CN109763458A - Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method - Google Patents

Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method Download PDF

Info

Publication number
CN109763458A
CN109763458A CN201910123116.7A CN201910123116A CN109763458A CN 109763458 A CN109763458 A CN 109763458A CN 201910123116 A CN201910123116 A CN 201910123116A CN 109763458 A CN109763458 A CN 109763458A
Authority
CN
China
Prior art keywords
door frame
template
dam body
body seepage
stringer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910123116.7A
Other languages
Chinese (zh)
Inventor
韩宏雷
贾雅斌
崔闯
曹道轲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910123116.7A priority Critical patent/CN109763458A/en
Publication of CN109763458A publication Critical patent/CN109763458A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to dam body seepage wall trolley, walling mechanism, dam body seepage wall construction methods;The walling mechanism that dam body seepage wall trolley includes track, sets running gear in orbit and is mounted in running gear, walling mechanism includes the door frame extended along the longitudinal direction, two stringers extended along the longitudinal direction are equipped at the top of door frame, the spaced template in a pair of of left and right is equipped with inside door frame, it is hinged on corresponding stringer on the upside of template, it is additionally provided with stringer driving hydraulic cylinder and template-driven hydraulic cylinder on door frame, the door frame lifting structure for adjusting mast height is additionally provided between running gear and door frame.Compared with the prior art, it reduces and constructs template time and demoulding time, shorten the construction period, the cut-pff wall section newly poured the cut-pff wall section formation interval time adjacent thereto is short, avoids generating crack between two adjacent cut-pff wall sections, improves the cracking resistance of dam body seepage wall.

Description

Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method
Technical field
The invention belongs to dam body seepage wall building technology fields in hydraulic engineering, and in particular to dam body seepage wall trolley and Its walling mechanism and the dam body seepage wall construction method for using the trolley.
Background technique
Existing cut-pff wall is that one kind is built in the ground diaphragm wall for playing antiseepage in loose pervious bed or earth and rockfill dam (weir), Antiseepage wall construction is reliable, good seepage-proof property, adapts to the advantages that all kinds of formation conditions, easy construction and low cost, China's water conservancy Water power coating and earth rock cofferdam etc. have the generally preferred cut-pff wall of the Anti-seeping technology of anti-consolidation pressure.In addition, existing trolley is general Including running gear, running gear generally includes moving trolley and drives the motor that walking rotation is dynamic on moving trolley, at the construction field (site) Often it is equipped with the track with moving trolley cooperation.
Cut-pff wall is divided into dam foundation impervious wall and dam body seepage wall two parts, and leading wall or more in dam foundation impervious wall, to pour dam body anti- Wall is seeped, dam body seepage wall is continuous structure, generally requires and pours mode by jumping storehouse and build, utilizes property in concrete 5-10 days Can it is not yet stable and without solidify before be easy release internal stress characteristic, according to " partition programming, spacer block construction, placement layer by layer, It is integrally formed " principle construction, pour one section every one section.
But the mode that wall form is poured again is cumbersome, and the duration is longer for traditional first constructing, and leads to adjacent two sections of intervals Time is longer, is easy to generate crack between adjacent two section concretes wall, and the cracking resistance of dam body seepage wall reduces.
Summary of the invention
The purpose of the present invention is to provide a kind of dam body seepage wall trolleys, and to solve, because pouring, cut-pff wall is long in time limit to be led Cut-pff wall is caused to lead to the problem of crack;The object of the invention is also to provide the walling mechanisms on a kind of dam body seepage wall trolley With a kind of dam body seepage wall construction method.
To achieve the above object, dam body seepage wall of the invention trolley uses following technical scheme: dam body seepage wall is used Trolley includes running gear for walking on predetermined trajectory and for installation into the walling mechanism in running gear, wall building machine Structure includes the door frame extended along the longitudinal direction, is equipped with two stringers extended along the longitudinal direction at the top of door frame, two stringers are between left and right The spaced template in a pair of of left and right is equipped with inside arrangement, door frame, the corresponding stringer of a template, template upside is hinged on correspondence Stringer on, be additionally provided on door frame the stringer driving hydraulic cylinder for driving stringer to move left and right and for drive template or so put Dynamic template-driven hydraulic cylinder is additionally provided with the door frame lifting structure for adjusting mast height between running gear and door frame.
The utility model has the advantages that a pair of of template is arranged in the dam body seepage wall trolley in door frame, predetermined pour is reached in trolley When position, the distance between two templates of adjustment, swing angle and height are formed to casting position, are solidified after pouring to cut-pff wall, Carry out demoulding step.Compared with the prior art, time and the demoulding time for constructing template are reduced, is shortened the construction period, what is newly poured is anti- The infiltration wall section cut-pff wall section formation interval time adjacent thereto is short, avoids generating crack between two adjacent cut-pff wall sections, improves The cracking resistance of dam body seepage wall.
Further, the door frame includes two bottom beams extended along the longitudinal direction and the two or more that is mounted on bottom beam Portal frame, the setting of each portal frame time interval, two stringers are mounted on the top of portal frame, are arranged between portal frame Portal frame attachment beam, the vertical portion of portal frame are equipped with the hinged seat installed for module drive hydraulic cylinder, set at the top of portal frame There is the hinged seat for the installation of stringer driving hydraulic cylinder.The stable structure of the door frame, low manufacture cost are practical.
Further, running gear includes moving trolley and the door frame mounting post that is arranged at the top of moving trolley, and bottom beam is equipped with For the door frame mounting post perforation that door frame mounting post passes through, bottom beam, the door frame lifting structure packet are stretched out in the upper end of door frame mounting post The door frame lifting hydraulic cylinder being arranged in above door frame mounting post on door frame is included, the piston rod of door frame lifting hydraulic cylinder is used for pushing tow Door frame mounting post.Door frame lifting hydraulic cylinder adjusts mast height, realize when building mould or when demoulding template height adjustment.
Further, the hinged seat at the top of portal frame is arranged except two stringers.Shorten the distance between two templates, is convenient for Two templates are formed to casting position, and the lesser cut-pff wall of thickness is conveniently poured.
Further, dam body seepage wall with trolley further include for template be mounted on afterwards between door frame and template in place with The support lead screw of fixed form position.The support force that support lead screw applies to template is stablized, and leakage in template-driven hydraulic cylinder is avoided Template is caused to loosen.
Further, dam body seepage wall trolley further includes the lower hopper for being mounted between two stringers, blanking bucket There is the stringer interconnecting piece being located on stringer for seat.Lower hopper is located on stringer, and the feed opening of lower hopper is aligned between two templates Interval, lower hopper seat are located on stringer, and lower hopper can move along the longitudinal direction, and convenient lay in interval between two templates is mixed Solidifying soil.
Further, the template includes pressing plate and the waling being arranged in the outer plate surface of pressing plate and laterally reinforces Muscle, the top of pressing plate have the bending part to bend inwards, and waling has multiple, each waling time interval setting, The upper end of waling is equipped with hinged ear, and template is hinged with stringer by waling, and cross reinforcing is transversely to the machine direction Reinforcing rib setting, cross reinforcing are equipped with the hinged ear connected for template-driven hydraulic cylinder.By setting reinforcing rib to increase The intensity of pressing plate, is bending section on pressing plate, and the molding of dam body seepage wall top portion is compact.
Further, dam body seepage wall further includes for the fixed station truck position when running gear stops working with trolley Suspension hook group, door frame bottom are equipped with the hangers connected for suspension hook group.Trolley prevents trolley itself from moving along direction of travel when working, and keeps away Exempt from template in casting process to loosen, reduces the quality of dam body seepage wall.
Walling mechanism in dam body seepage wall trolley of the invention uses following technical scheme: walling mechanism includes along preceding The door frame that rear direction extends, door frame top are equipped with two stringers extended along the longitudinal direction, two stringers or so arranged for interval, door frame Inside is equipped with the spaced template in a pair of of left and right, the corresponding stringer of a template, and template upside is hinged on corresponding stringer, door It is additionally provided with the stringer driving hydraulic cylinder for driving stringer to move left and right on frame and the template for driving template to swing is driven Hydrodynamic cylinder pressure is additionally provided with the door frame lifting structure for adjusting mast height on door frame.
The utility model has the advantages that a pair of of template is arranged in the dam body seepage wall trolley in door frame, predetermined pour is reached in trolley When position, the distance between two templates of adjustment, swing angle and height are formed to casting position, are solidified after pouring to cut-pff wall, Carry out demoulding step.Compared with the prior art, time and the demoulding time for constructing template are reduced, is shortened the construction period, what is newly poured is anti- The infiltration wall section cut-pff wall section formation interval time adjacent thereto is short, avoids generating crack between two adjacent cut-pff wall sections, improves The cracking resistance of dam body seepage wall.
Further, the door frame includes two bottom beams extended along the longitudinal direction and the two or more that is mounted on bottom beam Portal frame, the setting of each portal frame time interval, two stringers are mounted on the top of portal frame, are arranged between portal frame Portal frame attachment beam, the vertical portion of portal frame are equipped with the hinged seat installed for module drive hydraulic cylinder, set at the top of portal frame There is the hinged seat for the installation of stringer driving hydraulic cylinder.The stable structure of the door frame, low manufacture cost are practical.
Further, walling actuator base is equipped with and installs for door frame in running gear for installing running gear, bottom beam The door frame mounting post perforation that column passes through, for stretching out bottom beam, the door frame lifting structure is included in door for the upper end of door frame mounting post Door frame lifting hydraulic cylinder above door frame mounting post is set on frame, and the piston rod of door frame lifting hydraulic cylinder is pacified for pushing tow door frame Fill column.Door frame lifting hydraulic cylinder adjusts mast height, realize when building mould or when demoulding template height adjustment.
Further, the hinged seat at the top of portal frame is arranged except two stringers.Shorten the distance between two templates, is convenient for Two templates are formed to casting position, and the lesser cut-pff wall of thickness is conveniently poured.
Further, dam body seepage wall with trolley further include for template be mounted on afterwards between door frame and template in place with The support lead screw of fixed form position.The support force that support lead screw applies to template is stablized, and leakage in template-driven hydraulic cylinder is avoided Template is caused to loosen.
Further, the lower hopper for being mounted between two stringers is additionally provided on portal frame, lower hopper, which has, is used for seat The stringer interconnecting piece being located on stringer.Lower hopper is located on stringer, and the feed opening of lower hopper is aligned between two templates and is spaced, blanking Bucket seat is located on stringer, and lower hopper can move along the longitudinal direction, convenient to lay concrete in interval between two templates.
Further, the template includes pressing plate and the waling being arranged in the outer plate surface of pressing plate and laterally reinforces Muscle, the top of pressing plate have the bending part to bend inwards, and waling has multiple, each waling time interval setting, The upper end of waling is equipped with hinged ear, and template is hinged with stringer by waling, and cross reinforcing is transversely to the machine direction Reinforcing rib setting, cross reinforcing are equipped with the hinged ear connected for template-driven hydraulic cylinder.By setting reinforcing rib to increase The intensity of pressing plate, is bending section on pressing plate, and the molding of dam body seepage wall top portion is compact.
Further, door frame is equipped with the suspension hook group for the fixed station truck position when running gear stops working, door frame Bottom is equipped with the hangers connected for suspension hook group.Trolley prevents trolley itself from moving along direction of travel when working, and avoids casting process Middle template loosens, and reduces the quality of dam body seepage wall.
The dam body seepage wall construction method carried out using above-mentioned dam body seepage wall with trolley of the invention is using following steps: 1, it is laid with track and trolley is installed in orbit;2, trolley is walked to adjusting template position behind sequence placing position;3, it pours mixed Solidifying soil;4, after concrete setting setting time, start to demould, it is hydraulic in stringer driving hydraulic cylinder and template-driven in knockout course Cylinder shrink when using by several times shrink, stringer driving hydraulic cylinder and template-driven hydraulic cylinder contraction total kilometres be 50mm~ 200mm, in door frame lifting hydraulic cylinder using jacking by several times, it is 100mm~250mm that door frame lifting hydraulic cylinder, which jacks total kilometres,.
The utility model has the advantages that adjusting the position of template by each hydraulic cylinder in building mold process, being formed between two templates wait pour Position is fixed the position after two templates are adjusted with support lead screw later, is stablized to casting position, and template pine in casting process is avoided It is dynamic.In addition, stringer driving hydraulic cylinder and template-driven hydraulic cylinder are shunk by several times, prevent from causing dam body anti-because of disposable forced stripper mechanism It seeps wall breakage or generates crack, guarantee the cracking resistance of dam body seepage wall.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be apparent that, the accompanying drawings in the following description is only the embodiment of the present invention, common for this field For technical staff, without creative efforts, it can also be obtained according to these attached drawings other attached drawings;
Fig. 1 is the main view of the embodiment one of dam body seepage wall trolley of the invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the enlarged drawing of part A in Fig. 2;
Fig. 4 is structural schematic diagram when dam body seepage wall of the invention is demoulded with trolley.
In figure: 100- portal frame, 101- column, 102- crossbeam, 103- stringer, 104- hinged seat, 105- stringer drive liquid Cylinder pressure, 106- bottom beam, 107- door frame mounting post, 108- door frame lifting hydraulic cylinder, 109- pumping plant, 110- door frame mounting post perforation, 111- portal frame attachment beam, 112- hangers, 113-U type shackle, 114- suspension hook group, 200- running gear, 201- moving trolley, 202- Traveling wheel, 203- motor, 300- template, 301- pressing plate, 302- waling, 303- drive mould support lead screw, 304- template Hydrodynamic cylinder pressure, 305- cross reinforcing, 306- feed opening, 307- lower hopper, 308- track support lead screw, 309- hinged ear, 310- stringer interconnecting piece, 400- track, 500- dam body seepage wall, 600- lead wall.
Specific embodiment
In order to keep technical purpose of the invention, technical scheme and beneficial effects clearer, with reference to the accompanying drawing and specifically Embodiment is further illustrated technical solution of the present invention.
The embodiment one of dam body seepage wall trolley: as shown in Figures 1 to 4, dam body seepage wall trolley includes wall building machine Structure and running gear 200 positioned at walling actuator base, running gear 200 include moving trolley 201 and driving 201 uplink of moving trolley The motor 203 of wheel 202 is walked, moving trolley 201 includes that two active moving trolleys 201 and two driven moving trolleys 201, motor 203 are defeated Wheel is connected with the traveling wheel 202 in active moving trolley 201 by toothed belt transmission out, and the power of motor 203 is 2 × 5.5KW, dam Body cut-pff wall is 6m/min with the trolley speed of service, and moving trolley 201 is equipped with the door frame mounting post that axis extends along the vertical direction 107, it is often equipped with the track 400 cooperated with moving trolley 201 at the construction field (site).
Walling mechanism includes door frame and a pair of of template 300 inside door frame, and door frame is mounted on the top of running gear 200 Portion, two active moving trolleys 201 are located at the left and right sides of the bottom rear end of door frame, and two driven moving trolleys 201 are located at door The left and right sides of the bottom front of frame, door frame include six spaced portal frames 100 along the longitudinal direction, any portal frame 100 include two spaced columns 101 and the crossbeam 102 being arranged between two columns 101, two adjacent portal frames Portal frame attachment beam 111 is connected between 100, each 100 upper left side column 101 of portal frame and right side uprights 101 are located at two On 106 top surface of bottom beam that a length extends along the longitudinal direction, the front-end and back-end of bottom beam 106, which are run through, has axis along the vertical direction The door frame mounting post perforation 110 of extension, door frame mounting post 107 are set in door frame mounting post perforation 110, door frame mounting post 107 Door frame mounting post perforation 110 is stretched out, 100 column 101 of portal frame close to door frame mounting post 107 is equipped with door frame lifting hydraulic cylinder 108, door frame lifting hydraulic cylinder 108 is located at corresponding 107 top of door frame mounting post, and the piston rod of door frame lifting hydraulic cylinder 108 supports Meet the in door frame mounting post 107
In addition, being additionally provided with hangers 112 on bottom beam 106, ground is embedded with U-shaped hook ring 113, between hangers 112 and U-shaped hook ring 113 It is connected with suspension hook group 114, suspension hook group 114 is used to the fixed station truck position when running gear 200 stops working, go back on crossbeam 102 Equipped with pumping plant 109, pumping plant 106 connects pumping plant hydraulic operation console, and hydraulic cylinder and running gear 200 pass through the hydraulic behaviour of pumping plant Make console control.Certainly in the case where fixed trolley, suspension hook group 114 could alternatively be other forms, such as trolley can To tense by the earth anchor of setting on the ground, realize that trolley is fixed.
A pair of of template 300 inside door frame formed between setting, two templates 300 between left and right it is up-small and down-big between Every template 300 includes pressing plate 301 and the waling 302 and cross reinforcing 305 that are arranged in 301 outer plate surface of pressing plate, pressure The top of plate 301 has the bending part to bend inwards, and there are six the walings 302 in same template 300, waling 302 length extend along the vertical direction, and each 302 time interval of waling setting, the upper end of waling 302 is equipped with hinged Ear 309 reclines at the top of crossbeam 102 there are two the stringer 103 vertical with crossbeam 102, extends before and after 103 length of stringer, two stringers 103 between left and right every setting, and template 300 is hinged by waling 302 and stringer 103, and cross reinforcing 305 is transversely to the machine direction Reinforcing rib 302 is arranged, and cross reinforcing 305 is equipped with the hinged ear 309 connected for template-driven hydraulic cylinder 304.
Three lower hoppers 307 held for material are equipped with above crossbeam 102, three 307 time intervals of lower hopper are arranged, under The feed opening 306 of hopper 307 is aligned between two templates 300 and is spaced, and lower hopper 307 is between two stringers 103.One on trolley Template 300 corresponds to a stringer 103, and 103 bottom of stringer is equipped with hinged seat 104, hinged ear 309 on waling 302 and vertical The pin shaft that hinged seat 104 on beam 103 is extended along the longitudinal direction by axis is hinged, is equipped at the top of the both ends of each crossbeam 102 Hinged seat 104, two stringers 103 are respectively positioned between two hinged seats 104 on same crossbeam 102, and stringer 103 is equipped with and crossbeam The hinged ear 309 that hinged seat 104 cooperates on 102, is hinged with vertical for pushing and pulling between hinged seat 104 and corresponding hinged ear 309 The stringer driving hydraulic cylinder 105 that beam 103 moves in left-right direction.Crossbeam 102, column 101, stringer 103, bottom beam 106, portal frame Attachment beam 111 and hinged seat 104 are i-beam structure, and waling 302 and cross reinforcing 305 are square steel structure, crossbeam 102, column 101, portal frame attachment beam 111 and bottom beam 106 are bolted, and stringer 103 sticks on 102 top of crossbeam.
There are three cross reinforcings 305 in each template 300, and three cross reinforcings 305 are between the upper and lower every setting, each transverse direction Front and back is arranged at intervals with hinged ear 309 on reinforcing rib 305, and column 101 is equipped with two file hinged seats 104, the hinge of same file The setting of 104 time interval of joint chair, the hinged ear 309 of top cross reinforcing 305 and the upper file hinged ear 309 of column 101 Between be connected with to mould support lead screw 303, the hinged ear 309 of intermediate cross reinforcing 305 and the lower file of column 101 are hinged There are four support lead screw 303 and two template-driven hydraulic cylinders 304, two template-driven hydraulic cylinders 304 to mould for connection between ear 309 The front-end and back-end of door frame are located at, four support lead screw 303 between two template-driven hydraulic cylinders 304 mould, on the lower The hinged ear 309 of cross reinforcing 305 is hinged with the track support lead screw 308 for being used to support template 300, and track supports lead screw One end of 308 separate template 300 is connected on track 400.
Shore door frame by door frame lifting hydraulic cylinder 108, door frame band moving template 300 is gone up and down along the vertical direction, stringer 103 according to It is supported by crossbeam 102, and stringer 103 is moved left and right by stringer driving hydraulic cylinder 105, template 300 is opened and closed when mobile, template is driven Hydrodynamic cylinder pressure 304 cooperates stringer driving hydraulic cylinder 105 to demould, and template 300 is jacked up after demoulding by door frame lifting hydraulic cylinder 108, together When promoted by stringer 103 with moving template 300, running gear 200 and door frame mounting post 107 are fixed in 300 lifting process of template It is motionless, it is controlled by pumping plant hydraulic operation platform when walking, all hydraulic cylinder and running gear 200 are controlled by pumping plant hydraulic operation Platform control.
Mould support lead screw 303 is attached when template 300 is located at predetermined position, adjustment is long to mould support lead screw 303 Degree fixes 300 position of template, demoulds preceding remove and supports lead screw 303 to mould, track support lead screw 308 is that template 300 is located in advance Positioning is attached when setting, and is supported by track 400, is removed track before demoulding and is supported lead screw 303.In addition, being made using wall 600 is led Lower part template for the dam body seepage wall 500 poured in advance pours in dam body seepage wall 500 and completes the demoulding of rear pattern plate 300, pours in advance The both ends of dam body seepage wall 500 are additionally provided with locking plug template, by steel pipe purlin fixation, block to 300 gap of template. Compared with the prior art, trolley work efficiency height of the invention, short time limit, reliable in quality, high financial profit, reduce construct template when Between and demoulding time, shorten the construction period, the support force that applies to template of support lead screw is stablized, and avoids leaking in template-driven hydraulic cylinder and lead It causes template to loosen, prevents from generating crack between adjacent two section concretes wall, the cracking resistance of dam body seepage wall 500 is high, avoids Processing of the conventional construction method to wire drawing hole, ensure that impervious effect, improve concrete construction quality and concrete construction Mechanization degree.
When construction:
1, be laid with track 400 and install trolley on track 400: track 400 uses 43kg rail, and track 400 is layered on concrete On ground, dowel being beaten on mattess and fixes track 400, distance is 3450mm between two tracks 400, and door frame is completed Afterwards, template 300 is hinged on stringer 103, arrangement hydraulic cylinder, hydraulic tube and electric wiring, finally will support 303 He of lead screw to mould Track support lead screw 308 is hung on corresponding position.
2, trolley is walked to adjusting template position behind sequence placing position;Crawl trolley walking button runs to trolley point Storehouse casting position starts hydraulic electric motor, manipulates stringer driving hydraulic cylinder 105 and template-driven hydraulic cylinder 304 control respectively Valve handle makes two templates 300 be adjusted to scheduled position, then the control valve handle of manipulation door frame lifting hydraulic cylinder 108 makes respectively Template 300 drops to predetermined altitude, and template 300 is in closes hydraulic pump motor after casting position, while by adjusting supporting wire Thick stick holds out against template 300, completes the fixation of template 300, is respectively hinged at template 300 and gantry to the both ends of mould support lead screw 303 On 100 column 101 of frame, track support 308 one end of lead screw is hinged in template 300, and the other end is connected on track 400.
3, casting concrete;The lower part template that wall 600 is cast-in-place part is led, the both ends of cast-in-place part are respectively equipped with plug mould Plate, locking plug template use plank sheathing, and steel pipe purlin fixation blocks 300 gap of template, and concrete is from lower hopper 307 feed opening 306 enters in the cavity between template 300, checks support lead screw simultaneously in casting process, prevents support lead screw It loosens.
4, start to demould after concrete setting setting time;It dismantles first and supports lead screw and bulkhead, start hydraulic system, Hand-operated direction valve handle is operated, controls stringer driving hydraulic cylinder 105 and template-driven hydraulic cylinder 304, in stringer in knockout course Using shrinking by several times when driving hydraulic cylinder 105 and template-driven hydraulic cylinder 304 are shunk, stringer driving hydraulic cylinder 105 and template The contraction total kilometres of driving hydraulic cylinder 304 are 50mm~200mm, and two templates 300 are detached from lining;Operate hand-operated direction valve hand Handle controls door frame lifting hydraulic cylinder 108, and when door frame lifting hydraulic cylinder 108 jacks up door frame using jacking by several times, door frame is gone up and down It is 100mm~250mm that hydraulic cylinder 108, which jacks total kilometres, and template 300 is all detached from ground.
In building mold process, the position of template 300 is adjusted by each hydraulic cylinder, forms position to be poured between two templates 300 It sets, fixes the position after two templates 300 are adjusted with support lead screw later, positional structure to be poured is stablized, avoided in casting process Template 300 loosens.In addition, stringer driving hydraulic cylinder 105 and template-driven hydraulic cylinder 304 are shunk by several times, prevent because disposable strong System demoulding causes dam body seepage wall damaged or generates crack, guarantees the cracking resistance of dam body seepage wall.
The work progress is also the specific embodiment of the dam body seepage wall construction method in the present invention.
The embodiment two of dam body seepage wall trolley: template can be other shapes, such as template includes pressing plate, pressing plate Upper side edge is equipped with the stringer hinge hole entered for the hinged seat on stringer, is additionally provided with axis between two edges of stringer hinge hole The hinge bar extended along the longitudinal direction, hinge bar are rotatably installed in the hinged seat of stringer bottom.
The embodiment three of dam body seepage wall trolley: door frame lifting structure can be other forms, such as can be by door frame The mandril that lifting hydraulic cylinder is substituted for rod set and sliding is set in rod set, mandril are equipped with rack gear, and bottom beam is equipped with motor, bottom Wheel and rack engagement on beam motor output shaft, during demoulding, starting bottom beam motor driven mandril shores door frame installation Column completes the lifting of door frame.
The dam body seepage wall embodiment of the walling mechanism in trolley: the walling mechanism and above-mentioned dam body seepage wall platform Walling mechanism structure in any embodiment of vehicle is identical, therefore is not repeated to illustrate.
It should be noted last that: technical solution of the present invention that the above embodiments are only illustrative and not limiting is any right The equivalent replacement and do not depart from the modification of spirit and scope of the invention or locally replace that the present invention carries out, should all cover in this hair Within bright protective scope of the claims.

Claims (10)

1. dam body seepage wall trolley, including the running gear for walking on predetermined trajectory, it is characterised in that: further include using In the walling mechanism being installed in running gear, walling mechanism includes the door frame extended along the longitudinal direction, is equipped with two at the top of door frame The stringer that root extends along the longitudinal direction, two stringers or so arranged for interval, door frame inside are equipped with the spaced template in a pair of of left and right, One template corresponds to a stringer, is hinged on corresponding stringer on the upside of template, is additionally provided on door frame for driving stringer to move left and right Stringer driving hydraulic cylinder and template-driven hydraulic cylinder for driving template to swing, also set between running gear and door frame There is the door frame lifting structure for adjusting mast height.
2. dam body seepage wall trolley according to claim 1, it is characterised in that: the door frame includes two along front and back Bottom beam to extension and more than two portal frames for being mounted on bottom beam, each portal frame time interval setting, described two Stringer is mounted on the top of portal frame, and portal frame attachment beam is arranged between portal frame, and the vertical portion of portal frame is equipped with for mould The hinged seat of block driving hydraulic cylinder installation, portal frame top are equipped with the hinged seat installed for stringer driving hydraulic cylinder.
3. dam body seepage wall trolley according to claim 2, it is characterised in that: running gear includes moving trolley and setting Door frame mounting post at the top of moving trolley, bottom beam are equipped with the door frame mounting post passed through for door frame mounting post and perforate, door frame installation Bottom beam is stretched out in the upper end of column, and the door frame lifting structure includes the door frame lifting liquid being arranged in above door frame mounting post on door frame The piston rod of cylinder pressure, door frame lifting hydraulic cylinder is used for pushing tow door frame mounting post.
4. dam body seepage wall trolley according to claim 3, it is characterised in that: the hinged seat setting at the top of portal frame exists Except two stringers.
5. dam body seepage wall trolley according to claim 1-4, it is characterised in that: dam body seepage wall trolley It further include the support lead screw for being mounted on afterwards in place in template between door frame and template with fixed form position.
6. dam body seepage wall trolley according to claim 1-4, it is characterised in that: dam body seepage wall trolley It further include the lower hopper for being mounted between two stringers, lower hopper, which has, is located at the stringer interconnecting piece on stringer for seat.
7. dam body seepage wall trolley according to claim 1-4, it is characterised in that: the template includes pressing plate With the waling and cross reinforcing in the outer plate surface that pressing plate is arranged in, the top of pressing plate has the bending to bend inwards Portion, waling have multiple, and the upper end of the setting of each waling time interval, waling is equipped with hinged ear, template Hinged with stringer by waling, cross reinforcing is transversely to the machine direction reinforcing rib setting, and cross reinforcing is equipped with for mould The hinged ear of plate driving hydraulic cylinder connection.
8. dam body seepage wall trolley according to claim 1-4, it is characterised in that: dam body seepage wall trolley It further include the suspension hook group for the fixed station truck position when running gear stops working, door frame bottom is equipped with to be connected for suspension hook group Hangers.
9. the walling mechanism in dam body seepage wall trolley, it is characterised in that: the walling mechanism appoints for the claims 1-8 Walling mechanism in dam body seepage wall trolley described in one.
10. the construction party of dam body seepage wall construction is carried out with trolley using the described in any item dam body seepage walls of claim 1-8 Method, it is characterised in that: include the following steps, 1, be laid with and track and install trolley in orbit;2, trolley is walked to sequence placing Adjusting template position behind position;3, casting concrete;4, after concrete setting setting time, start to demould, in knockout course Using shrinking by several times when stringer driving hydraulic cylinder and template-driven hydraulic cylinder are shunk, stringer driving hydraulic cylinder and template-driven liquid The contraction total kilometres of cylinder pressure are 50mm~200mm, in door frame lifting hydraulic cylinder using jacking by several times, door frame lifting hydraulic cylinder top Rising total kilometres is 100mm~250mm.
CN201910123116.7A 2019-02-19 2019-02-19 Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method Pending CN109763458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910123116.7A CN109763458A (en) 2019-02-19 2019-02-19 Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910123116.7A CN109763458A (en) 2019-02-19 2019-02-19 Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method

Publications (1)

Publication Number Publication Date
CN109763458A true CN109763458A (en) 2019-05-17

Family

ID=66456967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910123116.7A Pending CN109763458A (en) 2019-02-19 2019-02-19 Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method

Country Status (1)

Country Link
CN (1) CN109763458A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748148A (en) * 2019-11-02 2020-02-04 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN115126243A (en) * 2022-07-11 2022-09-30 浙江五方建设有限公司 Concrete pouring equipment and pouring process thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204457802U (en) * 2014-12-31 2015-07-08 上海市机械施工集团有限公司 Formed by integrally casting formula formwork jumbo
CN204627625U (en) * 2015-04-14 2015-09-09 甘肃路桥建设集团有限公司 Automatic walking lining trolley
CN105887885A (en) * 2016-06-06 2016-08-24 中国水利水电第七工程局有限公司 Symmetric rock anchor beam concrete pouring trolley
CN206299394U (en) * 2016-12-26 2017-07-04 山东铁鹰建设工程有限公司 A kind of tunneling subway station side wall self-propelled hydraulic lining trolley
CN108755434A (en) * 2018-07-04 2018-11-06 长沙泽和智能科技有限公司 A kind of outer mould trolley of self-propelled hydraulic railway box girder
CN209669811U (en) * 2019-02-19 2019-11-22 韩宏雷 Dam body seepage wall trolley and its walling mechanism

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204457802U (en) * 2014-12-31 2015-07-08 上海市机械施工集团有限公司 Formed by integrally casting formula formwork jumbo
CN204627625U (en) * 2015-04-14 2015-09-09 甘肃路桥建设集团有限公司 Automatic walking lining trolley
CN105887885A (en) * 2016-06-06 2016-08-24 中国水利水电第七工程局有限公司 Symmetric rock anchor beam concrete pouring trolley
CN206299394U (en) * 2016-12-26 2017-07-04 山东铁鹰建设工程有限公司 A kind of tunneling subway station side wall self-propelled hydraulic lining trolley
CN108755434A (en) * 2018-07-04 2018-11-06 长沙泽和智能科技有限公司 A kind of outer mould trolley of self-propelled hydraulic railway box girder
CN209669811U (en) * 2019-02-19 2019-11-22 韩宏雷 Dam body seepage wall trolley and its walling mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748148A (en) * 2019-11-02 2020-02-04 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN110748148B (en) * 2019-11-02 2021-07-20 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN115126243A (en) * 2022-07-11 2022-09-30 浙江五方建设有限公司 Concrete pouring equipment and pouring process thereof
CN115126243B (en) * 2022-07-11 2024-01-09 浙江五方建设有限公司 Concrete pouring equipment and pouring process thereof

Similar Documents

Publication Publication Date Title
CN101586464B (en) Construction method of railway tunnel lining side wall concrete
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN107059920B (en) Loess formation piping lane construction technology
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN209669811U (en) Dam body seepage wall trolley and its walling mechanism
CN109519197A (en) A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application
CN208717763U (en) A kind of cast-in-place box culvert rapid molding device
CN110905554A (en) Tunnel inverted arch and filled concrete paver and construction process
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN109763458A (en) Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method
CN110904969A (en) High steep slope slab corridor structure concrete placement slipform system
CN211314235U (en) Tunnel inverted arch and filling concrete paver
CN107829408B (en) Rectangular aqueduct construction steel mould trolley
CN107542065B (en) Construction method for overturning and lifting small steel die of high-steep-clearance groove
CN209652963U (en) Mold for assembly concrete hypogee sole plate
CN107060831A (en) One kind is used for tunnel groove constructing device
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete
CN215332898U (en) Simple circular slip form trolley for flat tunnel
CN112012473B (en) Integrated steel formwork for wall body of cantilever rib type of sewage pool
CN211395897U (en) Underdrain external mold lining trolley
CN107160542A (en) Bracket type inner form support system construction method
CN209011843U (en) A kind of anchor section trolley for the secondary lining-up construction in tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination