CN204323345U - Railway truck and shipping loading and unloading system - Google Patents

Railway truck and shipping loading and unloading system Download PDF

Info

Publication number
CN204323345U
CN204323345U CN201420733748.8U CN201420733748U CN204323345U CN 204323345 U CN204323345 U CN 204323345U CN 201420733748 U CN201420733748 U CN 201420733748U CN 204323345 U CN204323345 U CN 204323345U
Authority
CN
China
Prior art keywords
freight car
railway
floor
railway freight
lifting part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420733748.8U
Other languages
Chinese (zh)
Inventor
伊永峰
王军松
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tf High Tech Co ltd
CRRC Qiqihar Rolling Stock Co Ltd
Original Assignee
BEIJING TF HIGH-TECH Co Ltd
Qiqihar Railway Rolling Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING TF HIGH-TECH Co Ltd, Qiqihar Railway Rolling Stock Co Ltd filed Critical BEIJING TF HIGH-TECH Co Ltd
Priority to CN201420733748.8U priority Critical patent/CN204323345U/en
Application granted granted Critical
Publication of CN204323345U publication Critical patent/CN204323345U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Abstract

本实用新型提供了一种铁路货车以及货运装卸系统。其中,铁路货车包括底架和设置在底架下方的车轮,底架包括地板(10),地板(10)包括两个端部地板(11)和设置在两个端部地板(11)之间的中间地板(12),中间地板(12)具有低于端部地板(11)的凹槽部,铁路货车还包括承载升降部(20),承载升降部(20)设置在凹槽部上,承载升降部(20)具有与凹槽部贴合的回收位置以及与两个端部地板(11)位于同一高度的升起位置。本实用新型的技术方案能够有效地解决现有技术中的铁路货车不能运输大型卡车的问题。

The utility model provides a railway freight car and a freight loading and unloading system. Wherein, the railway wagon comprises an underframe and wheels arranged under the underframe, the underframe comprises a floor (10), and the floor (10) comprises two end floors (11) and a wheel arranged between the two end floors (11). The intermediate floor (12), the intermediate floor (12) has a groove portion lower than the end floor (11), and the railway freight car also includes a load-bearing lifting portion (20), and the load-bearing lifting portion (20) is arranged on the groove portion, The lifting and lowering part (20) has a recovering position that is attached to the groove part and a raising position that is at the same height as the two end floors (11). The technical scheme of the utility model can effectively solve the problem that the railway wagons in the prior art cannot transport large trucks.

Description

铁路货车以及货运装卸系统Railway wagons and freight handling systems

技术领域technical field

本实用新型涉及铁路车辆技术领域,具体而言,涉及一种铁路货车以及货运装卸系统。The utility model relates to the technical field of railway vehicles, in particular to a railway freight car and a freight loading and unloading system.

背景技术Background technique

目前,公路运输是我国货物运输的主要方式之一。但是,由于公路运输受天气、地形以及夜间行车等因素影响较大,工作人员通常将货运卡车开到专用的铁路货车上,并通过铁路将货运卡车运送到目的地。这种通过铁路进行长距离、全天候的运输方式既经济又安全可靠。At present, road transportation is one of the main modes of cargo transportation in our country. However, because road transportation is greatly affected by factors such as weather, terrain, and night driving, the staff usually drives the freight truck to a special railway freight car, and transports the freight truck to the destination by rail. This long-distance, round-the-clock transportation by rail is economical, safe and reliable.

在上述运输方式中,工作人员通常将铁路货车通过装载线路牵至装载点的指定位置,并将卡车1’通过站台开到铁路货车的地板10’上(如图1所示),完成装载过程。此后,通过铁路将卡车运送到目的地,并将卡车从铁路货车的地板10’上通过站台开下,再自行到达指定地点。In the above transportation mode, the staff usually leads the railway freight car to the designated position of the loading point through the loading line, and drives the truck 1' through the platform to the floor 10' of the railway freight car (as shown in Figure 1), and completes the loading process . Thereafter, the truck is transported to the destination by rail, and the truck is driven off from the floor 10' of the railway wagon through the platform, and then arrives at the designated place by itself.

