CN103850164B - The construction method of penetrating induction type drainage pavement of a kind of long-life - Google Patents

The construction method of penetrating induction type drainage pavement of a kind of long-life Download PDF

Info

Publication number
CN103850164B
CN103850164B CN201410043158.7A CN201410043158A CN103850164B CN 103850164 B CN103850164 B CN 103850164B CN 201410043158 A CN201410043158 A CN 201410043158A CN 103850164 B CN103850164 B CN 103850164B
Authority
CN
China
Prior art keywords
construction method
conjugate fiber
road surface
induction type
life
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410043158.7A
Other languages
Chinese (zh)
Other versions
CN103850164A (en
Inventor
刘治龙
吕志伟
宋书彬
陈彦锋
张鹏
陈冠峰
吴歌
陈静
张晓朋
潘刚
陈磊
吕珩
于水敬
李冬梅
管东
胡文娟
杨春祥
金鑫
王春阳
贾海峰
程杰
宋满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU HIGHWAY ENGINEERING Co
Original Assignee
ZHENGZHOU HIGHWAY ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU HIGHWAY ENGINEERING Co filed Critical ZHENGZHOU HIGHWAY ENGINEERING Co
Priority to CN201410043158.7A priority Critical patent/CN103850164B/en
Publication of CN103850164A publication Critical patent/CN103850164A/en
Application granted granted Critical
Publication of CN103850164B publication Critical patent/CN103850164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses the construction method of penetrating induction type drainage pavement of a kind of long-life, step is as follows: 1. prepare penetratingly luring face, water route filtering material: coarse aggregate, fine aggregate, modified asphalt mixture weight ratio are 58.5:35.85:5.65, wherein: modified asphalt mixture comprises slaked lime, red mud and conjugate fiber, slaked lime, red mud, conjugate fiber weight ratio are 58.5:35.85:5.65; In conjugate fiber, the weight ratio of wood fibre, basalt fibre is 1:2; 2. to construct the base treatment on road surface; 3. thickness setting is adhesion coating or the sealing of 0.1 ~ 0.2mm, and porosity is 30%; 4. between the soil layer and macadam of bases, thickness setting is the substrate filtering material layer of 0.05 ~ 0.15mm; 5. machine spreading; 6. joint treatment; 7. maintenance of surface.The present invention can significantly improve the adhesive power on road surface, freedom from cracking performance, tension and anti-water damage property, anti-acoustic capability, increases the uprising rain ability on road surface, weakens the impact of rainwater long term storage on bituminous concrete stability.

Description

The construction method of penetrating induction type drainage pavement of a kind of long-life
Technical field:
The present invention relates to a kind of construction method of flexible pavement, particularly relate to the construction method of penetrating induction type drainage pavement of a kind of long-life, make rainwater resident in drainage topping make it lateral flow by the connectivity gap in surface layer and technical induction and then discharge road surface.
Background technology:
The waterproof, seepage control of road table is put undue emphasis in the work progress on non-permeable road surface traditional at present, this road surface by natural precipitation completely and bottom, road surface soil layer and underground water block, rainfall have to enter in the earth surface water sources such as river, river, lake, sea by urban sewerage and drainage system pipe network, this just causes Urban Underground water source to be difficult to be supplemented timely, has a strong impact on effective utilization of rainwater; During waterproof ground rainfall simultaneously, rainwater first enters sewer by the drainage grade on ground or open drain, earth's surface, just Urban Underground drainage system will can be entered through the surface flow of longer distance before entering sewer, this process makes the rainwater relatively cleaned dissolve in a large amount of urban surface pollutants, the secondary pollution produced in this runoff process, enter peripheral ground natural water by urban sewerage and drainage system, thus increase the weight of the degree of contamination of these natural waters.
Summary of the invention:
Technical problem to be solved by this invention is: provide a kind of long-life penetrating induction type drainage pavement construction method, this construction method can improve the adhesive power on road surface, freedom from cracking performance, tension and anti-water damage property, anti-acoustic capability, increase the uprising rain ability on road surface, also weaken the impact of rainwater long term storage on bituminous concrete stability simultaneously.
The technical scheme that the present invention takes for technical solution problem is:
A construction method for long-life penetrating induction type drainage pavement, is characterized in that: comprise the steps:
Penetratingly lure the preparation of face, water route filtering material: adopt the many spaces dewatering and noise reduction bituminous mixture be made up of coarse aggregate, fine aggregate and modified asphalt mixture as the penetrating filtering material luring face, water route, the weight ratio of coarse aggregate, fine aggregate, modified asphalt mixture is 58.5:35.85:5.65, wherein: modified asphalt mixture comprises slaked lime, red mud and conjugate fiber, the weight ratio of slaked lime, red mud, conjugate fiber is 32.1:64.2:3.7; In conjugate fiber, the weight ratio of wood fibre, basalt fibre is 1:2, and the consumption of conjugate fiber should be 3.7%;
2. to construct the base treatment on road surface: conveniently the base treatment of construction method operates;
3. arrange one deck adhesion coating or sealing at the interface of drainage topping and middle cutting optimal, the thickness of described adhesion coating or sealing is 0.1 ~ 0.2mm, and the porosity of described adhesion coating or sealing is 30%;
4. between the soil layer and macadam of bases, be provided with substrate filtering material layer, the thickness of described substrate filtering material layer is 0.05 ~ 0.15mm;
5. machine spreading: during drainage topping on pave, namely pave many spaces dewatering and noise reduction bituminous mixture time, paver adopts the conventional sliding equalizer bar of truss;
6. joint treatment: adopt the direct joint-cutting of electric pick, then blow dust with air compressor machine or forest fire extinguisher, then rinse seaming position with water, prevent the blocking of connectivity gap;
7. maintenance of surface: adopt vacuum draw or high pressure water flushing to inject row periodic maintenance.
Step 1. in, the absolute viscosity of described modified asphalt mixture is more than or equal to 20,000PaS under 60 DEG C of conditions.
The described long-life, penetrating induction type drainage pavement comprised penetrated asphalt pavement, permeable concrete road surface and porous brick.
Modified asphalt mixture in the present invention has high voidage and full-bodied feature, so-called " high viscosity " refer to absolute viscosity under 60 DEG C of conditions 20, more than 000PaS pitch, its concrete physical property is as shown in Table 1 below:
table 1 modified asphalt mixture technical indicator
Index Unit Detect desired value
Needle penetration (25 DEG C) 0.1 mm 40~50
Softening point, is not less than 80
Ductility (5 DEG C), is not less than cm 30
Flash-point, is not less than 260
Film heating mass change, is not more than % 0.6
Film heating needle penetration residual rate, is not less than % 65
Sticky toughness (25 DEG C), is not less than N·m 20
Toughness (25 DEG C), is not less than N·m 15
60 DEG C of viscosity, are not less than Pa·s 20000
In the present invention: the coarse aggregate of many spaces dewatering and noise reduction bituminous mixture, must be homogeneous, clean, hard, there is durability, strictly to control the hazardous substances (see table 2 and table 3) such as flag, dust, earth, organic matter of elongated flat
table 2 coarse aggregate technical indicator
table 3 coarse aggregate specification requirement (the empty sieve in side)
In the present invention: the fine aggregate kind used in the dewatering and noise reduction bituminous mixture of many spaces comprises:
(1) natural sand
(2) manufactured sand
(3) riddled sand
(4) special sand
Fine aggregate should clean, hard, dry, without weathering, free from admixture, good with asphalt adhesion, specific targets refer to table 4 and table 5.
table 4 fine aggregate technical indicator
table 5 fine aggregate size
In the present invention, adding surfactant with red mud, flyash replaces limestone mineral powder as the breeze in bituminous mixture, pitch is increased and the adhesiveness of gathering materials with this, improve the ability of compound absorption and absorption pitch, improve pitch gradation, improve the high-temperature stability of bituminous mixture, anti-dustability and water stability.The technical requirement following (see table 6) of breeze of the present invention:
table 6 breeze technical indicator
Pilot project Technical requirements Technical requirements
Apparent density, is not less than t/m 3 2.50
Water content, is not more than % 1
Particle size range < 0.6mm part % 100
< 0.15mm part % 90~100
< 0.075mm part % 75~100
Outward appearance Lump without granule
Hydrophilic coefficient < 1
Index of plasticity % < 4
Tool of the present invention has the following advantages and good effect:
1, have employed many spaces dewatering and noise reduction bituminous mixture and come asphalt road surface, effectively can reduce noise, particularly densely populated city, the construction of noise barrier can be reduced, improve the quality of life of resident, the noise pollution of solving road surrounding area.
2, many spaces dewatering and noise reduction flexible pavement that the present invention lays is a kind of flexible pavement of special shape, from the economic analysis of microcosmic, due to its distinctive ecological, environmental protective function, is huge to the macro-economy influence of entire society.
3, many spaces dewatering and noise reduction flexible pavement of laying of the present invention to improving safe driving, to reduce the property loss caused due to traffic accident quite obvious.
4, many spaces dewatering and noise reduction bituminous mixture of the present invention's use, rutting resistance at high operating temperatures, higher than asphalt concrete, mainly forms cage construction and enhances carrying effect because coarse aggregate mutually directly contacts; The asphalt mortar, bituminous mortar that asphaltum with high viscosity and fine aggregate are formed, effectively can wrap up the contact point between coarse aggregate, stop coarse aggregate particle at action of traffic loading bottom offset, improve the anti-shear ability of this flexible pavement, make it not easily be lost the drain function on road surface by further compaction deformation.
5, the many spaces dewatering and noise reduction bituminous mixture used due to the present invention has higher void content, aging speed is there is by air, sunlight and rainwater effect, therefore, except using polymer modified asphalt, strengthen with the adhesion stress of gathering materials, strengthen beyond scour resistance, also should improve asphalt content as far as possible, increase the thickness of asphalt binder film, to delay the aging of bituminous mixture, this becomes one of main points of many spaces dewatering and noise reduction Bitumen Mix Design.
6, the many spaces dewatering and noise reduction Air Voids of Asphalt Mixtures due to the present invention's use is high, radiating rate is fast, therefore Insulation and construction at high temperature should be strengthened, meanwhile, smooth and easy for ensureing surface drainage path, horizontal wall inscription must be strengthened and control, therefore when the drainage topping of paving concrete pavement, namely pave many spaces dewatering and noise reduction bituminous mixture time, paver adopts the conventional sliding equalizer bar of truss, reduces the quantity of transverse joint and longitudinal joint.
7, many spaces dewatering and noise reduction flexible pavement of the present invention's laying, void content is high, generally between 15-25%.In general, middle surface layer is waterproof, moisture enters rain water collecting system from road both sides, its design feature is divided into " thoroughly ", " blocking up ", " row " three functions: 1. so-called " thoroughly ", it is the high-voidage utilizing porous asphalt pavement, being flowed down in the footpath of rainwater or relevant range is seeped in drainage topping, makes road show unlikely ponding under certain rainfall; 2. so-called " block up ", be that the water in drainage topping is only limited in upper layer, ooze under not allowing it continue in, cutting optimal, in avoiding, the bituminous mixture generation Water Damage of cutting optimal, or affect the water stability of basic unit, and affects earth roadbed stablizing further; 3. so-called " row ", by the connectivity gap lateral flow in surface layer by rainwater resident in drainage topping, be pooled in rain water collecting system in both sides by scupper hose, Dewatering flat stone or natural side, increase the uprising rain ability on road surface, also weaken the impact of rainwater long term storage on bituminous concrete stability simultaneously.
8, many spaces dewatering and noise reduction flexible pavement of the present invention's laying, also has an outstanding feature to reduce noise exactly.Due to the space of its prosperity, serve the effect of porous absorption material, " sonic boom " sound that then release produces of tire bottom air compression is simultaneously inhibited because compressed air is dissipated by connectivity gap.Generally can reduce noise more than 3 decibels, the rainy day, its noise reduction was more remarkable, can reach 8 decibels owing to eliminating " sonic boom " of water body.
9, the present invention obtains strain energy by low temperature bend test result, determines that the part by weight of wood fibre in conjugate fiber, basalt fibre is for 1:2 with this, and the optimum amount of conjugate fiber is 3.7%.
10, the present invention proposes/drainage asphalt concrete interlayer should adopt the concept of water permeability adhesion coating or sealing, and arrange one deck adhesion coating or sealing at the interface of drainage topping and middle cutting optimal, thickness is 0.1 ~ 0.2mm, and the porosity of described adhesion coating or sealing is 30%;
11, the present invention proposes propose with red mud, flyash add surfactant replace limestone mineral powder as the breeze in bituminous mixture, pitch is increased and the adhesiveness of gathering materials with this, improve the ability of compound absorption and absorption pitch, improve pitch gradation, improve the high-temperature stability of bituminous mixture, anti-dustability and water stability.
12, the many spaces dewatering and noise reduction flexible pavement adopting construction method of the present invention to lay, can improve the application life of pass-through type drainage pavement, application life can reach more than 10 years.
Detailed description of the invention:
The construction method of embodiment 1, penetrating induction type drainage pavement of a kind of long-life, comprises the steps:
1. penetratingly the preparation of face, water route filtering material is lured: adopt the many spaces dewatering and noise reduction bituminous mixture be made up of coarse aggregate, fine aggregate and modified asphalt mixture as the penetrating filtering material luring face, water route, the weight ratio of coarse aggregate, fine aggregate, modified asphalt mixture is 58.5:35.85:5.65, wherein: modified asphalt mixture comprises slaked lime, red mud and conjugate fiber, the weight ratio of slaked lime, red mud, conjugate fiber is 32.1:64.2:3.7; In conjugate fiber, the weight ratio of wood fibre, basalt fibre is 1:2, and the consumption of conjugate fiber should be 3.7%;
2. to construct the base treatment on road surface: conveniently the base treatment of construction method operates;
3. arrange one deck adhesion coating or sealing at the interface of drainage topping and middle cutting optimal, the thickness of described adhesion coating or sealing is 0.1 ~ 0.2mm, and the porosity of described adhesion coating or sealing is 30%;
4. between the soil layer and macadam of bases, be provided with substrate filtering material layer, the thickness of described substrate filtering material layer is 0.05 ~ 0.15mm;
5. machine spreading: during drainage topping on pave, namely pave many spaces dewatering and noise reduction bituminous mixture time, paver adopts the conventional sliding equalizer bar of truss;
6. joint treatment: adopt the direct joint-cutting of electric pick, then blow dust with air compressor machine or forest fire extinguisher, then rinse seaming position with water, prevent the blocking of connectivity gap;
7. maintenance of surface: adopt vacuum draw or high pressure water flushing to inject row periodic maintenance.
Step 1. in, the absolute viscosity of described modified asphalt mixture is more than or equal to 20,000PaS under 60 DEG C of conditions.
Long-life recited above, penetrating induction type drainage pavement comprised penetrated asphalt pavement, permeable concrete road surface and porous brick.
Embodiment 2: the Specific construction step of penetrating induction type drainage pavement of a kind of long-life is as follows:
1. mix-design: the production mix proportion of Experiment Road carries out on job laboratory.First carried out Indexs measure to the raw material in hot storehouse, then carried out Marshall Test according to correlation step, finally determining that hot storehouse thickness is gathered materials with the ratio of modified asphalt mixture is: 58.5:35.85:5.65
2. process is mixed and stirred:
Before asphalt plants mixes and stirs, batching plant grating, bitumen aggregate ratio are carried out examination and adjusted, grating is made to be tending towards the intermediate value of grading limit, lorry mounted mixer is equipped with pneumatic conveyer, add fiber, asphalt heating temperature controls be no more than 180 DEG C, mineral heating up temperature 190 ~ 2lO DEG C, bituminous mixture dispatches from the factory normal 180 ~ 185 DEG C, and in bin stock process, temperature reduction is no more than 10 DEG C.
For mixing and stirring of composite modified fiber compound, what can refer to common SMA mixture mixes and stirs process.First by fiber and gathering materials and breeze dry mixing certain hour, then spray into pitch and mix and stir.
Mixing and stirring for modified fibre, because fiber wherein adds the cause of modifier, when temperature reaches more than 180 DEG C, fiber and modifier are become by dispersity and cohere block, join pole among gathering materials and be difficult to dispersion, therefore need in practice of construction, modified fibre and pitch are sprayed into batching plant simultaneously, and actual effect display effectively can avoid the generation of the problems referred to above; The blending technics of composite modified fiber is identical with the technique of general fibre, adds pitch again after first carrying out dry mixing certain hour.
The bituminous mixture mixing time should all be wrapped by pitch with compound uniform mixing, all mineral aggregate particles and determine through trial mix, the time that general batch mixer mixes and stirs one pot is 55 seconds, the conjugate fiber due to admixture, increase by 10 seconds compound dry mixing time, when condition license, suitably can increase the mixing time again.The bituminous mixture that batching plant mixes and stirs answers uniformity without grey material, becomes block or serious coarse fodder segregation phenomenon without conglomeration.The compound mixed and stirred when requiring as do not reached must not use, and should search problem and adjust solution in time.
3. prepare before paving: the foreign organic matter cleaning surface before paving, and remove road surface dust with air compressor machine or forest fit-extinguishing, road surface is made to keep clean without dust, carry out the spread of SBS modified bitumen bond capacity after also evaluation and test recognized by label through management Cheng Shi passed examination, locally and in the vertical edges of milling position manually brush with brush in concrete guardrail, people's (hand) hole etc.; The abundant preheating of screed before paving, " the C or higher that reaches 100.Mixture laying temperature is not less than 170 " C.Mercurial thermometer close inspection is used at scene, guarantee that the qualified material that mixes and stirs paves, otherwise the type fiber mixture is difficult to compacting.
4. machine spreading: it is 1.2 that the coefficient that paves controls.
5. roller compaction process: because bituminous mixture cohesive strength after adding of fiber in compound increases, need increase rolling layer 2 ~ 3 times when rolling, to reach best compactness.When rolling, driving wheel is front, steppedly to roll, finally oblique 45 of multiple pressure and final pressure ", road roller must not be reversed end for end or stop-for-waiting on non-roller-compaction and uncooled section; must carry out on cold burden when adding water, generally be advisable from paver 150 ~ 200 meters.The corner that road roller cannot be pressed onto, adopts hand compaction; The road surface complete to multiple pressure is detected with 6 meters of rulers, finds that out-of-flatness place is marked, and arranges road roller to eliminate to the sags and crests that may occur.
6. joint treatment: longitudinal seam adopts cold joint, carries out channel-section steel dismounting after having rolled.Horizontal construction joint adopts flat seam, carry out when laying compound cooling but not yet hardening, detect with ruler butt joint place, to injustice, place all cuts, so that seam Shunping County, remembers the paver elevation angle simultaneously, when making seam, the elevation angle is consistent, roll and adopt that road roller is oblique rolls, and then longitudinal rolling, emphasis process is done to out-of-flatness place road roller.
Embodiment 3: adopt construction method of the present invention second day road pavement degree of compaction after construction completes to adopt boring method to detect, each section of testing result is as shown in table 6.1:
From compaction detect result, paving material is larger on the impact of the consolidation effect of compound, first should ensure that its paving material is at about 170 DEG C in the fiber mixture paving process afterwards of this two type.
Be open to traffic after half a year in the Experiment Road completion that paves, we investigate the pavement usage situation of Experiment Road, and have carried out the mensuration (construction depth > 0.55mm) of pavement seepage coefficient and pendulum value, and result is as shown in table 6.2:
Embodiment 4: the penetrating induction type drainage pavement that construction method of the present invention is laid compared with traditional prevailing roadway when not increasing investment, effectively can reduce noise, reduce water smoke, be both conducive to environmental protection, more be conducive to traffic safety, meet the trend of current technological development.Concrete function is as follows:
(1) reduce the danger of " water drift " at a high speed, make, when road table has water, still can maintain the good contact on tire and road surface.
(2) improve the visuality at rainy day and night, what rainwater produced dabble and water smoke can reduce greatly, and rainy day and driving at night reverberation can be disperseed by road structure, and dazzle is little.
(3), under high speed traveling, cling property is significantly higher than prevailing roadway.
(4), due to the mechanism of porous sound absorption and connectivity gap earth pressure release, noise is decreased significantly.
(5) the raising of the aspect such as preventing atomization, fatigue resistance, non-skid property, durability makes service life of road surface extend about one times, reach more than 10 years application life, without there being common pavement disease to occur on the road surface using construction method of the present invention, for common earth, machine oil and household garbage, there is good contamination resistance, through good maintenance, road surface is durable as new, meets the requirement of porous pavement to matsurface.

Claims (3)

1. a construction method for long-life penetrating induction type drainage pavement, is characterized in that: comprise the steps:
1. penetratingly the preparation of face, water route filtering material is lured: adopt the many spaces dewatering and noise reduction bituminous mixture be made up of coarse aggregate, fine aggregate and modified asphalt mixture as the penetrating filtering material luring face, water route, the weight ratio of coarse aggregate, fine aggregate, modified asphalt mixture is 58.5:35.85:5.65, wherein: modified asphalt mixture comprises slaked lime, red mud and conjugate fiber, the weight ratio of slaked lime, red mud, conjugate fiber is 32.1:64.2:3.7; In conjugate fiber, the weight ratio of wood fibre, basalt fibre is 1:2, and the consumption of conjugate fiber should be 3.7%;
2. to construct the base treatment on road surface: conveniently the base treatment of construction method operates;
3. arrange one deck adhesion coating or sealing at the interface of drainage topping and middle cutting optimal, the thickness of described adhesion coating or sealing is 0.1 ~ 0.2mm, and the porosity of described adhesion coating or sealing is 30%;
4. between the soil layer and macadam of bases, be provided with substrate filtering material layer, the thickness of described substrate filtering material layer is 0.05 ~ 0.15mm;
5. machine spreading: during drainage topping on pave, paver adopts the conventional sliding equalizer bar of truss;
6. joint treatment: adopt the direct joint-cutting of electric pick, then blow dust with air compressor machine or forest fire extinguisher, then rinse seaming position with water, prevent the blocking of connectivity gap;
7. maintenance of surface: adopt vacuum draw or high pressure water flushing to inject row periodic maintenance.
2. the construction method of penetrating induction type drainage pavement of a kind of long-life according to claim 1, is characterized in that: step 1. in, the absolute viscosity of described modified asphalt mixture is more than or equal to 20,000PaS under 60 DEG C of conditions.
3. the construction method of penetrating induction type drainage pavement of a kind of long-life according to claim 2, is characterized in that: the described long-life, penetrating induction type drainage pavement comprised penetrated asphalt pavement, permeable concrete road surface and porous brick.
CN201410043158.7A 2014-01-29 2014-01-29 The construction method of penetrating induction type drainage pavement of a kind of long-life Active CN103850164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410043158.7A CN103850164B (en) 2014-01-29 2014-01-29 The construction method of penetrating induction type drainage pavement of a kind of long-life

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410043158.7A CN103850164B (en) 2014-01-29 2014-01-29 The construction method of penetrating induction type drainage pavement of a kind of long-life

Publications (2)

Publication Number Publication Date
CN103850164A CN103850164A (en) 2014-06-11
CN103850164B true CN103850164B (en) 2016-03-09

Family

ID=50858278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410043158.7A Active CN103850164B (en) 2014-01-29 2014-01-29 The construction method of penetrating induction type drainage pavement of a kind of long-life

Country Status (1)

Country Link
CN (1) CN103850164B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631265A (en) * 2014-12-30 2015-05-20 新乡市公路勘察设计院 Porous water-permeable pavement repair material as well as production method and construction method of repair material
CN105297573B (en) * 2015-10-14 2017-05-24 东南大学 Road pavement or airfield pavement paving structure, preparation method and pipe die
CN105714640B (en) * 2016-03-14 2017-05-17 合肥工业大学 Construction method for dust removing and water draining macroporous asphalt road surface containing graded broken stone composite layer
CN105887609B (en) * 2016-04-13 2018-07-03 浙江泽汉环境科技有限公司 A kind of construction method on sponge urban ecology diafiltration ground
CN107220460B (en) * 2017-06-25 2021-04-09 长安大学 Mix proportion design method of high-friction-resistance asphalt mixture
CN107722649A (en) * 2017-09-18 2018-02-23 同济大学 A kind of modified pitch and its preparation and application
CN111499240B (en) * 2020-03-16 2022-02-22 山东大学 Red mud fiber composite material, preparation method thereof and application thereof in modified asphalt
CN111747715B (en) * 2020-07-07 2022-05-27 上海应用技术大学 Semi-permeable emulsified asphalt mixture and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
GB2404213A (en) * 2003-07-16 2005-01-26 Tarmac Ltd Water management system
CN1587526A (en) * 2004-08-30 2005-03-02 邢台路桥建设总公司 New road surface structure layer
CN1598151A (en) * 2004-07-21 2005-03-23 易志坚 Road surface structure of rolled press polymer modified cement concrete and its constructure method
CN101016720A (en) * 2007-02-14 2007-08-15 易志坚 Porous cement concrete cement overlay having bond coat laying on bituminous surface and construction method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
GB2404213A (en) * 2003-07-16 2005-01-26 Tarmac Ltd Water management system
CN1598151A (en) * 2004-07-21 2005-03-23 易志坚 Road surface structure of rolled press polymer modified cement concrete and its constructure method
CN1587526A (en) * 2004-08-30 2005-03-02 邢台路桥建设总公司 New road surface structure layer
CN101016720A (en) * 2007-02-14 2007-08-15 易志坚 Porous cement concrete cement overlay having bond coat laying on bituminous surface and construction method therefor

Also Published As

Publication number Publication date
CN103850164A (en) 2014-06-11

Similar Documents

Publication Publication Date Title
CN103850164B (en) The construction method of penetrating induction type drainage pavement of a kind of long-life
CN205501732U (en) Flexible protection structure of ballastless track structural waterproof damping
CN104402339B (en) The constructional method of pervious concrete
CN207227890U (en) A kind of environment protection asphalt pavement structure
CN101691736A (en) Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN106587835B (en) A kind of cold mixing formula Cement emulsified asphalt concrete and its method for paving
CN107881858A (en) A kind of new railway sub-grade surface structure and its laying method
CN104003661B (en) A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof
CN105970761B (en) Primary mat formation formula heavy traffic asphalt pavement structure and construction method
CN207749370U (en) A kind of novel railway sub-grade surface structure
CN104294732A (en) High-elasto-viscosity stress absorbing layer and top facing construction process thereof
CN110846971A (en) Ultrathin high-skid-resistance surface layer of asphalt pavement and construction method thereof
CN110409251A (en) A kind of dewatering and noise reduction pavement construction method
CN102051848B (en) HMA/CC (Hot-Mix Asphalt)/(Cement Concrete) composite type pavement structure and constructing method thereof
CN104594151A (en) Water drainage anti-cracking type cold-recycling pavement structure
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN105648865A (en) Paving method for tropical zone road surface
CN103924495A (en) Small and medium-sized steel bridge deck pavement system and implementation method
CN108570897A (en) A kind of paving method of pavement of road base
CN207846123U (en) Reinforced structure complex
CN101265703A (en) Roadbed soil reinforcing agent
CN101429746A (en) Road paving method and stirring machine used in the same
CN114182595B (en) Construction method of long-life asphalt road
CN103233405A (en) Old-new bituminous pavement binder course and application thereof
CN204000529U (en) Engineering asphalt pavement structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant