CN107443547A - The production equipment and production method of a kind of precast beam - Google Patents

The production equipment and production method of a kind of precast beam Download PDF

Info

Publication number
CN107443547A
CN107443547A CN201710718882.9A CN201710718882A CN107443547A CN 107443547 A CN107443547 A CN 107443547A CN 201710718882 A CN201710718882 A CN 201710718882A CN 107443547 A CN107443547 A CN 107443547A
Authority
CN
China
Prior art keywords
side form
bed die
precast beam
mould
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710718882.9A
Other languages
Chinese (zh)
Inventor
张剑
陈韶临
刘艺
陈贤圣
陈仁伍
张博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN201710718882.9A priority Critical patent/CN107443547A/en
Publication of CN107443547A publication Critical patent/CN107443547A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention discloses a kind of production equipment of precast beam, it includes:At least two side forms that are disposed in parallel on pedestal horizontal direction, the adjustable for height bed die being arranged between the two neighboring side form and at least two end moulds for limiting prefabricated beam length; at least partly described side form is movably arranged as on the pedestal; the distance between two neighboring described side form is adjustable; in the position-adjustable of longitudinal direction, the end mould is arranged on the bed die at least two end mould.Invention significantly improves the applicability of precast beam production equipment, production equipment is repeatable to be utilized, and production efficiency is high, easy to operate, reduces production cost.