在铁路运输过程中,为了确保卡车在铁路线路上的安全,防止其撞击邻近线路的建筑物和设备,通常会对铁路货车和接近线路的建筑物、设备规定不允许超越的轮廓尺寸线(图2所示的点化线部分示出了轮廓尺寸线)。上述轮廓尺寸线称为铁路限界。基本的铁路限界包括车辆限界和建筑接近限界。In the process of railway transportation, in order to ensure the safety of the truck on the railway line and prevent it from hitting the buildings and equipment adjacent to the line, the outline dimension line that is not allowed to be exceeded is usually stipulated for the railway wagon and the buildings and equipment close to the line (Fig. The dotted line portion shown in 2 shows the outline dimension line). The above outline dimension lines are called rail limits. Basic railway gauges include vehicle gauges and building approach gauges.

由于受到铁路限界的影响,当使用现有技术中的铁路货车运输卡车时,若卡车的尺寸较大,装有卡车的铁路货车整体尺寸很容易超出车辆限界(如图2所示)。这样就导致上述运输方式只能运输小型卡车,不能运输大型卡车。Due to the influence of the railway margin, when using the railway freight car in the prior art to transport the truck, if the size of the truck is large, the overall size of the railway freight car with the truck is easy to exceed the vehicle limit (as shown in Figure 2). This causes the above-mentioned transportation methods to only transport small trucks, but not large trucks.

实用新型内容Utility model content

本实用新型的主要目的在于提供一种铁路货车以及货运装卸系统,以解决现有技术中的铁路货车不能运输大型卡车的问题。The main purpose of the utility model is to provide a railway freight car and a freight loading and unloading system to solve the problem that the railway freight car in the prior art cannot transport large trucks.

为了实现上述目的,根据本实用新型的一个方面,提供了一种铁路货车,包括底架和设置在底架下方的车轮,底架包括地板,地板包括两个端部地板和设置在两个端部地板之间的中间地板,中间地板具有低于端部地板的凹槽部,铁路货车还包括承载升降部,承载升降部设置在凹槽部上,承载升降部具有与凹槽部贴合的回收位置以及与两个端部地板位于同一高度的升起位置。In order to achieve the above object, according to one aspect of the present invention, a railway wagon is provided, which includes an underframe and wheels arranged under the underframe, the underframe includes a floor, the floor includes two end floors and The middle floor between the end floors, the middle floor has a groove part lower than the end floor, the railway freight car also includes a load-bearing lifting part, the load-bearing lifting part is arranged on the groove part, and the load-bearing lifting part has a groove that fits the groove part The retracted position and the raised position at the same height as the two end floors.

进一步地,底架还包括:两个侧梁,两个侧梁间隔设置且相互平行,两个侧梁设置在地板的相对的两个侧边处。Further, the underframe further includes: two side beams, the two side beams are arranged at intervals and parallel to each other, and the two side beams are arranged at two opposite sides of the floor.

进一步地,承载升降部包括:纵梁,纵梁为两个,两个纵梁间隔设置且相互平行;横梁,横梁为多个,多个横梁间隔设置在两个纵梁之间,并且每个横梁与两个纵梁均固定连接。Further, the load-bearing lifting part includes: a longitudinal beam, two longitudinal beams, the two longitudinal beams are arranged at intervals and parallel to each other; a crossbeam, a plurality of crossbeams, a plurality of crossbeams are arranged at intervals between the two longitudinal beams, and each The beam is fixedly connected to the two longitudinal beams.

进一步地,承载升降部还包括设置在纵梁和/或横梁上的定位槽。Further, the lifting and lowering part further includes a positioning slot provided on the longitudinal beam and/or the cross beam.

进一步地,承载升降部还包括设置在纵梁底部的垫板。Further, the lifting and lowering part further includes a backing plate arranged at the bottom of the longitudinal beam.

进一步地,中间地板的凹槽部上设置有与定位槽配合的定位件。Further, the groove portion of the middle floor is provided with a positioning piece matched with the positioning groove.

进一步地,定位槽和定位件为多个,并且一一对应地设置。Further, there are multiple positioning grooves and positioning pieces, and they are provided in one-to-one correspondence.

根据本实用新型的另一方面,提供了一种货运装卸系统,包括站台以及铁路货车,铁路货车为上述的铁路货车。According to another aspect of the present utility model, a freight loading and unloading system is provided, including a platform and a railway freight car, and the railway freight car is the above-mentioned railway freight car.

进一步地,底架的中间地板的凹槽部上具有避让孔,货运装卸系统还包括液压系统,液压系统包括液压缸,液压缸的缸体固定在铁路货车的下方,液压缸的活塞杆与避让孔对应设置,液压缸的活塞杆与承载升降部配合以使承载升降部在回收位置和升起位置之间移动。Further, there is an avoidance hole on the groove part of the middle floor of the underframe, and the cargo loading and unloading system also includes a hydraulic system, the hydraulic system includes a hydraulic cylinder, the cylinder body of the hydraulic cylinder is fixed below the railway freight car, and the piston rod of the hydraulic cylinder is connected with the avoidance hole. The holes are arranged correspondingly, and the piston rod of the hydraulic cylinder cooperates with the bearing lifting part to move the bearing lifting part between the recovery position and the raised position.

进一步地,货运装卸系统还包括过渡板,过渡板的一端与站台可枢转连接,过渡板的另一端与底架的端部地板配合。Further, the freight handling system further includes a transition board, one end of the transition board is pivotally connected to the platform, and the other end of the transition board is matched with the end floor of the chassis.

应用本实用新型的技术方案,底架的地板包括两个端部地板和设置在两个端部地板之间的中间地板,并且中间地板具有凹槽部。上述凹槽部上设置有承载升降部。当对大型卡车进行装载作业时,承载升降部由与凹槽部贴合的回收位置移动到与两个端部地板位于同一高度的升起位置。在将卡车开到铁路货车的中间地板上,并且卡车的轮胎处于承载升降部上之后,使承载升降部由升起位置移动到回收位置,卡车随之落入铁路货车内,从而完成装载过程。同样地,当对大型卡车进行卸载作业时,承载升降部由回收位置移动到升起位置,待将卡车从铁路货车的地板上开下后,使承载升降部由升起位置移动到回收位置,从而完成卸载过程。由于大型卡车落入铁路货车内,卡车顶面的高度降低,装有大型卡车的铁路货车整体尺寸不会超出车辆限界,从而有效地解决了铁路货车不能运输大型卡车的问题。Applying the technical solution of the utility model, the floor of the chassis includes two end floors and a middle floor arranged between the two end floors, and the middle floor has a groove. The above-mentioned groove part is provided with a bearing lifting part. When loading a large truck, the lifting and lowering part moves from the recovery position where it fits the groove part to the raised position where the two end floors are at the same height. After the truck is driven onto the middle floor of the railway freight car, and the tires of the truck are on the load-bearing lifting part, the load-bearing lifting part is moved from the raised position to the recovery position, and the truck falls into the railway freight car thereupon, thereby completing the loading process. Similarly, when a large truck is unloaded, the load-bearing lifting part moves from the recovery position to the raised position, and after the truck is driven off the floor of the railway wagon, the load-bearing lifting part is moved from the raised position to the recovery position, This completes the uninstallation process. Since the large truck falls into the railway freight car, the height of the top surface of the truck is reduced, and the overall size of the railway freight car equipped with the large truck will not exceed the vehicle limit, thereby effectively solving the problem that the railway freight car cannot transport large trucks.

附图说明Description of drawings

构成本申请的一部分的说明书附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings constituting a part of this application are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute improper limitations to the utility model. In the attached picture:

图1示出了现有技术中铁路货车的装载示意图;Fig. 1 shows the loading schematic diagram of railway wagon in the prior art;

图2示出了现有技术中铁路运输中的车辆限界的示意图;Fig. 2 shows the schematic diagram of the vehicle limit in the railway transportation in the prior art;

图3a和图3b示出了根据本实用新型的实施例的铁路货车的主视示意图和俯视示意图;Figure 3a and Figure 3b show a schematic front view and a schematic top view of a railway freight car according to an embodiment of the present invention;

图4a和图4b示出了根据本实用新型的实施例的承载升降部的主视示意图和俯视示意图;Figure 4a and Figure 4b show a schematic front view and a schematic top view of the load lifting part according to an embodiment of the present invention;

图5a和图5b示出了根据本实用新型的实施例的液压系统的主视示意图和俯视示意图;Figure 5a and Figure 5b show a schematic front view and a schematic top view of a hydraulic system according to an embodiment of the present invention;

图6a和图6b示出了根据本实用新型的实施例的站台和过渡板的主视示意图和俯视示意图;Figure 6a and Figure 6b show a schematic front view and a schematic top view of a platform and a transition plate according to an embodiment of the present invention;

图7示出了根据本实用新型的实施例的铁路货车的装载初始状态示意图;Fig. 7 shows a schematic diagram of the loading initial state of a railway freight car according to an embodiment of the present invention;

图8示出了根据本实用新型的实施例的铁路货车的装载中间状态示意图;以及Fig. 8 shows a schematic diagram of an intermediate loading state of a railway freight car according to an embodiment of the present invention; and

图9示出了根据本实用新型的实施例的铁路货车的装载结束状态示意图。Fig. 9 shows a schematic diagram of the loading end state of the railway freight car according to the embodiment of the present invention.

其中,上述附图包括以下附图标记:Wherein, the above-mentioned accompanying drawings include the following reference signs:

1’、卡车;10’、地板;1、卡车;10、地板;11、端部地板;12、中间地板;20、承载升降部;21、纵梁;22、横梁;23、定位槽;24、垫板;30、侧梁;40、定位件;50、液压缸;60、过渡板。1', truck; 10', floor; 1, truck; 10, floor; 11, end floor; 12, middle floor; 20, bearing lifting part; 21, longitudinal beam; 22, beam; 23, positioning groove; 24 , backing plate; 30, side beam; 40, positioning piece; 50, hydraulic cylinder; 60, transition plate.

具体实施方式detailed description

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本实用新型。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

如图3a至图4b所示,本实施例的铁路货车包括底架和设置在底架下方的车轮。底架包括地板10,地板10包括两个端部地板11和设置在两个端部地板11之间的中间地板12,中间地板12具有低于端部地板11的凹槽部。铁路货车还包括承载升降部20。承载升降部20设置在凹槽部上,承载升降部20具有与凹槽部贴合的回收位置以及与两个端部地板11位于同一高度的升起位置。As shown in Fig. 3a to Fig. 4b, the railway freight car of this embodiment includes an underframe and wheels arranged under the underframe. The chassis includes a floor panel 10 including two end panels 11 and an intermediate panel 12 disposed between the two end panels 11 , the intermediate panel 12 having a recessed portion lower than the end panels 11 . The railway freight car also includes a load lifting part 20 . The load-lifting part 20 is arranged on the groove part, and the load-lifting part 20 has a recovery position that fits into the groove part and a lifting position that is at the same height as the two end floors 11 .

应用本实施例的铁路货车,底架的地板10包括两个端部地板11和设置在两个端部地板11之间的中间地板12,并且中间地板12具有凹槽部。上述凹槽部上设置有承载升降部20。当对大型卡车进行装载作业时,承载升降部20由与凹槽部贴合的回收位置移动到与两个端部地板11位于同一高度的升起位置。在将卡车开到铁路货车的中间地板12上,并且卡车的轮胎处于承载升降部20上之后,使承载升降部20由升起位置移动到回收位置,卡车随之落入铁路货车内,从而完成装载过程。同样地,当对大型卡车进行卸载作业时,承载升降部20由回收位置移动到升起位置,待将卡车从铁路货车的地板10上开下后,使承载升降部20由升起位置移动到回收位置,从而完成卸载过程。由于大型卡车落入铁路货车内,卡车顶面的高度降低,装有大型卡车的铁路货车整体尺寸不会超出车辆限界,从而有效地解决了铁路货车不能运输大型卡车的问题。With the railway freight car of the present embodiment, the floor 10 of the chassis includes two end floors 11 and an intermediate floor 12 provided between the two end floors 11, and the intermediate floor 12 has a recessed portion. A loading lifting part 20 is arranged on the groove part. When a large truck is loaded, the lifting and lowering part 20 moves from a retracted position adjoining the groove to a raised position at the same height as the two end floors 11 . After the truck is driven onto the middle floor 12 of the railway freight car, and after the tires of the truck are on the load-bearing lifting part 20, the load-bearing lifting part 20 is moved from the raised position to the recovery position, and the truck falls into the railway freight car thereupon, thereby completing the process. loading process. Similarly, when large-scale trucks are unloaded, the load lifting unit 20 is moved from the recovery position to the raised position, and after the truck is opened from the floor 10 of the railway wagon, the load lift unit 20 is moved from the raised position to the raised position. The location is reclaimed, completing the uninstall process. Since the large truck falls into the railway freight car, the height of the top surface of the truck is reduced, and the overall size of the railway freight car equipped with the large truck will not exceed the vehicle limit, thereby effectively solving the problem that the railway freight car cannot transport large trucks.

如图3a和图3b所示,在本实施例的铁路货车中,底架还包括两个侧梁30。两个侧梁30间隔设置且相互平行,两个侧梁30设置在地板10的相对的两个侧边处。两个侧梁30的设置可以在铁路货车的装载和卸载过程中,对卡车的行进路线起到定位的作用,并且可以增强铁路货车的底架的承载能力。As shown in FIG. 3 a and FIG. 3 b , in the railway freight car of this embodiment, the underframe further includes two side beams 30 . The two side beams 30 are arranged at intervals and parallel to each other, and the two side beams 30 are arranged at two opposite sides of the floor 10 . The arrangement of the two side beams 30 can position the traveling route of the railway freight car during loading and unloading of the railway freight car, and can enhance the bearing capacity of the underframe of the railway freight car.

如图4a和图4b所示,在本实施例的铁路货车中,承载升降部20包括纵梁21和横梁22。纵梁21为两个,两个纵梁21间隔设置且相互平行。横梁22为多个,多个横梁22间隔设置在两个纵梁21之间,并且每个横梁22与两个纵梁21均固定连接。上述结构在可以保证承载升降部20的承载力的前提下,结构较为简单,节省材料,易于实现。优选地,上述纵梁21和横梁22可以为型钢,纵梁21和横梁22的固定连接方式可以为焊接,这样可以有效地增强承载升降部20的承载力。As shown in FIG. 4 a and FIG. 4 b , in the railway freight car of this embodiment, the load lifting part 20 includes a longitudinal beam 21 and a cross beam 22 . There are two longitudinal beams 21, and the two longitudinal beams 21 are arranged at intervals and parallel to each other. There are multiple cross beams 22 , and the multiple cross beams 22 are arranged at intervals between the two longitudinal beams 21 , and each cross beam 22 is fixedly connected to the two longitudinal beams 21 . On the premise that the bearing capacity of the lifting portion 20 can be ensured, the above structure has a relatively simple structure, saves materials, and is easy to implement. Preferably, the above-mentioned longitudinal beams 21 and cross beams 22 can be shaped steel, and the fixed connection method of the longitudinal beams 21 and the cross beams 22 can be welding, which can effectively enhance the bearing capacity of the lifting and lowering part 20 .

如图4a和图4b所示,在本实施例的铁路货车中,承载升降部20还包括设置在纵梁21和/或横梁22上的定位槽23。在承载升降部20由与两个端部地板11位于同一高度的升起位置移动到与凹槽部贴合的回收位置时,定位槽23可以起到定位的作用。As shown in FIG. 4 a and FIG. 4 b , in the railway freight car of this embodiment, the lifting and lowering part 20 further includes a positioning groove 23 provided on the longitudinal beam 21 and/or the cross beam 22 . When the load lifting part 20 is moved from the raised position at the same height as the two end floors 11 to the recovery position where it fits the groove part, the positioning groove 23 can play a positioning role.

如图4a和图4b所示,在本实施例的铁路货车中,承载升降部20还包括设置在纵梁21底部的垫板24。As shown in FIG. 4 a and FIG. 4 b , in the railway freight car of this embodiment, the load lifting part 20 further includes a backing plate 24 arranged at the bottom of the longitudinal beam 21 .

如图3a至图4b所示,在本实施例的铁路货车中,中间地板12的凹槽部上设置有与定位槽23配合的定位件40。定位槽23和定位件40为多个,并且一一对应地设置。上述凹槽部上的定位件40与承载升降部20上的定位槽23相配合。当承载升降部20升起位置移动到回收位置时,定位槽23落到对应的定位件40上,起到定位的作用。As shown in FIG. 3 a to FIG. 4 b , in the railway freight car of this embodiment, a positioning member 40 matching with the positioning groove 23 is provided on the groove portion of the middle floor 12 . There are multiple positioning grooves 23 and positioning pieces 40, and they are provided in one-to-one correspondence. The positioning piece 40 on the above-mentioned groove part cooperates with the positioning groove 23 on the lifting and lowering part 20 . When the lifting part 20 is raised and moved to the retracted position, the positioning groove 23 falls onto the corresponding positioning member 40 to play a positioning role.

本申请还提供了一种货运装卸系统,根据本申请的货运装卸系统的实施例包括站台以及上述铁路货车。The present application also provides a freight handling system. An embodiment of the freight handling system according to the present application includes a platform and the above-mentioned railway freight cars.

如图3a至图5b所示,在本实施例的货运装卸系统中,底架的中间地板12的凹槽部上具有避让孔(图中未示出)。货运装卸系统还包括液压系统。液压系统包括液压缸50,液压缸50的缸体固定在铁路货车的下方,液压缸50的活塞杆与避让孔对应设置,液压缸50的活塞杆与承载升降部20配合以使承载升降部20在回收位置和升起位置之间移动。As shown in Fig. 3a to Fig. 5b, in the freight handling system of this embodiment, there is an avoidance hole (not shown in the figure) on the groove part of the middle floor 12 of the chassis. Cargo handling systems also include hydraulic systems. The hydraulic system includes a hydraulic cylinder 50. The cylinder body of the hydraulic cylinder 50 is fixed below the railway freight car. The piston rod of the hydraulic cylinder 50 is arranged correspondingly to the avoidance hole. Moves between retracted and raised positions.

具体地,当工作人员将铁路货车通过装载线路牵至装载点的指定位置时,上述液压系统的液压缸50的缸体位于铁路货车的下方(如图7所示)。液压缸50的活塞杆与凹槽部上的避让孔相对应,液压缸50的活塞杆通过避让孔作用在承载升降部20的垫板24上。液压缸50的活塞杆伸出,将承载升降部20从凹槽部内顶起,待承载升降部20与端部地板11位于同一高度后,液压缸50停止动作。卡车1开上铁路货车的地板10(如图8所示)。待卡车1在铁路货车上停稳后,液压缸50的活塞杆缩回,承载升降部20落回到凹槽部内,待承载升降部20与凹槽部贴合后,液压缸50停止动作(如图9所示)。上述结构可以驱动承载升降部20在与凹槽部贴合的回收位置和与所述两个端部地板11位于同一高度的升起位置之间移动。Specifically, when the worker pulls the railway freight car to the designated position of the loading point through the loading line, the cylinder body of the hydraulic cylinder 50 of the hydraulic system is located below the railway freight car (as shown in FIG. 7 ). The piston rod of the hydraulic cylinder 50 corresponds to the avoidance hole on the groove part, and the piston rod of the hydraulic cylinder 50 acts on the backing plate 24 carrying the lifting part 20 through the avoidance hole. The piston rod of the hydraulic cylinder 50 is stretched out to lift the lifting part 20 from the groove. After the lifting part 20 and the end floor 11 are at the same height, the hydraulic cylinder 50 stops. The truck 1 drives onto the floor 10 of the railway wagon (as shown in Figure 8). After the truck 1 stops on the railway freight car, the piston rod of the hydraulic cylinder 50 is retracted, and the load lifting part 20 falls back into the groove part. After the load lifting part 20 and the groove part are attached, the hydraulic cylinder 50 stops acting as shown in Figure 9). The above-mentioned structure can drive the lifting and lowering part 20 to move between the recovery position adhering to the groove part and the lifting position at the same height as the two end floors 11 .

如图6a至图6b所示,在本实施例的货运装卸系统中,货运装卸系统还包括过渡板60。过渡板60的一端与站台可枢转连接,过渡板60的另一端与底架的端部地板11配合。当承载升降部20与端部地板11位于同一高度时,可将站台上的过渡板60翻转,搭接到铁路货车的端部地板11上,方便卡车1通过。As shown in FIGS. 6 a to 6 b , in the freight handling system of this embodiment, the freight handling system further includes a transition plate 60 . One end of the transition plate 60 is pivotably connected to the platform, and the other end of the transition plate 60 is matched with the end floor 11 of the chassis. When the load lifting part 20 and the end floor 11 are at the same height, the transition plate 60 on the platform can be turned over and overlapped on the end floor 11 of the railway freight car to facilitate the passage of the truck 1 .

从以上的描述中,可以看出,本实用新型上述的实施例可以使大型卡车落入铁路货车内,卡车顶面的高度降低,进而使装有大型卡车的铁路货车整体尺寸不会超出车辆限界,从而有效地解决了铁路货车不能运输大型卡车的问题。From the above description, it can be seen that the above-mentioned embodiment of the utility model can make a large truck fall into the railway freight car, and the height of the top surface of the truck is reduced, so that the overall size of the railway freight car equipped with a large truck will not exceed the vehicle limit , thus effectively solving the problem that railway wagons cannot transport large trucks.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. For those skilled in the art, the present utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1.一种铁路货车,包括底架和设置在所述底架下方的车轮,其特征在于,所述底架包括地板(10),所述地板(10)包括两个端部地板(11)和设置在两个所述端部地板(11)之间的中间地板(12),所述中间地板(12)具有低于所述端部地板(11)的凹槽部,所述铁路货车还包括承载升降部(20),所述承载升降部(20)设置在所述凹槽部上,所述承载升降部(20)具有与所述凹槽部贴合的回收位置以及与所述两个端部地板(11)位于同一高度的升起位置。 1. A railway wagon comprising an underframe and wheels arranged below said underframe, characterized in that said underframe comprises a floor (10) comprising two end floors (11) and an intermediate floor (12) disposed between two of said end floors (11), said intermediate floor (12) having a recessed portion lower than said end floors (11), said railway wagon also It includes a load lifting part (20), the load lifting part (20) is arranged on the groove part, the load lifting part (20) has a recovery position that fits with the groove part and is connected with the two The two end floors (11) are in the raised position at the same height. 2.根据权利要求1所述的铁路货车,其特征在于,所述底架还包括: 2. The railway freight car according to claim 1, wherein the underframe further comprises: 两个侧梁(30),两个所述侧梁(30)间隔设置且相互平行,所述两个侧梁(30)设置在所述地板(10)的相对的两个侧边处。 Two side beams (30), the two side beams (30) are arranged at intervals and parallel to each other, and the two side beams (30) are arranged at two opposite sides of the floor (10). 3.根据权利要求1所述的铁路货车,其特征在于,所述承载升降部(20)包括: 3. The railway freight car according to claim 1, characterized in that, the load lifting part (20) comprises: 纵梁(21),所述纵梁(21)为两个,两个所述纵梁(21)间隔设置且相互平行; Longitudinal beams (21), there are two longitudinal beams (21), and the two longitudinal beams (21) are arranged at intervals and parallel to each other; 横梁(22),所述横梁(22)为多个,多个所述横梁(22)间隔设置在两个所述纵梁(21)之间,并且每个所述横梁(22)与两个所述纵梁(21)均固定连接。 Crossbeam (22), described crossbeam (22) is a plurality of, a plurality of described crossbeams (22) are arranged at intervals between two described longitudinal beams (21), and each described crossbeam (22) and two The longitudinal beams (21) are all fixedly connected. 4.根据权利要求3所述的铁路货车,其特征在于,所述承载升降部(20)还包括设置在所述纵梁(21)和/或所述横梁(22)上的定位槽(23)。 4. The railway freight car according to claim 3, characterized in that, the load lifting part (20) further comprises a positioning groove (23) arranged on the longitudinal beam (21) and/or the cross beam (22) ). 5.根据权利要求4所述的铁路货车,其特征在于,所述承载升降部(20)还包括设置在所述纵梁(21)底部的垫板(24)。 5. The railway freight car according to claim 4, characterized in that, the load lifting part (20) further comprises a backing plate (24) arranged at the bottom of the longitudinal beam (21). 6.根据权利要求4所述的铁路货车,其特征在于,所述中间地板(12)的凹槽部上设置有与所述定位槽(23)配合的定位件(40)。 6. The railway freight car according to claim 4, characterized in that, the groove part of the middle floor (12) is provided with a positioning piece (40) matched with the positioning groove (23). 7.根据权利要求6所述的铁路货车,其特征在于,所述定位槽(23)和所述定位件(40)为多个,并且一一对应地设置。 7. The railway freight car according to claim 6, characterized in that there are multiple positioning grooves (23) and positioning pieces (40), and they are provided in one-to-one correspondence. 8.一种货运装卸系统,包括站台以及铁路货车,其特征在于,所述铁路货车为权利要求1至7中任一项所述的铁路货车。 8. A freight loading and unloading system, comprising a platform and a railway freight car, characterized in that the railway freight car is the railway freight car according to any one of claims 1-7. 9.根据权利要求8所述的货运装卸系统,其特征在于,所述底架的中间地板(12)的凹槽部上具有避让孔,所述货运装卸系统还包括液压系统,所述液压系统包括液压缸(50),所述液压缸(50)的缸体固定在所述铁路货车的下方,所述液压缸(50)的活塞杆与所述避让孔对应设置,所述液压缸(50)的活塞杆与所述承载升降部(20)配合以使所述承载升降部(20)在所述回收位置和所述升起位置之间移动。 9. The freight handling system according to claim 8, characterized in that, there is an avoidance hole on the groove part of the middle floor (12) of the underframe, and the freight handling system further comprises a hydraulic system, and the hydraulic system A hydraulic cylinder (50) is included, the cylinder body of the hydraulic cylinder (50) is fixed below the railway wagon, the piston rod of the hydraulic cylinder (50) is set correspondingly to the avoidance hole, and the hydraulic cylinder (50) The piston rod of ) cooperates with the loading lifting part (20) to make the loading lifting part (20) move between the recovery position and the lifting position. 10.根据权利要求9所述的货运装卸系统,其特征在于,所述货运装卸系统还包括过渡板(60),所述过渡板(60)的一端与所述站台可枢转连接,所述过渡板(60)的另一端与所述底架的端部地板(11)配合。 10. The freight handling system according to claim 9, characterized in that, the freight handling system further comprises a transition plate (60), one end of the transition plate (60) is pivotally connected to the platform, and the The other end of the transition plate (60) cooperates with the end floor (11) of the chassis.
CN201420733748.8U 2014-11-28 2014-11-28 Railway truck and shipping loading and unloading system Expired - Lifetime CN204323345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420733748.8U CN204323345U (en) 2014-11-28 2014-11-28 Railway truck and shipping loading and unloading system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420733748.8U CN204323345U (en) 2014-11-28 2014-11-28 Railway truck and shipping loading and unloading system

Publications (1)

Publication Number Publication Date
CN204323345U true CN204323345U (en) 2015-05-13

Family

ID=53159733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420733748.8U Expired - Lifetime CN204323345U (en) 2014-11-28 2014-11-28 Railway truck and shipping loading and unloading system

Country Status (1)

Country Link
CN (1) CN204323345U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105253153A (en) * 2015-11-10 2016-01-20 陈红颖 Road-rail transportation train-truck
CN109080713A (en) * 2018-08-16 2018-12-25 中车哈尔滨车辆有限公司 Pneumatic lifting depressed center car and coach transportation, discharging method
CN113879350A (en) * 2021-09-17 2022-01-04 中车长江运输设备集团有限公司 Road-rail combined transport system and railway transport vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105253153A (en) * 2015-11-10 2016-01-20 陈红颖 Road-rail transportation train-truck
CN109080713A (en) * 2018-08-16 2018-12-25 中车哈尔滨车辆有限公司 Pneumatic lifting depressed center car and coach transportation, discharging method
CN113879350A (en) * 2021-09-17 2022-01-04 中车长江运输设备集团有限公司 Road-rail combined transport system and railway transport vehicle

Similar Documents

Publication Publication Date Title
CN105383708B (en) Airport lifting loading and unloading ferry device
CN107914719B (en) A kind of chassis of hunchback transport vehicle
CN104386075B (en) Wagon for transporting commercial trucks and loading method for wagon
CN104670349B (en) It is a kind of can Self-loading-unloading goods semitrailer
CN107757272A (en) A kind of road rail vehicle
CN105501461A (en) Semi-trailer type ferry device realizing lift loading and unloading in airport
CN106671857A (en) Vehicle transporting center axle train
CN203780625U (en) Hydraulictelescopic load transportation carriage
CN204323345U (en) Railway truck and shipping loading and unloading system
CN103909940A (en) Side-dumping railway flatcar body
CN107719390B (en) The loading or unloading of railway freight-car
CN105459878A (en) Vehicle-mounted loading and unloading device and method used for container loading and unloading
CN204586616U (en) Mobile shipping railway carriage or compartment
CN204323346U (en) Railway truck and shipping loading and unloading system
CN205601678U (en) A on -vehicle handling device for container loading and unloading
US9656678B2 (en) Assembly for loading and unloading semi-trailers on railway wagons
CN205327438U (en) Loading and unloading ferry device goes up and down on semi -mounted formula airport
CN205990062U (en) Equipment for intermodal container handling
CN205327439U (en) Loading and unloading ferry device goes up and down on airport
CN204341039U (en) Railway truck and shipping loading and unloading system
CN205652129U (en) Carry transportation of out -of --way formula on back and use novel railway freight car
CN107344682A (en) Car transverse direction handling facilities based on passenger train platform
CN208036060U (en) The cargo of quick despatch
CN104527670A (en) Railway freight car and cargo loading and unloading system
CN103619689A (en) Device for transport and storage of passenger cars

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 161002 Qigihar City, Heilongjiang province Tiefeng District Plant Road No. 36

Patentee after: CRRC QIQIHAR ROLLING STOCK Co.,Ltd.

Patentee after: BEIJING TF HIGH-TECH Co.,Ltd.

Address before: 161002 Qigihar City, Heilongjiang province Tiefeng District Plant Road No. 36

Patentee before: QIQIHAR RAILWAY ROLLING STOCK Co.,Ltd.

Patentee before: BEIJING TF HIGH-TECH Co.,Ltd.

PP01 Preservation of patent right

Effective date of registration: 20241106

Granted publication date: 20150513

PP01 Preservation of patent right
CX01 Expiry of patent term

Granted publication date: 20150513

CX01 Expiry of patent term
PD01 Discharge of preservation of patent

Date of cancellation: 20241128

Granted publication date: 20150513

PD01 Discharge of preservation of patent