CN107476336A - A kind of steel pipe column positioning construction method - Google Patents

A kind of steel pipe column positioning construction method Download PDF

Info

Publication number
CN107476336A
CN107476336A CN201710719024.6A CN201710719024A CN107476336A CN 107476336 A CN107476336 A CN 107476336A CN 201710719024 A CN201710719024 A CN 201710719024A CN 107476336 A CN107476336 A CN 107476336A
Authority
CN
China
Prior art keywords
locator
backing plate
steel pipe
construction
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710719024.6A
Other languages
Chinese (zh)
Inventor
占有志
袁悦
奚文峰
李宝文
周冉
温磊
赵婷婷
安长红
张景丽
徐国双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd, Beijing MTR Construction Administration Corp filed Critical China Railway Sixth Group Co Ltd
Priority to CN201710719024.6A priority Critical patent/CN107476336A/en
Publication of CN107476336A publication Critical patent/CN107476336A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of construction steel tubing string locating mounting method belongs to subway station digging method construction steel pipe column technical field of construction.Whether steel pipe column positioning accurately determines whether lid excavation construction can be smoothed out.Present invention casting concrete first to locating cone and backing plate (1) below;Locating cone elevation and center are accurately positioned, is bored using Steel bar rack stationary positioned and backing plate (1);Casting concrete stationary positioned is bored and backing plate (1);Installation positioner, positioning hole (2) are inserted in locating cone and backing plate (1);Locator is supported using harness cord bolt (3);Locator flange respectively installs leveling nut (4) and is used for adjusting locator level up and down;Pour below locator to flange, fixed locator;Installation steel pipe column (6) simultaneously pours;The present invention reduces the construction procedure of conventional steel post construction, and positioning is more accurate, and precision is higher, and speed is faster.

Description

A kind of steel pipe column positioning construction method
Technical field
The invention belongs to digging method construction steel pipe column technical field of construction, the installation how positioned more particularly to steel pipe column Method.High construction method is required to steel pipe column positioning construction precision.
Background technology
Digging method construction is commonly used to busy section of town traffic main artery, when obstacles such as underground requirement of engineering highway crossing, buildings Generally use cap excavation method during thing, to reduce the influence to traffic.It is after one kind is excavated to certain depth downwards by ground, by top Closing, remaining bottom engineering are constructed under the top cover of closing.Horizontal displacement of its feature to structure is small, safety coefficient Height, the influence to ground is small, only blocks traffic above-ground in a short time, constructing, it is small to be influenceed by outside climatic.
The support of digging method construction top cover is generally completed by steel pipe column, and steel pipe column often also needs to undertake beam, plate etc. Structure, this requires that steel pipe column positions and elevation must be accurate, and otherwise beam, plate construction will be impacted.
The content of the invention
In order to solve the above problems, it is an object of the invention to provide a kind of steel pipe column positioning construction method.
In order to achieve the above object,
One kind lid digs station erection of steel pipe column positioning construction method, it is characterised in that comprises the following steps:
1) first casting concrete to locating cone and backing plate (1) below;
2) locating cone elevation and center are accurately positioned, is bored using Steel bar rack stationary positioned and backing plate (1);
3) casting concrete stationary positioned cone and backing plate (1);
4) installation positioner (5), positioning hole (2) are inserted in locating cone and backing plate (1);
5) using harness cord bolt (3) support locator (5);
6) locator (5) flange respectively installs leveling nut (4) and is used for adjusting locator (5) level up and down;
7) pour below locator (5) to flange, fixed locator (5);
8) steel pipe column (6) is installed and poured.
Steel pipe column construction method provided by the invention can reduce concreting number, save the concrete curing time, Faster more accurately positioning steel tube post, ensures the smooth installation in beam slab.
Brief description of the drawings
Fig. 1 is steel pipe column positioning construction method schematic diagram.
Embodiment
Below in conjunction with the accompanying drawings and instantiation the present invention is described in detail.
Now illustrated by taking metro station cover and cut engineering as an example:The station end portion superstructure is busy highway, To reduce the influence to highway, using digging method construction.After the completion of lid excavation construction, recover road travel, while use contrary sequence method Work car station agent structure.
Station cover plate supports covering plate structure, agent structure beam, plate etc. to be installed in side wall and steel pipe using 12 steel pipe columns On post bracket.
The construction method of the present invention includes carrying out the following steps in order:
1) first casting concrete to locating cone and backing plate (1) below;
2) after concrete final set, locating cone and backing plate (1) elevation and center is accurately positioned, is consolidated using Steel bar rack Determine locating cone and backing plate (1);
3) casting concrete stationary positioned cone and backing plate (1);
4) installation positioner (5), positioning hole (2) are inserted in locating cone and backing plate (1);
5) locator (5) is supported using 3 harness cord bolts (3), bolt branch is stood on concrete surface;
6) locator (5) flange respectively installs leveling nut (4) and is used for adjusting locator (5) level up and down;
7) after measurement and positioning device (5) position, elevation are errorless, pour below locator (5) to flange, fixed locator (5);
8) steel pipe column (6) is installed and poured;Fine sand, stable steel pipe column are backfilled after the completion of pouring.

Claims (1)

1. a kind of erection of steel pipe column positioning construction method, it is characterised in that comprise the following steps:
1) first casting concrete to locating cone and backing plate (1) below;
2) locating cone elevation and center are accurately positioned, is bored using Steel bar rack stationary positioned and backing plate (1);
3) casting concrete stationary positioned cone and backing plate (1);
4) installation positioner (5), positioning hole (2) are inserted in locating cone and backing plate (1);
5) using harness cord bolt (3) support locator (5);
6) locator (5) flange respectively installs leveling nut (4) and is used for adjusting locator (5) level up and down;
7) pour below locator (5) to flange, fixed locator (5);
8) steel pipe column (6) is installed and poured.
CN201710719024.6A 2017-08-21 2017-08-21 A kind of steel pipe column positioning construction method Pending CN107476336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710719024.6A CN107476336A (en) 2017-08-21 2017-08-21 A kind of steel pipe column positioning construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710719024.6A CN107476336A (en) 2017-08-21 2017-08-21 A kind of steel pipe column positioning construction method

Publications (1)

Publication Number Publication Date
CN107476336A true CN107476336A (en) 2017-12-15

Family

ID=60601101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710719024.6A Pending CN107476336A (en) 2017-08-21 2017-08-21 A kind of steel pipe column positioning construction method

Country Status (1)

Country Link
CN (1) CN107476336A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265750A (en) * 2018-02-02 2018-07-10 北京市政建设集团有限责任公司 A kind of steel pipe column localization method
CN108571008A (en) * 2018-04-27 2018-09-25 中国电建市政建设集团有限公司 Lid digs station steel pipe column positioning construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162370A (en) * 2002-11-13 2004-06-10 Takenaka Komuten Co Ltd Steel pipe structural permanent column erection method
CN203594051U (en) * 2013-12-11 2014-05-14 中铁九局集团第六工程有限公司 Steel pipe pillar positioner supporting frame device used for cover and cut top-down method
CN205062807U (en) * 2015-09-19 2016-03-02 中铁二十二局集团第一工程有限公司 Steel -pipe column construction installing the system
CN105926672A (en) * 2016-05-06 2016-09-07 中铁十六局集团地铁工程有限公司 Mined metro station steel pipe column construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162370A (en) * 2002-11-13 2004-06-10 Takenaka Komuten Co Ltd Steel pipe structural permanent column erection method
CN203594051U (en) * 2013-12-11 2014-05-14 中铁九局集团第六工程有限公司 Steel pipe pillar positioner supporting frame device used for cover and cut top-down method
CN205062807U (en) * 2015-09-19 2016-03-02 中铁二十二局集团第一工程有限公司 Steel -pipe column construction installing the system
CN105926672A (en) * 2016-05-06 2016-09-07 中铁十六局集团地铁工程有限公司 Mined metro station steel pipe column construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张昊等: "北京地铁菜市口站盖挖逆筑法施工技术", 《市政技术》 *
郝广成: "盖挖逆作法地铁车站钢管柱安装定位施工技术", 《施工技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265750A (en) * 2018-02-02 2018-07-10 北京市政建设集团有限责任公司 A kind of steel pipe column localization method
CN108571008A (en) * 2018-04-27 2018-09-25 中国电建市政建设集团有限公司 Lid digs station steel pipe column positioning construction method

Similar Documents

Publication Publication Date Title
CN102146672B (en) Method for constructing pile foundation in karst area
CN207048069U (en) A kind of pipe gallery segmental timbering
CN105926672B (en) A kind of Underground Subway Station steel pipe column construction method
KR101401934B1 (en) Method for constructing underground structure of railroad using steel pipe roof of two-side semicircle arch type and apparatus for pressing guidance pipe
KR20090100867A (en) The method construction work and unit metal tubing constructing system for the road underground driveway
CN109778992A (en) A kind of ride well device and its construction method for pipeline construction
CN105951747A (en) Construction method for embedding latticed column through reverse building method
CN103334379A (en) Construction method for hanging part of anti-collision guardrail on expressway
KR20190022132A (en) Top-down method using precast-concrete colum
CN107476336A (en) A kind of steel pipe column positioning construction method
CN106285040B (en) The method that building moving steering is realized using track height difference
CN202866304U (en) Reverse-building-method steel pipe column bottom locating device
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
CN102296600B (en) Method for positioning middle pile of spread built subway station
CN204282399U (en) A kind of subway space enclosing structure
CN110185390B (en) Miniature pile group pile drilling positioning and guiding device and use method
KR101165451B1 (en) Pillar foundation structure of street facility and construction method thereof
CN203891060U (en) Permanent steel pipe column positioning system of major structure of cover and excavation top-down station
CN106703072A (en) Scaffolding equipment foundation embedded part construction method
CN103669347B (en) Underwater anchor rod construction method
CN207538090U (en) A kind of externally reinforced structure of Urban underground Tunnel
CN110273435A (en) A kind of construction of city open trench tunnel
CN109235453B (en) Deep foundation pit PRC pipe pile assembled supporting method
CN111579039B (en) Anti-settling seamless construction method for flat plate type dynamic weighing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171215