CN107462794A - A kind of automatic test device - Google Patents
A kind of automatic test device Download PDFInfo
- Publication number
- CN107462794A CN107462794A CN201710711937.3A CN201710711937A CN107462794A CN 107462794 A CN107462794 A CN 107462794A CN 201710711937 A CN201710711937 A CN 201710711937A CN 107462794 A CN107462794 A CN 107462794A
- Authority
- CN
- China
- Prior art keywords
- cabinet
- test
- automatic
- measurement jig
- automatic test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The present invention is applied to measuring technology improvement areas, provide a kind of automatic test device, the automatic test device includes automatic feed mechanism, two lines of plugging into, automatic test machine structure and automatic material blanking mechanism, the automatic feed mechanism connects the automatic test machine structure by line of being plugged into described in one, and the automatic test machine structure connects the automatic material blanking mechanism by line of being plugged into described in one.The streamline of test equipment and correlation is designed using module words, is conveniently replaceable and increases according to demand or reduce the quantity of testing station;Measurement jig(Shielded box)Using small handcart form, it is conveniently replaceable and safeguards;The production capacity of whole line can be adjusted by increasing or reducing the quantity of testing station, to reach the demand of client;It is simple in construction, testing efficiency is high, save testing cost.
Description
Technical field
The invention belongs to module testing technological improvement field, more particularly to a kind of automatic test device.
Background technology
By progress scientific and technological now, and flourishing along with information electronics industry, and semiconductor technology is constantly entered
Step, its application constantly improves the life of the mankind, such as personal computer, transaction machine, mobile phone, tablet PC, number
The electronic consumer product such as code-phase machine, its constantly lighting and summary, and import in the life of the common people.However, manufacturer
Before electronic product is imported into market, first it need to be tested for electronic product, especially computer maker, it is developed
Trendy product need to test whether flaw in advance, if having looked into flaw, propose to report to research and development department for the part of flaw, by
This amendment flaw.
The test mode at the factory end of manufacturer is original test mode now, that is, manual operation, therefore, mostly
Number test operation needs tester manually to stir the switch and button of test system, and general test acts as follows:
1st, external screen test (CRT Test):Need tester that test system is connected into outside CRT screens, then with itself
Eyes judge image.2nd, LCD screen test (LCD Test):Tester is needed to judge LCD pictures with itself eye
Show result.3rd, video camera test (Camera Test):Tester is needed to judge video camera (camera) with itself eye
Camera picture show result.
In this way, eyes and ear of the tester with itself are needed, subjectively to judge test result, so by tester
The test that the manual operation of member is reached can produce drawback, such as:The plug of tool be inconvenient to cause test operation it is inconvenient,
Manually operated activity duration length, and the fatigue strength of tester influences can make a mistake test action, or even manually operated
Under, it may occur that erroneous judgement, and the test result of mistake is provided.
For it is above-mentioned the problem of, the present invention proposes a kind of automatic test device, and it not only improves manual operation
The problem of, and testing cost can be reduced by automation mechanized operation.
The content of the invention
It is an object of the invention to provide a kind of automatic test device, it is intended to solves above-mentioned technical problem.
The present invention is achieved in that a kind of automatic test device, and the automatic test device includes automatic charging
Mechanism, two lines of plugging into, automatic test machine structure and automatic material blanking mechanism, the automatic feed mechanism pass through line of being plugged into described in one
The automatic test machine structure is connected, the automatic test machine structure connects the automatic material blanking mechanism by line of being plugged into described in one.
The present invention further technical scheme be:The automatic test machine structure includes supporting streamline, cache mechanism, test
Equipment, the first measurement jig, the second measurement jig, the 3rd measurement jig, the 4th measurement jig, the first test car, second are surveyed
Dolly, the 3rd test car and the 4th test car are tried, the supporting streamline connects the test by the cache mechanism
One group of device, first test car and the second test car are set respectively with one group of the 3rd test car and the 4th test car
In the opposite sides of the test equipment, first measurement jig, the second measurement jig, the 3rd measurement jig and the 4th test
Tool is respectively arranged on the first test car, the second test car, the 3rd test car and the 4th test car, first test
Tool, the second measurement jig, the openend of the 3rd measurement jig and the 4th measurement jig are relative to the test equipment.
