CN107515344A - Test system and method for a kind of whole station information intelligent of digital transformer substation to point - Google Patents
Test system and method for a kind of whole station information intelligent of digital transformer substation to point Download PDFInfo
- Publication number
- CN107515344A CN107515344A CN201710998019.3A CN201710998019A CN107515344A CN 107515344 A CN107515344 A CN 107515344A CN 201710998019 A CN201710998019 A CN 201710998019A CN 107515344 A CN107515344 A CN 107515344A
- Authority
- CN
- China
- Prior art keywords
- test
- data
- point
- information
- tester
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Test system and method the invention discloses a kind of whole station information intelligent of digital transformer substation to point, the system is included to point server, intelligent substation equipment of the intelligence to a tester and comprising test system, to point server by parsing SCD file and 104 list files, the corresponding relation of substation information data and telemechanical point table data is established according to semantic information matching, testing scheme is generated and is handed down to intelligence to a tester;Intelligence receives testing scheme to a tester to point server, drive the reading and straighforward operation realized to point server by 104 stipulations to remote signalling/telemetered signal of intelligent substation equipment, and by MMS specifications directly from intelligent substation equipment reading device data, test judgement is carried out, will be given in test result data to point server;Test data is received to a tester from intelligence to point server, generates test report.The present invention can be greatly enhanced to an operating efficiency, reduce cost of labor, shorten the debugging duration.
Description
Technical field
The present invention relates to Automation of Electric Systems debugging apparatus and method, and in particular to a kind of whole station letter of digital transformer substation
Test system and method for the breath intelligence to point.
Background technology
It is (dynamic to point and protection information to point, remote control to point, remote measurement by remote signalling to a test in usual transformer station
Make information, warning information) 4 parts such as point are formed.For using the input of analog quantity voltage electric current, hard contact input and output
Conventional substation can only apply analog quantity to corresponding intrument by manual type or open into signal, be checked by telemechanical apparatus backstage
Whether signal intensity is correct.
With the popularization and application of digital transformer substation, stand in each intelligent electronic device (Intelligent Electronic
Device, IED) modeled using IEC61850 standards, the input of analog quantity voltage electric current is replaced with IEC61850-9-2 messages, with
Towards transformer substation case (Generic Object Oriented Substation Event, GOOSE) message of general object
It instead of the input and output of hard contact so that the communication information of whole station arrangement has been included in substation configuration description file
In (substation configuration document, SCD), this give directly from SCD file extraction to an empty terminal,
The test items such as control signal, control pressing plate bring possibility.
The whole station information of digital transformer substation still takes manual type to test one by one the work at present, generally each to become
Power station needs have many thousands of to a signal for test, and this brings great workload, Er Qieyou to field adjustable personnel
In substantial amounts manually to point during also easily malfunction, the bringing normally into operation to transformer station brings potential safety hazard.
The content of the invention
Goal of the invention:Based on problem above, the present invention proposes a kind of whole station information intelligent of digital transformer substation that is based on to point
Test system.
Another object of the present invention, which also resides in, proposes a kind of method of testing of the whole station information intelligent of digital transformer substation to point.
Technical scheme:A kind of whole test system of the information intelligent to point of standing of digital transformer substation, including:To point server,
A tester is communicated to connect to a tester and to point server and intelligence with the intelligence to point server wireless connection
Intelligent substation equipment, intelligent substation equipment include:Telemechanical apparatus and some IED devices to be measured, some IED dresses to be measured
Put and be connected to telemechanical apparatus via the station level network switch, and a tester is directly connected to intelligence;Telemechanical apparatus connects
It is connected to point server.Wherein, point server is used for by parsing SCD file and 104 list files, according to semantic information
With the corresponding relation for establishing substation information data and telemechanical point table data, generate testing scheme and be handed down to intelligence to a test
Instrument;Point server is additionally operable to receive test data to a tester from intelligence, generates test report;Intelligence is used a tester
In receiving testing scheme to point server, drive to point server by 104 stipulations realize remote signalling to IED devices to be measured/
The reading and straighforward operation of telemetered signal, and tested by MMS specifications directly from IED devices reading device data to be measured
Judge, and will be given in test data to point server.
Service end to point server as intelligence to a test system, including:
SCD file parses and extraction module, for reading and parsing SCD file, extracts IED device informations and IED devices
SV, GOOSE information and remote signalling, telemetry and telecommand data set information;
EXCEL point table parsing modules, for reading and parsing 104 table EXCEL files, by remote signalling, remote measurement, remote information
Classified, form 104 table information;
Intelligent Matching module, for analyzing respectively the information and 104 table information of SCD file extraction, extract
Semantic information, according to semantic information is matched and is established in each 104 tables information point, SCD file pattern number strong point,
The one-to-one relationship table of SCD file I/O channel;
Intelligent generation module, for traveling through each corresponding relation in mapping table, according to I/O channel type,
What is pre-set is corresponding to a functional template class to being searched in a functional template class libraries, and corresponding relation is incoming to a function mould
Plate class completes instantiation, generates the configuration file of testing scheme and intelligence to a tester;
Test assignment management module, for being managed to whole station test assignment, successively by the testing scheme of each IED devices
Intelligence is passed to a tester;
Service end communication module, for being communicated with intelligence to a tester, test parameter information is transmitted each other, is matched somebody with somebody
Put fileinfo and test report data;
Test report management module, the test result for intelligence to be passed over to a tester are automatically filled in corresponding survey
Examination report, and the generation to each IED devices is reported and is named classification by device model, title and report generation time, for
Report containing nonconformance provides mark prompting;
104 protocol modules, have 104 communication protocols realizes function, complete for the parameter setting in testing scheme
Into the communication with telemechanical apparatus, the reading for the remote signals sent on each IED devices is realized, order is sent and reads each IED devices
The value of remote measurement amount, send all kinds of guidance commands realize pressing plate throw move back, the switching of definite value area code.