Description

The production equipment and production method of a kind of precast beam
Technical field
The invention belongs to construction engineering technical field, and in particular to the production equipment and its production method of a kind of precast beam.
Background technology
At present, the mould used in prefabricated precast beam is produced, is assembled mostly using steel side template flange, bed die is fixed on platform On car or special chassis, flange connects with chassis to be used bolt or is welded and fixed mostly.Precast beam is produced using this beam form, by Fixed in bed die, in order to produce the precast beam of different height, different size side forms, side form weight need to be selected according to prefabricated trammel every time Multiple utilization rate is low, and use cost is high, wastes big;And side form weight is big, dismounting every time need to use driving handling, and labor intensity is high, It is big to dismount difficulty, production cost is high, complex operation.
The content of the invention
The present invention is in order to solve problems of the prior art, there is provided a kind of production equipment of precast beam, particular technique Scheme is as follows.
A kind of production equipment of precast beam, it is characterised in that:It includes:It is disposed in parallel on pedestal horizontal direction at least Two side forms;The adjustable for height bed die being arranged between the two neighboring side form;Be arranged on the two neighboring side form Between be used to limit at least two end moulds of prefabricated beam length, at least partly described side form is movably arranged as on the pedestal, The distance between two neighboring described side form is adjustable, at least two end mould longitudinal direction position-adjustable, it is described End mould is arranged on the bed die.When together with side form, bed die and end mould abutting, formed to the side form, bed die and end mould Cavity in casting concrete the precast beam is made., can be easy by the side form of activity setup module, bed die and end mould Produce the precast beam of different in width, height and length in ground.Longitudinal direction in the present invention is the length direction of precast beam, height Direction is vertical direction, and horizontal direction is to be transversely to the machine direction direction and the direction of short transverse.It should be noted that:It is two neighboring Various sizes of precast beam can be produced independently in side form, i.e., can produce more precast beams simultaneously along on horizontal direction, respectively Width, length and the height of precast beam can be different, it is only necessary to the width of the independent adjacent side form of regulation, hold mould in longitudinal side Upward position and the height of bed die it is achieved that and in the case of output is less, it is therein a part of adjacent With vacant, the production of precast beam can be only carried out in side form in the adjacent side form of part, and the flexibility of equipment greatly improves.It is optional Ground, when only wherein 1 in the size more problem of the beam of production, such as three width of precast beam, length and height sizes Or 2 parameters often change, the production equipment that can also change the beam of the present invention is:Width, the end mould of adjacent side form exist Position on longitudinal direction and wherein one or two Parameter adjustable section in the height of bed die, other specification is unadjustable, this Sample can reduce equipment cost, improve the convenience of operation.
In above-mentioned technical proposal, at least one side form in outermost two side forms is connected with for driving The drive device that the side form moves in transverse direction.Wherein, when setting a drive device, by farthest away from the side of drive device Mould is fixed on substrate, and the activity of remaining side form is set, and it is adjacent that a drive device can drive the side form of whole show to abut Bed die and end mould between two side forms.When all setting drive device on two outermost side forms, the side form in centre Can all be movable setting, or fixed setting one of in middle side form.
In above-mentioned technical proposal, cushion block is provided with below the bed die, utilizes different height and/or the pad of varying number Block adjusts the height of the bed die, according to the height of the pre-erection of precast beam to be produced come the height from cushion block so that The bed die upper surface to side form upper surface height be equal to pre-erection height, only needed when pouring by side form, bed die and The cavity that end mould is formed fills up, and the cushion block of different height and/or varying number can realize the regulation of the bed die height. When wherein making full precast beam, the pre-erection of above-mentioned precast beam refers to whole full precast beam;When making Prefabricated superposed beam, The pre-erection of above-mentioned precast beam refers to the pre-erection of Prefabricated superposed beam.