The present invention further technical scheme be:The test equipment includes workbench, the electricity under the workbench
Plate, electric-controlled switch, main control computer and robot controller are controlled, the electric-controlled switch connects the electric-controlled plate, the electric-controlled plate
Output end connects the main control computer and robot controller, the main control computer and the robot controller communication link respectively
Connect, by mounting seat on the workbench, material frame branch is set up on the workbench, is also set on the workbench for robot
There is feed belt, protective cover is additionally provided with the workbench, the protective cover is provided with display screen, the display screen communication connection
The main control computer, the robot communication connect the robot controller, and four pin of the workbench are respectively equipped with one
Individual universal wheel, be provided with by each universal wheel one can high high adjustment leg, the protective cover is provided with an alarm lamp, institute
The input for stating alarm lamp connects the output end of the main control computer, and the workbench has a protection dividing plate, the protection every
Draught fan is located on plate, the power end of the draught fan connects the output end of the electric-controlled plate.
The present invention further technical scheme be:First test car, the second test car, the 3rd test car and
4th test car is identical, and it includes carriage frame, the coaming plate being located at around carriage frame, the top plate located at carriage frame top
And male means cabinet, the framework bottom of getting off are provided with cart base plate, the carriage frame bottom surface is provided with four universal wheels, described
The leg of high high adjustment is provided with by universal wheel, the small in-car is located at industrial control host and tester, the tester communication connection
The industrial control host.
The present invention further technical scheme be:First measurement jig, the second measurement jig, the 3rd measurement jig and
4th measurement jig is identical, and it includes jig body, and the jig body is provided with the pull-out mechanism of an activity.
The present invention further technical scheme be:The cache mechanism includes the first buffer storage and the second buffer storage,
First buffer storage and the second buffer storage are set parallel, and first buffer storage and the second buffer storage are identical, its
Including caching cabinet, the caching material frame on the caching cabinet is described slow through the first conveyer belt of the caching material frame lower end
The pin of bottom surface four for depositing cabinet is respectively equipped with universal wheel, and the bottom surface for caching cabinet is located at the adjustable branch of height by the universal wheel
Pin.
The present invention further technical scheme be:The supporting streamline includes dispatching cabinet, in the dispatching cabinet
Double-speed chain, the second conveyer belt, jacking cylinder, gear stop, inductor, rfid reader device and alarm lamp, the rfid reader device
At the charging aperture of the dispatching cabinet, two double-speed chains are parallel in the dispatching cabinet, two double-speed chains
The charging aperture and discharging opening of the dispatching cabinet are stretched out in both ends respectively, and the jacking cylinder is in the dispatching cabinet, and described second
Conveyer belt is built between two double-speed chains located at the dispatching cabinet, the cylinder rod connection described second of the jacking cylinder
Conveyer belt, the inductor and gear stop being respectively arranged in the dispatching cabinet, and the alarm lamp is located at the top of the dispatching cabinet, institute
State four angle position of the top of dispatching cabinet provided with the bottom that cabinet is dispensed described in opening and be respectively equipped with a universal wheel, each described ten thousand
An adjustable leg of height is provided with to the dispatching bottom of cabinet end on wheel side.
The present invention further technical scheme be:The automatic feed mechanism is identical with the automatic material blanking mechanism, and it is wrapped
Upper and lower material cabinet is included, the lowering or hoisting gear of one end, the first double-speed chain on the lowering or hoisting gear, institute in the upper and lower material cabinet
The second double-speed chain in the middle part of the other end in upper and lower material cabinet is stated, the both ends of second double-speed chain lean out the cabinet of the material cabinet up and down
Body, the second double-speed chain centre are located at the first conveyer belt, and second double-speed chain passes through the second transmission with the lowering or hoisting gear
Band connection, first conveyer belt are provided with charging aperture, the bottom four of the material cabinet up and down up and down close to described at the cabinet of material cabinet
Individual pin position is respectively equipped with universal wheel, and the bottom of the material cabinet up and down beside each universal wheel is adjustable provided with a height
Leg, the lowering or hoisting gear include lift cylinder, and lifting panel is connected with the cylinder rod of the lift cylinder.
The present invention further technical scheme be:The line of plugging into includes cabinet of plugging into, located at the speed plugged into cabinet
Chain, located at the stop block plugged into cabinet, the inductor in the cabinet of plugging at charging aperture, the both ends of the double-speed chain are stretched respectively
Go out the cabinet of the cabinet of plugging into, the top of the cabinet of plugging into is provided with opening, and the pin position of bottom four of the cabinet of plugging into is respectively equipped with
Universal wheel, the bottom of the cabinet of plugging into beside each universal wheel are provided with an adjustable leg of height.
The present invention further technical scheme be:The automatic test machine structure of the automatic test device is multigroup, by connecing
Over-lapping stitch connects;The automatic test machine structure and automatic material blanking mechanism are respectively multiple, and composition is connected respectively by the line of plugging into
Automatic test device.
The beneficial effects of the invention are as follows:Test equipment and correlation streamline using module words design, be conveniently replaceable with
And increase or reduce the quantity of testing station according to demand;Measurement jig(Shielded box)Using small handcart form, be conveniently replaceable and
Safeguard;The production capacity of whole line can be adjusted by increasing or reducing the quantity of testing station, to reach the demand of client;Input and output material is all provided with
There is cache mechanism, be to be cached to have obstruction in disengaging, so as to ensure the smoothness of whole line;Can be by matching automatic loading/unloading
The quantity of machine(Each feeder is responsible for the feeding of a product, and each blanking machine is responsible for the blanking of a product), realize
The mixed survey of whole line different product;Whole line can realize the test of process above and below single type product by concatenating more test equipments;Often
The test of the process up and down of single product can be carried out in individual single station.It is simple in construction, testing efficiency is high, save testing cost.
Brief description of the drawings
Fig. 1 is the structural representation of test equipment provided in an embodiment of the present invention.
Fig. 2 is the structural representation of measurement jig and test car provided in an embodiment of the present invention.
Fig. 3 is the structural representation of buffer storage provided in an embodiment of the present invention.
Fig. 4 is the structural representation of supporting streamline provided in an embodiment of the present invention.
Fig. 5 is the structural representation of automatic feed mechanism and automatic material blanking mechanism provided in an embodiment of the present invention.
Fig. 6 is the structural representation of line provided in an embodiment of the present invention of plugging into.
Embodiment
Reference:10- automatic test machine structure 70- universal wheel 80- leg 90- alarm lamp 101- robots
102- material frame support 103- robot controller 104- draught fan 105- main control computer 106- carriage frames
107- coaming plate 108- device cabinet 109- measurement jig 110- pull-out mechanisms 111- caching cabinet 112- material frames 113-
Material cabinet 202- lowering or hoisting gears 301-'s conveyer belt 114- dispatchings cabinet 115- double-speed chains 201- plugs into cabinet up and down.
Fig. 1 shows automatic test device provided by the invention, and the automatic test device includes automatic charging machine
Structure, two lines of plugging into, automatic test machine structure 10 and automatic material blanking mechanism, the automatic feed mechanism pass through line of being plugged into described in one
The automatic test machine structure 10 is connected, the automatic test machine structure 10 connects the automatic blanking machine by line of being plugged into described in one
Structure.The streamline of test equipment and correlation using module words design, is conveniently replaceable and increases according to demand or reduce survey
Try the quantity at station.
The automatic test machine structure 10 includes supporting streamline, cache mechanism, test equipment, the first measurement jig 109, the
Two measurement jigs 109, the 3rd measurement jig 109, the 4th measurement jig 109, the first test car, the second test car, the 3rd
Test car and the 4th test car, the supporting streamline connect the test device by the cache mechanism, and described the
One group of one test car and the second test car are respectively arranged on the test with one group of the 3rd test car and the 4th test car
The opposite sides of equipment, first measurement jig 109, the second measurement jig 109, the 3rd measurement jig 109 and the 4th test
Tool 109 is respectively arranged on the first test car, the second test car, the 3rd test car and the 4th test car, and described first
Measurement jig 109, the second measurement jig 109, the openend of the 3rd measurement jig 109 and the 4th measurement jig 109 are relative to institute
State test equipment.
The test equipment includes workbench, electric-controlled plate, electric-controlled switch, main control computer 105 under the workbench
And robot controller 103, the electric-controlled switch connect the electric-controlled plate, the output end of the electric-controlled plate connects the master respectively
Control computer 105 and robot controller 103, the main control computer 105 communicate to connect with the robot controller 103, machine
By mounting seat on the workbench, material frame support 102 is also set people 101 on the workbench on the workbench
There is conveyer belt 113, protective cover is additionally provided with the workbench, the protective cover is provided with display screen, the display screen communication link
The main control computer 105 is connect, the robot 101 communicates to connect the robot controller 103, four pin of the workbench
Be respectively equipped with a universal wheel 70, each side of universal wheel 70 be provided with one can high high adjustment leg 80, the protective cover
It is provided with an alarm lamp 90, the input of the alarm lamp 90 connects the output end of the main control computer 105, under the workbench
Provided with protection dividing plate, draught fan 104 is located on the protection dividing plate, the power end of the draught fan 104 connects the electricity
Control the output end of plate.Material to be measured on charging tray to be measured is grabbed measurement jig by the robot 101 in test equipment one by one(Shielding
Case)It is interior, after the completion of test, product is placed into by relevant position according to test result(OK products are placed into OK charging trays, and NG products are put
Put NG belts).
First test car, the second test car, the 3rd test car and the 4th test car are identical, and it includes small
Frame 106, the coaming plate 107 being located at around carriage frame 106, top plate and male means cabinet located at the top of carriage frame 106
108, the lower bottom of frame 106 is provided with cart base plate, and the bottom surface of carriage frame 106 is provided with four universal wheels 70, described
The side of universal wheel 70 is provided with the leg 80 of high high adjustment, and the small in-car is located at industrial control host and tester, the tester communication
Connect the industrial control host.Measurement jig(Shielded box)Using small handcart form, it is conveniently replaceable and safeguards.
First measurement jig 109, the second measurement jig 109, the 3rd measurement jig 109 and the 4th measurement jig 109
Identical, it includes jig body, and the jig body is provided with the pull-out mechanism 110 of an activity.
The cache mechanism includes the first buffer storage and the second buffer storage, first buffer storage and the second caching
Device is set parallel, and first buffer storage and the second buffer storage are identical, and it includes caching cabinet 111, located at the caching
Caching material frame 112 on cabinet, through the first conveyer belt 113 of caching material frame 112 lower end, the bottom surface of the caching cabinet 111
Four pin are respectively equipped with universal wheel 70, and the bottom surface of the side of the universal wheel 70 caching cabinet 111 is located at the adjustable leg 80 of height.
Input and output material is equipped with cache mechanism, is to be cached to have obstruction in disengaging, so as to ensure the smoothness of whole line.
The supporting streamline includes dispatching cabinet 114, double-speed chain 115, the second conveyer belt in the dispatching cabinet 114
113rd, jacking cylinder(Not shown in figure), gear stop(Not shown in figure), inductor(Not shown in figure), rfid reader device(Figure
Not shown in)And alarm lamp 90, the rfid reader device is at the charging aperture of the dispatching cabinet 114, two speeds
Chain 115 is parallel in the dispatching cabinet 114, and entering for the dispatching cabinet 114 is stretched out at the both ends of two double-speed chains 115 respectively
Material mouth and discharging opening, for the jacking cylinder in the dispatching cabinet 114, second conveyer belt 113 is located at the dispatching cabinet
114 are built between two double-speed chains 115, and the cylinder rod of the jacking cylinder connects second conveyer belt 113, described
Inductor and gear stop being respectively arranged in the dispatching cabinet 114, and the alarm lamp 90 is described located at the top of the dispatching cabinet 114
Four angles position that the top of dispatching cabinet 114 is provided with the bottom that cabinet 114 is dispensed described in opening is respectively equipped with a universal wheel 70, each
The bottom of dispatching cabinet 114 on the side of universal wheel 70 is provided with the adjustable leg 80 of a height.Inductor senses charging tray,
Stop cylinder(Gear stops)Rise, charging tray stops place in gear and stopped, and the belt perpendicular to double-speed chain operation is being installed on the jacking of lower section
Charging tray is driven to rise in the presence of cylinder, belt is run after rising to peak, by the skin in charging tray outflow to charging caching machine
Take, RFID, which is installed at the charging of supporting wire body, to be entered row information to the charging tray of each entrance and read, inside each test equipment
Also there are RFID writing stations, write information into the RFID label tag on charging tray, to distinguish other charging trays.
The automatic feed mechanism is identical with the automatic material blanking mechanism, and it includes upper and lower material cabinet 201, above and below described
The lowering or hoisting gear 202 of one end in material cabinet 201, the first double-speed chain 115 on the lowering or hoisting gear 202, the material cabinet up and down
The second double-speed chain 115 in 201 in the middle part of the other end, the both ends of second double-speed chain 115 lean out the cabinet of the material cabinet 201 up and down
Body, the centre of the second double-speed chain 115 are located at the first conveyer belt 113, second double-speed chain 115 and the lowering or hoisting gear 202
Being connected by the second conveyer belt 113, first conveyer belt 113 is provided with charging aperture at the cabinet of material cabinet 201 up and down close to described,
The pin position of bottom four of the upper and lower material cabinet 201 is respectively equipped with universal wheel 70, described upper and lower beside each universal wheel 70
The bottom of material cabinet 201 is provided with the adjustable leg 80 of a height, and the lowering or hoisting gear includes lift cylinder, with the lift cylinder
Cylinder rod connection lifting panel.Can be by matching the quantity of automatic charging & discharging machine(Each feeder is responsible for a product
Feeding, each blanking machine are responsible for the blanking of a product).Manually(Or AGV dollies)The material frame of material charging tray to be measured will be filled
It is put into automatic charging machine inlet, material frame is sent to middle part by the double-speed chain below feeder to be stopped, and motor operating drives
Double-speed chain and material frame rise, and stop after rising to specified altitude assignment, and then double-speed chain is run, and drive material frame to run to speed last-in-chain(LIC)
Hold, now the charging tray of bottom is slightly above installed on above the belt line on top, and now lifting motor declines certain altitude, makes
The charging tray of bottom departs from material frame, and is run to belt at double-speed chain located above(The double-speed chain and line of plugging into are in one
On bar straight line), the belt among double-speed chain rises under cylinder action, the charging tray for being transmitted through taken over, then under belt
Drop, makes charging tray be on double-speed chain, then flows to line of plugging into double-speed chain.
The line of plugging into includes cabinet 301 of plugging into, located at the double-speed chain 115 plugged into cabinet 301, located at the cabinet of plugging into
Described connect is stretched out at stop block in 301, the inductor in the cabinet 301 of plugging at charging aperture, the both ends of the double-speed chain 115 respectively
The cabinet of cabinet 301 is refuted, the top of the cabinet 301 of plugging into is provided with opening, and the pin position of bottom four of the cabinet 301 of plugging into is respectively equipped with
Universal wheel 70, the bottom of the cabinet 301 of plugging on each side of universal wheel 70 are provided with the adjustable leg 80 of a height.
The automatic test machine structure of the automatic test device is multigroup, and by plugging into, line connects;The automatic test machine structure
And automatic material blanking mechanism is respectively multiple, composition automatic test device is connected by the line of plugging into respectively.Realize whole line not
With the mixed survey of product;Whole line can realize the test of process above and below single type product by concatenating more test equipments;Each single station
The test of the interior process up and down for carrying out single product.
The workflow of the device:It is 1. artificial(Or AGV dollies)The material frame for filling material charging tray to be measured is put on automatic
Expect machine inlet, charging tray is transported on streamline by automatic charging machine one by one;2. by the introducing of RFID technique, in each test
Supporting wire body porch reading charging tray bar code information stand to judge whether the charging tray is the station demand charging tray, if it is by slow
Deposit feeder and enter test equipment, if not then backward flowing away;3. charging tray to be measured enters after caching feeder if test
There is no charging tray to be measured in equipment, then the charging tray is directly entered test equipment, if there is charging tray to be measured in test equipment, the charging tray
Cached in caching feeder, until charging tray to be measured is flowed into test equipment by demand charging tray to be measured again in testing station;4. test is set
Material to be measured on charging tray to be measured is grabbed measurement jig by standby interior robot one by one(Shielded box)It is interior, after the completion of test, according to
Product is placed into relevant position by test result(OK products are placed into OK charging trays, and NG products are placed into NG belts);5.OK charging trays
Man Hou, OK charging tray enter streamline by caching blanking machine, if now caching blanking machine exit streamline has charging tray stop,
Then the OK charging trays are kept in caching blanking machine, until OK charging trays are flowed into flowing water by caching blanking machine exit streamline again without charging tray
Line;6.OK charging trays flow down backward, be both needed to when entering each station carry out RFID readings, so as to judge the disk whether need test or
Directly miss the stop;7. the OK charging trays for completing all test steps enter automatic blanking machine, OK charging trays are collected in material frame one by one,
Material frame declines after material frame is filled, and is flowed out with the streamline of inside, then by artificial(Or AGV dollies)Material frame is put away, and
An empty material frame is supplemented to collect follow-up OK charging trays
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
All any modification, equivalent and improvement made within principle etc., should be included in the scope of the protection.
Claims (10)
1. a kind of automatic test device, it is characterised in that the automatic test device connects including automatic feed mechanism, two
Over-lapping stitch, automatic test machine structure and automatic material blanking mechanism, the automatic feed mechanism are described certainly by line connection of being plugged into described in one
Dynamic mechanism for testing, the automatic test machine structure connect the automatic material blanking mechanism by line of being plugged into described in one.
2. automatic test device according to claim 1, it is characterised in that the automatic test machine structure includes supporting stream
Waterline, cache mechanism, test equipment, the first measurement jig, the second measurement jig, the 3rd measurement jig, the 4th measurement jig,
One test car, the second test car, the 3rd test car and the 4th test car, the supporting streamline pass through the caching
Mechanism connects the test device, and one group of first test car and the second test car are surveyed with the 3rd test car and the 4th
One group of opposite sides for being respectively arranged on the test equipment of dolly is tried, first measurement jig, the second measurement jig, the 3rd survey
Examination tool and the 4th measurement jig are respectively arranged on the first test car, the second test car, the 3rd test car and the 4th test
Dolly, first measurement jig, the second measurement jig, the openend of the 3rd measurement jig and the 4th measurement jig are relative to institute
State test equipment.
3. automatic test device according to claim 2, it is characterised in that the test equipment includes workbench, if
Electric-controlled plate, electric-controlled switch, main control computer and robot controller under the workbench, the electric-controlled switch connect the electricity
Control plate, the output end of the electric-controlled plate connects the main control computer and robot controller respectively, the main control computer with it is described
Robot controller communicates to connect, and by mounting seat on the workbench, material frame branch is set up in the workbench for robot
On, feed belt is additionally provided with the workbench, protective cover is additionally provided with the workbench, the protective cover is provided with display
Screen, the display screen communicate to connect the main control computer, and the robot communication connects the robot controller, the work
Four pin of platform are respectively equipped with a universal wheel, be provided with by each universal wheel one can high high adjustment leg, the guarantor
Shield is provided with an alarm lamp, and the input of the alarm lamp connects the output end of the main control computer, and the workbench is divided into
There is protection dividing plate, draught fan is located on the protection dividing plate, the power end of the draught fan connects the defeated of the electric-controlled plate
Go out end.
4. automatic test device according to claim 3, it is characterised in that first test car, the second test
Dolly, the 3rd test car and the 4th test car are identical, and it includes carriage frame, the coaming plate being located at around carriage frame, if
Top plate and male means cabinet in carriage frame top, the framework bottom of getting off are provided with cart base plate, the carriage frame bottom
Face is provided with four universal wheels, and the leg of high high adjustment is provided with by the universal wheel, and the small in-car is located at industrial control host and test
Instrument, the tester communicate to connect the industrial control host.
5. automatic test device according to claim 4, it is characterised in that first measurement jig, the second test
Tool, the 3rd measurement jig and the 4th measurement jig are identical, and it includes jig body, and the jig body is provided with an activity
Pull-out mechanism.
6. automatic test device according to claim 5, it is characterised in that the cache mechanism includes the first caching and filled
Put and the second buffer storage, first buffer storage and the second buffer storage are set parallel, first buffer storage and
Two buffer storages are identical, and it includes caching cabinet, the caching material frame on the caching cabinet, through the caching material frame lower end
First conveyer belt, the pin of bottom surface four of the caching cabinet are respectively equipped with universal wheel, the bottom surface of the universal wheel side caching cabinet
Located at the adjustable leg of height.
7. automatic test device according to claim 6, it is characterised in that the supporting streamline includes dispatching cabinet,
Double-speed chain, the second conveyer belt, jacking cylinder, gear in the dispatching cabinet stop, inductor, rfid reader device and alarm
Lamp, for the rfid reader device at the charging aperture of the dispatching cabinet, two double-speed chains are parallel to be located at the dispatching cabinet
Interior, the charging aperture and discharging opening of the dispatching cabinet are stretched out in the both ends of two double-speed chains respectively, and the jacking cylinder is located at institute
State in dispatching cabinet, second conveyer belt is built between two double-speed chains located at the dispatching cabinet, the jacking cylinder
Cylinder rod connect second conveyer belt, the inductor and gear stop being respectively arranged in the dispatching cabinet, and the alarm lamp is set
In the top of the dispatching cabinet, the four angle position of the top of dispatching cabinet provided with the bottom that cabinet is dispensed described in opening is respectively equipped with
One universal wheel, the dispatching bottom of cabinet end beside each universal wheel are provided with an adjustable leg of height.
8. automatic test device according to claim 7, it is characterised in that the automatic feed mechanism with it is described automatic
Cutting agency is identical, and it includes upper and lower material cabinet, the lowering or hoisting gear of one end in the upper and lower material cabinet, located at the lowering or hoisting gear
On the first double-speed chain, second double-speed chain in material cabinet in the middle part of the other end up and down, the both ends of second double-speed chain are leant out
The cabinet of the material cabinet up and down, the second double-speed chain centre are located at the first conveyer belt, second double-speed chain and the lifting
For device by the second transmission band connection, first conveyer belt is provided with charging aperture at the cabinet of material cabinet up and down close to described, described
The pin position of bottom four of upper and lower material cabinet is respectively equipped with universal wheel, and the bottom of the material cabinet up and down beside each universal wheel is set
There is an adjustable leg of height, the lowering or hoisting gear includes lift cylinder, and lifting is connected with the cylinder rod of the lift cylinder
Panel.
9. automatic test device according to claim 8, it is characterised in that the line of plugging into includes cabinet of plugging into, and is located at
The double-speed chain plugged into cabinet, located at the stop block plugged into cabinet, the inductor in the cabinet of plugging at charging aperture is described
The cabinet of the cabinet of plugging into is stretched out at the both ends of double-speed chain respectively, and the top of the cabinet of plugging into is provided with opening, the bottom of the cabinet of plugging into
The four pin positions in end are respectively equipped with universal wheel, and the bottom of the cabinet of plugging into beside each universal wheel is adjustable provided with a height
Leg.
10. according to the automatic test device described in claim any one of 1-9, it is characterised in that the automatic test dress
The automatic test machine structure put is multigroup, and by plugging into, line connects;The automatic test machine structure and automatic material blanking mechanism are respectively multiple,
Composition automatic test device is connected by the line of plugging into respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710711937.3A CN107462794B (en) | 2017-08-18 | 2017-08-18 | Automatic change testing arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710711937.3A CN107462794B (en) | 2017-08-18 | 2017-08-18 | Automatic change testing arrangement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107462794A true CN107462794A (en) | 2017-12-12 |
CN107462794B CN107462794B (en) | 2023-09-01 |
Family
ID=60550006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710711937.3A Active CN107462794B (en) | 2017-08-18 | 2017-08-18 | Automatic change testing arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107462794B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108039926A (en) * | 2018-01-15 | 2018-05-15 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108072831A (en) * | 2018-01-15 | 2018-05-25 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108112187A (en) * | 2017-12-15 | 2018-06-01 | 苏州和瑞科自动化科技有限公司 | A kind of tin furnace tool charging and discharging mechanism |
CN108328243A (en) * | 2018-03-30 | 2018-07-27 | 深圳市艾特讯科技有限公司 | Automatic testing equipment |
CN108328238A (en) * | 2018-03-30 | 2018-07-27 | 深圳市艾特讯科技有限公司 | Automatic test assembly line |
CN108601320A (en) * | 2018-04-23 | 2018-09-28 | 苏州智合源电子科技有限公司 | A kind of FOFI cachings heat dissipation equipment |
CN109412707A (en) * | 2018-12-21 | 2019-03-01 | 深圳市麒麟实业有限公司 | A kind of uninterrupted energization wireless telecommunications test equipment |
CN109683084A (en) * | 2019-01-25 | 2019-04-26 | 深圳市迈腾电子有限公司 | The detection device of wireless router circuit board |
CN109725179A (en) * | 2019-03-19 | 2019-05-07 | 晓视自动化科技(上海)有限公司 | A kind of automatic testing equipment of Quick Changeover |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203585721U (en) * | 2013-12-09 | 2014-05-07 | 海尔科化工程塑料国家工程研究中心股份有限公司 | Movable household appliance base |
CN104391257A (en) * | 2014-10-31 | 2015-03-04 | 广东泰卓光电科技股份有限公司 | Lamp test production line |
CN205191671U (en) * | 2015-07-11 | 2016-04-27 | 钱德进 | Integrated kitchen |
CN205317915U (en) * | 2015-12-29 | 2016-06-15 | 深圳市捷思特电子设备有限公司 | Full automatic testing apparatus for producing that ages |
CN205393790U (en) * | 2016-03-02 | 2016-07-27 | 台州市程光激光设备有限公司 | Convenient welding rack that moves |
CN106628928A (en) * | 2017-01-22 | 2017-05-10 | 深圳訾岽科技有限公司 | Combined type test assembly line |
CN206203311U (en) * | 2016-09-19 | 2017-05-31 | 珠海迈超智能装备有限公司 | Ate |
CN207366650U (en) * | 2017-08-18 | 2018-05-15 | 深圳市艾特讯科技有限公司 | A kind of automatic test device |
-
2017
- 2017-08-18 CN CN201710711937.3A patent/CN107462794B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203585721U (en) * | 2013-12-09 | 2014-05-07 | 海尔科化工程塑料国家工程研究中心股份有限公司 | Movable household appliance base |
CN104391257A (en) * | 2014-10-31 | 2015-03-04 | 广东泰卓光电科技股份有限公司 | Lamp test production line |
CN205191671U (en) * | 2015-07-11 | 2016-04-27 | 钱德进 | Integrated kitchen |
CN205317915U (en) * | 2015-12-29 | 2016-06-15 | 深圳市捷思特电子设备有限公司 | Full automatic testing apparatus for producing that ages |
CN205393790U (en) * | 2016-03-02 | 2016-07-27 | 台州市程光激光设备有限公司 | Convenient welding rack that moves |
CN206203311U (en) * | 2016-09-19 | 2017-05-31 | 珠海迈超智能装备有限公司 | Ate |
CN106628928A (en) * | 2017-01-22 | 2017-05-10 | 深圳訾岽科技有限公司 | Combined type test assembly line |
CN207366650U (en) * | 2017-08-18 | 2018-05-15 | 深圳市艾特讯科技有限公司 | A kind of automatic test device |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108112187A (en) * | 2017-12-15 | 2018-06-01 | 苏州和瑞科自动化科技有限公司 | A kind of tin furnace tool charging and discharging mechanism |
CN108039926B (en) * | 2018-01-15 | 2023-09-05 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108072831A (en) * | 2018-01-15 | 2018-05-25 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108039926A (en) * | 2018-01-15 | 2018-05-15 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108072831B (en) * | 2018-01-15 | 2023-12-26 | 深圳市海能达通信有限公司 | Complete machine detection device and detection method |
CN108328243A (en) * | 2018-03-30 | 2018-07-27 | 深圳市艾特讯科技有限公司 | Automatic testing equipment |
CN108328238A (en) * | 2018-03-30 | 2018-07-27 | 深圳市艾特讯科技有限公司 | Automatic test assembly line |
CN108328243B (en) * | 2018-03-30 | 2024-03-15 | 深圳市艾特讯科技有限公司 | Automatic testing device |
CN108328238B (en) * | 2018-03-30 | 2024-03-15 | 深圳市艾特讯科技有限公司 | Automatic test assembly line |
CN108601320A (en) * | 2018-04-23 | 2018-09-28 | 苏州智合源电子科技有限公司 | A kind of FOFI cachings heat dissipation equipment |
CN109412707A (en) * | 2018-12-21 | 2019-03-01 | 深圳市麒麟实业有限公司 | A kind of uninterrupted energization wireless telecommunications test equipment |
CN109412707B (en) * | 2018-12-21 | 2024-04-30 | 深圳市麒麟实业有限公司 | Uninterrupted power-on wireless communication test equipment |
CN109683084A (en) * | 2019-01-25 | 2019-04-26 | 深圳市迈腾电子有限公司 | The detection device of wireless router circuit board |
CN109725179A (en) * | 2019-03-19 | 2019-05-07 | 晓视自动化科技(上海)有限公司 | A kind of automatic testing equipment of Quick Changeover |
Also Published As
Publication number | Publication date |
---|---|
CN107462794B (en) | 2023-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107462794A (en) | A kind of automatic test device | |
CN106770341A (en) | A kind of automatic optical detectors of double-decker AOI | |
CN207366650U (en) | A kind of automatic test device | |
CN109813721A (en) | Visual detection device and appearance detection equipment | |
CN106707574B (en) | Liquid crystal display post-process circulation detection system | |
CN201311528Y (en) | Automatic lamp test device for small-dimension liquid crystal panels | |
CN104460064B (en) | A kind of automatic optical detector structure of liquid crystal module | |
CN207752140U (en) | The flexible intelligent calibrating installation of compatible a variety of electric energy meter calibrations | |
CN201815496U (en) | Full-automatic high-precision O-belt sorting scale | |
CN205809240U (en) | PCBA board multi-track on-line normalization mechanism | |
CN111774324A (en) | Compact type multi-quality automatic sorting device for large fruits and vegetables | |
CN108918551A (en) | Testing agency and PCB automatic encapsulation device | |
CN209049751U (en) | A kind of 46F armature vision sorting machine | |
CN207663179U (en) | Liquid crystal display appearance automatic checkout equipment | |
CN206348281U (en) | A kind of automatic optical detectors of double-decker AOI | |
CN104502828B (en) | A kind of flip LED chips online test method | |
CN207482779U (en) | Transfer docking conveying mechanism | |
CN114184619A (en) | PCB board equipment of plugging into | |
CN206532050U (en) | Process cycle detection system after liquid crystal display | |
CN206832198U (en) | A kind of pcb board detection means | |
CN108011585A (en) | The mechanical resistance detection method and system of a kind of photovoltaic module | |
CN105666103B (en) | For the production system of LCD | |
CN207380205U (en) | A kind of inversion type AOI test platforms | |
JP2020011792A (en) | Electronic component conveyance system and conveying vehicle | |
CN212821222U (en) | Visual inspection instrument for IC defect inspection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 Room 401, building a, Hongwei Industrial Park, No. 6, liuxiansan Road, Xingdong community, Xin'an street, Bao'an District, Shenzhen City, Guangdong Province Applicant after: SHENZHEN ITC TECHNOLOGY Co.,Ltd. Address before: 518000 3rd floor, building C1, Jiaan Industrial Park, 72 District, Xin'an street, Bao'an District, Shenzhen City, Guangdong Province Applicant before: SHENZHEN ITC TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |