CN107299585A - A kind of municipal road construction method - Google Patents

A kind of municipal road construction method Download PDF

Info

Publication number
CN107299585A
CN107299585A CN201710543045.7A CN201710543045A CN107299585A CN 107299585 A CN107299585 A CN 107299585A CN 201710543045 A CN201710543045 A CN 201710543045A CN 107299585 A CN107299585 A CN 107299585A
Authority
CN
China
Prior art keywords
paving
compound
asphalt
construction method
municipal road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710543045.7A
Other languages
Chinese (zh)
Inventor
蔡陈潘
蔡延慧
夏贤建
郑璇璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grand Municipal Garden Engineering Construction Co Ltd Of China Of Wenzhou City
Original Assignee
Grand Municipal Garden Engineering Construction Co Ltd Of China Of Wenzhou City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grand Municipal Garden Engineering Construction Co Ltd Of China Of Wenzhou City filed Critical Grand Municipal Garden Engineering Construction Co Ltd Of China Of Wenzhou City
Priority to CN201710543045.7A priority Critical patent/CN107299585A/en
Publication of CN107299585A publication Critical patent/CN107299585A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder

Abstract

The invention discloses a kind of municipal road construction method, construction procedure is:A. preparation of construction works;B. the mix of bituminous concrete and its transport;C. asphalt paving and rolls;D. seam, deburring and clear out a gathering place;E. road test works;The paving to try one's best of asphalt is worked continuously, and road roller must not cross the unprotect end of new paving compound, and end of travel of transverse joint Ying Qian is cut into, to expose the comprehensive of laying.When connecing the new compound of paving, appropriate adhesion coating pitch should be brushed in the end of last time stroke, then be close to the material previously pressed and overlay compound, and note arranging the height of screed, sufficient pre- allowance is reserved to roll.The transverse joint of adjacent two width and levels all should misplace more than 1m.Rolling for transverse joint carries out conventional roll again after use is laterally rolled.The material and other discarded asphalts that deburring is cut all should be removed from road.

