CN1074501A - Construction of slope drain in geologically unstable area - Google Patents
Construction of slope drain in geologically unstable area Download PDFInfo
- Publication number
- CN1074501A CN1074501A CN 92114280 CN92114280A CN1074501A CN 1074501 A CN1074501 A CN 1074501A CN 92114280 CN92114280 CN 92114280 CN 92114280 A CN92114280 A CN 92114280A CN 1074501 A CN1074501 A CN 1074501A
- Authority
- CN
- China
- Prior art keywords
- water
- ditch body
- gutter
- lay
- unstable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Sewage (AREA)
Abstract
A kind of gutter construction method, construction of slope drain in geologically unstable area particularly, its master operation is: in time pour into the soft sticking fluid sealant of oiliness in the groove behind excavation, sealing scar slit, on fluid sealant, lay the braiding water proof cloth of one deck softness, retractility Water penetrative flexible pipe, macadam, barrier paper and reinforcement wire gauze, cement paste is established in spray more at last, finishes the ditch body; For further making the ditch body stable, lay turf in the bank both sides, and, the band that intercepts water that is filled with pitch is set from the suitable distance of bank.Build the gutter with the present invention in unstable geology district, can prevent that rainwater from infiltrating the rock stratum, guarantee the strong stable of gutter.
Description
The present invention relates to a kind of gutter construction method, particularly construction of slope drain in geologically unstable area.
Always in unstable geology district, build the gutter as geological provinces such as mud stone, mostly be brick, mortar flag stone, concrete or reinforced concrete prefabricated structure of building by laying bricks or stones, these gutters, during because of construction, geology is disturbed, on every side mud stone when summer high temperature, dry and cracked weathering, during summer rainfall, the crack becomes water-flowing path, especially at ditch body structure beyond the region of objective existence side and domatic joining place, often its substrate is washed in a pan empty by current scour, sunk in the gutter, crumble, so on unstable geology district domatic, how to build the gutter, become a hard nut to crack in the civil works.
Purpose of the present invention is that construction of slope drain in geologically unstable area such as a kind of mud stone will be provided, the gutter of building with this method, when even the concrete ditch body produces crack or fracture, still seepage water effectively can be cut and lead, make the condition of a disaster control to minimum zone, and be easy to remedy.
The object of the present invention is achieved like this: this construction of slope drain in geologically unstable area is the timely soft sticking fluid sealant of perfusion oiliness in the groove behind excavation, sealing scar slit, on fluid sealant, lay the braiding water proof cloth of one deck softness, the retractility Water penetrative flexible pipe, macadam, barrier paper and reinforcement wire gauze, cement paste is established in spray more at last, finishes the ditch body; For further making the ditch body stable, lay turf in the bank both sides, and, the band that intercepts water that is filled with pitch is set from the suitable distance of bank.
There is following advantage in gutter of the present invention:
1. the gutter can adapt to unstable geology, solid and reliable: because of the gutter of being finished, the rock crevice of bottom of trench and both sides is all sealed by soft sticking fluid sealant, can soften the generation displacement during sealing glue high temperature, can in time fill up the crack that geology Yin Gaowen cracking is produced, and there is the gunite layer of reinforcing with wire gauze on the top layer, by macadam infiltrate in the Water penetrative flexible pipe moisture content can along with the isolated pipeline of top layer bottom in discharge, so can absorb the irregular settlement of certain degree, prevent that large tracts of land is because of caving in that infiltration produces.
2. help maintenance and maintenance: intercept water band and lay turf on the surface because of the both sides, gutter are provided with, plant careless bank protection, the gunite rough surface of ditch body infiltrates bottom of trench and the ditch body has a little distortion also to study for a second time courses one has flunked easily even old place table water electrode is difficult.
3. construction speed is fast, the efficient height: adopt the gunite layer because of the ditch surface, need not build stone or precast concrete block by laying bricks or stones, and in the gunite, as add the strong agent of drought, and more can improve its rate of set, be delivered for use early.
Concrete construction method of the present invention is provided by following examples and accompanying drawing thereof:
Fig. 1 is the past gutter schematic diagram.
Fig. 2 is that the present invention is applied to the domatic schematic perspective view of going up of mud stone.
Fig. 3 is I-I section enlarged diagram of Fig. 2.
Describe in detail below in conjunction with accompanying drawing:
With reference to Fig. 1, the gutter on mud stone face 1 previously, corresponding measure for want of, 101 places, ditch body prefabricated section 10 outsides are very easily because of being subjected to the current scour avalanche.
With reference to Fig. 2,3, the present invention is undertaken by following operation: in the good groove of excavation, in the both sides and the bottom of trench of ditch body 2, dispose weathering or loosening unstable rock, pour into the soft sticking fluid sealant 3 of oiliness immediately, as mulseal, pitch class material, be full of ditch side 21, fill up slit 11 on the scar 1; On fluid sealant 3, lay the soft braiding of one deck rubber-like water proof cloth 6, on water proof cloth 6, lay 1~3 Water penetrative flexible pipe 7, on Water penetrative flexible pipe 7, fill out multiple macadam 8; On macadam 8, lay one deck barrier paper or isolation cloth 9, and follow closely on the ditch body, prevent that upper water mud from infiltrating with iron nail 91; At barrier paper or 1~2 layer of wire gauze 92 of isolation cloth 9 upper berths nail, spray lays cement and starches 93 then.
In addition, for further preventing, protect domaticly, from bank 22 suitable distances, be provided with to ditch body 2, and be filled with intercepting water of pitch 51 therein and be with 5 in ditch body 2 both sides to bottom of trench infiltration, and along two outer rims layings of ditch body turf 4 banks 22 that go directly.
Claims (3)
1, a kind of gutter construction method, particularly construction of slope drain in geologically unstable area is characterized in that being undertaken by following operation:
1) in the good groove of excavation,, disposes weathering or loosening unstable rock, pour into the soft sticking fluid sealant 3 of oiliness immediately,, be full of ditch side 21, fill up slit 11 on the scar 1 as mulseal, pitch class material in the both sides and the bottom of trench of ditch body 2;
2) on fluid sealant 3, lay the soft braiding of one deck rubber-like water proof cloth 6, on water proof cloth 6, lay 1~3 Water penetrative flexible pipe 7, on Water penetrative flexible pipe 7, fill out multiple macadam 8;
3) on macadam 8, lay one deck barrier paper or isolation cloth 9, and follow closely on the ditch body, prevent that upper water mud from infiltrating with iron nail 91;
4) at barrier paper or 1~2 layer of wire gauze 92 of isolation cloth 9 upper berths nail, spray lays cement and starches 93 then.
2, slope, unstable geology district according to claim 1 and gutter construction method is characterized in that in ditch body 2 both sides being provided with to ditch body 2 from bank 22 suitable distances, and are filled with intercepting water of pitch 51 therein and are with 5.
3, slope, unstable geology district according to claim 1 and gutter construction method is characterized in that being covered with turf 4 and through banks 22 along ditch body both sides outer rim.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92114280 CN1025966C (en) | 1992-12-15 | 1992-12-15 | Construction of slope drain in geologically unstable area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92114280 CN1025966C (en) | 1992-12-15 | 1992-12-15 | Construction of slope drain in geologically unstable area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1074501A true CN1074501A (en) | 1993-07-21 |
CN1025966C CN1025966C (en) | 1994-09-21 |
Family
ID=4946876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 92114280 Expired - Fee Related CN1025966C (en) | 1992-12-15 | 1992-12-15 | Construction of slope drain in geologically unstable area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1025966C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101914934A (en) * | 2009-12-27 | 2010-12-15 | 北京泰宁科创科技有限公司 | Rainwater collection and utilization system and method |
CN104186233A (en) * | 2014-08-15 | 2014-12-10 | 申新山 | Frame beam slope greening method and frame beam slope greening facility |
CN104763017A (en) * | 2015-04-20 | 2015-07-08 | 江苏山水环境建设集团股份有限公司 | Ground permeating rainwater recovery system utilizing building waste materials and construction method of ground permeating rainwater recovery system |
CN106337424A (en) * | 2016-10-20 | 2017-01-18 | 长江勘测规划设计研究有限责任公司 | Cofferdam semi-enclosed type foundation pit without interrupting water conveying during canal lining restoration and method |
CN106759126A (en) * | 2017-02-24 | 2017-05-31 | 化学工业岩土工程有限公司 | Construction method of side slope support drainage channel |
CN109372082A (en) * | 2018-12-11 | 2019-02-22 | 佛山科学技术学院 | A kind of adaptive flexible body structure side slop drainage channel |
-
1992
- 1992-12-15 CN CN 92114280 patent/CN1025966C/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101914934A (en) * | 2009-12-27 | 2010-12-15 | 北京泰宁科创科技有限公司 | Rainwater collection and utilization system and method |
CN104186233A (en) * | 2014-08-15 | 2014-12-10 | 申新山 | Frame beam slope greening method and frame beam slope greening facility |
CN104763017A (en) * | 2015-04-20 | 2015-07-08 | 江苏山水环境建设集团股份有限公司 | Ground permeating rainwater recovery system utilizing building waste materials and construction method of ground permeating rainwater recovery system |
CN106337424A (en) * | 2016-10-20 | 2017-01-18 | 长江勘测规划设计研究有限责任公司 | Cofferdam semi-enclosed type foundation pit without interrupting water conveying during canal lining restoration and method |
CN106337424B (en) * | 2016-10-20 | 2018-06-15 | 长江勘测规划设计研究有限责任公司 | Cofferdam semi-wrapped style foundation pit and method under the conditions of water delivery are not interrupted in canal lining reparation |
CN106759126A (en) * | 2017-02-24 | 2017-05-31 | 化学工业岩土工程有限公司 | Construction method of side slope support drainage channel |
CN106759126B (en) * | 2017-02-24 | 2018-08-17 | 化学工业岩土工程有限公司 | Construction method of side slope support drainage channel |
CN109372082A (en) * | 2018-12-11 | 2019-02-22 | 佛山科学技术学院 | A kind of adaptive flexible body structure side slop drainage channel |
Also Published As
Publication number | Publication date |
---|---|
CN1025966C (en) | 1994-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206768880U (en) | A kind of waterproof construction for seashore pipe gallery | |
CN201695408U (en) | Basement baseplate integrating water-proofing and drainage functions | |
CN103883328B (en) | The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel | |
CN105569058A (en) | Expansive soil cutting structure and construction method thereof | |
CN108385701A (en) | Road Protection of Expansive Soil structure and its construction method | |
CN108677982A (en) | Complex geological condition foundation pit substrate excavates Tunnel gushing treatment method | |
CN209457282U (en) | Ground library top plate planted roof deformation joint structure | |
CN104514216A (en) | Fill channel anti-frost heaving and anti-seepage structure and construction method | |
CN103147614A (en) | Pool with multi-layer structure and building method thereof | |
CN107152012A (en) | Sluice construction technique | |
CN108547260A (en) | Seepage-proofing treatment structure for reservoir full-reservoir basin in karst region and construction method | |
CN214574037U (en) | Comprehensive treatment system for up-down landslides of highway | |
CN1025966C (en) | Construction of slope drain in geologically unstable area | |
CN109610505A (en) | A kind of tunnel upper foundation pit construction method | |
CN206016823U (en) | π shapes plate and inverted arch combined type tunnel bottom lining structure | |
CN112983461A (en) | Construction method for bias tunnel portal in slope volume | |
CN1080010A (en) | The construction method of the composite geo-membrane heart (tiltedly) wall earth dam | |
CN205936632U (en) | Tunnel lining structure can be maintained to disconnect -type | |
CN111663390A (en) | Expansive soil terrace embankment filling structure and construction method | |
CN208293588U (en) | A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages | |
CN208167783U (en) | Gear mud wall composite structure | |
CN206477347U (en) | The water storage structure of basement | |
CN214460984U (en) | Water-spreading slope | |
CN209723194U (en) | Drainage system of freeway | |
CN107386053A (en) | A kind of construction method on pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
OR01 | Other related matters | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |