CN107499849A - A kind of container handling equipment and its carrying method - Google Patents
A kind of container handling equipment and its carrying method Download PDFInfo
- Publication number
- CN107499849A CN107499849A CN201710864172.7A CN201710864172A CN107499849A CN 107499849 A CN107499849 A CN 107499849A CN 201710864172 A CN201710864172 A CN 201710864172A CN 107499849 A CN107499849 A CN 107499849A
- Authority
- CN
- China
- Prior art keywords
- track
- area
- container
- frame
- running
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 5
- 230000007704 transition Effects 0.000 claims description 76
- 230000032258 transport Effects 0.000 claims description 36
- 238000006243 chemical reaction Methods 0.000 claims description 16
- 238000003032 molecular docking Methods 0.000 claims description 7
- 238000010586 diagram Methods 0.000 description 37
- 230000007547 defect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
- B65G35/06—Mechanical conveyors not otherwise provided for comprising a load-carrier moving along a path, e.g. a closed path, and adapted to be engaged by any one of a series of traction elements spaced along the path
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/02—Articles
- B65G2201/0235—Containers
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Warehouses Or Storage Devices (AREA)
Abstract
本发明提出的是一种集装箱输送装置及其输送方法,其集装箱输送装置1包括集装箱2的输送车3、车3运行的空中轨道4、立柱构件5和集装箱2的堆场及输送区域6;车3包括行走装置3‑1、起重装置3‑2、框架3‑3和切换装置3‑4,行走装置3‑1位于框架3‑3的下部,起重装置3‑2位于框架3‑3的上部,框架3‑3是底部开口的空腔,起重装置3‑2的吊挂装置3‑2‑1将框架3‑3下方的集装箱2吊挂至框架3‑3的空腔内;车3水平运行时框架3‑3内的集装箱2的底面高于轨道4的上平面,即不影响车3的运行。优点:自带动力的载物小车3把工件吊至框架3‑3的空腔内,在空中轨道上运行,可以自动取放工件,可实现全覆盖物流输送,容易实现自动化作业。
The present invention proposes a container conveying device and a conveying method thereof. The container conveying device 1 includes a conveying vehicle 3 for a container 2, an aerial track 4 on which the vehicle 3 operates, a column member 5, and a storage yard and a conveying area 6 for the container 2; Car 3 comprises traveling device 3-1, lifting device 3-2, frame 3-3 and switching device 3-4, and traveling device 3-1 is positioned at the bottom of frame 3-3, and lifting device 3-2 is positioned at frame 3-3. 3, the frame 3-3 is a cavity with a bottom opening, and the hanging device 3-2-1 of the lifting device 3-2 hangs the container 2 below the frame 3-3 into the cavity of the frame 3-3 The bottom surface of the container 2 in the frame 3-3 is higher than the upper plane of the track 4 when the car 3 runs horizontally, which does not affect the operation of the car 3. Advantages: The loading trolley 3 with its own power lifts the workpiece into the cavity of the frame 3-3, runs on the track in the air, can automatically pick and place the workpiece, can realize full-coverage logistics transportation, and is easy to realize automatic operation.
Description
技术领域technical field
本发明涉及的是一种集装箱输送装置及其输送方法,属物流输送技术领域。The invention relates to a container conveying device and a conveying method thereof, belonging to the technical field of logistics conveying.
背景技术Background technique
现有集装箱输送主要有底盘车系统、跨运车系统龙门吊系统及混合型系统;1)底盘车系统:底盘车的需求量大,投资大,在运量高峰期可能会出现因底盘车不足而间断作业的现象;不易实现自动化。2)跨运车系统:码头前沿采用岸边集装箱装卸桥承担船舶的装卸作业,跨运车承担码头前沿与堆场之间的水平运输,以及堆场的堆码和进出场车辆的装卸作业;跨运车作业作业区域切换受限制,输送效率不高。The existing container transportation mainly includes chassis vehicle system, straddle carrier system, gantry crane system and hybrid system; 1) chassis vehicle system: the demand for chassis vehicles is large, and the investment is large. The phenomenon of intermittent operation; it is not easy to realize automation. 2) Straddle carrier system: the front of the terminal adopts the container loading and unloading bridge on the shore to undertake the loading and unloading operations of ships, and the straddle carrier undertakes the horizontal transportation between the front of the terminal and the yard, as well as the stacking of the yard and the loading and unloading of vehicles entering and leaving the yard; The switching of the operating area of the straddle carrier is limited, and the conveying efficiency is not high.
发明内容Contents of the invention
本发明提出的是一种集装箱输送装置及其输送方法,其目的旨在克服现有技术存在的缺陷,其主要优点:自带动力的载物小车3把工件吊至框架3-3的空腔内,在空中轨道上运行,可以自动取放工件,若干载物小车3利用车7的轨道和固定立柱的轨道实现X、Y方向的行走,可实现全覆盖物流输送,容易实现自动化作业,效率高。What the present invention proposes is a kind of container conveying device and its conveying method, and its purpose aims at overcoming the defect existing in the prior art, and its main advantage: the loading trolley 3 with its own power lifts the workpiece to the cavity of the frame 3-3 Inside, running on the track in the air, it can automatically pick and place the workpiece. Several loading trolleys 3 use the track of the car 7 and the track of the fixed column to realize the walking in the X and Y directions, which can realize full-coverage logistics transportation, easy to realize automatic operation, and high efficiency. high.
本发明的技术解决方案:集装箱输送装置1包括集装箱2的输送车3、车3运行的空中轨道4、立柱构件5和集装箱2的堆场及输送区域6;车3的长度方向是集装箱2的长度方向,车3的宽度方向是集装箱2的宽度方向,车3包括行走装置3-1、起重装置3-2、框架3-3和切换装置3-4,行走装置3-1位于框架3-3的下部,起重装置3-2位于框架3-3的上部,框架3-3是底部开口的空腔,起重装置3-2的吊挂装置3-2-1将框架3-3下方的集装箱2吊挂至框架3-3的空腔内;轨道4包括车3沿集装箱2长度方向运行的轨道41和沿集装箱2宽度方向运行的轨道42,车3水平运行时框架3-3内的集装箱2的底面高于轨道4的上平面,即不影响车3的运行;起重装置3-2将框架3-3内的集装箱2放置在轨道4的下方,或将轨道4下方的集装箱2抓取至框架3-3内;行走装置3-1包括A结构和B结构:Technical solution of the present invention: the container conveying device 1 comprises the conveying car 3 of container 2, the aerial track 4 that car 3 runs, the column member 5 and the yard and conveying area 6 of container 2; In the longitudinal direction, the width direction of the car 3 is the width direction of the container 2. The car 3 includes a running device 3-1, a lifting device 3-2, a frame 3-3 and a switching device 3-4, and the running device 3-1 is located on the frame 3. -3 bottom, lifting device 3-2 is positioned at the top of frame 3-3, and frame 3-3 is the cavity of bottom opening, and the hanging device 3-2-1 of lifting device 3-2 will frame 3-3 The container 2 below is hung into the cavity of the frame 3-3; the track 4 includes a track 41 running along the length of the container 2 and a track 42 running along the width of the container 2. When the car 3 runs horizontally, the frame 3-3 The bottom surface of the container 2 in the frame is higher than the upper plane of the track 4, that is, it does not affect the operation of the car 3; the lifting device 3-2 places the container 2 in the frame 3-3 below the track 4, or places the container 2 under the track 4 The container 2 is grabbed into the frame 3-3; the running device 3-1 includes the A structure and the B structure:
A结构、行走装置3-1包括沿集装箱2长度方向运行的行走装置3-1-1、沿集装箱2宽度方向运行的行走装置3-1-2,切换装置3-4是具有顶升功能的切换装置3-4Z,行走装置3-1-1低于行走装置3-1-2时,行走装置3-1-2脱离轨道4,行走装置3-1-1在轨道41上运行,切换装置3-4动作,使行走装置3-1-2低于行走装置3-1-1时,行走装置3-1-1脱离轨道4,行走装置3-1-2在轨道42上运行;A structure, the running device 3-1 includes the running device 3-1-1 running along the length direction of the container 2, and the running device 3-1-2 running along the width direction of the container 2, and the switching device 3-4 has a jacking function Switching device 3-4Z, when running device 3-1-1 is lower than running device 3-1-2, running device 3-1-2 breaks away from track 4, and running device 3-1-1 runs on track 41, and switching device 3-4 action, when making running device 3-1-2 lower than running device 3-1-1, running device 3-1-1 breaks away from track 4, and running device 3-1-2 runs on track 42;
B结构、切换装置3-4是具有回转功能的切换装置3-4R,当装置3-4R回轨90度时,装置3-1从沿着X或Y方向运行回转至沿着Y或X方向运行。B structure, the switching device 3-4 is a switching device 3-4R with a turning function. When the device 3-4R returns to the track at 90 degrees, the device 3-1 turns from running along the X or Y direction to along the Y or X direction run.
本发明的优点:自带动力的载物小车3把工件吊至框架3-3的空腔内,在空中轨道上运行,可以自动取放工件,若干载物小车3利用车7的轨道和固定立柱的轨道实现X、Y方向的行走,可实现全覆盖物流输送,容易实现自动化作业。Advantages of the present invention: the loading trolley 3 with its own power lifts the workpiece into the cavity of the frame 3-3, runs on the track in the air, and can automatically pick and place the workpiece, and several loading trolleys 3 utilize the track and fixed The track of the column realizes the walking in the X and Y directions, which can realize the full coverage of logistics transportation, and it is easy to realize automatic operation.
附图说明Description of drawings
图1是组成集装箱输送装置1的输送车3、车3运行的空中轨道4、和立柱构件5的结构示意图,也是组件输送车3的行走装置3-1、起重装置3-2和框架3-3的结构示意图;Fig. 1 is a structural schematic diagram of the transport vehicle 3, the aerial track 4 on which the vehicle 3 operates, and the column member 5 that make up the container transport device 1, and also the running device 3-1, lifting device 3-2 and frame 3 of the component transport vehicle 3 Schematic diagram of the structure of -3;
图2是图1的A向视图,也是行走装置3-1-1和行走装置3-1-2的结构示意图;Fig. 2 is an A-direction view of Fig. 1, and is also a schematic structural view of the traveling device 3-1-1 and the traveling device 3-1-2;
图3是图2的Ⅰ局部放大视图,也是切换装置3-4Z使行走装置3-1-2低于行走装置3-1-1的结构示意图,也是行走装置3-1-1脱离轨41,行走装置3-1-2在轨道42上运行的结构示意图;Fig. 3 is a partial enlarged view of I of Fig. 2, and it is also a schematic structural view of the switching device 3-4Z making the traveling device 3-1-2 lower than the traveling device 3-1-1, and also the traveling device 3-1-1 detached from the rail 41, Structural schematic diagram of running device 3-1-2 running on track 42;
图4是切换装置3-4Z使行走装置3-1-1低于行走装置3-1-2的结构示意图,也是行走装置3-1-2脱离轨42,行走装置3-1-1在轨道41上运行的结构示意图;Fig. 4 is the structural representation that switching device 3-4Z makes running device 3-1-1 lower than running device 3-1-2, also is that running device 3-1-2 breaks away from rail 42, and running device 3-1-1 is on track Schematic diagram of the structure running on 41;
图5是具有回转功能的切换装置3-4R的结构示意图;Fig. 5 is a schematic structural view of a switching device 3-4R with a rotary function;
图6是装置3-4R回轨90度时,装置3-1从沿着轨道41(Y方向)运行回转至沿着轨道42(X方向)运行的结构示意图;Fig. 6 is a schematic diagram of the structure of device 3-1 from running along track 41 (Y direction) to running along track 42 (X direction) when device 3-4R returns to the track at 90 degrees;
图7是集装箱2的堆场及输送区域6的结构示意图,也是X方向为集装箱2沿长度方向输送的区域61X的结构示意图;Fig. 7 is a schematic structural view of the yard and the conveying area 6 of the container 2, and is also a structural schematic view of the area 61X where the container 2 is transported along the length direction in the X direction;
图8是X方向为集装箱2沿宽度方向输送的区域62X的结构示意图;Fig. 8 is a structural schematic diagram of the area 62X where the container 2 is conveyed along the width direction in the X direction;
图9是Y方向为集装箱2沿长度方向输送的区域61Y的结构示意图;Fig. 9 is a structural schematic diagram of the area 61Y where the container 2 is transported along the longitudinal direction in the Y direction;
图10是Y方向为集装箱2沿海宽度方向输送的区域62Y的结构示意图;Fig. 10 is a schematic structural diagram of the area 62Y where the Y direction is transported along the width direction of the container 2;
图11是子区域62X-1的车3沿X方向的轨道42X5X运行的结构示意图,也是轨道42X5X的间距等于车3行走轮3-1-2-1的轮距的结构示意图;Fig. 11 is a structural schematic diagram of the car 3 in the sub-area 62X-1 running along the track 42X5X in the X direction, and it is also a structural schematic diagram in which the distance between the track 42X5X is equal to the wheel base of the car 3 running wheels 3-1-2-1;
图12是车3把集装箱2抓取至框架3-3内,切换装置3-4Z切换行走装置后车3沿空中轨道42X5X运行至过渡轨道42X-1的结构示意图;Fig. 12 is a structural schematic diagram of the car 3 grabbing the container 2 into the frame 3-3, and the switching device 3-4Z switches the running device, and the rear car 3 runs along the aerial track 42X5X to the transition track 42X-1;
图13是车3沿轨道41Y5X进入另一子区域62X-1的结构示意图;Fig. 13 is a structural schematic diagram of the car 3 entering another sub-area 62X-1 along the track 41Y5X;
图14是子区域62Y-1的车3沿Y方向的轨道42Y5Y运行的结构示意图;Fig. 14 is a structural schematic diagram of the vehicle 3 in the sub-area 62Y-1 running along the track 42Y5Y in the Y direction;
图15是车3把集装箱2抓取至框架3-3内,切换装置3-4Z切换行走装置后车3沿空中轨道42Y5Y运行至过渡轨道42Y-1的结构示意图;Fig. 15 is a structural schematic diagram of the car 3 grabbing the container 2 into the frame 3-3, and the switching device 3-4Z switches the running device, and the rear car 3 runs along the aerial track 42Y5Y to the transition track 42Y-1;
图16是车3沿轨道41X5Y进入另一子区域62Y-1的结构示意图;Fig. 16 is a structural schematic diagram of the car 3 entering another sub-area 62Y-1 along the track 41X5Y;
图17是在子区域61X-1内,组成运输车7的行走装置7-1、框架7-3和轨道42Y7的结构示意图,也是车7沿X方向的轨道8X5X运行的结构示意图;Fig. 17 is a schematic structural diagram of the running device 7-1, frame 7-3 and track 42Y7 that make up the transport vehicle 7 in the sub-area 61X-1, and is also a structural schematic diagram of the vehicle 7 running along the track 8X5X in the X direction;
图18是图17的A-A视图,也是轨道8X5X的间距等于行走装置7-1中的行走轮7-1-1的间距的结构示意图;Fig. 18 is the A-A view of Fig. 17, also is the structural representation that the spacing of rail 8X5X is equal to the spacing of the traveling wheel 7-1-1 in the traveling device 7-1;
图19是在子区域61Y-1内,组成运输车7的行走装置7-1、框架7-3和轨道42X7的结构示意图,也是车7沿Y方向的轨道8Y5Y运行的结构示意图;Fig. 19 is a schematic structural view of the traveling device 7-1, frame 7-3 and track 42X7 that make up the transport vehicle 7 in the sub-area 61Y-1, and is also a structural schematic view of the vehicle 7 running along the track 8Y5Y in the Y direction;
图20是图19的A-A视图,也是轨道8Y5Y的间距等于行走装置7-1中的行走轮7-1-1的间距的结构示意图;Fig. 20 is the A-A view of Fig. 19, also is the structural representation that the spacing of track 8Y5Y is equal to the spacing of the traveling wheel 7-1-1 in the traveling device 7-1;
图21是轨道42Y5X将两个子区域61X-1在Y方向连成一体的结构示意图,也是左边子区域61X-1的车7的轨道42Y7与过渡轨道42Y5X-1对接的结构示意图;Fig. 21 is a structural schematic diagram of the track 42Y5X connecting two sub-regions 61X-1 in the Y direction, and is also a structural schematic diagram of the docking of the track 42Y7 of the vehicle 7 in the left sub-region 61X-1 and the transition track 42Y5X-1;
图22是车3利用过渡轨道42Y5X-1从Y方向驾出车7运行至轨道41X5X上的结构示意图;Fig. 22 is a schematic diagram of the structure of the car 3 using the transition track 42Y5X-1 to drive the car 7 from the Y direction to the track 41X5X;
图23是车3利用过渡轨道41X5X-1从X方向运行至轨道42Y5X上的结构示意图;Fig. 23 is a structural schematic diagram of the car 3 running from the X direction to the track 42Y5X by using the transition track 41X5X-1;
图24是车3经过轨道42Y5X、过渡轨道41X5X-1运行至相邻子区域61X-1的轨道41X5X的结构示意图;Fig. 24 is a structural schematic diagram of the track 41X5X where the car 3 runs to the adjacent sub-area 61X-1 through the track 42Y5X and the transition track 41X5X-1;
图25是车3经过轨道42Y5X-1从Y方向进入车7的结构示意图;Fig. 25 is a structural schematic diagram of car 3 entering car 7 from the Y direction through track 42Y5X-1;
图26是轨道42X5Y将两个子区域61Y-1在Y方向连成一体的结构示意图,也是左边子区域61Y-1的车7的轨道42X7与过渡轨道42X5Y-1对接的结构示意图;Fig. 26 is a structural schematic diagram of the track 42X5Y connecting two sub-regions 61Y-1 in the Y direction, and it is also a structural schematic diagram of the docking of the track 42X7 of the vehicle 7 in the left sub-region 61Y-1 and the transition track 42X5Y-1;
图27是车3利用过渡轨道42X5Y-1从X方向驾出车7运行至轨道41Y5Y上的结构示意图;Fig. 27 is a schematic diagram of the structure of the car 3 using the transition track 42X5Y-1 to drive the car 7 from the X direction to the track 41Y5Y;
图28是车3利用过渡轨道41Y5Y-1从Y方向运行至轨道42X5Y上的结构示意图;Fig. 28 is a structural schematic diagram of the car 3 running from the Y direction to the track 42X5Y by using the transition track 41Y5Y-1;
图29是车3经过轨道42X5Y、过渡轨道41Y5Y-1运行至相邻子区域61Y-1的轨道41Y5Y的结构示意图;Fig. 29 is a structural schematic diagram of the track 41Y5Y where the car 3 runs to the adjacent sub-area 61Y-1 via the track 42X5Y and the transition track 41Y5Y-1;
图30是车3经过轨道42X5Y-1从X方向进入车7的结构示意图;Fig. 30 is a structural schematic diagram of car 3 entering car 7 from X direction through track 42X5Y-1;
图31是组成运输车7的沿集装箱2宽度方向运行的行走装置7-2和切换装置7-4的结构示意图;Fig. 31 is a structural schematic diagram of the running device 7-2 and the switching device 7-4 that make up the transport vehicle 7 and run along the width direction of the container 2;
图32是行走装置7-2、切换装置7-4实现X方向轨道与Y方向轨道间的转换的结构示意图;Fig. 32 is a schematic structural diagram of the traveling device 7-2 and the switching device 7-4 realizing the conversion between the X direction track and the Y direction track;
图33是区域62X的轨道41Y5X与区域62Y的轨道41X5Y的接口处设有回转装置9的结构示意图;Fig. 33 is a schematic diagram of the structure of the turning device 9 at the interface between the track 41Y5X in the area 62X and the track 41X5Y in the area 62Y;
图34是区域62X的轨道41Y5X与区域61Y的轨道42X5Y的接口处过渡轨道42X5Y-2的结构示意图;Fig. 34 is a schematic structural diagram of the transition track 42X5Y-2 at the interface between the track 41Y5X in the area 62X and the track 42X5Y in the area 61Y;
图35是在轨道42X5Y内设有与轨道41Y5X对接的过渡轨道41Y5X-2的结构示意图;Fig. 35 is a structural schematic diagram of a transition track 41Y5X-2 docked with the track 41Y5X in the track 42X5Y;
图36是区域61X的轨道42Y5X与区域62Y的轨道41X5Y的接口处设有对接的过渡轨道41X5Y-2的结构示意图;Fig. 36 is a structural schematic diagram of a transition track 41X5Y-2 that is docked at the interface between the track 42Y5X in area 61X and the track 41X5Y in area 62Y;
图37是区域61X的轨道42Y5X与区域61Y的轨道42X5Y的接口处设有回转装置10的结构示意图;Fig. 37 is a schematic diagram of the structure of the turning device 10 at the interface between the track 42Y5X in the area 61X and the track 42X5Y in the area 61Y;
图38是车3中的起重装置3-2将框架3-3内的集装箱2放置在位于装车位的卡车11上的结构示意图,也是起重机12将船14上的集装箱2放置在平台13上后,车3再也将平台13上的集装箱2抓取至框架3-3内,运送至区域6内设定的位置的结构示意图;Fig. 38 is a structural schematic diagram of the lifting device 3-2 in the car 3 placing the container 2 in the frame 3-3 on the truck 11 located in the loading space, and also the crane 12 placing the container 2 on the ship 14 on the platform 13 After boarding, the car 3 grabs the container 2 on the platform 13 into the frame 3-3, and transports it to the set position in the area 6;
图中的1是集装箱输送装置,包括集装箱2的输送车3、车3运行的空中轨道4、立柱构件5和集装箱2的堆场及输送区域6;2是集装箱;3是输送车,利用蓄电池或接触网供电,包括行走装置3-1、起重装置3-2、框架3-3和切换装置3-4;3-1是行走装置,包括行走装置3-1-1和行走装置3-1-2;3-1-1是沿集装箱2长度方向运行的行走装置;3-1-2是沿集装箱2宽度方向运行的行走装置;3-1-2-1是装置3-1-2行走轮;3-2是起重装置,位于框架3-3的上部;3-3是框架,底部开口的空腔;3-4是切换装置,包括具有顶升功能的切换装置3-4Z和具有回转功能的切换装置3-4R;3-4Z 是具有顶升功能的切换装置;3-4R是具有回转功能的切换装置;4是车3运行的空中轨道,轨道4包括车3沿集装箱2长度方向运行的轨道41和沿集装箱2宽度方向运行的轨道42;41是车3沿集装箱2长度方向运行的轨道;42是沿集装箱2宽度方向运行的轨道;42X5X是子区域62X-1的构件5X上设有的车3沿X方向的行走轨道;41Y5X是在区域62X内的车3沿集装箱2长度方向运行的轨道;42X-1是轨道41Y5X内设有与各子区域62X-1内的轨道42X5X相连的若干过渡轨道; 42Y5Y是子区域62Y-1的构件5Y上设有的车3沿Y方向的行走轨道;41X5Y是在区域62Y内的车3沿集装箱2长度方向运行的轨道;42Y-1是轨道41X5Y内设有与各子区域62Y-1内的轨道42Y5Y相连的若干过渡轨道;42X5Y-2是区域62X的轨道41Y5X与区域61Y的轨道42X5Y的接口处过渡轨道;41Y5X-2是在轨道42X5Y内设有与轨道41Y5X对接的过渡轨道;41X5Y-2是区域61X的轨道42Y5X与区域62Y的轨道41X5Y的接口处,在轨道42Y5X内设有与轨道41X5Y对接的过渡轨道;42Y5X-2是在轨道41X5Y内设有与轨道42Y5X对接的过渡轨道42Y5X-2;5是立柱构件;5X是区域62X的立柱构件;5Y是区域62Y的立柱构件;6是集装箱2的堆场及输送区域,分区域6X和区域6Y;6X是垂直于沿海宽度方向的区域,包括区域61X和区域62X;61X 是X方向为集装箱2沿长度方向输送的区域;62X是X方向为集装箱2沿宽度方向输送的区域;62X-1是区域62X的子区域;6Y是沿海宽度方向输送的区域,包括区域61Y和区域62Y;61Y是Y方向为集装箱2沿长度方向输送的区域;62Y是Y方向为集装箱2沿海宽度方向输送的区域;62Y-1是区域62Y的子区域;7是子区域61X-1设有的运输车,包括行走装置7-1、行走装置7-2和框架(7-3);7-1是沿集装箱2长度方向运行的行走装置;7-1-1是行走装置7-1的行走轮;7-2是沿集装箱2宽度方向运行的行走装置;7-3是框架;8X5X是相邻两构件5X上设有运输车7运行的空中轨道;7-4是运输车7的切换装置;42X7是框架7-3上设有垂直于轨道8Y5Y的行走装置3-1-2的运行轨道;42Y7是框架7-3上设有垂直于轨道8X5X的行走装置3-1-2的运行轨道;42Y5X是区域61X内设有车3沿集装箱2宽度方向运行的轨道;41X5X是子区域61X-1的构件5X的上方设有行走装置3-1-1运行的轨道;41X5X-1是在轨道42Y5X上设有若干与轨道41X5X对接的过渡轨道;42Y5X-1是在轨道41X5X上设有若干与轨道42Y7对接的过渡轨道;42X5Y是区域61Y内设有车3沿集装箱2宽度方向运行的轨道;41Y5Y是子区域61Y-1的构件5Y的上方设有行走装置3-1-1运行的轨道;41Y5Y-1是在轨道42X5Y上设有若干与轨道41Y5Y对接的过渡轨道;42X5Y1是在轨道41Y5Y上设有若干与轨道42X7对接的过渡轨道;9是区域62X的轨道41Y5X与区域62Y的轨道41X5Y的接口处设有的回转装置;10是区域61X的轨道42Y5X与区域61Y的轨道42X5Y的接口处设有回转装置;11是集装箱卡车;12是岸边集装箱起重机;13是装卸平台;14是船。1 in the figure is a container conveying device, including the conveying vehicle 3 of the container 2, the aerial track 4 on which the vehicle 3 operates, the column member 5, and the yard and conveying area 6 of the container 2; 2 is the container; Or catenary power supply, including running gear 3-1, hoisting gear 3-2, frame 3-3 and switching device 3-4; 3-1 is running gear, including running gear 3-1-1 and running gear 3- 1-2; 3-1-1 is the running device running along the length direction of the container 2; 3-1-2 is the running device running along the width direction of the container 2; 3-1-2-1 is the device 3-1-2 Walking wheels; 3-2 is a lifting device, located on the top of the frame 3-3; 3-3 is a frame, a cavity with a bottom opening; 3-4 is a switching device, including a switching device 3-4Z with a jacking function and Switching device 3-4R with a turning function; 3-4Z is a switching device with a lifting function; 3-4R is a switching device with a turning function; 4 is an aerial track for the vehicle 3 to run, and the track 4 includes the vehicle 3 along the container 2 The track 41 running along the length direction and the track 42 running along the width direction of the container 2; 41 is the track running along the length direction of the container 2; 42 is the track running along the width direction of the container 2; 42X5X is a component of the sub-area 62X-1 5X is provided with the car 3 running track along the X direction; 41Y5X is the track that the car 3 in the area 62X runs along the length direction of the container 2; Several transitional tracks connected by track 42X5X; 42Y5Y is the running track along the Y direction of the car 3 provided on the member 5Y of the sub-area 62Y-1; 41X5Y is the track that the car 3 in the area 62Y runs along the length direction of the container 2; 42Y -1 is the track 41X5Y with a number of transition tracks connected to the track 42Y5Y in each sub-area 62Y-1; 42X5Y-2 is the transition track at the interface between the track 41Y5X of the area 62X and the track 42X5Y of the area 61Y; 41Y5X-2 is In the track 42X5Y, there is a transition track docking with the track 41Y5X; 41X5Y-2 is the interface between the track 42Y5X in the area 61X and the track 41X5Y in the area 62Y, and there is a transition track in the track 42Y5X that is docked with the track 41X5Y; 42Y5X-2 The transition track 42Y5X-2 docked with the track 42Y5X is provided in the track 41X5Y; 5 is a column component; 5X is a column component in the area 62X; 5Y is a column component in the area 62Y; Sub-area 6X and area 6Y; 6X is the area perpendicular to the width direction of the coast, including area 61X and area 62X; 61X is the area where the container 2 is transported along the length direction in the X direction; 62X is the area where the container 2 is transported along the width direction in the X direction area; 62X-1 is a sub-area of area 62X; 6Y is an area transported in the width direction along the coast, including area 61Y and Area 62Y; 61Y is the area where the container 2 is transported along the length direction in the Y direction; 62Y is the area where the container 2 is transported along the width direction in the Y direction; 62Y-1 is a sub-area of the area 62Y; 7 is the sub-area 61X-1. The transport vehicle comprises a running device 7-1, a running device 7-2 and a frame (7-3); 7-1 is a running device running along the length direction of the container 2; 7-1-1 is a running device 7-1 Walking wheels; 7-2 is a running device running along the width direction of the container 2; 7-3 is a frame; 8X5X is an aerial track on which two adjacent components 5X are provided with transport vehicles 7; 7-4 is the switching of transport vehicles 7 device; 42X7 is the running track of the running device 3-1-2 perpendicular to the track 8Y5Y on the frame 7-3; 42Y7 is the running track of the running device 3-1-2 perpendicular to the track 8X5X on the frame 7-3 Track; 42Y5X is the track on which the car 3 runs along the width direction of the container 2 in the area 61X; 41X5X is the track on which the running device 3-1-1 runs on the top of the component 5X of the sub-area 61X-1; 41X5X-1 is on the Track 42Y5X is provided with several transition tracks docked with track 41X5X; 42Y5X-1 is provided with several transition tracks docked with track 42Y7 on track 41X5X; 42X5Y is a track with vehicles 3 running along the width direction of container 2 in area 61Y ; 41Y5Y is the track on which the traveling device 3-1-1 runs above the member 5Y of the sub-area 61Y-1; 41Y5Y-1 is provided with a number of transition tracks docked with the track 41Y5Y on the track 42X5Y; 42X5Y1 is on the track 41Y5Y There are several transition tracks docking with track 42X7; 9 is the turning device provided at the interface between track 41Y5X in area 62X and track 41X5Y in area 62Y; 10 is the interface between track 42Y5X in area 61X and track 42X5Y in area 61Y A slewing device is provided; 11 is a container truck; 12 is a shoreside container crane; 13 is a loading and unloading platform; 14 is a ship.
具体实施方式detailed description
集装箱输送装置1包括集装箱2的输送车3、车3运行的空中轨道4、立柱构件5和集装箱2的堆场及输送区域6;车3的长度方向是集装箱2的长度方向,车3的宽度方向是集装箱2的宽度方向,车3包括行走装置3-1、起重装置3-2、框架3-3和切换装置3-4,行走装置3-1位于框架3-3的下部,起重装置3-2位于框架3-3的上部,框架3-3是底部开口的空腔,起重装置3-2的吊挂装置3-2-1将框架3-3下方的集装箱2吊挂至框架3-3的空腔内;轨道4包括车3沿集装箱2长度方向运行的轨道41和沿集装箱2宽度方向运行的轨道42,车3水平运行时框架3-3内的集装箱2的底面高于轨道4的上平面,即不影响车3的运行;起重装置3-2将框架3-3内的集装箱2放置在轨道4的下方,或将轨道4下方的集装箱2抓取至框架3-3内;行走装置3-1包括A结构和B结构:The container conveying device 1 comprises the transport vehicle 3 of the container 2, the aerial track 4 that the vehicle 3 operates, the stacking yard and the conveying area 6 of the column member 5 and the container 2; the longitudinal direction of the vehicle 3 is the longitudinal direction of the container 2, and the width of the vehicle 3 The direction is the width direction of the container 2, and the car 3 includes a running device 3-1, a lifting device 3-2, a frame 3-3 and a switching device 3-4, and the running device 3-1 is located at the bottom of the frame 3-3. The device 3-2 is located on the top of the frame 3-3, and the frame 3-3 is a cavity with an open bottom, and the hanging device 3-2-1 of the lifting device 3-2 hangs the container 2 below the frame 3-3 to In the cavity of the frame 3-3; the track 4 includes a track 41 running along the length direction of the container 2 and a track 42 running along the width direction of the container 2, and the bottom surface of the container 2 in the frame 3-3 is high when the car 3 runs horizontally. On the upper plane of the track 4, that is, it does not affect the operation of the car 3; the lifting device 3-2 places the container 2 in the frame 3-3 under the track 4, or grabs the container 2 under the track 4 to the frame 3 -3; walking device 3-1 includes structure A and structure B:
A结构、行走装置3-1包括沿集装箱2长度方向运行的行走装置3-1-1、沿集装箱2宽度方向运行的行走装置3-1-2,切换装置3-4是具有顶升功能的切换装置3-4Z,行走装置3-1-1低于行走装置3-1-2时,行走装置3-1-2脱离轨道4,行走装置3-1-1在轨道41上运行,切换装置3-4动作,使行走装置3-1-2低于行走装置3-1-1时,行走装置3-1-1脱离轨道4,行走装置3-1-2在轨道42上运行;A structure, the running device 3-1 includes the running device 3-1-1 running along the length direction of the container 2, and the running device 3-1-2 running along the width direction of the container 2, and the switching device 3-4 has a jacking function Switching device 3-4Z, when running device 3-1-1 is lower than running device 3-1-2, running device 3-1-2 breaks away from track 4, and running device 3-1-1 runs on track 41, and switching device 3-4 action, when making running device 3-1-2 lower than running device 3-1-1, running device 3-1-1 breaks away from track 4, and running device 3-1-2 runs on track 42;
B结构、切换装置3-4是具有回转功能的切换装置3-4R,当装置3-4R回轨90度时,装置3-1从沿着X或Y方向运行回转至沿着Y或X方向运行。B structure, the switching device 3-4 is a switching device 3-4R with a turning function. When the device 3-4R returns to the track at 90 degrees, the device 3-1 turns from running along the X or Y direction to along the Y or X direction run.
所述的集装箱2的堆场及输送区域6包括区域6X和/或区域6Y,区域6X包括X方向为集装箱2沿长度方向输送的区域61X和X方向为集装箱2沿宽度方向输送的区域62X,区域6Y包括Y方向为集装箱2沿长度方向输送的区域61Y和Y方向为集装箱2沿海宽度方向输送的区域62Y。The storage yard and conveying area 6 of the container 2 includes an area 6X and/or an area 6Y. The area 6X includes an area 61X where the container 2 is transported along the length direction in the X direction and an area 62X where the container 2 is transported along the width direction in the X direction. The area 6Y includes an area 61Y in which the container 2 is transported in the longitudinal direction in the Y direction and an area 62Y in which the container 2 is transported in the width direction in the Y direction.
所述的区域62X包括若干个子区域62X-1,子区域62X-1的两侧设有构件5X,相邻两构件5X上设有空中轨道42X5X,轨道42X5X的间距等于装置3-1-2行走轮3-1-2-1的轮距,子区域62X-1内的车3沿X方向的轨道42X5X运行,起重装置3-2将框架3-3内的集装箱放置在轨道42X5X的下方,或将轨道42X5X下方的集装箱2抓取至框架3-3内;区域62X内设有车3沿集装箱2长度方向运行的轨道41Y5X,将各子区域62X-1在Y方向连成一体,轨道41Y5X内设有与各子区域62X-1内的轨道42X5X相连的若干过渡轨道42X-1;子区域62X-1内的车3在通过过渡轨道42X-1进入轨道41Y5X,通过轨道41Y5X进入另一子区域62X-1,实现在区域62X内的若干子区域62X-1之间的转换;所述的区域62Y包括若干个子区域62Y-1,子区域62Y-1的两侧设有构件5Y,构件5Y上设有空中轨道42Y5Y,轨道42Y5Y的间距等于装置3-1-2行走轮3-1-2-1的轮距,子区域62Y-1内的车3沿Y方向的轨道42Y5Y运行,起重装置3-2将框架3-3内的集装箱放置在轨道42Y5Y的下方,或将轨道42Y5Y下方的集装箱2抓取至框架3-3内;区域62Y内设有车3沿集装箱2长度方向运行的轨道41X5Y,将各子区域62Y-1在X方向连成一体,轨道41X5Y内设有与各子区域62Y-1内的轨道42Y5Y相连的若干过渡轨道42Y-1;子区域62Y-1内的车3在通过过渡轨道42Y-1进入轨道41X5Y,通过轨道41X5Y进入另一子区域62Y-1,实现在区域62Y内的若干子区域62Y-1之间的转换。Said area 62X includes several sub-areas 62X-1. Components 5X are arranged on both sides of the sub-area 62X-1. Air rails 42X5X are arranged on adjacent two components 5X. The distance between the rails 42X5X is equal to that of the device 3-1-2. The track of the wheel 3-1-2-1, the car 3 in the sub-area 62X-1 runs along the track 42X5X in the X direction, and the lifting device 3-2 places the container in the frame 3-3 under the track 42X5X, Or grab the container 2 below the track 42X5X into the frame 3-3; in the area 62X, there is a track 41Y5X where the car 3 runs along the length direction of the container 2, and connect each sub-area 62X-1 in the Y direction, and the track 41Y5X There are several transition tracks 42X-1 connected to the track 42X5X in each sub-area 62X-1; the car 3 in the sub-area 62X-1 enters the track 41Y5X through the transition track 42X-1, and enters another sub-track 41Y5X through the track 41Y5X. The area 62X-1 realizes the conversion between several sub-areas 62X-1 in the area 62X; the area 62Y includes several sub-areas 62Y-1, and the two sides of the sub-area 62Y-1 are provided with components 5Y, and the components 5Y Aerial track 42Y5Y is arranged on the top, the distance of track 42Y5Y is equal to the wheel base of device 3-1-2 traveling wheel 3-1-2-1, and the car 3 in the sub-area 62Y-1 moves along the track 42Y5Y in the Y direction, lifting The device 3-2 places the container in the frame 3-3 under the track 42Y5Y, or grabs the container 2 under the track 42Y5Y into the frame 3-3; the area 62Y is equipped with a vehicle 3 running along the length direction of the container 2 The track 41X5Y connects the sub-areas 62Y-1 in the X direction, and the track 41X5Y is provided with a number of transition tracks 42Y-1 connected with the track 42Y5Y in each sub-area 62Y-1; the vehicles in the sub-area 62Y-1 3 After entering the track 41X5Y through the transition track 42Y-1, and entering another sub-region 62Y-1 through the track 41X5Y, the transition between several sub-regions 62Y-1 in the region 62Y is realized.
所述的区域61X包括若干个子区域61X-1,子区域61X-1设有运输车7,车7包括沿集装箱2长度方向运行的行走装置7-1和框架7-3,行走装置7-1位于框架7-3的两端,子区域61X-1的两侧设有构件5X,相邻两构件5X上设有运输车7运行的空中轨道8X5X,轨道8X5X的间距等于行走装置7-1中的行走轮7-1-1的间距,框架7-3上设有垂直于轨道8X5X的行走装置3-1-2的运行轨道42Y7,轨道42Y7的间距等于装置3-1-2行走轮3-1-2-1的轮距;子区域61X-1内的车7沿X方向的轨道8X5X运行,行走装置3-1-2沿着Y方向的轨道42Y7运行,起重装置3-2将框架3-3内的集装箱2放置在区域61X-1内,或将区域61X-1内的集装箱2抓取至框架3-3内;所述的区域61Y包括若干个子区域61Y-1,The area 61X includes several sub-areas 61X-1, and the sub-area 61X-1 is provided with a transport vehicle 7, and the vehicle 7 includes a running device 7-1 and a frame 7-3 running along the length direction of the container 2, and the running device 7-1 Located at both ends of the frame 7-3, there are components 5X on both sides of the sub-area 61X-1, two adjacent components 5X are provided with aerial tracks 8X5X for transport vehicles 7, and the distance between the tracks 8X5X is equal to that of the running device 7-1. The spacing of the walking wheels 7-1-1, the frame 7-3 is provided with the running track 42Y7 of the running device 3-1-2 perpendicular to the track 8X5X, and the spacing of the track 42Y7 is equal to the running wheel 3-1-2 of the device 3-1-2 The wheel base of 1-2-1; the car 7 in the sub-area 61X-1 runs along the track 8X5X in the X direction, the running device 3-1-2 runs along the track 42Y7 in the Y direction, and the lifting device 3-2 moves the frame The container 2 in 3-3 is placed in the area 61X-1, or the container 2 in the area 61X-1 is grabbed into the frame 3-3; the area 61Y includes several sub-areas 61Y-1,
子区域61Y-1设有运输车7,车7包括沿集装箱2长度方向运行的行走装置7-1和框架7-3,行走装置7-1位于框架7-3的两端,子区域61Y-1的两侧设有构件5Y,相邻两构件5Y上设有运输车7运行的空中轨道8Y5Y,轨道8Y5Y的间距等于行走装置7-1中的行走轮(7-1-1的间距,框架7-3上设有垂直于轨道8Y5Y的行走装置3-1-2的运行轨道42X7,轨道42X7的间距等于装置3-1-2行走轮3-1-2-1的轮距;子区域61Y-1内的车7沿Y方向的轨道8Y5Y运行,行走装置3-1-2沿着X方向的轨道42X7运行,起重装置3-2将框架3-3内的集装箱2放置在区域61Y-1内,或将区域61Y-1内的集装箱2抓取至框架3-3内。The sub-area 61Y-1 is provided with a transport vehicle 7. The vehicle 7 includes a running device 7-1 and a frame 7-3 running along the length direction of the container 2. The running device 7-1 is located at both ends of the frame 7-3. The sub-area 61Y- The two sides of 1 are provided with component 5Y, and adjacent two components 5Y are provided with the air track 8Y5Y that transport vehicle 7 runs, and the distance of track 8Y5Y is equal to the walking wheel (the distance of 7-1-1 in the traveling device 7-1, frame 7-3 is provided with the running track 42X7 of the running device 3-1-2 perpendicular to the track 8Y5Y, and the distance between the track 42X7 is equal to the wheel base of the running wheel 3-1-2-1 of the device 3-1-2; the sub-area 61Y - The car 7 in 1 runs along the track 8Y5Y in the Y direction, the traveling device 3-1-2 runs along the track 42X7 in the X direction, and the lifting device 3-2 places the container 2 in the frame 3-3 in the area 61Y- 1, or grab the container 2 in the area 61Y-1 into the frame 3-3.
所述的区域61X内设有车3沿集装箱2宽度方向运行的轨道42Y5X,将若干个子区域61X-1在Y方向连成一体,子区域61X-1的构件5X的上方设有行走装置3-1-1运行的轨道41X5X,在轨道42Y5X上设有若干与轨道41X5X对接的过渡轨道41X5X-1,轨道41X5X-1垂直于轨道42Y5X,在轨道41X5X上设有若干与轨道42Y7对接的过渡轨道42Y5X-1,过渡轨道42Y5X-1垂直于轨道41X5X,通过过渡轨道42Y5X-1实现车3从Y方向出入车7,并通过轨道41X5X和轨道42Y5X实现车3在不同的区域61X-1间的转换;所述的区域61Y内设有车3沿集装箱2宽度方向运行的轨道42X5Y,将若干个子区域61Y-1在X方向连成一体;子区域61Y-1的构件5Y的上方设有行走装置3-1-1运行的轨道41Y5Y,在轨道42X5Y上设有若干与轨道41Y5Y对接的过渡轨道41Y5Y-1,轨道41Y5Y-1垂直于轨道42X5Y,在轨道41Y5Y上设有若干与轨道42X7对接的过渡轨道42X5Y-1,过渡轨道42X5Y-1垂直于轨道41Y5Y,通过过渡轨道42X5Y-1实现车3从X方向出入车7,并通过轨道41Y5Y和轨道42X5Y实现车3在不同的区域61Y-1间的转换。The above-mentioned area 61X is provided with a track 42Y5X for the vehicle 3 to run along the width direction of the container 2, and several sub-areas 61X-1 are integrated in the Y direction, and a running device 3- 1-1 running track 41X5X, there are several transition tracks 41X5X-1 docked with track 41X5X on track 42Y5X, track 41X5X-1 is perpendicular to track 42Y5X, and several transition tracks 42Y5X docked with track 42Y7 are set on track 41X5X -1, the transition track 42Y5X-1 is perpendicular to the track 41X5X, through the transition track 42Y5X-1, the car 3 can enter and exit the car 7 from the Y direction, and the car 3 can switch between different areas 61X-1 through the track 41X5X and the track 42Y5X; The above-mentioned area 61Y is provided with a track 42X5Y for the vehicle 3 to run along the width direction of the container 2, and several sub-areas 61Y-1 are integrated in the X direction; above the component 5Y of the sub-area 61Y-1, a running device 3- 1-1 running track 41Y5Y, there are several transition tracks 41Y5Y-1 docked with track 41Y5Y on track 42X5Y, track 41Y5Y-1 is perpendicular to track 42X5Y, and several transition tracks 42X5Y docked with track 42X7 are set on track 41Y5Y -1, the transition track 42X5Y-1 is perpendicular to the track 41Y5Y, through the transition track 42X5Y-1, the car 3 enters and exits the car 7 from the X direction, and the transition between the car 3 in different areas 61Y-1 is realized through the track 41Y5Y and the track 42X5Y.
所述的区域61X和/或区域61Y中设有运输车7沿集装箱2宽度方向运行的轨道8Y5X和/或轨道8X5Y,运输车7还包括沿集装箱2宽度方向运行的行走装置7-2和切换装置7-4,通过行走装置7-2、切换装置7-4和轨道8Y5X实现车7在区域61X内不同的区域61X-1间的转换,通过行走装置7-2、切换装置7-4和轨道8X5Y实现车7在区域61Y内不同的区域61Y-1间的转换。Said area 61X and/or area 61Y is provided with a track 8Y5X and/or track 8X5Y on which the transport vehicle 7 runs along the width direction of the container 2, and the transport vehicle 7 also includes a running device 7-2 and a switching device running along the width direction of the container 2. Device 7-4 realizes the conversion of car 7 between different areas 61X-1 in area 61X through running device 7-2, switching device 7-4 and track 8Y5X, through running device 7-2, switching device 7-4 and The track 8X5Y realizes the transfer of the vehicle 7 between different areas 61Y-1 in the area 61Y.
所述的区域62X的轨道41Y5X与区域62Y的轨道41X5Y的接口处设有回转装置9,车3通过装置9实现了在轨道41Y5X与轨道41X5Y之间的转换;所述的区域62X的轨道41Y5X与区域61Y的轨道42X5Y的接口处,在轨道41Y5X内设有与轨道42X5Y对接的过渡轨道42X5Y-2,或在轨道42X5Y内设有与轨道41Y5X对接的过渡轨道41Y5X-2,车3通过轨道42X5Y-2或过渡轨道41Y5X-2实现了在轨道41Y5X与轨道42X5Y之间的转换;所述的区域61X的轨道42Y5X与区域62Y的轨道41X5Y的接口处,在轨道42Y5X内设有与轨道41X5Y对接的过渡轨道41X5Y-2,或在轨道41X5Y内设有与轨道42Y5X对接的过渡轨道42Y5X-2,车3通过过渡轨道41X5Y-2或过渡轨道42Y5X-2实现了在轨道42Y5X与轨道42Y5Y之间的转换;所述的区域61X的轨道42Y5X与区域61Y的轨道42X5Y的接口处设有回转装置10,车3通过装置10实现了在轨道42Y5X与轨道42X5Y之间的转换。A turning device 9 is provided at the interface between the track 41Y5X of the area 62X and the track 41X5Y of the area 62Y, and the car 3 realizes the conversion between the track 41Y5X and the track 41X5Y through the device 9; the track 41Y5X of the area 62X and the At the interface of the track 42X5Y in the area 61Y, a transition track 42X5Y-2 docked with the track 42X5Y is provided in the track 41Y5X, or a transition track 41Y5X-2 docked with the track 41Y5X is provided in the track 42X5Y, and the vehicle 3 passes through the track 42X5Y- 2 or the transition track 41Y5X-2 realizes the conversion between the track 41Y5X and the track 42X5Y; at the interface between the track 42Y5X in the area 61X and the track 41X5Y in the area 62Y, there is a transition in the track 42Y5X that docks with the track 41X5Y The track 41X5Y-2, or the transition track 42Y5X-2 docked with the track 42Y5X is provided in the track 41X5Y, and the car 3 realizes the conversion between the track 42Y5X and the track 42Y5Y through the transition track 41X5Y-2 or the transition track 42Y5X-2; A turning device 10 is provided at the interface between the track 42Y5X in the area 61X and the track 42X5Y in the area 61Y. The car 3 realizes the conversion between the track 42Y5X and the track 42X5Y through the device 10 .
所述的装置1是一种用于集装箱码头的集装箱输送装置。The device 1 is a container conveying device used in a container terminal.
所述的区域6包括集装箱卡车11的装卸车位,车3中的起重装置3-2将框架3-3内的集装箱2放置在位于装车位的卡车11上,或将缷车位卡车11上的集装箱2抓取至框架3-3内;所述的区域6还包括岸边集装箱起重机12的装卸平台13,起重机12将船14上的集装箱2放置在平台13上后,车3再也将平台13上的集装箱2抓取至框架3-3内,运送至区域6内设定的位置;或者车3将区域6内设定的位置上的集装箱2抓取、运行并放置在平台13上后,起重机12再抓取平台13上的集装箱2运送至船13上。Said area 6 includes the loading and unloading parking space of the container truck 11, and the lifting device 3-2 in the car 3 places the container 2 in the frame 3-3 on the truck 11 positioned at the loading space, or places the container 2 on the truck 11 of the parking space. The container 2 is grabbed into the frame 3-3; the area 6 also includes the loading and unloading platform 13 of the shore container crane 12, and after the crane 12 places the container 2 on the ship 14 on the platform 13, the vehicle 3 will be placed on the platform 13 again. The container 2 on the platform 13 is grabbed into the frame 3-3, and transported to the set position in the area 6; or the vehicle 3 grabs, runs and places the container 2 at the set position in the area 6 on the platform 13 Afterwards, the crane 12 grabs the container 2 on the platform 13 and transports it to the ship 13.
下面结合附图进一步描述本发明Further describe the present invention below in conjunction with accompanying drawing
如图1~图6所示,集装箱输送装置1包括集装箱2的输送车3、车3运行的空中轨道4、立柱构件5和集装箱2的堆场及输送区域6;车3的长度方向是集装箱2的长度方向,车3的宽度方向是集装箱2的宽度方向,车3包括行走装置3-1、起重装置3-2、框架3-3和切换装置3-4,行走装置3-1位于框架3-3的下部,起重装置3-2位于框架3-3的上部,框架3-3是底部开口的空腔,起重装置3-2的吊挂装置3-2-1将框架3-3下方的集装箱2吊挂至框架3-3的空腔内;轨道4包括车3沿集装箱2长度方向运行的轨道41和沿集装箱2宽度方向运行的轨道42,车3水平运行时框架3-3内的集装箱2的底面高于轨道4的上平面,即不影响车3的运行;起重装置3-2将框架3-3内的集装箱2放置在轨道4的下方,或将轨道4下方的集装箱2抓取至框架3-3内;行走装置3-1包括A结构和B结构: As shown in Figures 1 to 6, the container conveying device 1 includes a conveying vehicle 3 for the container 2, an aerial rail 4 for the operation of the vehicle 3, a column member 5, and a storage yard and a conveying area 6 for the container 2; the longitudinal direction of the vehicle 3 is the container 2, the width direction of the car 3 is the width direction of the container 2, the car 3 includes a running device 3-1, a lifting device 3-2, a frame 3-3 and a switching device 3-4, and the running device 3-1 is located at The bottom of frame 3-3, lifting device 3-2 is positioned at the top of frame 3-3, and frame 3-3 is the cavity of bottom opening, and the hanging device 3-2-1 of lifting device 3-2 will frame 3 The container 2 below the -3 is hung in the cavity of the frame 3-3; the track 4 includes a track 41 that the car 3 runs along the length direction of the container 2 and a track 42 that runs along the width direction of the container 2. When the car 3 runs horizontally, the frame 3 The bottom surface of the container 2 in the -3 is higher than the upper plane of the track 4, that is, it does not affect the operation of the car 3; the lifting device 3-2 places the container 2 in the frame 3-3 below the track 4, or the track 4 The container 2 below is grabbed into the frame 3-3; the running device 3-1 includes structure A and structure B:
A结构、行走装置3-1包括沿集装箱2长度方向运行的行走装置3-1-1、沿集装箱2宽度方向运行的行走装置3-1-2,切换装置3-4是具有顶升功能的切换装置3-4Z,行走装置3-1-1低于行走装置3-1-2时,行走装置3-1-2脱离轨道4,行走装置3-1-1在轨道41上运行,切换装置3-4动作,使行走装置3-1-2低于行走装置3-1-1时,行走装置3-1-1脱离轨道4,行走装置3-1-2在轨道42上运行;A structure, the running device 3-1 includes the running device 3-1-1 running along the length direction of the container 2, and the running device 3-1-2 running along the width direction of the container 2, and the switching device 3-4 has a jacking function Switching device 3-4Z, when running device 3-1-1 is lower than running device 3-1-2, running device 3-1-2 breaks away from track 4, and running device 3-1-1 runs on track 41, and switching device 3-4 action, when making running device 3-1-2 lower than running device 3-1-1, running device 3-1-1 breaks away from track 4, and running device 3-1-2 runs on track 42;
B结构、切换装置3-4是具有回转功能的切换装置3-4R,当装置3-4R回轨90度时,装置3-1从沿着X或Y方向运行回转至沿着Y或X方向运行。B structure, the switching device 3-4 is a switching device 3-4R with a turning function. When the device 3-4R returns to the track at 90 degrees, the device 3-1 turns from running along the X or Y direction to along the Y or X direction run.
如图7~图10所示,集装箱2的堆场及输送区域6包括区域6X和/或区域6Y,区域6X包括X方向为集装箱2沿长度方向输送的区域61X和X方向为集装箱2沿宽度方向输送的区域62X,区域6Y包括Y方向为集装箱2沿长度方向输送的区域61Y和Y方向为集装箱2沿海宽度方向输送的区域62Y。As shown in Figures 7 to 10, the storage yard and transport area 6 of the container 2 includes an area 6X and/or an area 6Y, and the area 6X includes an area 61X in which the container 2 is transported along the length direction in the X direction and an area 61X in which the container 2 is transported along the width direction in the X direction. The area 62X and the area 6Y include the area 61Y where the container 2 is transported along the longitudinal direction in the Y direction and the area 62Y where the container 2 is transported along the width direction in the Y direction.
如图11~图16所示,区域62X包括若干个子区域62X-1,子区域62X-1的两侧设有构件5X,相邻两构件5X上设有空中轨道42X5X,轨道42X5X的间距等于装置3-1-2行走轮3-1-2-1的轮距,子区域62X-1内的车3沿X方向的轨道42X5X运行,起重装置3-2将框架3-3内的集装箱放置在轨道42X5X的下方,或将轨道42X5X下方的集装箱2抓取至框架3-3内;区域62X内设有车3沿集装箱2长度方向运行的轨道41Y5X,将各子区域62X-1在Y方向连成一体,轨道41Y5X内设有与各子区域62X-1内的轨道42X5X相连的若干过渡轨道42X-1;子区域62X-1内的车3在通过过渡轨道42X-1进入轨道41Y5X,通过轨道41Y5X进入另一子区域62X-1,实现在区域62X内的若干子区域62X-1之间的转换;所述的区域62Y包括若干个子区域62Y-1,子区域62Y-1的两侧设有构件5Y,构件5Y上设有空中轨道42Y5Y,轨道42Y5Y的间距等于装置3-1-2行走轮3-1-2-1的轮距,子区域62Y-1内的车3沿Y方向的轨道42Y5Y运行,起重装置3-2将框架3-3内的集装箱放置在轨道42Y5Y的下方,或将轨道42Y5Y下方的集装箱2抓取至框架3-3内;区域62Y内设有车3沿集装箱2长度方向运行的轨道41X5Y,将各子区域62Y-1在X方向连成一体,轨道41X5Y内设有与各子区域62Y-1内的轨道42Y5Y相连的若干过渡轨道42Y-1;子区域62Y-1内的车3在通过过渡轨道42Y-1进入轨道41X5Y,通过轨道41X5Y进入另一子区域62Y-1,实现在区域62Y内的若干子区域62Y-1之间的转换。As shown in Figures 11 to 16, the area 62X includes several sub-areas 62X-1, the two sides of the sub-area 62X-1 are provided with components 5X, and the adjacent two components 5X are provided with air rails 42X5X, and the distance between the rails 42X5X is equal to that of the device. 3-1-2 The wheelbase of the traveling wheels 3-1-2-1, the car 3 in the sub-area 62X-1 runs along the track 42X5X in the X direction, and the lifting device 3-2 places the container in the frame 3-3 Below the track 42X5X, or grab the container 2 below the track 42X5X into the frame 3-3; in the area 62X, there is a track 41Y5X where the car 3 runs along the length direction of the container 2, and each sub-area 62X-1 in the Y direction Connected into one body, the track 41Y5X is provided with a number of transition tracks 42X-1 connected to the track 42X5X in each sub-area 62X-1; the car 3 in the sub-area 62X-1 enters the track 41Y5X through the transition track 42X-1, and passes through The track 41Y5X enters another sub-area 62X-1 to realize the transition between several sub-areas 62X-1 in the area 62X; the area 62Y includes several sub-areas 62Y-1, and the two sides of the sub-area 62Y-1 are set There is a component 5Y, and the component 5Y is provided with an aerial track 42Y5Y, and the distance between the track 42Y5Y is equal to the wheelbase of the device 3-1-2 traveling wheel 3-1-2-1, and the vehicle 3 in the sub-area 62Y-1 moves along the Y direction. The track 42Y5Y runs, and the lifting device 3-2 places the container in the frame 3-3 under the track 42Y5Y, or grabs the container 2 under the track 42Y5Y into the frame 3-3; The track 41X5Y running in the length direction of the container 2 connects the sub-areas 62Y-1 in the X direction, and the track 41X5Y is provided with a number of transition tracks 42Y-1 connected with the track 42Y5Y in each sub-area 62Y-1; the sub-areas Car 3 in 62Y-1 enters track 41X5Y through transition track 42Y-1, and enters another sub-area 62Y-1 through track 41X5Y, realizing the transition between several sub-areas 62Y-1 in area 62Y.
如图17~图20所示,区域61X包括若干个子区域61X-1,子区域61X-1设有运输车7,车7包括沿集装箱2长度方向运行的行走装置7-1和框架7-3,行走装置7-1位于框架7-3的两端,子区域61X-1的两侧设有构件5X,相邻两构件5X上设有运输车7运行的空中轨道8X5X,轨道8X5X的间距等于行走装置7-1中的行走轮7-1-1的间距,框架7-3上设有垂直于轨道8X5X的行走装置3-1-2的运行轨道42Y7,轨道42Y7的间距等于装置3-1-2行走轮3-1-2-1的轮距;子区域61X-1内的车7沿X方向的轨道8X5X运行,行走装置3-1-2沿着Y方向的轨道42Y7运行,起重装置3-2将框架3-3内的集装箱2放置在区域61X-1内,或将区域61X-1内的集装箱2抓取至框架3-3内;所述的区域61Y包括若干个子区域61Y-1,As shown in Figures 17 to 20, the area 61X includes several sub-areas 61X-1, and the sub-area 61X-1 is provided with a transport vehicle 7, and the vehicle 7 includes a running device 7-1 and a frame 7-3 running along the length direction of the container 2 , the running device 7-1 is located at the two ends of the frame 7-3, the two sides of the sub-area 61X-1 are provided with components 5X, and the adjacent two components 5X are provided with air tracks 8X5X for transport vehicles 7 to run, and the distance between the tracks 8X5X is equal to The distance between the walking wheels 7-1-1 in the running device 7-1, the frame 7-3 is provided with the running track 42Y7 perpendicular to the running device 3-1-2 of the track 8X5X, and the spacing of the track 42Y7 is equal to the device 3-1 -2 the wheelbase of the traveling wheels 3-1-2-1; the car 7 in the sub-area 61X-1 runs along the track 8X5X in the X direction, and the running device 3-1-2 runs along the track 42Y7 in the Y direction, lifting The device 3-2 places the container 2 in the frame 3-3 in the area 61X-1, or grabs the container 2 in the area 61X-1 into the frame 3-3; the area 61Y includes several sub-areas 61Y -1,
子区域61Y-1设有运输车7,车7包括沿集装箱2长度方向运行的行走装置7-1和框架7-3,行走装置7-1位于框架7-3的两端,子区域61Y-1的两侧设有构件5Y,相邻两构件5Y上设有运输车7运行的空中轨道8Y5Y,轨道8Y5Y的间距等于行走装置7-1中的行走轮7-1-1的间距,框架7-3上设有垂直于轨道8Y5Y的行走装置3-1-2的运行轨道42X7,轨道42X7的间距等于装置3-1-2行走轮3-1-2-1的轮距;子区域61Y-1内的车7沿Y方向的轨道8Y5Y运行,行走装置3-1-2沿着X方向的轨道42X7运行,起重装置3-2将框架3-3内的集装箱2放置在区域61Y-1内,或将区域61Y-1内的集装箱2抓取至框架3-3内。The sub-area 61Y-1 is provided with a transport vehicle 7. The vehicle 7 includes a running device 7-1 and a frame 7-3 running along the length direction of the container 2. The running device 7-1 is located at both ends of the frame 7-3. The sub-area 61Y- The two sides of 1 are provided with components 5Y, and two adjacent components 5Y are provided with air rails 8Y5Y for transport vehicles 7 to run. -3 is provided with the running track 42X7 of the running device 3-1-2 perpendicular to the track 8Y5Y, and the distance of the track 42X7 is equal to the wheel base of the device 3-1-2 walking wheel 3-1-2-1; the sub-area 61Y- The car 7 in 1 runs along the track 8Y5Y in the Y direction, the traveling device 3-1-2 runs along the track 42X7 in the X direction, and the lifting device 3-2 places the container 2 in the frame 3-3 in the area 61Y-1 or grab the container 2 in the area 61Y-1 into the frame 3-3.
如图21~图30所示,区域61X内设有车3沿集装箱2宽度方向运行的轨道42Y5X,将若干个子区域61X-1在Y方向连成一体,子区域61X-1的构件5X的上方设有行走装置3-1-1运行的轨道41X5X,在轨道42Y5X上设有若干与轨道41X5X对接的过渡轨道41X5X-1,轨道41X5X-1垂直于轨道42Y5X,在轨道41X5X上设有若干与轨道42Y7对接的过渡轨道42Y5X-1,过渡轨道42Y5X-1垂直于轨道41X5X,通过过渡轨道42Y5X-1实现车3从Y方向出入车7,并通过轨道41X5X和轨道42Y5X实现车3在不同的区域61X-1间的转换;所述的区域61Y内设有车3沿集装箱2宽度方向运行的轨道42X5Y,将若干个子区域61Y-1在X方向连成一体;子区域61Y-1的构件5Y的上方设有行走装置3-1-1运行的轨道41Y5Y,在轨道42X5Y上设有若干与轨道41Y5Y对接的过渡轨道41Y5Y-1,轨道41Y5Y-1垂直于轨道42X5Y,在轨道41Y5Y上设有若干与轨道42X7对接的过渡轨道42X5Y-1,过渡轨道42X5Y-1垂直于轨道41Y5Y,通过过渡轨道42X5Y-1实现车3从X方向出入车7,并通过轨道41Y5Y和轨道42X5Y实现车3在不同的区域61Y-1间的转换。As shown in Figures 21 to 30, the area 61X is provided with a track 42Y5X on which the vehicle 3 runs along the width direction of the container 2, and several sub-areas 61X-1 are integrated in the Y direction. There is a track 41X5X running on the running device 3-1-1, on the track 42Y5X there are several transition tracks 41X5X-1 docked with the track 41X5X, the track 41X5X-1 is perpendicular to the track 42Y5X, and on the track 41X5X are provided The transition track 42Y5X-1 docked with 42Y7, the transition track 42Y5X-1 is perpendicular to the track 41X5X, through the transition track 42Y5X-1, the car 3 can enter and exit the car 7 from the Y direction, and the car 3 can be in a different area 61X through the track 41X5X and the track 42Y5X -1 conversion; the area 61Y is provided with a track 42X5Y for the vehicle 3 to run along the width direction of the container 2, and several sub-areas 61Y-1 are integrated in the X direction; above the component 5Y of the sub-area 61Y-1 There is a track 41Y5Y running on the running device 3-1-1. On the track 42X5Y, there are several transition tracks 41Y5Y-1 docked with the track 41Y5Y. The track 41Y5Y-1 is perpendicular to the track 42X5Y. The transition track 42X5Y-1 docked with 42X7, the transition track 42X5Y-1 is perpendicular to the track 41Y5Y, through the transition track 42X5Y-1, the car 3 can enter and exit the car 7 from the X direction, and the car 3 can be in a different area 61Y through the track 41Y5Y and the track 42X5Y -1 between conversions.
如图31~图32所示,区域61X和/或区域61Y中设有运输车7沿集装箱2宽度方向运行的轨道8Y5X和/或轨道8X5Y,运输车7还包括沿集装箱2宽度方向运行的行走装置7-2和切换装置7-4,通过行走装置7-2、切换装置7-4和轨道8Y5X实现车7在区域61X内不同的区域61X-1间的转换,通过行走装置7-2、切换装置7-4和轨道8X5Y实现车7在区域61Y内不同的区域61Y-1间的转换。As shown in Figures 31 to 32, the area 61X and/or the area 61Y is provided with a track 8Y5X and/or a track 8X5Y that the transport vehicle 7 runs along the width direction of the container 2, and the transport vehicle 7 also includes a walking track that runs along the width direction of the container 2. The device 7-2 and the switching device 7-4 realize the conversion of the car 7 between different areas 61X-1 in the area 61X through the running device 7-2, the switching device 7-4 and the track 8Y5X. Through the running device 7-2, The switching device 7-4 and the track 8X5Y realize the switching of the vehicle 7 between different areas 61Y-1 in the area 61Y.
如图33~图37所示,区域61X和/或区域61Y中设有运输车7沿集装箱2宽度方向运行的轨道8Y5X和/或轨道8X5Y,运输车7还包括沿集装箱2宽度方向运行的行走装置7-2和切换装置7-4,通过行走装置7-2、切换装置7-4和轨道8Y5X实现车7在区域61X内不同的区域61X-1间的转换,通过行走装置7-2、切换装置7-4和轨道8X5Y实现车7在区域61Y内不同的区域61Y-1间的转换。As shown in Figures 33 to 37, the area 61X and/or the area 61Y is provided with a track 8Y5X and/or a track 8X5Y that the transport vehicle 7 runs along the width direction of the container 2, and the transport vehicle 7 also includes a walking track that runs along the width direction of the container 2. The device 7-2 and the switching device 7-4 realize the conversion of the car 7 between different areas 61X-1 in the area 61X through the running device 7-2, the switching device 7-4 and the track 8Y5X. Through the running device 7-2, The switching device 7-4 and the track 8X5Y realize the switching of the vehicle 7 between different areas 61Y-1 in the area 61Y.
如图38所示,装置1是一种用于集装箱码头的集装箱输送装置;区域6包括集装箱卡车11的装卸车位,车3中的起重装置3-2将框架3-3内的集装箱2放置在位于装车位的卡车11上,或将卸车位卡车11上的集装箱2抓取至框架3-3内;所述的区域6还包括岸边集装箱起重机12的装卸平台13,起重机12将船14上的集装箱2放置在平台13上后,车3再也将平台13上的集装箱2抓取至框架3-3内,运送至区域6内设定的位置;或者车3将区域6内设定的位置上的集装箱2抓取、运行并放置在平台13上后,起重机12再抓取平台13上的集装箱2运送至船14上。As shown in Figure 38, the device 1 is a container conveying device for a container terminal; the area 6 includes the loading and unloading parking space of the container truck 11, and the lifting device 3-2 in the car 3 places the container 2 in the frame 3-3 On the truck 11 at the loading bay, or grab the container 2 on the truck 11 at the unloading bay into the frame 3-3; the area 6 also includes the loading and unloading platform 13 of the shoreside container crane 12, and the crane 12 will move the ship After the container 2 on the platform 14 is placed on the platform 13, the car 3 grabs the container 2 on the platform 13 into the frame 3-3, and transports it to the set position in the area 6; After the container 2 on the predetermined position is grabbed, operated and placed on the platform 13, the crane 12 grabs the container 2 on the platform 13 and transports it to the ship 14.
Claims (9)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710864172.7A CN107499849A (en) | 2017-09-22 | 2017-09-22 | A kind of container handling equipment and its carrying method |
PCT/CN2018/107202 WO2019057186A1 (en) | 2017-09-22 | 2018-09-25 | Container conveying apparatus and conveying method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710864172.7A CN107499849A (en) | 2017-09-22 | 2017-09-22 | A kind of container handling equipment and its carrying method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107499849A true CN107499849A (en) | 2017-12-22 |
Family
ID=60697907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710864172.7A Pending CN107499849A (en) | 2017-09-22 | 2017-09-22 | A kind of container handling equipment and its carrying method |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107499849A (en) |
WO (1) | WO2019057186A1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108792485A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of railway container yard and its conveying device |
CN108792482A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of dock container goods yard and its conveying device |
CN108792483A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of dock container goods yard and its conveying device |
CN108792484A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109250406A (en) * | 2018-07-31 | 2019-01-22 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109250407A (en) * | 2018-07-31 | 2019-01-22 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109436831A (en) * | 2018-12-22 | 2019-03-08 | 王燏斌 | A kind of conveying device for container yard |
WO2019057186A1 (en) * | 2017-09-22 | 2019-03-28 | 王燏斌 | Container conveying apparatus and conveying method |
CN111137692A (en) * | 2019-11-05 | 2020-05-12 | 王燏斌 | A conveying vehicle with a flanged traveling wheel for a jacking-up traveling device |
CN112158547A (en) * | 2020-09-22 | 2021-01-01 | 福建纬龙机械制造有限公司 | Intelligent lifting device for container |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4973219A (en) * | 1986-04-30 | 1990-11-27 | Sea-Land Corporation | Grid rail container transport and storage system |
US20020197135A1 (en) * | 1998-03-10 | 2002-12-26 | Arntzen John O. | Container transfer terminal system and method |
CN1590272A (en) * | 2003-08-27 | 2005-03-09 | 上海振华港口机械(集团)股份有限公司 | Roil type bitrolley gantry container hoister |
US20070134076A1 (en) * | 2005-12-14 | 2007-06-14 | Hong Tian | Carrier transferring load and unload system of low frame bridge type between the shore side crane and the stack field crane |
CN101486433A (en) * | 2009-02-27 | 2009-07-22 | 中冶建工有限公司 | Method and device for automatically converting field of gantry crane |
CN101711210A (en) * | 2007-03-01 | 2010-05-19 | 查尔斯·贝内迪克特 | Port storage and distribution system for international shipping containers |
CN102285525A (en) * | 2011-08-09 | 2011-12-21 | 武汉利德测控技术股份有限公司 | Track transfer system for containers |
CN103213816A (en) * | 2013-04-26 | 2013-07-24 | 江苏速升自动化装备股份有限公司 | Railway vehicle bogie midair crossing transport finger car |
CN203359441U (en) * | 2013-06-27 | 2013-12-25 | 中国二十冶集团有限公司 | Direction-changing rail for steel structure roof transport cart |
CN103895995A (en) * | 2012-12-28 | 2014-07-02 | 昆山光腾智能机械有限公司 | Automatic-rail-changing shuttle |
CN203740623U (en) * | 2014-02-11 | 2014-07-30 | 华电重工股份有限公司 | Novel ferry crane for quayside container handling |
CN104773453A (en) * | 2015-03-25 | 2015-07-15 | 中机中联工程有限公司 | Heavy-load cross shunt transport vehicle |
CN106575391A (en) * | 2014-06-25 | 2017-04-19 | 奥卡多创新有限公司 | Robotic object handling system, device and method |
CN207810542U (en) * | 2017-09-22 | 2018-09-04 | 王燏斌 | A kind of container handling equipment |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203877524U (en) * | 2014-02-11 | 2014-10-15 | 华电重工股份有限公司 | High-efficiency transit system for shoreside container |
CN203740622U (en) * | 2014-02-11 | 2014-07-30 | 华电重工股份有限公司 | Novel ferry crane and container yard combined system for quayside container handling |
JP6539961B2 (en) * | 2014-09-01 | 2019-07-10 | 村田機械株式会社 | Carrier system and control method of carrier system |
EP3015400B1 (en) * | 2014-10-27 | 2017-08-09 | Intrion Nv | A storage assembly for bulk bags |
CN106379747B (en) * | 2016-10-24 | 2017-10-13 | 中车长江车辆有限公司 | A kind of multimodal transport intercommunicating system |
CN107499849A (en) * | 2017-09-22 | 2017-12-22 | 王燏斌 | A kind of container handling equipment and its carrying method |
-
2017
- 2017-09-22 CN CN201710864172.7A patent/CN107499849A/en active Pending
-
2018
- 2018-09-25 WO PCT/CN2018/107202 patent/WO2019057186A1/en active Application Filing
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4973219A (en) * | 1986-04-30 | 1990-11-27 | Sea-Land Corporation | Grid rail container transport and storage system |
US20020197135A1 (en) * | 1998-03-10 | 2002-12-26 | Arntzen John O. | Container transfer terminal system and method |
CN1590272A (en) * | 2003-08-27 | 2005-03-09 | 上海振华港口机械(集团)股份有限公司 | Roil type bitrolley gantry container hoister |
US20070134076A1 (en) * | 2005-12-14 | 2007-06-14 | Hong Tian | Carrier transferring load and unload system of low frame bridge type between the shore side crane and the stack field crane |
CN101711210A (en) * | 2007-03-01 | 2010-05-19 | 查尔斯·贝内迪克特 | Port storage and distribution system for international shipping containers |
CN101486433A (en) * | 2009-02-27 | 2009-07-22 | 中冶建工有限公司 | Method and device for automatically converting field of gantry crane |
CN102285525A (en) * | 2011-08-09 | 2011-12-21 | 武汉利德测控技术股份有限公司 | Track transfer system for containers |
CN103895995A (en) * | 2012-12-28 | 2014-07-02 | 昆山光腾智能机械有限公司 | Automatic-rail-changing shuttle |
CN103213816A (en) * | 2013-04-26 | 2013-07-24 | 江苏速升自动化装备股份有限公司 | Railway vehicle bogie midair crossing transport finger car |
CN203359441U (en) * | 2013-06-27 | 2013-12-25 | 中国二十冶集团有限公司 | Direction-changing rail for steel structure roof transport cart |
CN203740623U (en) * | 2014-02-11 | 2014-07-30 | 华电重工股份有限公司 | Novel ferry crane for quayside container handling |
CN106575391A (en) * | 2014-06-25 | 2017-04-19 | 奥卡多创新有限公司 | Robotic object handling system, device and method |
CN104773453A (en) * | 2015-03-25 | 2015-07-15 | 中机中联工程有限公司 | Heavy-load cross shunt transport vehicle |
CN207810542U (en) * | 2017-09-22 | 2018-09-04 | 王燏斌 | A kind of container handling equipment |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019057186A1 (en) * | 2017-09-22 | 2019-03-28 | 王燏斌 | Container conveying apparatus and conveying method |
CN108792485A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of railway container yard and its conveying device |
CN108792482A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of dock container goods yard and its conveying device |
CN108792483A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of dock container goods yard and its conveying device |
CN108792484A (en) * | 2018-07-31 | 2018-11-13 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109250406A (en) * | 2018-07-31 | 2019-01-22 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109250407A (en) * | 2018-07-31 | 2019-01-22 | 王燏斌 | A kind of railway container yard and its conveying device |
CN109436831A (en) * | 2018-12-22 | 2019-03-08 | 王燏斌 | A kind of conveying device for container yard |
CN111137692A (en) * | 2019-11-05 | 2020-05-12 | 王燏斌 | A conveying vehicle with a flanged traveling wheel for a jacking-up traveling device |
CN112158547A (en) * | 2020-09-22 | 2021-01-01 | 福建纬龙机械制造有限公司 | Intelligent lifting device for container |
Also Published As
Publication number | Publication date |
---|---|
WO2019057186A1 (en) | 2019-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107499849A (en) | A kind of container handling equipment and its carrying method | |
CN107500143B (en) | A kind of container crane for U-shaped berth | |
CN102951420B (en) | Sectional track traffic locomotive vehicle bogie frame inspection platform | |
WO2018076836A1 (en) | Aerial railway-based multimodal transport interconnecting system | |
CN111762687B (en) | System and method for loading and unloading container road-rail combined transport side | |
CN101229883A (en) | Container terminal loading and unloading system | |
CN108792483A (en) | A kind of dock container goods yard and its conveying device | |
CN106627603B (en) | A kind of multimodal transport intercommunication control system | |
WO2014169732A1 (en) | Shuttle carrier system for container terminal and container transporting method therefor | |
CN101920912A (en) | Crane in rear storage yard for automated container terminal | |
EP3428094B1 (en) | Multimodal transport interworking system | |
CN210028984U (en) | Electric power and free vehicle group conveyor | |
CN207810542U (en) | A kind of container handling equipment | |
CN201151567Y (en) | Loading and unloading system for container pier | |
CN212221736U (en) | A conveying vehicle with a jack-up traveling device running in a trough rail | |
CN103407900A (en) | Efficient loading and unloading system and process for harbor containers | |
JP2012511486A5 (en) | ||
CN107499850A (en) | A kind of conveying device for rolling stock maintenance production | |
CN107686012A (en) | A kind of conveying device | |
CN212221740U (en) | A conveying device for container freight yard | |
CN212221739U (en) | A conveying device for container railway freight yard | |
CN208265646U (en) | A kind of container crane for U-shaped berth | |
CN111137692A (en) | A conveying vehicle with a flanged traveling wheel for a jacking-up traveling device | |
CN203529773U (en) | High-efficiency loading and unloading system of containers at ports | |
CN212221737U (en) | A conveying vehicle with a flanged traveling wheel for a jacking-up traveling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 214112 No. 226, Xi Da Road, Mei Cun town, Xin Wu District, Wuxi, Jiangsu Applicant after: Wang Yubin Address before: 214112 Xinhua Road 121, Meishan Town, Wuxi New District, Jiangsu Applicant before: Wang Yubin |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171222 |