Test lead of the intelligence to a tester as intelligence to a test system, including:
Test lead communication module, is used to and services end communication module being communicated, realize to a tester with to a service
Device communicates, and its function includes:Single device to test scheme is downloaded, test report data is uploaded, sends 104 communication commands, obtains 104
Stipulations message data;
MMS communication modules, for being communicated by MMS specifications with tested IED devices, parsing MMS messages, reading are tested
The data of IED devices;
Single device to test scheme execution module, based on from single the device to test scheme and 104 stipulations obtained to point server
Message, and the MMS messages and IED device data obtained from tested IED devices, perform test and judge and send test result
To point server;
61850 functional modules, the intelligent substation IED devices according to corresponding to simulating configuration file, SV, GOOSE are exported, is connect
Receive and gather the GOOSE outgoing messages of tested IED devices;This module is also defeated comprising the output of a pair of switches amount and a pair of switches amount
Enter.
It is a kind of to be digitized the whole station information intelligent of transformer station to the method for testing of point using above-mentioned test system, including with
Lower step:
Step 1, point server is parsed to SCD file and 104 list files, established according to semantic information each
The one-to-one relationship table of information point in 104 tables and SCD file data channel, generate IED devices testing scheme and
Testing scheme and configuration file are handed down to intelligence to a tester by intelligence to the configuration file of a tester;
Step 2, intelligence receive testing scheme to a tester to point server, drive and pass through 104 rule to point server
The reading and straighforward operation to remote signalling/telemetered signal of intelligent substation equipment are about realized, and by MMS specifications directly from intelligence
Substation equipment reading device data, test judgement is carried out, and test result is reported to point server;
Step 3, test data is received to a tester from intelligence to point server, generate test report.
Wherein, the mono- device to test schemes of IED include relay protection remote control testing scheme, remote-controlled test scheme, remote signalling
Testing scheme, remote measurement testing scheme, tester configuration file, wherein, relay protection remote control testing scheme is pressed including a distant place
Plate operates testing scheme and definite value area switch test scheme;Single device to test scheme of all IED devices in SCD file is completed
After generation, each single device to test scheme is uploaded into database, forms whole station test assignment.
Beneficial effect:
1st, it is of the invention that intelligent Matching module and intelligent generation module are used to point server, can quickly and accurately it solve
Analyse, read and match SCD and the information of point table, and then generate tester configuration file, which greatly improves configuration file
Accuracy and standardization level, reduce configuration file contrast and the workload examined, to realize that fast and accurately intelligence is to point
Test is laid a solid foundation.
2nd, intelligence of the invention applies failure amount to IED devices to be measured, driving is remote to a tester by testing connecting line
Dynamic device obtains remote signalling/remote measurement/remote regulating signal by 104 stipulations, while is obtained and filled from test system by other connected modes
Data are put, realize the automatic execution of testing scheme.Such mode drastically increases operating efficiency, reduces cost, shortens
The debugging duration, solves the signal in existing digital transformer substation to a job using manually to point mode, real work amount
The problem of big and cumbersome.Also, in normal digital transformer station to a signal at least more than 5000, intelligence is to the side of point
Formula ensure that the correctness of test, solves and currently employed manually the mode of point is easily malfunctioned, according to the side repeatedly tested
Formula will extend the problem of debugging the duration again.
3rd, the remote signals substantial amounts of digital protection device or measure and control device, can cover by the way of intelligence is to point
The remote signals test of the device overwhelming majority, the completion quality of test is improved, reduces the potential risk after transformer station puts into operation;Solution
Existing actual test of having determined only tests the problem of plant failure, device exception etc. main remote signals.
Brief description of the drawings
Fig. 1 is the intelligence of the present invention to a test system overall structure figure;
Fig. 2 is each device connection diagram of the present invention;
Fig. 3 is the testing scheme product process figure of the present invention;
Fig. 4 is the structured flowchart to dot system test lead of the present invention;
Fig. 5 is the structured flowchart to dot system service end of the present invention;
Fig. 6 is the example of the mapping table generated after intelligent Matching of the present invention.
Embodiment
Technical scheme is described further below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of whole station information intelligent of digital transformer substation includes to the test system of point:To a clothes
Device, intelligence be engaged in a tester, protection/measure and control device (IED devices i.e. to be measured), the station level network switch and telemechanical apparatus,
Wherein, point server is connected with telemechanical apparatus by netting twine, wireless network is passed through to a tester to point server and intelligence
Connection is established, intelligence is established two-way by optical fiber and netting twine with protection/measure and control device to a tester and is connected, protection/observing and controlling dress
Put and be connected with the station level network switch by netting twine, the station level network switch is connected with telemechanical apparatus by grid line, far
Dynamic device is connected with host computer PC (i.e. to point server) by netting twine, forms closed loop test loop.Wherein, point server is made
Service end for intelligence to a test system, intelligence is to a tester end as the test lead to a test system.To a test
Server of the system includes SCD file parsing and information extraction modules, EXCEL point tables parsing module, intelligent Matching module, intelligence are raw
Into module, test assignment management module, single device to test scheme execution module, service end communication module, test report management mould
Block and 104 protocol modules, test lead communication module, MMS communication modules, single device to test side are included to a test system and test end
Case execution module and 61850 functional modules.These modules use ARM chips or fpga chip to realize, and such as Fig. 4 and Fig. 5 institutes
Show and establish a connection, the transmission of information and data is realized by respective processing and cooperations from each other, complete to test
Task.Service end communication module and test lead communication module using ARM chips come complete server program and test lead program it
Between communication, transmit test parameter information, profile information, test report data etc. each other.
Using the system, first have to generate testing scheme.Reference picture 3- Fig. 5, SCD file parsing and information extraction modules are complete
The parsing of paired SCD file, and complete to IED device informations and SV, GOOSE information of IED devices and remote signalling, remote measurement and
The extraction of remote-control data collection information;EXCEL point tables parsing module completes the reading and parsing to EXCEL forms point table, is pressed
Test-types are classified, and are divided into remote signalling, remote measurement, remote information, intelligent Matching mould will be given to an information transmission one by one after the completion of classification
Block.
Intelligent Matching module completes the requirement according to test-types to being looked into one by one in SCD file extraction information an information
Look for, find corresponding intrument IED information according to device name where signal, then as corresponding to matching signal name remote signalling, remote measurement,
Remote signal.Fig. 6 shows the example of obtained mapping table.
Intelligent generation module is used to automatically generate testing scheme:
(1) automatically generated for remote signalling, remote measurement testing scheme:Intelligent generation module is each according to being extracted from SCD file
The remote signalling of IED devices, telemetry collection signal type intelligent Matching correspond to method of testing, according to signal name from editing in advance
A functional template class is completed for what different types of remote signalling, telemetered signal test were adapted to lookup in a functional template class libraries
Replace, while the generation of tester configuration file is completed according to corresponding GOOSE control blocks passage.Specifically, remote signalling test side
Case generating process is:A) 104 table remote signalling datas of intellectual analysis, IED devices remote signalling data, IED apparatus GOOSE input channel numbers
According to the GOOSE output channel data of, each IED device associated with tested IED devices, each data semantic information is extracted, according to
104 table remote signalling datas of semantic information Intelligent Establishment and the one-to-one mapping table of other three kinds of data;B) traversal is reflected
Each mapping relations of relation table are penetrated, obtain remote signalling test to a functional template class, mapping relations are incoming to a functional template
Class, instantiation generation remote signalling testing scheme.Wherein, remote signalling test describes remote signalling testing process and side to a functional template class
Method, including control export GOOSE message to a tester, the remote signalling message of tested IED devices are parsed by MMS specifications, is passed through
104 stipulations parse remote signalling message, and the script of result judgement is carried out according to these information.
Remote measurement testing scheme generating process is:A) 104 table telemetries of intellectual analysis, IED devices telemetry, IED
The SV output channel data of device SV input channels data, each IED device associated with tested IED devices, extract each data
Semantic information, closed according to the one-to-one mapping of 104 table telemetries of semantic information Intelligent Establishment and other three kinds of data
It is table;B) each mapping relations of Ergodic Maps relation table, remote measurement test is obtained to a functional template class, mapping relations are passed to
To a functional template class, instantiation generation remote measurement testing scheme.Wherein, remote measurement test describes remote measurement survey to a functional template class
Flow and method are tried, including control exports SV messages to a tester, the remote measurement number of tested IED devices is read by MMS specifications
According to, pass through 104 stipulations parse telemetry, and according to these information carry out result judgement script.
(2) automatically generating for remote-controlled test scheme:Intelligent generation module need to be according to each IED devices in SCD file
The information such as pressing plate, definite value area generate corresponding testing scheme, and the orders such as corresponding pressing plate throwing is moved back, definite value area code switches are included in scheme,
Order is sent completely the rear set time, reads corresponding remote signals automatically or reads the current state of pressing plate or definite value area code, complete
Judge into test result.Remote-controlled test schemes generation process is specific as follows:A) 104 table remote-control datas of intellectual analysis, IED devices
Remote-control data, IED devices remote signalling data, 104 table remote signalling datas, extract each data semantic information, according to semantic information intelligence
Establish the one-to-one mapping table of 104 table remote-control datas and other three kinds of data;B) Ergodic Maps relation table is every
Individual mapping relations, straighforward operation test is obtained to a functional template class, mapping relations are incoming to a functional template class, instantiation
Generate distant place clamp operation testing scheme.The straighforward operation test describes straighforward operation testing process to a functional template class
And method, including send 104 guidance commands, the message commands of tested IED devices are read by MMS specifications, pass through 104 stipulations solutions
Analyse remote signalling message commands, call the GOOSEUOT passages for obtaining tested IED devices to a tester to conjugate, and according to these letters
Breath carries out the script of result judgement.
Specifically, relay protection remote control testing scheme includes distant place clamp operation testing scheme and the switching of definite value area is surveyed
Examination scheme, its generating process are:A) the relay protection remote control data of 104 tables of intellectual analysis and the pressure of tested IED devices
Plate data set, definite value area number of data sets evidence, semantic information is extracted, according to semantic information Intelligent Establishment relay protection remote control number
According to other two kinds of one-to-one mapping tables of data;B) each mapping relations of Ergodic Maps relation table, a distant place is obtained
Clamp operation test is incoming to a functional template class, instantiation generation distant place pressing plate behaviour by mapping relations to a functional template class
Make testing scheme;C) operation of definite value area is obtained to test to a functional template class, mapping relations are incoming to a functional template class, it is real
Example metaplasia is into definite value area handover operation testing scheme.Wherein, distant place clamp operation test describes a distant place to a functional template class
The flow and method of clamp operation test, including send 104 distant place clamp operation orders, tested IED dresses are read by MMS specifications
The message commands put, the order for parsing by 104 stipulations remote signalling message, and the script that test result judges.Definite value area operates
Test describes the testing process and method of the switching of definite value area to a functional template class, including sends the switching of 104 distant place definite value areas
Order, the message commands of tested IED devices, the order by 104 stipulations parsing remote signalling message are read by MMS specifications, and
The script that test result judges.
(3) for protection information to a testing scheme:The function lookup tested as needed completes mould to corresponding submodule
Type is replaced, and obtains judgement of the completion to test result after protection information remote signalling message, while according to test to a functional template class
Complete the intelligence configuration of tester configuration file.
After every testing scheme of single device and corresponding configuration file generation is completed, intelligent generation module is automatically by each dress
Put testing scheme to be incorporated into database, form whole station test assignment.
After testing scheme generation, test assignment management module completes the management to whole station test assignment, successively will be each to be measured
The testing scheme of device passes to intelligence to single device to test scheme execution module in a tester, carries out intelligence to a survey
Examination.
Single device to test scheme execution module uses ARM chips, performs following operate:1) complete to single device to test scheme
Loading, drive intelligence to send message to tested IED devices to a tester by parameter setting in scheme;2) call
61850 functional modules, the intelligent substation IED devices according to corresponding to simulating configuration file, SV, GOOSE are exported, receives and gathers
The GOOSE outgoing messages of tested IED devices;3) driving performs 104 stipulations communication commands to point server, obtains 104 stipulations reports
Text, and drive 104 protocol modules to read remote signalling, the telemetered signal for giving backstage on tested IED devices, the survey for remote signal
Examination, single device to test scheme execution module loading test template drive the transmission of 104 protocol modules completion communication command, and fixation is prolonged
When after read pressing plate, the current state of definite value area code etc. or remote signalling message corresponding to reading.104 protocol modules have 104 communications
Stipulations realize function, and the communication with telemechanical apparatus can be completed according to the parameter setting in testing scheme, is realized on each IED devices
The reading for the remote signals sent, the value that the remote measurement amount of each IED devices is read in order can be also sent, send all kinds of guidance commands and realize
Pressing plate throw move back, the switching of definite value area code etc..4) MMS protocol modules are called, MMS protocol modules use ARM chips, realize and tested
IED devices communicate, analytic message and reading data;5) implementing result judges script, carries out result judgement;6) by test result
It is sent to test server.
After the completion of test, intelligence reports test result to point server to a tester.Test report management module will
The test result that single device to test scheme execution module passes over is automatically filled in corresponding test report, and to the generation of each device
Report is named classification by device model, title, report generation time, and providing mark for the report containing nonconformance carries
Show.
The foregoing describe the composition of the system and carried out using the system to a process for test.In actual applications,
After the completion of device monomer debugging in transformer station, whole station SCD file updates and finished substantially, test system according to SCD file with it is right
104 table intelligent Matchings of EXCEL forms are answered to complete single device to test scheme and corresponding single device configuration file to a test signal
Generation, each device allocation plan is merged into the whole station test assignment of generation.
When intelligence is to test, system hardware structure is connected by accompanying drawing 1 and Fig. 2, will according to the sequencing of tested device
Tester is connected by optical fiber cable with tested device.Intelligence the external interface of a tester is included two pairs of optical ports, a network interface,
One wireless network card, one it is split enter to output with a pair, its optical port connects the optical port of IED devices to be measured by optical fiber, and its network interface leads to
The network interface that netting twine connects IED devices to be measured is crossed, and its wireless network card is connected by wireless network with to point server.Test
When, for remote signalling, remote measurement to test, testing scheme execution module loading testing scheme, the parameter testing in scheme,
Driving controls a tester drive module the corresponding message of tester output, tested device to produce corresponding remote signalling change after receiving message
Position or remote measurement amount displacement, actively or passively on call inbound control layer network together, reach telemechanical apparatus, pass through 104 protocol modules complete
Parsing to 104 messages, judge whether test result is correct, test result is inserted into standard report.For being remotely controlled to a test,
Testing scheme execution module loads testing scheme, is thrown by a 104 protocol module distant places and moves back corresponding pressing plate or the corresponding definite value area of switching,
Read after the completion of switching when whether front pressuring plate state or current definite value area, exact p-value result are qualified, and result is inserted into standard
Report.
According to another embodiment of the present invention, after configuration file is generated, static test is carried out to configuration file and is moved
After state test, then perform testing scheme.Wherein, static test includes following process:Verify consistent between different ICD files
Property, whether the information model and its configuration file that check test system meet IEC61850 standards;Carry out the standardization of SCD file
Verification and the consistency desired result of same engineering different type model file;Test content includes:The test of ICD files, SCD file are surveyed
Examination and the test of CID files.Station level and process layer are verified, is treated specifically by the online acquisition of station level MMS communication service interface
The dynamic model and data of device are surveyed, the dynamic model of acquisition and data are contrasted with offline CID or SID data, is examined
Look into both uniformity.The GOOSE message for recording IED and sending is sent out by message analysis logging modle, analyzes every message parameter
It is whether consistent with the information in SCD file.For inputting empty terminal, SCD file is parsed by tester and generates GOOSE/SV reports
Text is simultaneously sent to IED, and the action behavior arrived according to the observation judges whether configuration is correct.
After the completion of static test, the correctness in empty loop is verified, including imports SCD file, IED is filled according to SCD file
Mark of being classified and standardized is put, the design specification and relevant knowledge according to intelligent substation form the empty end of each IED devices
Sub- transmission/reception examines template, extraction contrast keyword, generates corresponding template, the SCD texts according to the template generated to importing
Part examined automatically, graphical representation examination result.
Dynamic test includes following process:Read using XML parser and parse SCD file, extract MMS in IED to be measured
Model information under accessing points;By each layer model information MAPs of the IED of extraction into MMS object spaces, local model library is established,
Communicated with client mode with tested IED, IED model information is read by ACSI reading models service online, established online
Model library;In the return value that network application layer obtains deposited with MMS object forms using ACSI reading model service access IED
Model information, contrast the local model information and on-time model information of acquisition, detect whether consistent;Wherein, contrast is local
The process of model information and on-time model information is specially:Breadth first traversal is carried out to tree of the local model in internal memory, sentenced
The node for each level that disconnected leaf is included whether there is in SCD model trees, if in the presence of, corresponding node is put into upper mark T,
Conversely, mismatch information in interface prompt;Above-mentioned traversal and judgment step are repeated until all leaves of on-time model have verified
Finish.
The process for verifying empty loop correctness is further:Generation includes the empty terminal of intelligent station relay protection relevant device
Line database, the template file of corresponding HTML form is established according to voltage class, IED types:To SCD texts
IED equipment in part is labeled, and imports SCD file, detects each item data corresponding to IED, extracts IED lists, and contingency table
Know;According to IED types, template file is read, checks each node in SCD file, the doname under each node is described to carry out
Matching;The node data searched in SCD file, reference address is built, find out the corresponding empty terminal description of each reference address, will
The empty terminal description matches with the terminal of template definition;By the way of reference address, successively to pressing plate entry number and empty terminal
Quote path to be matched, export matching result and displaying that empty terminal description, pressing plate entry number and empty terminal quote path.
Further, the process for establishing the template file of corresponding HTML form is specially:Establish super literary
The SV of this markup language inputs empty terminal and checks template, and GOOSE inputs empty terminal and checks template, define empty terminal description and
Implication, and check keyword according to each specific empty terminal implication structure;Establish the SV outputs of HTML form
Empty terminal checks template, and GOOSE exports empty terminal and checks template, defines empty terminal description and implication structure checks keyword;Build
The SV of vertical HTML form inputs soft pressing plate, the soft pressing plate of GOOSE input/output checks module, defines soft pressing plate and retouches
State and implication, build the check keyword.
Whole station is as follows to the intelligent generation method of a testing scheme:According to whole station SCD file and 104 list file (EXCEL
Formatted file) whole station is automatically generated to a testing scheme and tester IEC61850 intelligence configuration files.Remote signalling is automatically to a side
Method is as follows:Intelligence is driven to export GOOSE void terminal displacement message to a tester to protection/observing and controlling dress automatically according to testing scheme
Put, while the remote signalling message of telemechanical apparatus is given in automatic reading, be automatically performed test result assessment.Remote measurement is automatically to a side
Method:The sampling value message of automatic driving tester output setting telemetry value, and the remote measurement message of telemechanical apparatus can be read automatically, it is complete
Into outcome evaluation.It is Remote Control Automatic to point methods:An automatic distant place, which is thrown, moves back remote control pressing plate, switching definite value area, by read automatically pressing plate,
Definite value zone state, complete outcome evaluation.Protection information is automatically to point methods:Automatic modification definite value, throw and move back pressing plate, apply protection and survey
Try energizing quantity and produce protection act, alarm event, it is automatic to obtain protection information remote signalling message, complete outcome evaluation.
Claims (9)
1. a kind of whole station information intelligent of digital transformer substation is to the test system of point, it is characterised in that including:To point server,
With it is described to point server wireless connection intelligence to a tester, with it is described to point server and the intelligence to a tester
The intelligent substation equipment communicated to connect, wherein,
It is described to point server by parsing SCD file and 104 list files, according to semantic information matching establish substation information
The corresponding relation of data and telemechanical point table data, generate testing scheme and be handed down to intelligence to a tester;Described pair of point service
Device also receives test data from intelligence to a tester, generates test report;
The intelligence receives testing scheme to a tester to point server, drives and point server is realized by 104 stipulations
Reading and straighforward operation to remote signalling/telemetered signal of intelligent substation equipment, and by MMS specifications directly from intelligent substation
Equipment reading device data, test judgement is carried out, and will be given in test data to point server.
2. the whole station information intelligent of a kind of digital transformer substation according to claim 1 exists to the test system of point, its feature
In the intelligent substation equipment includes:Telemechanical apparatus and some IED devices to be measured, some IED devices to be measured are via station
Control layer network interchanger is connected to the telemechanical apparatus, and a tester is directly connected to intelligence;The telemechanical apparatus connects
It is connected to point server.
3. the whole station information intelligent of a kind of digital transformer substation according to claim 2 exists to the test system of point, its feature
In described that point server is included:
SCD file parses and extraction module, for reading and parsing SCD file, extract IED device informations and IED devices SV,
GOOSE information and remote signalling, telemetry and telecommand data set information;
EXCEL point table parsing modules, for reading and parsing 104 table EXCEL files, carried out by remote signalling, remote measurement, remote information
Classification, form 104 table information;
Intelligent Matching module, for analyzing respectively the information and 104 table information of SCD file extraction, extraction is semantic
Information, according to semantic information is matched and is established in each 104 tables information point, SCD file pattern number strong point, SCD texts
The one-to-one relationship table of part I/O channel;
Intelligent generation module, for traveling through each corresponding relation in mapping table, according to I/O channel type, advance
What is set is corresponding to a functional template class to being searched in a functional template class libraries, and corresponding relation is incoming to a functional template class
Instantiation is completed, generates the configuration file of testing scheme and intelligence to a tester;Described pair of point functional template class is to logical
It is abstracted with to a function, describes the method that the process to a function and the method and result to point judge.
Test assignment management module, for being managed to whole station test assignment, successively by the testing scheme transmission of each IED devices
To intelligence to a tester;
Service end communication module, for being communicated with intelligence to a tester, test parameter information and configuration are transmitted each other
Fileinfo, test report data;
Test report management module, the test result for intelligence to be passed over to a tester are automatically filled in corresponding test report
Accuse, and the generation to each IED devices is reported and is named classification by device model, title and report generation time, for containing not
The report of qualified item provides mark prompting;
104 protocol modules, there are 104 communication protocols to realize function, for the parameter setting in testing scheme complete with
The communication of telemechanical apparatus, the reading for the remote signals sent on each IED devices is realized, send the remote measurement that each IED devices are read in order
The value of amount, send all kinds of guidance commands realize pressing plate throw move back, the switching of definite value area code.
4. the whole station information intelligent of a kind of digital transformer substation according to claim 2 exists to the test system of point, its feature
In the intelligence includes to a tester:
Test lead communication module, is used to and services end communication module being communicated, realize intelligence to a tester with to a service
The communication of device, its function include:Single device to test scheme is downloaded, test report data is uploaded, sends 104 communication commands, obtains
104 stipulations message datas;
MMS communication modules, for being communicated by MMS specifications with tested IED devices, parsing MMS messages, read tested IED
The data of device;
Single device to test scheme execution module, based on from the single device to test scheme and 104 stipulations messages obtained to point server,
And the MMS messages and IED device data obtained from tested IED devices, perform test and judge and be sent to test result pair
Point server.
61850 functional modules, the intelligent substation IED devices according to corresponding to simulating configuration file, SV, GOOSE are exported, received simultaneously
The GOOSE outgoing messages of the tested IED devices of collection;This module is also comprising the output of a pair of switches amount and the input of a pair of switches amount.
5. a kind of test system using according to any one of claim 1-4 is digitized the whole station information of transformer station
Method of testing of the intelligence to point, it is characterised in that comprise the following steps:
Step 1, point server is parsed to SCD file and 104 list files, establish at each 104 points according to semantic information
The one-to-one relationship table of information point and SCD file data channel in table, testing scheme and the intelligence for generating IED devices are right
The configuration file of point tester, testing scheme and configuration file are handed down to intelligence to a tester;
Step 2, intelligence receive testing scheme to a tester to point server, drive real by 104 stipulations to point server
Now to the reading and straighforward operation of remote signalling/telemetered signal of intelligent substation equipment, and by MMS specifications directly from intelligent power transformation
Station equipment reading device data, test judgement is carried out, and test result is reported to point server;
Step 3, test data is received to a tester from intelligence to point server, generate test report.
6. the whole station information intelligent of digital transformer substation according to claim 5 is to the method for testing of point, it is characterised in that institute
Stating step 1 includes:
Step 1.1, SCD file parsing and extraction module read and parse SCD file, extract IED device informations and IED devices
SV, GOOSE information and remote signalling, telemetry and telecommand data set information;
Step 1.2, EXCEL point table parsing modules read and parse 104 table EXCEL files, by remote signalling, remote measurement, remote information
Classified, form 104 table information;
Step 1.3, intelligent Matching module are analyzed the information and 104 table information of SCD file extraction respectively, extract language
Adopted information, according to semantic information is matched and is established in each 104 tables information point, SCD file pattern number strong point, SCD
The one-to-one relationship table of file I/O channel;
Each corresponding relation in step 1.4, intelligent generation module traversal mapping table, according to I/O channel type,
It is default corresponding to a functional template class to being searched in a functional template class libraries, corresponding relation is incoming to a functional template class
Complete the configuration file of instantiation, the mono- device to test schemes of generation IED and intelligence to a tester;
Wherein, the mono- device to test schemes of IED include relay protection remote control testing scheme, remote-controlled test scheme, remote signalling test
Scheme, remote measurement testing scheme, tester configuration file.
7. the whole station information intelligent of digital transformer substation according to claim 6 is to the method for testing of point, it is characterised in that institute
Stating remote-controlled test scheme, remote signalling testing scheme, the generating process of remote measurement testing scheme is:
1) data of the data and IED devices in 104 tables are analyzed, wherein, it is distant for remote-controlled test scheme, 104 tables of analysis
Control data, IED devices remote-control data, IED devices remote signalling data, 104 table remote signalling datas;For remote signalling testing scheme, analysis
It is 104 table remote signalling datas, IED devices remote signalling data, IED apparatus GOOSE input channels data, associated with tested IED devices
Each IED devices GOOSE output channel data;For remote measurement testing scheme, 104 table telemetries of analysis, IED devices are distant
Survey data, IED device SV input channels data, the SV output channel data of each IED device associated with tested IED devices;
2) each data semantic information is extracted, 104 table corresponding operating data and other three kinds of data are established according to semantic information
One-to-one mapping table;
3) each mapping relations of Ergodic Maps relation table, corresponding operating test are obtained to a functional template class, by mapping relations
It is incoming that corresponding operating testing scheme is generated to a functional template class, instantiation.
8. the whole station information intelligent of digital transformer substation according to claim 6 is to the method for testing of point, it is characterised in that institute
Stating relay protection remote control testing scheme includes distant place clamp operation testing scheme and definite value area switch test scheme, generates
Cheng Wei:
1) pressing plate data set, definite value area data set of the relay protection remote control data with tested IED devices of 104 tables are analyzed
Data, semantic information is extracted, establishing two kinds of data of relay protection remote control data and other according to semantic information corresponds
Mapping table;
2) each mapping relations of Ergodic Maps relation table, the test of distant place clamp operation is obtained to a functional template class, will be mapped
Relation is incoming to a functional template class, instantiation generation distant place clamp operation testing scheme;
3) the operation test of definite value area is obtained to a functional template class, mapping relations are incoming to a functional template class, example metaplasia
Into definite value area handover operation testing scheme.
9. the whole station information intelligent of digital transformer substation according to claim 6 is to the method for testing of point, it is characterised in that institute
Stating tester configuration file generating process is:Obtain SV output controls block, the GOOSE for the exterior I ED being connected with tested IED devices
The GOOSE output control blocks of output control block and tested IED devices, the fan-out capability with reference to intelligence to a tester, generation
Configuration file of the intelligence to a tester.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710998019.3A CN107515344A (en) | 2017-10-18 | 2017-10-18 | Test system and method for a kind of whole station information intelligent of digital transformer substation to point |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710998019.3A CN107515344A (en) | 2017-10-18 | 2017-10-18 | Test system and method for a kind of whole station information intelligent of digital transformer substation to point |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107515344A true CN107515344A (en) | 2017-12-26 |
Family
ID=60727518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710998019.3A Withdrawn CN107515344A (en) | 2017-10-18 | 2017-10-18 | Test system and method for a kind of whole station information intelligent of digital transformer substation to point |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107515344A (en) |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108268706A (en) * | 2017-12-30 | 2018-07-10 | 国网天津市电力公司电力科学研究院 | The closed loop test system and method applied towards integrated monitoring system intelligent alarm |
CN108897563A (en) * | 2018-08-24 | 2018-11-27 | 南京国电南自电网自动化有限公司 | A kind of protective relaying device midpoint table conversion method |
CN109150636A (en) * | 2018-10-31 | 2019-01-04 | 国网四川省电力公司电力科学研究院 | A kind of intelligent substation of full link information stream is assisted to experimental tests method and system |
CN109521300A (en) * | 2018-11-29 | 2019-03-26 | 贵州电网有限责任公司 | A kind of test method of multifunctional digital tester |
CN109613906A (en) * | 2018-11-08 | 2019-04-12 | 国网湖南省电力有限公司 | Third generation intelligent substation observing and controlling handset test macro and its application method |
CN109884422A (en) * | 2019-01-22 | 2019-06-14 | 许昌许继软件技术有限公司 | A kind of site protective device loading tests method and apparatus |
CN110289681A (en) * | 2019-06-10 | 2019-09-27 | 国网福建省电力有限公司泉州供电公司 | Intelligent substation regulates and controls remote operation modeling, monitoring method and monitoring system |
CN110493079A (en) * | 2019-08-14 | 2019-11-22 | 长园深瑞继保自动化有限公司 | The production automation test method of industrial ethernet switch |
CN110632410A (en) * | 2019-08-19 | 2019-12-31 | 国网湖南省电力有限公司 | Intelligent debugging system for automatic equipment of intelligent substation and application method thereof |
CN110691008A (en) * | 2019-09-30 | 2020-01-14 | 南京能云电力科技有限公司 | Intelligent management unit test system and test method |
CN110868341A (en) * | 2019-12-05 | 2020-03-06 | 华北电力科学研究院有限责任公司 | In-place protection intelligent management unit testing method and device |
CN110942400A (en) * | 2019-11-09 | 2020-03-31 | 国网辽宁省电力有限公司电力科学研究院 | Automatic point aligning method and device for intelligent substation monitoring system |
CN111458586A (en) * | 2020-04-16 | 2020-07-28 | 国网湖南省电力有限公司 | Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation |
CN111610397A (en) * | 2020-05-26 | 2020-09-01 | 中国电力科学研究院有限公司 | Automatic closed-loop test system and method |
CN111654101A (en) * | 2020-05-07 | 2020-09-11 | 温州电力建设有限公司 | Method for debugging secondary equipment of transformer substation |
CN111708700A (en) * | 2020-06-17 | 2020-09-25 | 南京太司德智能电气有限公司 | Intelligent telemechanical closed-loop comprehensive test method |
CN112180897A (en) * | 2020-09-25 | 2021-01-05 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112541833A (en) * | 2020-12-07 | 2021-03-23 | 广东电网有限责任公司 | Power system telemechanical data quality management method and system based on feature matching knowledge base |
CN112630565A (en) * | 2020-12-08 | 2021-04-09 | 浙江省送变电工程有限公司 | Automatic testing and analyzing system and method for relay protection of intelligent substation |
CN113256766A (en) * | 2021-07-13 | 2021-08-13 | 国网浙江省电力有限公司宁波供电公司 | Method and device for acquiring power graphic picture, storage medium and electronic equipment |
CN113394778A (en) * | 2021-07-08 | 2021-09-14 | 国网浙江省电力有限公司温州供电公司 | Configuration mode-based system-level debugging system and method for secondary equipment of transformer substation |
CN113533887A (en) * | 2021-07-21 | 2021-10-22 | 广东电网有限责任公司 | Intelligent debugging method and system for power distribution terminal |
CN113866531A (en) * | 2021-08-17 | 2021-12-31 | 广西电网有限责任公司防城港供电局 | Method for establishing connection with different testers for testing and generating test report |
CN114123509A (en) * | 2021-11-25 | 2022-03-01 | 广东电网有限责任公司 | Micro-grid distributed resource parallel automatic point-to-point system, method and medium |
CN114401323A (en) * | 2021-12-09 | 2022-04-26 | 国网江苏省电力有限公司苏州供电分公司 | Transformer substation communication protocol full-mapping analysis analog conversion device |
CN114648869A (en) * | 2022-03-10 | 2022-06-21 | 东方电子股份有限公司 | Remote control instruction operation method for electric power protection measurement and control device |
CN114915639A (en) * | 2022-05-06 | 2022-08-16 | 华润新能源(阜新)风能有限公司 | Method, device, electronic equipment and medium for analyzing messages of scheduling channel special for electric power |
-
2017
- 2017-10-18 CN CN201710998019.3A patent/CN107515344A/en not_active Withdrawn
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108268706B (en) * | 2017-12-30 | 2023-10-03 | 国网天津市电力公司电力科学研究院 | Closed loop test system and method for intelligent alarm application of integrated monitoring system |
CN108268706A (en) * | 2017-12-30 | 2018-07-10 | 国网天津市电力公司电力科学研究院 | The closed loop test system and method applied towards integrated monitoring system intelligent alarm |
CN108897563A (en) * | 2018-08-24 | 2018-11-27 | 南京国电南自电网自动化有限公司 | A kind of protective relaying device midpoint table conversion method |
CN108897563B (en) * | 2018-08-24 | 2021-10-15 | 南京国电南自电网自动化有限公司 | Point table conversion method in relay protection device |
CN109150636A (en) * | 2018-10-31 | 2019-01-04 | 国网四川省电力公司电力科学研究院 | A kind of intelligent substation of full link information stream is assisted to experimental tests method and system |
CN109150636B (en) * | 2018-10-31 | 2023-08-22 | 国网四川省电力公司电力科学研究院 | Intelligent substation auxiliary point-to-point test method and system for full-link information flow |
CN109613906A (en) * | 2018-11-08 | 2019-04-12 | 国网湖南省电力有限公司 | Third generation intelligent substation observing and controlling handset test macro and its application method |
CN109521300A (en) * | 2018-11-29 | 2019-03-26 | 贵州电网有限责任公司 | A kind of test method of multifunctional digital tester |
CN109884422A (en) * | 2019-01-22 | 2019-06-14 | 许昌许继软件技术有限公司 | A kind of site protective device loading tests method and apparatus |
CN109884422B (en) * | 2019-01-22 | 2020-12-11 | 许昌许继软件技术有限公司 | On-site protection device load testing method and device |
CN110289681A (en) * | 2019-06-10 | 2019-09-27 | 国网福建省电力有限公司泉州供电公司 | Intelligent substation regulates and controls remote operation modeling, monitoring method and monitoring system |
CN110289681B (en) * | 2019-06-10 | 2023-04-28 | 国网福建省电力有限公司泉州供电公司 | Remote operation modeling and monitoring method and monitoring system for intelligent substation regulation and control |
CN110493079A (en) * | 2019-08-14 | 2019-11-22 | 长园深瑞继保自动化有限公司 | The production automation test method of industrial ethernet switch |
CN110493079B (en) * | 2019-08-14 | 2022-06-28 | 长园深瑞继保自动化有限公司 | Production automation test method of industrial Ethernet switch |
CN110632410A (en) * | 2019-08-19 | 2019-12-31 | 国网湖南省电力有限公司 | Intelligent debugging system for automatic equipment of intelligent substation and application method thereof |
CN110632410B (en) * | 2019-08-19 | 2021-10-01 | 国网湖南省电力有限公司 | Intelligent debugging system for automatic equipment of intelligent substation and application method thereof |
CN110691008A (en) * | 2019-09-30 | 2020-01-14 | 南京能云电力科技有限公司 | Intelligent management unit test system and test method |
CN110691008B (en) * | 2019-09-30 | 2022-07-19 | 北京博电新力电气股份有限公司 | Intelligent management unit test system and test method |
CN110942400A (en) * | 2019-11-09 | 2020-03-31 | 国网辽宁省电力有限公司电力科学研究院 | Automatic point aligning method and device for intelligent substation monitoring system |
CN110942400B (en) * | 2019-11-09 | 2023-09-19 | 国网辽宁省电力有限公司电力科学研究院 | Automatic point-to-point method and device for intelligent substation monitoring system |
CN110868341B (en) * | 2019-12-05 | 2024-04-30 | 华北电力科学研究院有限责任公司 | Method and device for testing intelligent management unit of in-situ protection |
CN110868341A (en) * | 2019-12-05 | 2020-03-06 | 华北电力科学研究院有限责任公司 | In-place protection intelligent management unit testing method and device |
CN111458586B (en) * | 2020-04-16 | 2022-09-16 | 国网湖南省电力有限公司 | Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation |
CN111458586A (en) * | 2020-04-16 | 2020-07-28 | 国网湖南省电力有限公司 | Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation |
CN111654101A (en) * | 2020-05-07 | 2020-09-11 | 温州电力建设有限公司 | Method for debugging secondary equipment of transformer substation |
CN111610397A (en) * | 2020-05-26 | 2020-09-01 | 中国电力科学研究院有限公司 | Automatic closed-loop test system and method |
CN111708700B (en) * | 2020-06-17 | 2023-10-20 | 南京太司德智能电气有限公司 | Intelligent remote machine closed loop comprehensive test method |
CN111708700A (en) * | 2020-06-17 | 2020-09-25 | 南京太司德智能电气有限公司 | Intelligent telemechanical closed-loop comprehensive test method |
CN112180897A (en) * | 2020-09-25 | 2021-01-05 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112180897B (en) * | 2020-09-25 | 2021-12-17 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112541833A (en) * | 2020-12-07 | 2021-03-23 | 广东电网有限责任公司 | Power system telemechanical data quality management method and system based on feature matching knowledge base |
CN112630565A (en) * | 2020-12-08 | 2021-04-09 | 浙江省送变电工程有限公司 | Automatic testing and analyzing system and method for relay protection of intelligent substation |
CN113394778A (en) * | 2021-07-08 | 2021-09-14 | 国网浙江省电力有限公司温州供电公司 | Configuration mode-based system-level debugging system and method for secondary equipment of transformer substation |
CN113394778B (en) * | 2021-07-08 | 2022-09-30 | 国网浙江省电力有限公司温州供电公司 | Configuration mode-based system-level debugging system and method for secondary equipment of transformer substation |
CN113256766A (en) * | 2021-07-13 | 2021-08-13 | 国网浙江省电力有限公司宁波供电公司 | Method and device for acquiring power graphic picture, storage medium and electronic equipment |
CN113533887A (en) * | 2021-07-21 | 2021-10-22 | 广东电网有限责任公司 | Intelligent debugging method and system for power distribution terminal |
CN113533887B (en) * | 2021-07-21 | 2024-01-26 | 广东电网有限责任公司 | Intelligent debugging method and system for power distribution terminal |
CN113866531A (en) * | 2021-08-17 | 2021-12-31 | 广西电网有限责任公司防城港供电局 | Method for establishing connection with different testers for testing and generating test report |
CN114123509A (en) * | 2021-11-25 | 2022-03-01 | 广东电网有限责任公司 | Micro-grid distributed resource parallel automatic point-to-point system, method and medium |
CN114401323A (en) * | 2021-12-09 | 2022-04-26 | 国网江苏省电力有限公司苏州供电分公司 | Transformer substation communication protocol full-mapping analysis analog conversion device |
CN114401323B (en) * | 2021-12-09 | 2024-02-13 | 国网江苏省电力有限公司苏州供电分公司 | Full mapping analysis analog conversion device for transformer substation communication protocol |
CN114648869A (en) * | 2022-03-10 | 2022-06-21 | 东方电子股份有限公司 | Remote control instruction operation method for electric power protection measurement and control device |
CN114915639A (en) * | 2022-05-06 | 2022-08-16 | 华润新能源(阜新)风能有限公司 | Method, device, electronic equipment and medium for analyzing messages of scheduling channel special for electric power |
CN114915639B (en) * | 2022-05-06 | 2024-04-05 | 华润新能源(阜新)风能有限公司 | Method, device, electronic equipment and medium for analyzing message of power dedicated scheduling channel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107515344A (en) | Test system and method for a kind of whole station information intelligent of digital transformer substation to point | |
CN104793076B (en) | Intelligent Auto-Test System and method of testing | |
CN107346917B (en) | Secondary device based on virtual machine integrates joint debugging method | |
CN106019039B (en) | Standardize protective relaying device assembly line automatic checkout system and method | |
CN103529377B (en) | The Auto-Test System of intelligent transformer substation digital protection device and method | |
CN107786000B (en) | Intelligent generation method for configuration file of digital relay protection tester | |
CN106961362B (en) | Automated testing method and mobile cloud test system | |
CN102291277B (en) | Automatic test system and method for intelligent substation spacing apparatus | |
CN104820635B (en) | A kind of self-closing ring gauge about robustness testing method based on the semantic parsing of dynamic script | |
CN105978159B (en) | A kind of substation's remote control test is online to exempt to execute checking method | |
CN110829595B (en) | Intelligent power station relay protection equipment overhaul safety isolation measure execution method and system | |
CN106372301A (en) | Method and system for detecting visualization and configuration consistency of configuration file of intelligent substation | |
CN108767818B (en) | A kind of Commissioning of Relay Protection system and adjustment method based on virtual Prudential Master | |
CN109873497A (en) | A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence | |
CN101887269B (en) | Five-prevention logic test method of 61850 transformer substation and system thereof | |
CN108923953A (en) | A kind of virtual main station system of power remote machine debugging | |
CN103941240B (en) | A kind of detection method of the extension set detecting device that communicates based on radar system | |
CN108776278B (en) | Topological-associated configuration type relay protection test system and method | |
CN104868599A (en) | Intelligent substation message simulation test and association analysis system, and simulation method | |
CN104391244A (en) | Closed loop test method of relay protection apparatus and system thereof | |
CN107257304B (en) | Telecontrol point-aligning-free configuration test system | |
CN108333547A (en) | A kind of distribution line failure indicator automatic checkout system and method | |
CN113419920B (en) | Real-time monitoring method for joint debugging test process of simulation test system of Internet of things management platform | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN113705026B (en) | Digital modeling and intelligent detection system for power secondary equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171226 |