In above-mentioned technical proposal, it is preferable that be provided with lowering or hoisting gear below the bed die, the lowering or hoisting gear can be hydraulic pressure Lowering or hoisting gear or leading screw and nut mechanism.
In above-mentioned technical proposal, the both sides on the bed die top are provided with the chamfering of the prominent bed die upper surface, chamfering Inclined plane towards the precast beam.Beam corner obtained from entering forms chamfering, reduces the probability damaged during beam transport.
In above-mentioned technical proposal, described end mould is extruded by two adjacent side forms and is fixed on adjacent two Between side form, it is preferable that the end mould is provided with rubber blanket on the surface corresponding with the side form and bed die, utilizes rubber blanket It can prevent concrete from being overflowed from the junction of end mould and bed die, side form;Preferably, short transverse is provided with the side form to prolong Raised line/the groove stretched, groove/raised line corresponding with the raised line/groove is provided with the both sides of the end mould, it is preferable that institute Raised line is stated to be removably attachable on the side form or end mould.
In above-mentioned technical proposal, the end mould can be an entirety, it is preferable that the end mould is split-type structural, its It is provided with lower mould including upper mould and below upper mould, the lower end of the upper mould and/or the upper end of lower mould For the groove for the protrusion reinforcing bar for wearing precast beam.
In above-mentioned technical proposal, the side form is stretched out in the upper part of the end mould, and the upper part of the end mould exists Width on horizontal direction is more than the width of the bed die in a lateral direction, and described upper part can removably be fixed In the upper surface of the side form.
In above-mentioned technical proposal, the precast beam is full precast beam or Prefabricated superposed beam.
In above-mentioned technical proposal, adjacent two side forms are connected with flexible cable, and the flexible cable is steel wire rope Or chain.
In above-mentioned technical proposal, described pedestal is tower structure, overflows or the concrete of spluttering can pass through frame Space on rack and panel construction is dropped, and is easy to the working condition for keeping pedestal good.Described pedestal is arranged on track roller, just In streamlined operation.
When the protrusion reinforcing bar for not having to protrude precast beam both ends in precast beam, implementation of the invention includes following step Suddenly:
1) will end mould be placed on two adjacent side forms between, end mould be located at bed die top, corresponding to the length of precast beam Adjust the distribution of at least two end moulds in a longitudinal direction;
2) drive device being connected with least one side form in outermost two side forms promotes outermost At least one side form transverse shifting in two side forms, the side form promote remaining described side form, bed die and end mould, Until whole two neighboring side forms, bed die and end mould abut all between the two neighboring side form;
3) embedded bar is placed in the cavity that side form, bed die and end mould are formed;
4), by concreting in the cavity that side form, bed die and end mould are formed;
5), after concrete setting, drive device pulls the coupled side form, and the side form pulls remaining side form successively The flexible cable being connected respectively with two neighboring side form with both ends, two all adjacent side forms are opened, taken out prefabricated Beam.
Preferably, there are following steps before the step 1):It is located at according to the regulation of the height of the pre-erection of precast beam The height of bed die between two neighboring side form so that the height of bed die upper surface to side form upper surface is equal to the height of pre-erection Degree.
When being provided with the protrusion reinforcing bar at protrusion precast beam both ends in precast beam, implementation of the invention includes following step Suddenly:
1) lower mould, embedded bar and upper mould, are sequentially placed between two adjacent side forms, lower mould is located at bed die Top, upper mould is located above lower mould, and protrusion reinforcing bar passes from the hole of end mould or groove;
2) drive device being connected with least one side form in outermost two side forms promotes outermost Two side forms at least one side form transverse shifting, the side form promotes remaining side form, bed die and end Mould, until whole two neighboring side forms, bed die and end mould abut all between the two neighboring side form;
3), by concreting in the cavity that side form, bed die and end mould are formed;
4), after concrete setting, drive device pulls the coupled side form, and the side form pulls remaining side form successively The flexible cable being connected respectively with two neighboring side form with both ends, by the opening of two all adjacent side forms, take out precast beam.
Preferably, there are following steps before the step 1):It is located at according to the regulation of the height of the pre-erection of precast beam The height of bed die between two neighboring side form so that the height of bed die upper surface to side form upper surface is equal to the height of pre-erection Degree.
The technique effect of the present invention.
1st, the present invention can adjust the width of precast beam during precast beam using the bed die of different transverse widths, The height of regulation bed die can adjust prefabricated depth of beam, and mould will be held to set diverse location in a longitudinal direction to produce The precast beam of different length.Applicability is greatly improved, and production equipment is repeatable to be utilized, and reduces production cost.
2nd, multiple side forms are set up in parallel in a lateral direction and be set up in parallel multiple end moulds, Neng Gou great in a longitudinal direction Big raising production efficiency, it is also beneficial to the subsequent treatment on factory lines of precast beam.
3rd, in the prior art because bed die is fixed, making the precast beam of different height needs to select the side of different height For mould, it is necessary to retain the side form of various height, utilization rate is low;Or poured from higher side form but the control artificial when pouring Highly, complex operation, it is difficult to control.Bed die is realized prefabricated by the cushion block of different height and/or varying number in the present invention The regulation of depth of beam, is advantageous to modularization making, it is not required that makes the side form of different height in advance, improves the utilization of side form Rate, simplify production process.
4th, side form switching action of the invention is easy, it is only necessary to sets drive device, side form matched moulds in unilateral or bilateral When, it is that whole side forms, bed die and end mould abuts assembling can be achieved in place to start drive device to drive outermost side form, side form During opening, also only need to pull outermost side form, linked using flexible cable and open whole side forms, operate very simple.
Brief description of the drawings
Fig. 1 is the front view of production equipment of the present invention;
Fig. 2 is the top view of production equipment of the present invention;
Fig. 3 is the sectional view under production equipment side form matched moulds state of the present invention in transverse direction;
Fig. 4 is the sectional view under production equipment side form die opening state of the present invention in transverse direction;
Fig. 5 is the sectional view of the production equipment of the invention with screw body in transverse direction;
Fig. 6 is the schematic diagram of end mould of the present invention;
Fig. 7 is the schematic diagram of lower mould of the present invention;
Fig. 8 is the schematic diagram of present invention end mould with groove;
Fig. 9 is the stereogram of present invention end mould with groove;
Figure 10 is Fig. 9 side view;
Figure 11 is schematic diagram when bed die is observed in a longitudinal direction.
In figure:Pedestal 1, side form 2, bed die 3, end mould 4, upper mould 41, lower mould 42, groove 43, rubber blanket 44, groove 45, Cushion block 5, protrusion reinforcing bar 6, steel wire rope 7, production line track roller 8, bed die upper surface 9, inclined-plane 10, pre-erection 11, pre-buried steel Muscle 12, hydraulic cylinder 13, leading screw and nut mechanism 14, precast beam 15, chamfering 16.
Embodiment
Referring to Fig. 1-10, the longitudinal direction in the present invention is the length direction of precast beam, and short transverse is vertical direction, horizontal It is to be transversely to the machine direction direction and the direction of short transverse to direction.The production equipment of precast beam includes:It is horizontal to be disposed in parallel in pedestal 1 To multiple side forms 2 on direction;The adjustable for height bed die 3 being arranged between two neighboring side form 2;With for limiting precast beam The end mould 4 of 15 length, the side form 1 of the leftmost side is fixedly installed on pedestal 1 in Fig. 3, and remaining side form 2 is movably arranged as on pedestal 1, The side form 2 of the rightmost side is connected with the drive device for driving the side form 2 to move in transverse direction, and the drive device can be liquid Cylinder pressure 13 (being shown in Fig. 3) or leading screw and nut mechanism 14 (being shown in Fig. 5), adjacent two side forms 2 are connected with steel wire rope 7 or chain Bar, when producing precast beam 15, bed die 3 and end mould 4 by adjacent two side forms extrude and be fixed on two adjacent side forms it Between.The lower section of bed die 3 is provided with cushion block 5, is shown in Fig. 3 using the cushion block of different height and/or varying number to adjust bottom The height of mould 3.Show that end mould 4 is split-type structural in Fig. 6-10, it includes upper mould 41 and lower mould 42, the lower mould 42 upper end is provided with the groove 43 of the protrusion reinforcing bar 6 for wearing precast beam 15.Alternatively, it is provided with the lower end of upper mould 41 For the groove 43 for the protrusion reinforcing bar 6 for wearing precast beam 15, or it is respectively provided with the lower end of upper mould 41 and the upper end of lower mould 42 It is used for the groove 43 of protrusion reinforcing bar for wearing precast beam 15 corresponding to having, the groove of the lower end of upper mould 41 and the upper end of lower mould 42 Groove forms the hole passed for protrusion reinforcing bar 6 together.Alternatively, when in precast beam 15 without protrusion reinforcing bar 6, end mould 4 can be with one Body.
Preferably, it is provided with rubber blanket 44, Huo Zheru on the surface corresponding with side form and bed die of mould 4 as shown in fig. 6, holding Shown in Fig. 9-10, the raised line (not shown) extended along short transverse, the both sides of the end mould 4 are provided with the side form 4 On be provided with groove 45 corresponding with the raised line.The position of certain raised line, groove on side form, end mould can exchange, and also can Serve the same role.Raised line be removably attachable to the side form or end mould on, such as by glass cement be pasted onto side form 2 or Hold on mould 4.
Pedestal 1 is tower structure, overflows or the concrete of spluttering can be dropped by the space on tower structure, Pedestal 1 is convenient to clean, is advantageous to the working condition for keeping pedestal good.Pedestal 1 is arranged on production line track roller 8, is easy to Streamlined operation.Schematic diagram when Figure 11 bed dies 3 are observed in a longitudinal direction, the both sides on the top of bed die 3 are provided with described in protrusion The chamfering 16 of bed die upper surface 9, for the inclined plane 10 of chamfering 16 towards the precast beam, the inclined plane can be that plane can also It is cambered surface.And then the precast beam corner caused forms chamfering, it is possible to prevente effectively from the situation at the few angle in the scarce side of precast beam, is reduced The probability that beam damages when transporting.It should be noted that the precast beam 15 shown in Fig. 1,3 is Prefabricated superposed beam, but this hair The production equipment of bright precast beam also can be used for the production of full precast beam.Feelings of the drive device in side are shown in figure Condition, but can also all be connected with drive device on the side form of both sides.
The production method of the precast beam of the present invention is as follows.
When the protrusion reinforcing bar 6 for not having to protrude precast beam both ends in precast beam, implementation of the invention includes following step Suddenly:
1) cushion block 5 of proper height, is selected according to the height of the pre-erection of precast beam so that the upper surface of bed die 3 to side The height of the upper surface of mould 2 is equal to the height of pre-erection 11;
2), it is equal to the bed die 3 and end mould 4 of prefabricated beam width from transverse width according to the width of precast beam, by the He of bed die 3 End mould 4 is placed between two adjacent side forms, and end mould 4 is located at the top of bed die 3, and cushion block 5 is located at the lower section of bed die 3;
3), drive device promotes the side form 2 of the rightmost side, and the side form 2 promotes remaining side form, bed die and end successively Mould, until whole two neighboring side forms 2, bed die 3 and end mould 4 abut all between the two neighboring side form 2;
4), embedded bar 12 is placed in the cavity that side form 2, bed die 3 and end mould 4 are formed;
5), by concreting in the cavity that side form 2, bed die 3 and end mould 4 are formed;
6), after concrete setting, drive device pulls coupled side form 2, and the side form 2 pulls remaining side form 2 successively With steel wire rope 7, two all adjacent side forms 2 are opened, take out precast beam.
When being provided with the protrusion reinforcing bar 6 at protrusion precast beam both ends in precast beam,
1) cushion block 5 of proper height, is selected according to the height of the pre-erection of precast beam so that the upper surface of bed die 3 to side The height of the upper surface of mould 2 is equal to the height of pre-erection 11;
2), it is equal to the bed die 3 and end mould 4 of prefabricated beam width from transverse width according to the width of precast beam, bed die 3 is put Put between two adjacent side forms 2, cushion block 5 is located at the lower section of bed die 3, and end mould 4 is located at the top of bed die 3;
3) lower mould 42, embedded bar 12 and upper mould 41, are sequentially placed between two adjacent side forms 2, lower mould 42 are located at the top of bed die 3, and upper mould 41 is located at the top of lower mould 42, and protrusion reinforcing bar 6 passes from the hole of end mould or groove;
4), drive device promotes the side form 2 of the rightmost side, and the side form 2 promotes remaining described side form 2, bed die 3 and end successively Mould 4, until whole two neighboring side forms 2, bed die 3 and end mould 4 abut all between the two neighboring side form 2;
5), by concreting in the cavity that side form 2, bed die 3 and end mould 4 are formed;
6), after concrete setting, drive device pulls the coupled side form 2, and the side form 2 pulls remaining side successively Mould 2 and steel wire rope 7, two all adjacent side forms 2 are opened, take out precast beam.

Claims (14)

1. a kind of production equipment of precast beam, it is characterised in that it includes:Pedestal, it is disposed in parallel in the pedestal horizontal direction On at least two side forms, the bed die that is arranged between the two neighboring side form and for limiting prefabricated beam length at least two Individual end mould, the position-adjustable of at least two end mould in a longitudinal direction, the end mould are arranged on the bed die.
2. the production equipment of precast beam according to claim 1, it is characterised in that the height and/or phase of described bed die The distance between adjacent two side forms are adjustable, and at least partly described side form is movably arranged as on the pedestal.
3. the production equipment of precast beam according to claim 2, it is characterised in that in outermost two side forms At least one side form is connected with the drive device for driving the side form to move in transverse direction.
4. the production equipment of precast beam according to claim 2, it is characterised in that pad is provided with below the bed die Block, the height of the bed die is adjusted using the cushion block of different height and/or varying number;Or it is provided with below the bed die Lowering or hoisting gear, the lowering or hoisting gear are hydraulic lift or leading screw and nut mechanism.
5. the production equipment of the precast beam according to claim 1-4 any one, it is characterised in that the bed die top Both sides are provided with the chamfering of the prominent bed die upper surface, and the inclined plane of chamfering is towards the precast beam.
6. the production equipment of precast beam according to claim 1 or 2, it is characterised in that the end mould and the side form and Be respectively arranged with the corresponding surface of bed die be provided with rubber blanket, or the side form along short transverse extension raised line/ Groove, groove/raised line corresponding with the raised line/groove is provided with the both sides of the end mould.
7. the production equipment of precast beam according to claim 6, it is characterised in that the raised line is removably attachable to institute State on side form or end mould.
8. the production equipment of the precast beam according to claim 1-4 any one, it is characterised in that the end mould is split Formula structure, it includes upper mould and the lower mould below upper mould, the lower end of the upper mould and/or the upper end of lower mould On be provided with for wear precast beam protrusion reinforcing bar groove.
9. the production equipment of precast beam according to claim 2, it is characterised in that two adjacent side forms are connected with Flexible cable.
10. the production equipment of the precast beam according to claim 1-4 any one, it is characterised in that described pedestal is Tower structure, described pedestal are arranged on track roller.
11. a kind of production method of the production equipment of precast beam using as described in claim 1-10 any one, its feature It is, it comprises the following steps:
1) will end mould be placed on two adjacent side forms between, end mould be located at bed die top, corresponding to the length adjustment of precast beam The distribution of at least two end moulds in a longitudinal direction;
2) drive device being connected with least one side form in outermost two side forms promotes outermost two At least one side form transverse shifting in the side form, the side form promote remaining described side form, bed die and end mould, until Whole two neighboring side forms bed die and end mould all between the two neighboring side form abut;
3) embedded bar is placed in the cavity that side form, bed die and end mould are formed;
4), by concreting in the cavity that side form, bed die and end mould are formed;
5), after concrete setting, drive device pulls the coupled side form, and the side form pulls remaining side form and two successively The flexible cable being connected respectively with two neighboring side form is held, two all adjacent side forms are opened, take out precast beam.
12. production method according to claim 11, it is characterised in that also have following steps before the step 1):Root The height of the bed die between two neighboring side form is adjusted according to the height of the pre-erection of precast beam so that bed die upper surface is arrived The height of side form upper surface is equal to the height of pre-erection.
13. a kind of production method of the production equipment of precast beam using as described in claim 1-10 any one, its feature It is, it comprises the following steps:
1) lower mould, embedded bar and upper mould, are sequentially placed between two adjacent side forms, lower mould is located at the upper of bed die Side, upper mould are located above lower mould, and protrusion reinforcing bar passes from the hole of end mould or groove;
2) drive device being connected with least one side form in outermost two side forms promotes outermost two At least one side form transverse shifting in the individual side form, the side form promote remaining described side form, bed die and end mould, directly To whole two neighboring side forms, bed die and end mould abut all between the two neighboring side form;
3), by concreting in the cavity that side form, bed die and end mould are formed;
4), after concrete setting, drive device pulls the coupled side form, and the side form pulls remaining side form and two successively The flexible cable being connected respectively with two neighboring side form is held, by the opening of two all adjacent side forms, takes out precast beam.
14. production method according to claim 13, it is characterised in that also have following steps before the step 1):Root The height of the bed die between two neighboring side form is adjusted according to the height of the pre-erection of precast beam so that bed die upper surface is arrived The height of side form upper surface is equal to the height of pre-erection.
CN201710718882.9A 2017-08-21 2017-08-21 The production equipment and production method of a kind of precast beam Pending CN107443547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710718882.9A CN107443547A (en) 2017-08-21 2017-08-21 The production equipment and production method of a kind of precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710718882.9A CN107443547A (en) 2017-08-21 2017-08-21 The production equipment and production method of a kind of precast beam

Publications (1)

Publication Number Publication Date
CN107443547A true CN107443547A (en) 2017-12-08

Family

ID=60492885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710718882.9A Pending CN107443547A (en) 2017-08-21 2017-08-21 The production equipment and production method of a kind of precast beam

Country Status (1)

Country Link
CN (1) CN107443547A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107901196A (en) * 2017-12-15 2018-04-13 许金根 A kind of prefabricated beam column production mould
CN110394884A (en) * 2019-08-20 2019-11-01 湘潭远大住宅工业有限公司 A kind of prefabricated post adjustable mold and prefabricated column production method
CN110450273A (en) * 2019-08-15 2019-11-15 中交二公局第三工程有限公司 A kind of small-sized prefabricated member automatic demoulding equipment
CN113618884A (en) * 2021-08-17 2021-11-09 四川吉浦森建材有限公司 Adjustable mould car that opens and shuts

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19747042C1 (en) * 1997-10-24 1999-05-06 D D C Planungs Entwicklungs Un Method of assembly of building frame
CN2349297Y (en) * 1998-11-28 1999-11-17 李岭群 Length-adjustable prefabricated shearing force beam form
CN105666661A (en) * 2016-01-20 2016-06-15 广东科达洁能股份有限公司 Novel mold for automatically producing magnesite brick
CN106217600A (en) * 2016-08-29 2016-12-14 无锡市锡山区仁景模具厂 A kind of for producing the curb mould being easy to splicing
CN206048460U (en) * 2016-08-24 2017-03-29 北京中铁房山桥梁有限公司 A kind of nylon sheet wallboard mould and wallboard formwork for placing system
CN206109994U (en) * 2016-10-26 2017-04-19 北京二七机车工业有限责任公司 Pier pier shaft prefabricated mould
CN209665731U (en) * 2017-08-21 2019-11-22 长沙远大住宅工业集团股份有限公司 A kind of production equipment of precast beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19747042C1 (en) * 1997-10-24 1999-05-06 D D C Planungs Entwicklungs Un Method of assembly of building frame
CN2349297Y (en) * 1998-11-28 1999-11-17 李岭群 Length-adjustable prefabricated shearing force beam form
CN105666661A (en) * 2016-01-20 2016-06-15 广东科达洁能股份有限公司 Novel mold for automatically producing magnesite brick
CN206048460U (en) * 2016-08-24 2017-03-29 北京中铁房山桥梁有限公司 A kind of nylon sheet wallboard mould and wallboard formwork for placing system
CN106217600A (en) * 2016-08-29 2016-12-14 无锡市锡山区仁景模具厂 A kind of for producing the curb mould being easy to splicing
CN206109994U (en) * 2016-10-26 2017-04-19 北京二七机车工业有限责任公司 Pier pier shaft prefabricated mould
CN209665731U (en) * 2017-08-21 2019-11-22 长沙远大住宅工业集团股份有限公司 A kind of production equipment of precast beam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107901196A (en) * 2017-12-15 2018-04-13 许金根 A kind of prefabricated beam column production mould
CN107901196B (en) * 2017-12-15 2024-03-15 许金根 Mould is used in precast beam post production
CN110450273A (en) * 2019-08-15 2019-11-15 中交二公局第三工程有限公司 A kind of small-sized prefabricated member automatic demoulding equipment
CN110394884A (en) * 2019-08-20 2019-11-01 湘潭远大住宅工业有限公司 A kind of prefabricated post adjustable mold and prefabricated column production method
CN110394884B (en) * 2019-08-20 2024-01-30 湘潭远大住宅工业有限公司 Prefabricated column adjustable die and prefabricated column production method
CN113618884A (en) * 2021-08-17 2021-11-09 四川吉浦森建材有限公司 Adjustable mould car that opens and shuts

Similar Documents

Publication Publication Date Title
CN107443547A (en) The production equipment and production method of a kind of precast beam
CN106120563B (en) Construction method based on Combined movable mould bases cast-in-situ box girder
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN100586682C (en) Advanced tension method bi-directional prestress concrete track board steel model
CN106906758A (en) A kind of culvert fluid pressure type entire combination moving die plate
CN107398985A (en) The production equipment and production method of a kind of precast beam
CN104695335B (en) Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device
CN111996916A (en) Cast-in-place box girder integrated construction equipment and construction method thereof
CN106541489A (en) A kind of floorings prefab-form system
CN209408814U (en) A kind of PC track beam form system
CN108556129B (en) Automatic casting vehicle for cement precast block
CN107599132A (en) A kind of side mold device and side form opening/closing method
CN205936645U (en) A full liquid die plate system for culvert is pour
CN209665731U (en) A kind of production equipment of precast beam
CN209579949U (en) A kind of production equipment of precast beam
CN208594572U (en) Single layer double cabin pipe galleries in underground are hydraulic from walking formwork jumbo
CN209669811U (en) Dam body seepage wall trolley and its walling mechanism
CN211221301U (en) Prefabricated slidable formwork system for concrete bridge deck
CN112177046A (en) Open cut tunnel lining external mold trolley
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier
CN109763458A (en) Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method
CN217151958U (en) Tunnel center ditch pouring trolley
CN207344801U (en) A kind of side mould limiting mechanism
CN212399901U (en) Gypsum slat production host computer
CN204997809U (en) Prefabricated little case beam side device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication