CN104631266B - Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology - Google Patents

Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology Download PDF

Info

Publication number
CN104631266B
CN104631266B CN201410841881.XA CN201410841881A CN104631266B CN 104631266 B CN104631266 B CN 104631266B CN 201410841881 A CN201410841881 A CN 201410841881A CN 104631266 B CN104631266 B CN 104631266B
Authority
CN
China
Prior art keywords
cold
normal temperature
construction
bituminous
paving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410841881.XA
Other languages
Chinese (zh)
Other versions
CN104631266A (en
Inventor
蔡海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cai Haijun
Original Assignee
NANTONG FULUNLI NEW MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG FULUNLI NEW MATERIAL CO Ltd filed Critical NANTONG FULUNLI NEW MATERIAL CO Ltd
Priority to CN201410841881.XA priority Critical patent/CN104631266B/en
Publication of CN104631266A publication Critical patent/CN104631266A/en
Application granted granted Critical
Publication of CN104631266B publication Critical patent/CN104631266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a normal-temperature asphalt pavement cold-mixed and cold-paved construction technology. The construction technology comprises the following steps: preparation before construction, mixing of mixed materials, transportation of mixed materials, spreading and paving of the mixed materials, grinding and detection of results, wherein the blending refers to blending of a basalt aggregate, normal-temperature rapidly-strong asphalt liquid, a curing and water, with the sequence of firstly basalt aggregate, then the curing agent and water, and finally normal-temperature rapidly-strong asphalt liquid; the traditional thermal asphalt spreading and paving machine is adopted in and a manner of controlling the elevation under the guidance of a steel wire is adopted in the spreading and paving, and in the grinding step, a rubber tire type tire roller is adopted to roll the road surface. The normal-temperature asphalt pavement cold-mixed and cold-paved construction technology basically follows up the construction requirement and procedures of the hot-mix asphalt mixture pavement, the thermal-insulating heating link can be omitted due to no temperature control requirement, and the normal-temperature asphalt pavement cold-mixed and cold-paved construction technology is more convenient.

Description

A kind of normal temperature bituminous paving cold mixing cold-application construction technology
Technical field
The present invention relates to a kind of asphalt pavement construction technique and in particular to a kind of normal temperature bituminous paving cold mixing cold-application construction work Skill.
Background technology
Normal temperature bituminous paving is colded pressing asphaltic road-mix surface course for cold mixing cold-application, mixes hot black top mixture pavement contrast with heat There is significant difference, necessarily have its particular/special requirement therefore in construction technology.
The design of Cold bituminous mixture, construction equipment and construction technology are systematically studied, and making Experiment Road.Theoretical research and practical experience prove that hot-mixed bitumen pavement construction machinery can be completely used for normal temperature pitch and mixes Close material pavement construction.Much better using rubber-tired roller consolidation effect, and the easy sizing of steel roller, surface is also easy to produce Pitted skin.
Content of the invention
Goal of the invention: the present invention is directed to deficiency, proposes a kind of completely compatible hot asphalt construction equipment, construction technology letter The normal temperature bituminous paving cold mixing cold-application construction technology single, easy to operate, repairing effect is good.
Technical scheme: a kind of normal temperature bituminous paving cold mixing cold-application construction technology of the present invention it is characterised in that: include Following steps:
(1) preparation of construction: the relevant technique preparation before Cold bituminous mixture construction has been constructed with hot-mix asphalt mixture Exactly the same, according to jtg f40-2004 execution;
(2) mixing: by basalt aggregate, the strong bituminous liquids of normal temperature speed, curing agent and water mixing, feeding sequence is first Basalt aggregate, secondly curing agent and water, is finally the strong bituminous liquids of normal temperature speed, and the parts by weight of wherein basalt aggregate are 100 parts, the parts by weight of curing agent are 1.5-5.0 parts, and water is 0.5-2.0 part, and the strong bituminous liquids of normal temperature speed are 7.0-10.5 Part;Existing use can either now be mixed using artificial/small-sized drum-type concrete mixer, can be carried out greatly using heated bitumen batching plant again Scale spice, only pitch and gather materials and need not heat, control aggregate chips sand equivalent > 50%
(3) transport of compound: equally fill in three times during compound entrucking: two ends behind first centre, for preventing compound Weathering, air-dry, above compound cover Tarpauling;
(4) the paving of compound: paved using mixing the same heated bitumen of hot black top mixture pavement construction usage with heat Machine, by the way of steel wire guides and controls elevation, before construction, screed and seam crossing road surface, but will be in seam crossings all without heating Brush pitch strengthens bonding;Work progress is with reference to hot-mixed bitumen pavement construction reference, the transverse joint in the seam of paving concrete pavement Processed using carvel joint, longitudinal joint adopts inclined-plane joint treatment;
(5) roll: Cold bituminous mixture road surface is rolled using rubber tyre formula road roller, starts when surface layer does not glue wheel Roll, first gently weigh afterwards, first outside behind inner side, does not bring to a halt on uncompacted surface layer, do not turn around, do not turn, uniformly grind at a slow speed Pressure, rolled section becomes ladder to advance, and number of rolling is 5-8 time;
(6) detect: after each working section terminates, according to the requirement of jtgf40-2004, carry out compactness, thickness, put down Whole degree, infiltration coefficient, the coherent detection such as Marshall stability, index system requires fully according to hot-mixed bitumen pavement.
As optimization, fine aggregate 0.075 sieve aperture in the basalt aggregate described in step (2) is 0-3 by percentage, The requirement that remaining gathers materials executes according to jtg f40-2004.
As optimization, the part of the strong bituminous liquids of the speed of normal temperature described in step (2) includes the weight hundred of sbs aqueous latex Divide than being 6%-10%, compound blending emulsion is 8%-15%, pitch is 55%-65%, water is 25%-35%.
As optimization, curing agent described in step (2) is by suitable by powder anti-stripping agent, breeze, polymer glue powder, cement Mass ratio allotment forms.
As optimization, curing agent described in step (2) knock down after with basalt aggregate first dry mixing 10-15 second, Ran Houzai Put the strong bituminous liquids of normal temperature speed and mix the uniform 40-50 second.
Beneficial effect: Cold bituminous mixture Pavement Construction Equipment completely compatible hot asphalt construction equipment, such as mix sets Standby, then simpler than the mixing equipment of hot-mix asphalt mixture, it is not required to raw material be heated it is not required that carrying out to compound Heating, because without firing equipment facility.Former mixing apparatus are directly used.Little for materials, sectional repair at ordinary times When, small-sized mixing equipment can be used, such as Cement Concrete forces mixer just to solve, very convenient.Cold bituminous mixture road surface Construction technology, operation identical with the construction technology of hot-mix asphalt mixture, operation, administrative staff, operating personnel need not Special training.The spreading machine on Cold bituminous mixture road surface, rolling compaction machine, haulage vehicle, identical.It requires completely With reference to hot-mixed bitumen pavement construction requirement, due to not having temperature control requirement, Heat preservation link is saved, thus more Convenient.
Specific embodiment
A kind of normal temperature bituminous paving cold mixing cold-application construction technology, comprises the steps:
(1) preparation of construction: the relevant technique preparation before Cold bituminous mixture construction has been constructed with hot-mix asphalt mixture Exactly the same, according to jtg f40-2004 execution;
(2) mixing: by basalt aggregate, the strong bituminous liquids of normal temperature speed, curing agent and water mixing, feeding sequence is first Basalt aggregate, secondly curing agent and water, is finally the strong bituminous liquids of normal temperature speed, and the parts by weight of wherein basalt aggregate are 100 parts, the parts by weight of curing agent are 1.5-5.0 parts, and water is 0.5-2.0 part, and the strong bituminous liquids of normal temperature speed are 7.0-10.5 Part;Fine aggregate 0.075 sieve aperture wherein in basalt aggregate is 0-3 by percentage, and the requirement that remaining gathers materials is according to jtg F40-2004 executes;The percentage by weight that the part of the strong bituminous liquids of normal temperature speed includes sbs aqueous latex is 6%-10%, is combined Blending emulsion is 8%-15%, and pitch is 55%-65%, and water is 25%-35%;Curing agent is by powder anti-stripping agent, breeze, polymer latex Powder, cement are formed by the allotment of suitable mass ratio;Curing agent knock down after with basalt aggregate first dry mixing 10-15 second, Ran Houzai Put the strong bituminous liquids of normal temperature speed and mix the uniform 40-50 second;
(3) transport of compound: equally fill in three times during compound entrucking: two ends behind first centre, for preventing compound Pollution, above compound cover Tarpauling;
(4) the paving of compound: paved using mixing the same heated bitumen of hot black top mixture pavement construction usage with heat Machine, by the way of steel wire guides and controls elevation, before construction, screed and seam crossing road surface, but will be in seam crossings all without heating Brush pitch strengthens bonding;Work progress is with reference to hot-mixed bitumen pavement construction reference, the transverse joint in the seam of paving concrete pavement Processed using carvel joint, longitudinal joint adopts inclined-plane joint treatment;
(5) roll: Cold bituminous mixture road surface is rolled using rubber tyre formula road roller, starts when surface layer does not glue wheel Roll, first gently weigh afterwards, first outside behind inner side, does not bring to a halt on uncompacted surface layer, do not turn around, do not turn, uniformly grind at a slow speed Pressure, rolled section becomes ladder to advance, and number of rolling is 5-8 time;
(6) detect: after each working section terminates, according to the requirement of jtgf40-2004, carry out compactness, thickness, put down Whole degree, infiltration coefficient, the coherent detection such as Marshall stability, index system requires fully according to hot-mixed bitumen pavement.
With reference to specific embodiment, the invention will be further described:
Embodiment 1
S234 Jianhu section normal temperature asphalt slurry seal coat
First, project scale: 2km(45000) one-level road.
2nd, the engineering time: in July, 2013.
3rd, original road Major Diseases: surface layer serious wear, there are some cracks in length and breadth, wherein transverse crack is in the majority, rut Deeper 2-3cm.
4th, processing scheme:
(1) milling original surface, reaches elimination rut and gathers around bag;
(2) fracture fills oil and fills out envelope;
(3) overlay normal temperature asphalt slurry seal coat
5th, construction machinery: milling machine one, transport vehicle two, grooving machine, small-sized pouring machine one, hair-dryer one, wind One, pick machine, 16 tons of rubber-tyred rollers one, 400l Cement Concrete forced mixer one, slurry seal paver one, drip Blue or green distribution vehicle one.
6th, construction and order:
1st, setting-out: go out boundary of works area with lime line drawing;
2nd, milling: with milling machine milling surface layer, edge pneumatic pick is repaired;
3rd, dedusting: use hair-dryer, broom, spades understands floating dust;
4th, mixing: by basalt aggregate, the strong bituminous liquids of normal temperature speed, curing agent and water mixing, feeding sequence is first Basalt aggregate, secondly curing agent and water, is finally the strong bituminous liquids of normal temperature speed, and wherein #3 gathers materials (2.36-4.75mm): #4 collection Material (0.075-2.36mm): curing agent: the strong bituminous liquids of normal temperature speed: water weight ratio=120:80:6:23:12;Wherein basalt Fine aggregate 0.075 sieve aperture in gathering materials is 0-3 by percentage, and the requirement that remaining gathers materials executes according to jtg f40-2004;Often The percentage by weight that the part of Wen Suqiang bituminous liquids includes sbs aqueous latex is 6%, and compound blending emulsion is 8%, and pitch is 55%, water is 25%;Curing agent is to be formed by the allotment of suitable mass ratio by powder anti-stripping agent, breeze, polymer glue powder, cement; Curing agent knock down after with the dry mixing 10 seconds of basalt aggregate elder generation, bituminous liquids mix uniform 40 seconds by force then to put normal temperature speed again;
5th, the transport of compound: equally fill in three times during compound entrucking: two ends behind first centre, for preventing compound Pollution, covers Tarpauling above compound;
6th, the paving of compound: paved using mixing the same heated bitumen of hot black top mixture pavement construction usage with heat Machine, by the way of steel wire guides and controls elevation, before construction, screed and seam crossing road surface, but will be in seam crossings all without heating Brush pitch strengthens bonding;Work progress is with reference to hot-mixed bitumen pavement construction reference, the transverse joint in the seam of paving concrete pavement Processed using carvel joint, longitudinal joint adopts inclined-plane joint treatment;The specifically first cementation of fissures, with normal temperature pitch cementation of fissures material and small-sized pouring machine Envelope is filled out to the seam material filling more than 0.2mm;Carry out again spilling sticking layer oil, spray sticking layer oil with pitch sprinkling car, control in 0.5 kg/ ㎡;It is finally paving slurry seal, after the solidification of sticking layer oil breakdown of emulsion, spread slurry seal;
7th, roll: Cold bituminous mixture road surface is rolled using rubber tyre formula road roller, starts when surface layer does not glue wheel Roll, first gently weigh afterwards, first outside behind inner side, does not bring to a halt on uncompacted surface layer, do not turn around, do not turn, uniformly grind at a slow speed Pressure, rolled section becomes ladder to advance, and number of rolling is 5-8 time;
8th, detect: after each working section terminates, according to the requirement of jtgf40-2004, carry out compactness, thickness, put down Whole degree, infiltration coefficient, the coherent detection such as Marshall stability, index system requires fully according to hot-mixed bitumen pavement.
7th, repairing effect
1st, using effect: through the use in nearly 9 months of spring autumn and winter in summer, owner evaluates good.
In addition, this project team also all learns rich section in July, 2012 in s331(salt) carry out 7000 square metres similar Repair (0.5 centimeter of -1.0 centimeters of thickness), be open to traffic substantially intact so far.
Embodiment 2
S331 salt all section Cold bituminous mixture ac-10 surface layers
First, project scale: 850 meters of full width (7650 square metres) second grade highway.
2nd, the engineering time: 5 days on the 3rd December in 2013.
3rd, original road disease: surface layer is more smooth, serious wear, large area is undisguised, has some vertically and horizontally cracks.
4th, processing scheme: embedding is carried out to larger crack, after spilling sticking layer oil, overlays 2.5cmac-10 normal temperature pitch Mixture surface course.
5th, construction machinery: small-sized pouring machine one, hair-dryer one, pitch sprinkling car one, 400l forced action type stirs machine one Platform, paver one, 10t steel cylinder formula road roller one, 16t rubber tyred roller two.
6th, construction and order:
1st, clean surface layer, carry out the cementation of fissures.
2nd, spray sticking layer oil.
3rd, the sideline that paves, center line are drawn.
4th, measure absolute altitude.In avris, curved section presses 5m interval nail crooked chisel support, and straightway presses 8m interval nail crooked chisel support, Make pine paving height thereon, steel wire is fixed on crooked chisel support and is strained by pine paving height, pulling force is not less than 800n.Steel wire is Turn round wound, diameter is not less than 6mm, the high process control that this steel wire guides for paver.
5th, spice: ac-10 Mixture Ratio is: 1# material (9.5-13.2mm): 2# material (4.75-9.5mm): 3# material (2.36-4.75mm): 4# material (0-2.36mm): curing agent: normal temperature pitch=5%:20%:25%:50%:3%:9.5%(curing agent and Normal temperature pitch percentage ratio is outer ratio, and such as bitumen aggregate ratio, wherein bitumen aggregate ratio is conversion or pitch solid content about 6%).
6th, paver paves asphalt.After screed amplitude, frequency, horizontal wall inscription are adjusted, allow the compound mixed thoroughly Pour the hopper of paver into, open spiral distributor.When compound exceedes spiral distributor 2/3 height, make material jaw opening, carrier bar Before the speed of feed appliance and the rotational speed matches of spiral distributor, screed, the height of compound is basically identical in the range of overall with When, start paved mixture.
7th, roll: rolled after not gluing wheel.With rubber tyre formula road roller, roll 5-8 time.
8th, detect: according to jtg f40-2004 about requiring detection: the Cold bituminous mixture mix-design before construction, Normal temperature pitch raw material detect, optimum oil-stone ratio and Marshall Test etc.;Surface friction coefficient after compacting, infiltration coefficient, thickness Degree, compactness detection etc..
9th, health: closure construction road surface, open to traffic again after 4 hours.
7th, repairing effect
1st, through detection after repairing: thickness (mm) is 2.35 coefficient of frictions (bpn) is 0.60 infiltration for 78 construction depths (mm) Coefficient (ml/min) is 5.9.
2nd, through the use in spring in a winter one, respond well, client satisfaction.

Claims (4)

1. a kind of normal temperature bituminous paving cold mixing cold-application construction technology it is characterised in that: comprise the steps:
(1) preparation of construction: the relevant technique preparation before Cold bituminous mixture construction and the hot-mix asphalt mixture complete phase of construction With according to jtg f40-2004 execution;
(2) mixing: by basalt aggregate, the strong bituminous liquids of normal temperature speed, curing agent and water mixing, feeding sequence is the first Black Warrior Rock gathers materials, secondly curing agent and water, is finally the strong bituminous liquids of normal temperature speed, and the wherein parts by weight of basalt aggregate are 100 parts, The parts by weight of curing agent are 1.5-5.0 parts, and water is 0.5-2.0 part, and the strong bituminous liquids of normal temperature speed are 7.0-10.5 part;Described solid Agent is to be formed by powder anti-stripping agent, breeze, polymer glue powder, cement allotment;
(3) transport of compound: equally fill in three times during compound entrucking: two ends behind first centre, close material and cover waterproof above Canvas;
(4) the paving of compound: using traditional heated bitumen paver, by the way of steel wire guides and controls elevation, before construction Screed and seam crossing road surface are all without heating, but will strengthen bonding in seam crossing brush pitch;Work progress is with reference to hot asphalt Mixture pavement construction reference, the transverse joint in the seam of paving concrete pavement adopts carvel joint to process, longitudinal joint adopts inclined-plane joint treatment;
(5) roll: Cold bituminous mixture road surface is rolled using rubber tyre formula road roller, starts when surface layer does not glue wheel to grind Pressure, first gently weighs afterwards, and first outside behind inner side, does not bring to a halt on uncompacted surface layer, do not turn around, do not turn, uniformly roll at a slow speed, Rolled section becomes ladder to advance, and number of rolling is 5-8 time;
(6) detect: after each working section terminates, according to the requirement of jtgf40-2004, carry out compactness, thickness, smooth Degree, infiltration coefficient, Marshall stability coherent detection, index system requires fully according to hot-mixed bitumen pavement.
2. a kind of normal temperature bituminous paving cold mixing cold-application construction technology according to claim 1 it is characterised in that: step (2) Described in basalt aggregate in fine aggregate 0.075 sieve aperture by percentage be 0-3, the requirement that remaining gathers materials is according to jtg F40-2004 executes.
3. a kind of normal temperature bituminous paving cold mixing cold-application construction technology according to claim 1 it is characterised in that: step (2) Described in the part of the strong bituminous liquids of normal temperature speed to include the percentage by weight of sbs aqueous latex be 6%-10%, be combined blending Emulsion is 8%-15%, and pitch is 55%-65%, and water is 25%-35%.
4. a kind of normal temperature bituminous paving cold mixing cold-application construction technology according to claim 1 it is characterised in that: step (2) Described in curing agent knock down after with dry mixing 10-15 second of basalt aggregate elder generation, bituminous liquids are mixed uniformly by force then to put normal temperature speed again The 40-50 second.
CN201410841881.XA 2014-12-30 2014-12-30 Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology Active CN104631266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410841881.XA CN104631266B (en) 2014-12-30 2014-12-30 Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410841881.XA CN104631266B (en) 2014-12-30 2014-12-30 Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology

Publications (2)

Publication Number Publication Date
CN104631266A CN104631266A (en) 2015-05-20
CN104631266B true CN104631266B (en) 2017-01-18

Family

ID=53210467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410841881.XA Active CN104631266B (en) 2014-12-30 2014-12-30 Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology

Country Status (1)

Country Link
CN (1) CN104631266B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387780A (en) * 2019-08-15 2019-10-29 湖南鑫长胜材料科技有限公司 A kind of room temperature asphalt pavement construction technique

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106747143A (en) * 2016-12-22 2017-05-31 南通福伦利新材料有限公司 A kind of municipal road and bridge are with the preparation method and its construction procedure of normal temperature material for quickly repairing
CN111996860A (en) * 2020-07-21 2020-11-27 湖南砼艺市政工程建设有限公司 Construction process of pavement structure of ecological cold-mixing permeable asphalt structure
CN114717899A (en) * 2022-02-15 2022-07-08 河南广润建设有限公司 Winter asphalt pavement hot-mixing warm-paving construction process

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1212956A (en) * 1998-11-13 1999-04-07 李思雪 Normal temp. asphalt mixture
CN1376756A (en) * 2002-04-04 2002-10-30 鞍山森远高等级公路养护机械制造有限公司 Sealing adhesive for crack on road
JP4074526B2 (en) * 2003-02-12 2008-04-09 東邦瓦斯株式会社 Room temperature asphalt mixture and its construction method
CN101475351B (en) * 2009-01-20 2011-11-23 钦兰成 Cold mixing high polymer modified asphalt concrete and preparing method thereof
CN102173663B (en) * 2011-01-10 2013-06-12 武汉理工大学 Waterborne epoxy modified emulsified asphalt concrete for steel bridge surface and preparation method thereof
CN102190897B (en) * 2011-03-19 2012-08-01 重庆诚邦路面材料有限公司 Water-based road asphalt rehabilitating agent and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387780A (en) * 2019-08-15 2019-10-29 湖南鑫长胜材料科技有限公司 A kind of room temperature asphalt pavement construction technique

Also Published As

Publication number Publication date
CN104631266A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN104762858B (en) Asphalt concrete construction method for soft soil matrix pavement
CN101929119B (en) Color asphalt ultrathin wearing layer and preparation method thereof
CN104631266B (en) Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology
CN101691736A (en) Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN104312175A (en) Asphalt modifier, modified emulsified asphalt, modified asphalt mixture and respective preparation methods thereof
CN110258236A (en) A kind of high-performance steel slag road surface and its construction method
CN103850164B (en) The construction method of penetrating induction type drainage pavement of a kind of long-life
CN103590296A (en) In-situ heat regeneration remixing and paving technology of asphalt pavement
CN102864758A (en) Construction method of rolling compaction type asphalt concrete impervious core wall in high altitude and cold areas
CN106149500B (en) A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement
CN104446156B (en) A kind of emulsified bitumen slurry mixture penetration type bituminous paving
CN110409251A (en) A kind of dewatering and noise reduction pavement construction method
CN106948235A (en) A kind of bituminous paving interlayer construction method
CN108867231A (en) A kind of antiskid type asphalt pavement construction technique
CN101532273B (en) Anti-rutting road surface RS2000 modified asphalt mixture proportion and construction technology
CN109736161A (en) A kind of composite construction Sub-sealing Course for the road face between the cement road face on airport and semi-rigid type base
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN112301826B (en) Emulsified asphalt cold-recycling pavement structure and rapid curing method for pavement
CN107419635A (en) A kind of composite pavement sealing method
CN103924495A (en) Small and medium-sized steel bridge deck pavement system and implementation method
CN112982058A (en) Vibration mixing construction method for cement stabilized macadam
CN103233405B (en) Old-new bituminous pavement binder course and application thereof
CN113699852A (en) Environment-friendly high-strength solidified soil construction process
CN101429746A (en) Road paving method and stirring machine used in the same
CN206591384U (en) Bituminous concrete prefabricated section and assembly type road surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170727

Address after: 226000 No. 788 Century Avenue, Nantong, Jiangsu, Tongzhou District

Patentee after: Cai Haijun

Address before: 226300 Century Avenue, Tongzhou Economic Development Zone, Jiangsu, China, No. 788, No.

Patentee before: Nantong Fulunli New Material Co., Ltd.