Description

A kind of municipal road construction method
Technical field
The present invention relates to municipal road construction technical field, specially a kind of municipal road construction method.
Background technology
Road construction frequently with ground surface material be cement, sandy soil etc. and the compound of water, be less than 5 DEG C in temperature It is general under cryogenic conditions to stop ground surface material construction, because the water in ground surface material easily coagulates with sandy soil material in this case Knot, although add the compression strength and stretch capability of ground surface material to a certain extent, once but temperature recovery, wherein Condensation dissipate so that the intensity of ground surface material is substantially reduced;And under cryogenic pavement construction also will appear from it is a series of Problem, because temperature is scattered and disappeared comparatively fast, road surface causes pavement spread, compacting because material internal voidage is excessive, infiltration coefficient is bigger than normal Difficulty, highway are once come into operation, and the quality problems such as crack, hollow easily occurs in the high temperature and rainy season road surface after being open to traffic, but Some engineerings must work to tight deadlines, and need to construct under cryogenic, inevitably there is above-mentioned construction problem, therefore, how look for It is industry practitioner's urgent problem to be solved of building the road to a kind of construction method for being applied to road surface under low temperature environment.
The content of the invention
The technical problem to be solved in the present invention is to overcome the defect of prior art there is provided a kind of municipal road construction method.
To achieve the above object, the present invention provides following technical scheme:A kind of municipal road construction method, construction procedure For:A. preparation of construction works;B. the mix of bituminous concrete and its transport;C. asphalt paving and rolls;D. connect Seam, deburring and clear out a gathering place;E. road test works.
It is preferred that, in the step a, thickness used in bituminous concrete is gathered materials, filler and pitch;Asphalt mixture mixing Equipment;Kerbstone, Lu Gou, a thin layer pitch should be uniformly coated with the contact surface of inspection shaft and other structures thing;Check two Dypass kerb fine status, position elevation, which is not inconsistent requirement, to be corrected, and must be changed in time if any disturbance or damage, especially it is noted that the back of the body Tamp situation in face, it is ensured that in decking and rolling, be not extruded, move.
It is preferred that, in the step b, the hot-mix asphalt mixture mixed not immediately making when, the finished product of insulation can be put into Storage bin store, storage time must not exceed 72h, when storage bin is without heat-preserving equipment, it is allowed to the storing time should be paved with meeting Temperature requirement is defined, and the transport of blue or green compound is transported using dumper, during from mixing equipment to dumper blowing, to reduce thickness The segregation phenomenon gathered materials, often unloads a pipeful of compound and moves automobile position, during haul, the covering of self-unloading vehicle tarpaulin.
It is preferred that, in the step c, asphalt it is as follows the step of paving and roll:
(1)Compound produces model LTU125 type Automatic Levelling asphalt-spreaders using Xuzhou(Maximum paving width 12.5m), enter Row full duration is paved and struck off, during paver Automatic Levelling, and hanging steel wire by metal skirt piles using the elevation of institute's paving layer is formed Reference line traffic control, horizontal slope controls by horizontal slope controller, and precision is in ± 0.1% scope.
(2)When paving, asphalt must slowly, it is uniform, uninterruptedly pave, must not arbitrarily conversion rate or Stop over, the height of the compound in paver screw feed appliance keeps being not less than the 2/3 of feed appliance height, and ensures at stand Do not isolated on paving machine full duration section.
(3)Paving for compound is carried out with domestic paver, with reference to line traffic control making layer absolute altitude.
(4)The transverse joint between two layers should stagger more than 50cm up and down.
(5)The place that can not be paved and rebuild in machinery, Manual can be used and whole obtaining after supervising engineer agrees to Repair.
(6)When constructing arrangement, bituminous mixture laying operation is not arranged when temperature is less than 10 DEG C.
It is preferred that, in the step e, in the paving process of test section, analysis is conscientiously made a record, actively receives prison Engineer or the supervision of engineering quality supervision department, the construction quality of checkout facility section are managed, relevant achievement is determined, after making terminates, Just every content of the test proposes test summary report in time, reports supervising engineer to examine, is used as manufacture bases.
Compared with prior art, beneficial effects of the present invention are as follows:
1. the present invention is reasonable in design, the waste rate of material is reduced.
2. the section for needing to construct is set into roof insulating and heating and thermal insulation, ground surface material stirring and construction are all entered in roof insulating OK, it is ensured that roll temperature, the porosity and infiltration coefficient of ground surface material are reduced, so as to mitigate the compacting difficulty of ground surface material;Apply Work is laid on road after terminating with plastic foil, then covers heat-insulation layer, can be incubated the ground surface material do not dried also, ensure into Type quality.
Brief description of the drawings
Fig. 1 is a kind of municipal road construction method and step flow chart of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments, is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme:A kind of municipal road construction method, construction procedure is:a. Preparation of construction works;B. the mix of bituminous concrete and its transport;C. asphalt paving and rolls;D. seam, deburring With clear out a gathering place;E. road test works.
It is preferred that, in the step a, thickness used in bituminous concrete is gathered materials, filler and pitch;Asphalt mixture mixing Equipment;Kerbstone, Lu Gou, a thin layer pitch should be uniformly coated with the contact surface of inspection shaft and other structures thing;Check two Dypass kerb fine status, position elevation, which is not inconsistent requirement, to be corrected, and must be changed in time if any disturbance or damage, especially it is noted that the back of the body Tamp situation in face, it is ensured that in decking and rolling, be not extruded, move.
It is preferred that, in the step b, the hot-mix asphalt mixture mixed not immediately making when, the finished product of insulation can be put into Storage bin store, storage time must not exceed 72h, when storage bin is without heat-preserving equipment, it is allowed to the storing time should be paved with meeting Temperature requirement is defined, and the transport of blue or green compound is transported using dumper, during from mixing equipment to dumper blowing, to reduce thickness The segregation phenomenon gathered materials, often unloads a pipeful of compound and moves automobile position, during haul, the covering of self-unloading vehicle tarpaulin.
It is preferred that, in the step c, asphalt it is as follows the step of paving and roll:
(1)Compound produces model LTU125 type Automatic Levelling asphalt-spreaders using Xuzhou(Maximum paving width 12.5m), enter Row full duration is paved and struck off, during paver Automatic Levelling, and hanging steel wire by metal skirt piles using the elevation of institute's paving layer is formed Reference line traffic control, horizontal slope controls by horizontal slope controller, and precision is in ± 0.1% scope.
(2)When paving, asphalt must slowly, it is uniform, uninterruptedly pave, must not arbitrarily conversion rate or Stop over, the height of the compound in paver screw feed appliance keeps being not less than the 2/3 of feed appliance height, and ensures at stand Do not isolated on paving machine full duration section.
(3)Paving for compound is carried out with domestic paver, with reference to line traffic control making layer absolute altitude.
(4)The transverse joint between two layers should stagger more than 50cm up and down.
(5)The place that can not be paved and rebuild in machinery, Manual can be used and whole obtaining after supervising engineer agrees to Repair.
(6)When constructing arrangement, bituminous mixture laying operation is not arranged when temperature is less than 10 DEG C.
It is preferred that, in the step e, in the paving process of test section, analysis is conscientiously made a record, actively receives prison Engineer or the supervision of engineering quality supervision department, the construction quality of checkout facility section are managed, relevant achievement is determined, after making terminates, Just every content of the test proposes test summary report in time, reports supervising engineer to examine, is used as manufacture bases.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, although with reference to foregoing reality Apply example the present invention is described in detail, for those skilled in the art, it still can be to foregoing each implementation Technical scheme described in example is modified, or equivalent substitution, all essences in the present invention are carried out to which part technical characteristic God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (5)

1. a kind of municipal road construction method, construction procedure is:A. preparation of construction works;B. the mix of bituminous concrete and its Transport;C. asphalt paving and rolls;D. seam, deburring and clear out a gathering place;E. road test works.
2. a kind of municipal road construction method according to claim 1, it is characterised in that:In the step a, pitch coagulation Native used thickness is gathered materials, filler and pitch;Bituminous mixture blending equipment;Kerbstone, Lu Gou, inspection shaft and other structures thing Contact surface on should be uniformly coated with a thin layer pitch;Both sides kerbstone fine status is checked, position elevation is not inconsistent requirement should Correct, must be changed in time if any disturbance or damage, especially it is noted that situation is tamped at the back side, it is ensured that in decking and rolling, be not squeezed Pressure, movement.
3. a kind of municipal road construction method according to claim 1, it is characterised in that:In the step b, the heat mixed Mix asphalt not immediately making when, the finished product storage bin storage of insulation can be put into, storage time must not exceed 72h, bin stock When storehouse is without heat-preserving equipment, it is allowed to the storing time should be defined by meeting paving material requirement, the transport of blue or green compound uses self-unloading Car is transported, during from mixing equipment to dumper blowing, to reduce the segregation phenomenon that thickness is gathered materials, is often unloaded a pipeful of compound and is moved one Lower automobile position, during haul, the covering of self-unloading vehicle tarpaulin.
4. a kind of municipal road construction method according to claim 1, it is characterised in that:In the step c, pitch mixing That expects is as follows the step of paving and roll:
(1)Compound produces model LTU125 type Automatic Levelling asphalt-spreaders using Xuzhou(Maximum paving width 12.5m), enter Row full duration is paved and struck off;During paver Automatic Levelling, steel wire is hung by metal skirt piles using the elevation of institute's paving layer and formed Reference line traffic control, horizontal slope controls by horizontal slope controller, and precision is in ± 0.1% scope;
(2)When paving, asphalt must slowly, it is uniform, uninterruptedly pave, must not arbitrarily conversion rate or midway Pause, the height of the compound in paver screw feed appliance keeps being not less than the 2/3 of feed appliance height, and ensures in paver Do not isolated on full duration section;
(3)Paving for compound is carried out with domestic paver, with reference to line traffic control making layer absolute altitude;
(4)The transverse joint between two layers should stagger more than 50cm up and down;
(5)The place that can not be paved and rebuild in machinery, Manual and trimming can be used obtaining after supervising engineer agrees to;
(6)When constructing arrangement, bituminous mixture laying operation is not arranged when temperature is less than 10 DEG C.
5. a kind of municipal road construction method according to claim 1, it is characterised in that:In the step e, in Experiment Road In the paving process of section, analysis is conscientiously made a record, actively receives supervising engineer or the supervision of engineering quality supervision department, check The construction quality of test section, determines relevant achievement, after making terminates, and just every content of the test proposes test summary report in time, Report supervising engineer to examine, be used as manufacture bases.
CN201710543045.7A 2017-07-05 2017-07-05 A kind of municipal road construction method Pending CN107299585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710543045.7A CN107299585A (en) 2017-07-05 2017-07-05 A kind of municipal road construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710543045.7A CN107299585A (en) 2017-07-05 2017-07-05 A kind of municipal road construction method

Publications (1)

Publication Number Publication Date
CN107299585A true CN107299585A (en) 2017-10-27

Family

ID=60135370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710543045.7A Pending CN107299585A (en) 2017-07-05 2017-07-05 A kind of municipal road construction method

Country Status (1)

Country Link
CN (1) CN107299585A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914735A (en) * 2018-07-25 2018-11-30 赵建军 A kind of road construction method
CN110662170A (en) * 2019-09-27 2020-01-07 中国人民解放军63850部队 All-terrain rapid observation vehicle cleaning system
CN111287052A (en) * 2019-12-31 2020-06-16 河南省公路工程局集团有限公司 Construction method for leftover material self-processing broken stone cement stabilized base

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02266005A (en) * 1989-04-06 1990-10-30 Nippon Steel Corp Hydraulic surface paving method
CN101694083A (en) * 2009-09-23 2010-04-14 中交二公局第六工程有限公司 Express highway pavement asphalt concrete construction technique
CN101892613A (en) * 2009-12-30 2010-11-24 中铁八局集团有限公司 Construction process of double-block ballastless track supporting layer
RU2536517C1 (en) * 2013-06-18 2014-12-27 Александр Александрович Ермилов Road patching method
CN104631267A (en) * 2015-01-16 2015-05-20 中交一公局第五工程有限公司 Construction method of asphalt concrete pavement of skid pad
CN105350421A (en) * 2015-09-28 2016-02-24 北京城建道桥建设集团有限公司 Thin layer overlaying surface construction method suitable for pavement overhaul and intermediate maintenance and preventive conservation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02266005A (en) * 1989-04-06 1990-10-30 Nippon Steel Corp Hydraulic surface paving method
CN101694083A (en) * 2009-09-23 2010-04-14 中交二公局第六工程有限公司 Express highway pavement asphalt concrete construction technique
CN101892613A (en) * 2009-12-30 2010-11-24 中铁八局集团有限公司 Construction process of double-block ballastless track supporting layer
RU2536517C1 (en) * 2013-06-18 2014-12-27 Александр Александрович Ермилов Road patching method
CN104631267A (en) * 2015-01-16 2015-05-20 中交一公局第五工程有限公司 Construction method of asphalt concrete pavement of skid pad
CN105350421A (en) * 2015-09-28 2016-02-24 北京城建道桥建设集团有限公司 Thin layer overlaying surface construction method suitable for pavement overhaul and intermediate maintenance and preventive conservation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高建纲: "城市沥青路面施工质量控制研究", 《中国学位论文全文数据库》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914735A (en) * 2018-07-25 2018-11-30 赵建军 A kind of road construction method
CN110662170A (en) * 2019-09-27 2020-01-07 中国人民解放军63850部队 All-terrain rapid observation vehicle cleaning system
CN110662170B (en) * 2019-09-27 2020-09-25 中国人民解放军63850部队 All-terrain rapid observation vehicle cleaning system
CN111287052A (en) * 2019-12-31 2020-06-16 河南省公路工程局集团有限公司 Construction method for leftover material self-processing broken stone cement stabilized base

Similar Documents

Publication Publication Date Title
CN105113351B (en) A kind of extremely frigid zones concrete road surface structure and its construction method
Button et al. Guidelines for using geosynthetics with hot-mix asphalt overlays to reduce reflective cracking
US10435850B1 (en) Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications
CN107905052A (en) A kind of heat in low temperature season mixes temperature and pressure asphalt concrete construction method
CN105218000B (en) A kind of production of color asphalt road and construction technology
CN107299585A (en) A kind of municipal road construction method
CN104131512B (en) Cement concrete bridge deck thermal jet polymer modified asphalt water-proof tack coat paving structure and construction method
CN103590296A (en) In-situ heat regeneration remixing and paving technology of asphalt pavement
US9885157B1 (en) Paver adhesive and method of laying pavers
CN108914735A (en) A kind of road construction method
CN107227671A (en) A kind of construction technology of in-situ heat regeneration
CN106012743A (en) Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area
CN110258236A (en) A kind of high-performance steel slag road surface and its construction method
CN110409251A (en) A kind of dewatering and noise reduction pavement construction method
CN103911930A (en) Construction method of warm mix asphalt concrete pavement of municipal road
Gnatenko et al. Technological sides of crack sealing in asphalt pavements
CN108342939A (en) A kind of anti-ponding type asphalt pavement construction method
CA2109452C (en) Method of asphalt paving and pavement
US6682260B2 (en) Roller compacted concrete paving sealing method
CN206591384U (en) Bituminous concrete prefabricated section and assembly type road surface
CN106566469A (en) Ultra-thin asphalt film for engineering interface treatment and using method for ultra-thin asphalt film
CN110820466A (en) Quick repairing method for cement concrete pavement
RU143147U1 (en) WATERPROOF TAPE
CN205893846U (en) Anti road surface structure of splitting of semi rigid base course suitable for high temperature difference area
CN104775347B (en) Hot asphalt spraying repair construction method with characteristic of concurrent repair and unblocking of municipal road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000

Applicant after: Wenzhou Huahong Construction Co., Ltd.

Address before: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000

Applicant before: Grand municipal garden engineering Construction Company Limited of China of Wenzhou City

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171027

RJ01 Rejection of invention patent application after publication