CN1730841A - Slope support method by compacting soil-lime to form cushion solid - Google Patents

Slope support method by compacting soil-lime to form cushion solid Download PDF

Info

Publication number
CN1730841A
CN1730841A CN 200510019240 CN200510019240A CN1730841A CN 1730841 A CN1730841 A CN 1730841A CN 200510019240 CN200510019240 CN 200510019240 CN 200510019240 A CN200510019240 A CN 200510019240A CN 1730841 A CN1730841 A CN 1730841A
Authority
CN
China
Prior art keywords
soil
mixed
fiber
slope
lime
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510019240
Other languages
Chinese (zh)
Other versions
CN100427687C (en
Inventor
贾燎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100192407A priority Critical patent/CN100427687C/en
Publication of CN1730841A publication Critical patent/CN1730841A/en
Application granted granted Critical
Publication of CN100427687C publication Critical patent/CN100427687C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to geotechnical engineering, and is especially one kind of slope supporting method with densified lime soil to refill slope. Specifically, the operation process includes mixing lime and fiber into soil homogeneously, refilling the soil with lime and/or fiber to slope and rolling to densify the slope. The present invention has low cost, simple construction, high safety of the refilled slope, and is suitable for treatment of temporary and permanent slopes.

Description

Compacted lime soil backfill solid slope supporting method
Technical Field
The invention relates to a method for supporting a dense lime soil solid side slope in a foundation pit in the field of geotechnical engineering, in particular to a method for supporting a foundation pit in a soft soil area.
Background
In engineering construction, when a foundation pit or a road side slope is excavated by soft foundation soil, support measures need to be taken for the side slope so as to ensure that the excavated side slope is kept stable. At present, the main technical means commonly used for slope support include methods such as powder-injection pile gravity retaining wall support, cantilever pile support, pile anchor support and the like, which are mature and effective technical methods, but have certain defects:
the powder-sprayed pile gravity type retaining wall supporting method comprises the following steps: when sludge with water content over 70 percent or peat in soil is too large or acid soil is encountered, the method has the problems of difficult pile forming or low pile forming strength, and has the defects of long construction period, unstable quality, high manufacturing cost and the like;
the method comprises the following steps of cantilever pile support, pile anchor support and the like: the two methods have the advantages that the calculation model is clear, the method is suitable for supporting the deep foundation pit with the depth of more than six meters, the problems of long construction period and high construction cost exist, and the method is very waste when used for shallow foundation pits of soft foundations.
In a word, the above methods have certain limitations, and the problems of long construction period, high construction cost, more mechanical equipment required by construction, complex construction process and the like are common defects of the methods.
In the prior art, the traditional method of compacting with lime soil as a road base course is favorable, and the principle is that the compressibility of the compacted lime soil is improved. However, the shear strength index of compacted lime soil is also remarkably improved, and in this regard, the compacted lime soil has not been fully recognized and valued by the geotechnical engineering industry for a long time and has not been effectively utilized.
Disclosure of Invention
The invention aims to provide a compacted limestone soil solid-replacement side slope supporting method which can use local materials, has good technical stability, short construction period and low manufacturing cost.
The invention aims to realize a method for supporting a compacted limestone soil backfill solid side slope, which is characterized by comprising the following specific operation steps:
1) taking out soil on site, mixing 5-20% of quicklime in soil, stirring, and digesting for 8-24 hr;
2) and (4) filling the mixed soil to the slope position, and rolling and compacting according to the designed size to form a filling and replacing entity.
The invention has the following advantages:
1. the used blended materials of quicklime and fiber materials are common building materials, are available in all places, are convenient to obtain materials, are low in price, are wide in application range and low in engineering cost, and the manufacturing cost is only 30-50% of that of the traditional method;
2. the construction equipment is simple, and only an excavator is needed to cooperate with construction;
3. the construction is convenient, and the construction period is short;
4. the safety performance of the filling and replacement entity built by the invention is good.
The invention is suitable for excavating below ten meters in depth, has temporary slope releasing condition, and can be widely applied to temporary slope support and permanent slope treatment with the safety level below two levels.
Drawings
FIG. 1 is a schematic view of a first supporting method using the present invention
FIG. 2 is a schematic view of a second supporting method using the present invention
FIG. 3 is a schematic view of a third supporting mode made by the invention
FIG. 4 is a structural diagram of the analysis of the overall stability of the front slope before replacement and filling calculated by the arc sliding method
FIG. 5 is a structural diagram of analysis of the stability of the slope after replacement and filling calculated by the arc sliding method
Detailed Description
The concrete operation of the invention is that the soil is taken out on site, quicklime is mixed into the soil, the mixture is evenly mixed and digested, the mixed soil is filled into the slope position, and the mixed soil is rolled and compacted according to the design size to form the filling and replacing entity. And (3) adding 1-8% of fibers into the digested mixed soil for 8-24 hours, uniformly mixing, filling the mixed soil mixed with the fibers to a side slope, and rolling and compacting according to the designed size to form a filling and replacing entity.
The soil taken in situ is general cohesive soil, silt soil, silty clay, silt, mucky soil, sandy soil, gravel soil, backfill soil or the soil mixed with construction waste and industrial waste.
For sandy soils with a clay content below 20%, it is necessary to incorporate clay or silt into them to achieve a clay content above 20% in order to increase the proportion of particles of secondary minerals in the soil.
Mixing soil with calcium lime, and covering with film in rainy day.
The specific proportion of the quicklime mixing amount is determined according to the water content of the soil:
the water content of the soil is lower than 70 percent, the mixing amount of the quicklime is 5 to 10 percent,
the water content of the soil is 70-100%, the content of quicklime is 10-12%,
the water content of the soil is higher than 100 percent, the content of quicklime is 12 to 20 percent,
mixing soil with quicklime, uniformly mixing, and digesting for 8-24 hours, wherein the digestion reaction process is as follows:
the quicklime digestion reaction process not only changes the water content of the soil on the surface, but also changes the physical and chemical structure of the soil, namely, changes the bound water, the combination of silicate mineral particles and water in the soil is broken, and Ca (OH) is generated in the later period2The strong alkalinity of the silicate activates the activity of the silicate and generates a complex and slow chemical reaction process along with the silicate, the aluminate and water, so the digestion process not only plays a role in draining water, but also plays a role in the physicochemical action of structural reorganization on mineral particles such as silicate, aluminate and the like in soil.
The quicklime digestion time cannot be too long because the simultaneous chemical action when exposed to air is also:
thus, the content of calcium hydroxide is reduced, the moisture in the soil is increased, and the lime soil compacting agent has adverse effect.
After digestion, the lime soil becomes loose, 1-8% of fiber is mixed into the mixed soil, and the mixture is uniformly mixed. The fiber is plant fiber such as rice straw, wheat straw, bamboo branch, etc. 50-200 mm long, or other cheap short mineral fiber or artificial fiber. The shear strength of the soil can be greatly improved by 2-5 times by mixing the fiber.
And (3) replacing and filling the mixed soil mixed with the fibers to the side slope position, and carrying out layered rolling compaction according to the designed geometric shape of the side slope retaining wall, wherein the thickness of each layer is 300-500 mm, the rolling strength is not less than 80kPa, and the larger the rolling strength is, the better the effect is.
The method for determining the geometric dimension of the compacted lime soil backfill entity and checking the safety degree comprises the following steps:
the calculation formula is as follows:
T = Σ i = 1 n 1 ( Q i + W i ) sin α i
khd=R/T
in the formula:
t-glide force
R-sliding resistance
Cki’The ith earthA standard value of cohesive force (kPa) determined by a total stress method for the bottom surface of the strip;
φki-the internal friction angle (°) normalized value of the bottom surface of the ith swath determined by the total stress method;
li-arc length (m) of the bottom surface of the ith soil strip;
Qi-the value of the standard of overload (kN/m) of the top surface of the ith soil bar;
Wi-weighted average of the deadweight of the ith soil strip (kN/m);
αi-the angle (°) between the tangent to the bottom midpoint of the ith swath and the horizontal;
n, n 1-total number of branches, number of branches on active side;
khd-anti-skid stability safety factor.
khdThe foundation pits with importance levels of one, two and three should respectively satisfy not less than 1.30, 1.15 and 1.05. (see Hubei province local Standard Foundation pit engineering technical Specification (DB42/159 and 2004) page 16).
Aiming at different soil conditions, the invention adopts different retaining walls. When the soil layer of the side slope is soft and the soil texture of the pit bottom is hard, the solid backfill 4 shown in figure 1 is adopted; when the soil layer of the side slope is hard and the soil quality of the pit bottom is soft, the solid replacement and filling body 5 shown in figure 2 is adopted; when the soil layer of the side slope and the soil quality of the pit bottom are soft, the combined body of the solid backfill body 4 and the solid backfill body 5 shown in figure 3 is adopted. In the figure, 1-ground, 2-soft and hard soil and 3-soft soil.
The following examples illustrate specific applications of the present invention:
the excavation depth of the second-level foundation pit is 3.35 meters, and the geological conditions are as follows:
① layers of plain filling soil with thickness of 4.46 m, which is newly filled cohesive soil mixed with sundries such as broken stone, and has uneven and loose soil texture, c is 6kPa, phi is 14 degrees,
② layers of sludge with thickness of 1.7 m, gray black, flow plastic, saturation, average water content of 60%, c 10kPa, phi 5 deg,
③ layered clay with thickness of 5.3 m, yellow brown to grey brown, plasticity, and wet, c 21kPa, phi 11 deg.
By adopting the method to fill and replace the sludge on the side slope and the pit bottom, the actual measurement shows that the cohesive force c value of the filling and replacing entity for 3 days is 11kPa, and the value of the internal friction angle phi is 11 degrees. The calculation results of K before and after the replacement are shown in figures 4 and 5, and it can be seen from the figures that before the replacement, the anti-skid stability safety coefficient K (4) is 1.114 < 1.15, which does not meet the requirement, and after the replacement, the anti-skid stability safety coefficient K (i) > 1.15, which meets the requirement.
It can be seen that the stability requirement is not met before the filling and is completely met after the filling. There is also a large increase in the values of c and Φ over time.

Claims (5)

1. A compacted lime soil backfill entity side slope supporting method is characterized by comprising the following specific operation steps:
1) taking out soil on site, mixing 5-20% of quicklime into soil, stirring, digesting for 8-24 hr,
2) and (4) filling the mixed soil to the slope position, and rolling and compacting according to the designed size to form a filling and replacing entity.
2. The method of claim 1, wherein 1-8% of fiber is added into the digested mixed soil for 8-24 hours, the mixture is mixed uniformly, the mixed soil mixed with the fiber is filled into the slope, and the mixed soil is compacted according to the designed size to form the solid.
3. The method of claim 1 or 2, wherein the soil is selected from the group consisting of clay, silt, silty clay, silt, sandy soil, gravelly soil, backfill soil, and construction waste and industrial waste.
4. The method as claimed in claim 1 or 2, wherein the clay content is less than 20% and the sandy soil and crushed rock soil are mixed with clay soil or silt soil to make the clay content higher than 20%.
5. The method as claimed in claim 2, wherein the fiber is plant fiber such as straw, wheat straw, bamboo branch, etc. 50-200 mm long, or other cheap short mineral fiber or artificial fiber.
CNB2005100192407A 2005-08-05 2005-08-05 Slope support method by compacting soil-lime to form cushion solid Expired - Fee Related CN100427687C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100192407A CN100427687C (en) 2005-08-05 2005-08-05 Slope support method by compacting soil-lime to form cushion solid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100192407A CN100427687C (en) 2005-08-05 2005-08-05 Slope support method by compacting soil-lime to form cushion solid

Publications (2)

Publication Number Publication Date
CN1730841A true CN1730841A (en) 2006-02-08
CN100427687C CN100427687C (en) 2008-10-22

Family

ID=35963256

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100192407A Expired - Fee Related CN100427687C (en) 2005-08-05 2005-08-05 Slope support method by compacting soil-lime to form cushion solid

Country Status (1)

Country Link
CN (1) CN100427687C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021910A (en) * 2010-05-20 2011-04-20 山西省第二建筑工程公司 Strip-type inter-grating construction method for spreading lime-loess cushion
CN102535476A (en) * 2010-12-27 2012-07-04 上海勘测设计研究院 Method for reducing side load influence
CN102587385A (en) * 2011-12-30 2012-07-18 青建集团股份公司 Foundation pit supporting method for sludge-exchanged and filled soft soil
CN102912803A (en) * 2012-10-08 2013-02-06 中冶集团武汉勘察研究院有限公司 LTBD technology for treatment of rear construction type high-steepness fill side slope
CN102912801A (en) * 2012-10-08 2013-02-06 中冶集团武汉勘察研究院有限公司 RAW technology for treatment of rear construction type high-steepness fill side slope
CN103850258A (en) * 2014-03-24 2014-06-11 北京城建勘测设计研究院有限责任公司 Natural freezing support method
CN105152588A (en) * 2015-09-29 2015-12-16 长安大学 Loess road slope surface protection material and preparation
CN105625444A (en) * 2016-03-14 2016-06-01 攀枝花学院 Impermeable surface layer structure for soil slope
CN107558339A (en) * 2017-09-21 2018-01-09 南昌工程学院 A kind of high road pavement construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61257534A (en) * 1985-05-08 1986-11-15 Kensetsu Kiso Eng Kk Slope stabilization work
CN1097033A (en) * 1993-06-26 1995-01-04 黄尊景 Prevent the domatic construction method that is washed away
DE19613389A1 (en) * 1996-04-03 1997-10-09 Leopold Peterstorfer Protective covering for steep earth slope

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021910B (en) * 2010-05-20 2011-12-28 山西省第二建筑工程公司 Strip-type inter-grating construction method for spreading lime-loess cushion
CN102021910A (en) * 2010-05-20 2011-04-20 山西省第二建筑工程公司 Strip-type inter-grating construction method for spreading lime-loess cushion
CN102535476B (en) * 2010-12-27 2014-06-18 上海勘测设计研究院 Method for reducing side load influence
CN102535476A (en) * 2010-12-27 2012-07-04 上海勘测设计研究院 Method for reducing side load influence
CN102587385A (en) * 2011-12-30 2012-07-18 青建集团股份公司 Foundation pit supporting method for sludge-exchanged and filled soft soil
CN102912803B (en) * 2012-10-08 2015-09-09 中冶集团武汉勘察研究院有限公司 A kind of for the treatment of after build the LTBD method of the high steep embankment side slope of formula
CN102912801A (en) * 2012-10-08 2013-02-06 中冶集团武汉勘察研究院有限公司 RAW technology for treatment of rear construction type high-steepness fill side slope
CN102912801B (en) * 2012-10-08 2015-09-09 中冶集团武汉勘察研究院有限公司 A kind of for the treatment of after build the method for the high steep embankment side slope of formula
CN102912803A (en) * 2012-10-08 2013-02-06 中冶集团武汉勘察研究院有限公司 LTBD technology for treatment of rear construction type high-steepness fill side slope
CN103850258A (en) * 2014-03-24 2014-06-11 北京城建勘测设计研究院有限责任公司 Natural freezing support method
CN103850258B (en) * 2014-03-24 2016-06-29 北京城建勘测设计研究院有限责任公司 A kind of weather freezing method for protecting support
CN105152588A (en) * 2015-09-29 2015-12-16 长安大学 Loess road slope surface protection material and preparation
CN105625444A (en) * 2016-03-14 2016-06-01 攀枝花学院 Impermeable surface layer structure for soil slope
CN107558339A (en) * 2017-09-21 2018-01-09 南昌工程学院 A kind of high road pavement construction method

Also Published As

Publication number Publication date
CN100427687C (en) 2008-10-22

Similar Documents

Publication Publication Date Title
CN1730841A (en) Slope support method by compacting soil-lime to form cushion solid
CN103233468A (en) Polymer gravel pile grouting method
CN1352718A (en) Short aggregate pier techniques
CN101798810A (en) Cement-soil composite pile inserted into reinforced concrete core materials
CN1851154A (en) Concrete long-core cement-soil composite pile building foundation treating method
CN1760466A (en) Groundwork firming agent for soft soil of marine accumulation, and preparation method
CN1932167A (en) Chopped fiber reinforced rendzinas ground treatment method
CN1718937A (en) Technology of non soil taking hole guiding prestressed pipe pile or premade square sunk pile
CN101078216A (en) Method for embedding cement purdah into prefabricated reinforced concrete anti-lateral-force pile
CN1245557C (en) Air bubble mixed light-weight earth and production method thereof
CN110512591B (en) Reinforcing method for vacuum preloading and carbonization ultra-soft foundation by utilizing gas injection of guide pipe pile
CN101012648A (en) Method for compacting cohesive soil road embankment and ground foundation of highroad, road and railroad by using vacuum precompression
CN218027470U (en) Take glutinous rice mortar stone structure of building of multidirectional hole
CN113201987B (en) Roadbed base of high liquid limit clay ground and construction method thereof
CN211421091U (en) Coconut husk fiber adds muscle foundation
Yu et al. Field test study on treatment of dredged soil with cotton straw
CN115059111B (en) Marginal backfill reinforced retaining wall and preparation method thereof
CN101704649A (en) Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN1233696A (en) Comprehensive foundation and its construction technology by using spiral soil lifting and pressure filling mortar for producing piles in situ
CN1676763A (en) Boring-tamping cement-soil compacting pile construction method
CN112321225A (en) Curing agent for curing soft soil and widening roadbed
CN1064721A (en) The combined composite foundation facture of ground
CN1119232A (en) After-grouting pile composite foundation and construction method thereof
CN1563584A (en) Method for treating soft base of high-grade highway of agitation pile made from concrete soil cement
Cao et al. The technology and application of improving bearing capacity of deep peat soil subgrade

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20130805