is by 51% rubble, 25% furnace
Slag, 24% rendzinas constitute, the particle size of rubble is the rubble of 2-10mm, and the partial size of clinker is 3-6mm, the thickness of bed course
It is compacted not less than 5cm, and using road roller, it, need to also be at the gap on road shoulder and road surface and construction joint after being compacted road surface
Place's filling sealing material, the height of sealing material are lower than the height on road surface, and sealing material has securely to be connected with gap side
The property connect when the hot-mix asphalt mixture mixed is without making immediately, can be put into the finished product storage bin storage of heat preservation, when storage
Between must not exceed 72h, when storage bin is without heat-preserving equipment, the storing time of permission, which should be subject to, meets paving material requirement, and blueness is mixed
The transport for closing material is transported using dumper, when from mixing equipment to dumper blowing, for the segregation phenomenon that reduction thickness is gathered materials, often
It unloads a pipeful of mixture and moves automobile position, when haul, the covering of self-unloading vehicle tarpaulin is laid with one layer of rubber drip on bed course
Bed course after laying rubber asphalt is compacted by blueness using road roller, and it is 2Kg/m that the laying amount of rubber asphalt, which is no less than,
The emulsified asphalt of one layer of melting is uniformly laid on the pitch of compacting, when paving, asphalt must slowly, uniformly and even
It is continuous to pave incessantly, it must not arbitrarily conversion rate or stop over, the height of the mixture in paver screw feed appliance is protected
Hold 2/3rds not less than feed appliance height, and guarantee not isolate on paver full duration section, upper layer and lower layer it
Between transverse joint should be staggered 60cm or more, it is same obtaining supervising engineer and in the place that machinery cannot be paved and be rebuild
Manual and trimming can be used after meaning, and completes cleaning work, in step (6) in the paving process of test section, conscientiously done
It is good to record and analyze, actively receive the construction quality of supervising engineer or the supervision of engineering quality supervision department, checkout facility section, determines
Related achievement, after making, just every content of the test proposes test summary report in time, report supervising engineer's examination & approval, as
Manufacture bases, will need construct section installation roof insulating heating and thermal insulation, ground surface material stirring and construct all in roof insulating into
Row, guarantee roll temperature, reduce the porosity and infiltration coefficient of ground surface material, to mitigate the compacting difficulty of ground surface material, apply
Be laid on road after work with plastic foil, then cover insulating layer, ground surface material heat preservation dry not yet can be made, ensure at
Type quality, a possibility that reducing the drying shrinkage and cracking of asphalt roads, improve intensity, while it also has flame retardant property, and has
The waste rate of the reduction material of effect, has saved cost, has been very suitable to the road surface of high quality and the pavement usage of weak subgrade, can be with
Greatly improve the service life on road surface.
To sum up, the road construction method, will need construct section installation roof insulating heating and thermal insulation, ground surface material stirring and
Construction carries out all in roof insulating, and guarantee rolls temperature, the porosity and infiltration coefficient of ground surface material is reduced, to mitigate road surface
The compacting difficulty of material, is laid on road after construction with plastic foil, then cover insulating layer, can make road dry not yet
The heat preservation of plane materiel material improves intensity, while it also has a possibility that ensureing Forming Quality, reduce the drying shrinkage and cracking of asphalt roads
There is flame retardant property, and effectively reduce the waste rate of material, has saved cost, be very suitable to the road surface and soft road of high quality
The pavement usage of base can greatly improve the service life on road surface, solve existing asphalt road or bituminous concrete horse
Fork in the road etc. is being handed over than more crowded section through use after a period of time in road, and temperature is excessively high so that pitch softens, for a long time
Excess load be easy to cause pavement crack in use, especially in the case where weak subgrade, accelerates the damage on road surface, influences road
The problem of service life.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (7)
1. a kind of road construction method, which is characterized in that including following construction procedure:
(1) preparation of construction works, and the ground of smooth road to be onstructed, forms roadbed;
(2) one layer of bed course is laid on roadbed;
(3) mix of bituminous concrete and its transport;
(4) asphalt paving and rolls;
(5) road surface is cleared up;
(6) it road test and records.
2. a kind of road construction method according to claim 1, it is characterised in that:In the step (1), preparation packet
Include mix asphalt concrete, thickness used in bituminous concrete gathers materials, filler and pitch, kerbstone, Lu Gou, inspection shaft and other
It should be uniformly coated with a thin layer pitch on the contact surface of works, to check that two sides kerbstone fine status, position elevation are not inconsistent
It it is required that should correct, must replace if any disturbance or damage, especially it is noted that situation is tamped at the back side, guarantee in decking and rolling in time,
It is not extruded, moves, and while forming roadbed, set gutter.
3. a kind of road construction method according to claim 1, it is characterised in that:In the step (2), it is being laid with bed course
When, bed course use thin sand, thin sand by 51% rubble, 25% clinker, 24% rendzinas constitute, the grain of rubble
Diameter size is the rubble of 2-10mm, and the partial size of clinker is 3-6mm, and the thickness of bed course is not less than 5cm, and is pressed using road roller
It is real, after being compacted road surface, sealing material, the height of sealing material need to be also filled at the gap on road shoulder and road surface and at construction joint
Lower than the height on road surface, sealing material has the property securely being connect with gap side.
4. a kind of road construction method according to claim 1, it is characterised in that:In the step (3), the heat mixed is mixed
When asphalt is without making immediately, it can be put into the finished product storage bin storage of heat preservation, storage time must not exceed 72h, bin stock
When storehouse is without heat-preserving equipment, the storing time of permission, which should be subject to, meets paving material requirement, and the transport of green mixture uses self-unloading
Vehicle transport when from mixing equipment to dumper blowing, to reduce the segregation phenomenon that thickness is gathered materials, often unloads a pipeful of mixture and moves one
Lower automobile position, when haul, the covering of self-unloading vehicle tarpaulin.
5. a kind of road construction method according to claim 1, it is characterised in that:In the step (4), on bed course upper berth
If one layer of rubber asphalt, the bed course after laying rubber asphalt is compacted using road roller, the laying of rubber asphalt
Amount is no less than 2Kg/m, and the emulsified asphalt of one layer of melting, when paving, asphalt are uniformly laid on the pitch of compacting
It must slowly, pave uniformly and uninterruptedly must not arbitrarily conversion rate or stop over, in paver screw feed appliance
The height of mixture keep being not less than 2/3rds of feed appliance height, and guarantee not occur on paver full duration section
Isolation.
6. a kind of road construction method according to claim 1, it is characterised in that:In the step (5), upper layer and lower layer it
Between transverse joint should be staggered 60cm or more, it is same obtaining supervising engineer and in the place that machinery cannot be paved and be rebuild
Manual and trimming can be used after meaning, and complete cleaning work.
7. a kind of road construction method according to claim 1, it is characterised in that:In test section in the step (6)
Paving process in, conscientiously make a record analysis, actively receive supervising engineer or engineering quality supervision department supervision, check examination
The construction quality for testing section, determines related achievement, and after making, just every content of the test proposes test summary report, report in time
Supervising engineer's examination & approval, as manufacture bases.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810826834.6A CN108914735A (en) | 2018-07-25 | 2018-07-25 | A kind of road construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810826834.6A CN108914735A (en) | 2018-07-25 | 2018-07-25 | A kind of road construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108914735A true CN108914735A (en) | 2018-11-30 |
Family
ID=64418167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810826834.6A Pending CN108914735A (en) | 2018-07-25 | 2018-07-25 | A kind of road construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108914735A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853315A (en) * | 2019-03-25 | 2019-06-07 | 广州市诚利建设工程有限公司 | A kind of road construction method |
CN110438873A (en) * | 2019-07-31 | 2019-11-12 | 深圳市惠深博越智慧建造科技有限公司 | Rapid shaping concrete pavement maintenance tool and maintenance process |
CN110685203A (en) * | 2019-09-19 | 2020-01-14 | 杭州南岳建设工程有限公司 | Method for ensuring compactness of periphery of gully of inspection well |
CN111472224A (en) * | 2020-04-22 | 2020-07-31 | 河南派普建工集团有限公司 | Road construction method |
CN113026468A (en) * | 2021-03-09 | 2021-06-25 | 中国水利水电第九工程局有限公司 | Construction method for urban and rural main line highway |
CN115341760A (en) * | 2022-09-08 | 2022-11-15 | 中建八局第二建设有限公司 | Construction method for isolation shelter box room |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1138121A (en) * | 1995-05-01 | 1996-12-18 | 黄益铉 | Paving method of water-permeable concrete |
CN101831854A (en) * | 2010-05-26 | 2010-09-15 | 重庆市智翔铺道技术工程有限公司 | Composite reinforced pouring type bituminous concrete |
US20140112717A1 (en) * | 2012-10-19 | 2014-04-24 | Tao Yu | Composite tack film |
CN106381792A (en) * | 2016-10-28 | 2017-02-08 | 李爱军 | Road construction method |
CN107299585A (en) * | 2017-07-05 | 2017-10-27 | 温州市华宏市政园林工程建设有限公司 | A kind of municipal road construction method |
-
2018
- 2018-07-25 CN CN201810826834.6A patent/CN108914735A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1138121A (en) * | 1995-05-01 | 1996-12-18 | 黄益铉 | Paving method of water-permeable concrete |
CN101831854A (en) * | 2010-05-26 | 2010-09-15 | 重庆市智翔铺道技术工程有限公司 | Composite reinforced pouring type bituminous concrete |
US20140112717A1 (en) * | 2012-10-19 | 2014-04-24 | Tao Yu | Composite tack film |
CN106381792A (en) * | 2016-10-28 | 2017-02-08 | 李爱军 | Road construction method |
CN107299585A (en) * | 2017-07-05 | 2017-10-27 | 温州市华宏市政园林工程建设有限公司 | A kind of municipal road construction method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853315A (en) * | 2019-03-25 | 2019-06-07 | 广州市诚利建设工程有限公司 | A kind of road construction method |
CN110438873A (en) * | 2019-07-31 | 2019-11-12 | 深圳市惠深博越智慧建造科技有限公司 | Rapid shaping concrete pavement maintenance tool and maintenance process |
CN110438873B (en) * | 2019-07-31 | 2021-04-20 | 深圳市惠深博越智慧建造科技有限公司 | Maintenance tool and maintenance method for quickly-formed concrete pavement |
CN110685203A (en) * | 2019-09-19 | 2020-01-14 | 杭州南岳建设工程有限公司 | Method for ensuring compactness of periphery of gully of inspection well |
CN111472224A (en) * | 2020-04-22 | 2020-07-31 | 河南派普建工集团有限公司 | Road construction method |
CN111472224B (en) * | 2020-04-22 | 2021-11-26 | 河南派普建工集团有限公司 | Road construction method |
CN113026468A (en) * | 2021-03-09 | 2021-06-25 | 中国水利水电第九工程局有限公司 | Construction method for urban and rural main line highway |
CN115341760A (en) * | 2022-09-08 | 2022-11-15 | 中建八局第二建设有限公司 | Construction method for isolation shelter box room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108914735A (en) | A kind of road construction method | |
CN107881858B (en) | Railway foundation bed surface layer structure and laying method thereof | |
CN205501732U (en) | Flexible protection structure of ballastless track structural waterproof damping | |
CN103850164B (en) | The construction method of penetrating induction type drainage pavement of a kind of long-life | |
EP2202359A1 (en) | Semi-flexible multi-layer paving | |
CN110409251A (en) | A kind of dewatering and noise reduction pavement construction method | |
CN207259961U (en) | A kind of Reflection Cracking type heavy traffic drainage pavement paving structure | |
WO2023020630A1 (en) | Construction method for upper surface course made of steel slag-asphalt mixture | |
Gnatenko et al. | Technological sides of crack sealing in asphalt pavements | |
CN113430887A (en) | Municipal road sponge drainage noise reduction comprehensive treatment construction process | |
CN107354834A (en) | The construction technique and reinforced structure complex in Civil Aviation Airport field road | |
CN213625024U (en) | Cold regeneration road surface structure of emulsified asphalt | |
CN207846123U (en) | Reinforced structure complex | |
CN207091855U (en) | LSPM pavement structure | |
CN105401502A (en) | Road bituminous pavement maintenance method | |
CN107299585A (en) | A kind of municipal road construction method | |
CN108842561B (en) | Construction method of anti-cracking drainage road | |
CN113417182A (en) | Asphalt pavement paving method capable of reducing air bubbles for highway engineering | |
Estakhri et al. | Guidelines on construction and maintenance of porous friction courses in Texas | |
CN204780555U (en) | Structure that repaired in bituminous paving hole groove | |
TWM627596U (en) | Cold mix and cold paved asphalt mixture construction | |
CN113250010B (en) | Large-particle-size asphalt macadam flexible ballast bed and construction method thereof | |
CN113756148A (en) | Construction method of pouring type composite pavement | |
CN113089410A (en) | Asphalt pavement structure for permanent structure conversion of highway precast beam field pavement | |
JP6532163B2 (en) | Simple pavement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |