CN107443353A - A kind of wall-building robot and its method of work - Google Patents

A kind of wall-building robot and its method of work Download PDF

Info

Publication number
CN107443353A
CN107443353A CN201610368659.1A CN201610368659A CN107443353A CN 107443353 A CN107443353 A CN 107443353A CN 201610368659 A CN201610368659 A CN 201610368659A CN 107443353 A CN107443353 A CN 107443353A
Authority
CN
China
Prior art keywords
brick
axis
guide rail
aerated blocks
stage body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610368659.1A
Other languages
Chinese (zh)
Inventor
雷永强
徐宏艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Haite Intelligent Technology Co Ltd
Original Assignee
Luoyang Haite Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Haite Intelligent Technology Co Ltd filed Critical Luoyang Haite Intelligent Technology Co Ltd
Priority to CN201610368659.1A priority Critical patent/CN107443353A/en
Publication of CN107443353A publication Critical patent/CN107443353A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J15/00Gripping heads and other end effectors
    • B25J15/08Gripping heads and other end effectors having finger members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines

Abstract

A kind of wall-building robot,Including the stage body that works,Brick car transfer mechanism is provided with the work stage body,Double four-axle linked control systems,Automatic claying device,Hydraulic pressure brick cutter,Brick folding pallet,Lifting,Translation mechanism,The brick car transfer mechanism is moved up and down by the guide rail of stage body support first and the guide rail of stage body support second on the workbench,Double four-axle linked control systems carry out space orientation and movement to brick picking manipulators,The automatic claying device is parallel to each other with hydraulic pressure brick cutter and is set across the brick folding pallet,The automatic claying device is connected by hopper support plate and the workbench body phase and is provided with hopper,Impeller and motor,The hydraulic pressure brick cutter is provided with blade support,The lifting,Translation mechanism is arranged at the hollow part between stage body base and work top support frame in the work stage body,The robot can replace people to perform and take brick,Claying,Clip,The action such as build a wall,Automaticity is high,Efficiency high,It is easy to use.

Description

A kind of wall-building robot and its method of work
Technical field
The present invention relates to the robot of the building wall for building, and in particular to a kind of wall-building robot and its work Method.
Background technology
At present, with the development of industrial technology, especially in building trade, it is necessary to which work of largely building a wall, most Working environment of building a wall is poor, and worker is mostly the elderly, and muscle power is very limited, and not only labor intensity is big by manual work, and efficiency is low, And easily because longevity of service, it is easily tired out, miswork is caused, in building operation environment, worker's person also be present Potential safety hazard, therefore, manpower operation can not meet the needs of growing industrial development, common to build a wall operation at least Cooperations more than 2 people is needed to complete, operating efficiency is extremely low.Traditional flow of building a wall is also more complicated, before this at least through 1 Individual worker and mud, it is also necessary to which worker shovels mud, fortune mud, applies the operation such as mud, and process is various, it is necessary to the hand labor of input is more, builds It is higher to build up this.
The content of the invention
In order to overcome the shortcomings of above-mentioned technology, it is an object of the invention to provide a kind of wall-building robot and its method of work, It can be automatically performed and take brick, claying, clip, build a wall, its technical scheme is as follows:
A kind of wall-building robot, including work stage body, the work stage body include work top, stage body base, work top branch Support, the guide rail of stage body support first, the guide rail of stage body support second, it is characterised in that be provided with transfer brick on the work stage body The brick car transfer mechanism of car, the brick car transfer mechanism is by the guide rail of stage body support first and the guide rail of stage body support second described Moved up and down on workbench, be provided with the hollow part that the work top support frame is formed with the stage body base Perform aerated blocks to build a wall the lifting of action, translation mechanism, be provided with described work top and space seat is carried out to aerated blocks Demarcate double four-axle linked control systems of position, to the automatic claying device of the automatic claying of aerated blocks, cut off unnecessary aerated blocks automatically Hydraulic pressure brick cutter, carrying aerated blocks and the brick folding pallet that aerated blocks are positioned, wherein, the automatic claying device and the hydraulic cutting Brick device is parallel to each other and is set across the brick folding pallet, and double four-axle linked set-up of control system are in the automatic claying Device, the hydraulic pressure brick cutter, the side of the top of the brick folding pallet and the work stage body.
Preferably, double four-axle linked control systems include the first X-axis guide rail and are arranged in first X-axis guide rail The first X-servo motor and the first X-axis slide block, the second X-axis guide rail and the second X-axis being arranged in second X-axis guide rail Servomotor and the second X-axis slide block, the Y-axis guide rail and Y-axis servomotor and Y-axis sliding block, Z being arranged in the Y-axis guide rail Axle telescopic arm and the brick picking manipulators being arranged on the Z axis telescopic arm, first X-axis guide rail is by being arranged on described first First X-axis slide block in X-axis guide rail is slidably connected with the Y-axis guide rail, and second X-axis guide rail is by being arranged on Second X-axis slide block stated in the second X-axis guide rail is slidably connected with the Y-axis guide rail, first X-axis guide rail, the Y Axis rail is connected by the first X-axis guide rail support frame and the workbench body phase, and second X-axis guide rail, Y-axis guide rail pass through second X-axis guide rail support frame connects with the workbench body phase, and the Z axis telescopic arm is led via installing plate by Y-axis sliding block and the Y-axis Rail is slidably connected.
Preferably, brick picking manipulators pass through with the brick picking manipulators installing plate being arranged on the Z axis telescopic arm and taking Brick mechanical hand hydraulic cylinder is connected with the Z axis telescopic arm, and the brick picking manipulators include gripping aerated blocks and parallel relative The first clamping jaw and the second clamping jaw set.
Preferably, the brick folding pallet is arranged in tray rail and including the first pallet gear edge and first pallet Tray bottom of the gear along the second pallet gear edge, connection the first pallet gear edge and second pallet gear edge being oppositely arranged in parallel Portion, the first tray rail for being arranged at the tray bottom and being connected with roller bearing screw mandrel, the first tray rail sliding block, the second pallet Guide rail and the second tray rail sliding block and the pallet servomotor for driving the roller bearing screw mandrel movement.
Preferably, the automatic claying device is provided with hopper, the impeller being arranged in the hopper and the drive of carrying mud The impeller drive motor of the dynamic impeller rotation.
Preferably, the hydraulic pressure brick cutter is provided with is oppositely arranged in parallel by the first supporting plate, with first supporting plate The second supporting plate, connect the supporting plate crossbeam of first supporting plate and second supporting plate, be arranged on described first Fixation blade on fagging, the blade hydraulic cylinder being arranged in second supporting plate, it is arranged on the blade hydraulic cylinder The moving blade of end, the blade hydraulic cylinder cross second supporting plate and set and installed by blade hydraulic cylinder Plate is arranged in second supporting plate.
Preferably, the lifting, translation mechanism include transverse axis mechanical arm, longitudinal axis mechanical arm, manipulator for laying brick, the transverse axis Mechanical arm, longitudinal axis mechanical arm are connected by transverse axis mechanical arm support base, and the longitudinal axis mechanical arm passes through with the manipulator for laying brick Manipulator for laying brick installing plate connects.
Preferably, the transverse axis mechanical arm is to be set in the mechanical arm and the transverse axis mechanical arm for can carry out way moving There are transverse axis mechanical arm servomotor and steel wire rope.
Preferably, the manipulator for laying brick include be connected with the manipulator for laying brick installing plate installing arm, hinge, regulation The manipulator for laying brick hydraulic cylinder of the hinge length, with hinged 3rd clamping jaw, be connected with installing arm the 4th Clamping jaw.
Preferably, the brick car transfer mechanism is arranged to by being arranged on the first brick car in the guide rail of stage body support first Transfer sliding block and the second brick car transfer sliding block being arranged in the guide rail of stage body support second are led with the stage body support first The rectangle profile structure that rail and the guide rail of stage body support second are engaged, the brick car transfer mechanism top are provided with semicircle Parallel a pair of the relative sheet materials of shape, the neck of fastening brick car is formed between the pair of sheet material.
A kind of method of work of wall-building robot, comprises the following steps:
S0:Start;
S1:Brick car is in place
It is artificial to promote brick car to be moved to work stage body, aerated blocks entrucking is piled up neatly, brick car is placed into brick car transfer mechanism On;
S2:Aerated blocks are in place
Make brick car card firm by the neck on brick car transfer mechanism, brick car transfer mechanism is in the guide rail of stage body support first and stage body branch Driven in the guide rail of frame second by transfer mechanism servomotor, brick car is moved upwards along work stage body, aerated blocks are by transfer Onto work top;
S3:Computer is assigned to brick picking manipulators takes brick order
Control program in computer is sent to control centre takes brick order, orders double four-axle linked systems 4 to brick picking manipulators Carry out space orientation;
S4:By double four-axle linked systems to taking table manipulator to position
The Y-axis guide rail is by the driving of the first X-axis servomotor, the second X-axis servomotor in first X-axis Moved on guide rail, second X-axis guide rail, can determine the position of the Y-axis guide rail, and then determine the brick picking manipulators X-axis coordinate points, the Z axis telescopic arm are slided in the Y-axis guide rail under the driving of the Z axis servomotor, can determine The Y-axis coordinate points of the brick picking manipulators, the brick picking manipulators can be along the Z axis telescopic arms on the Z axis telescopic arm Move up and down, and then determine the Z axis coordinate points of brick picking manipulators, complete the positioning to taking table manipulator;
S5:Brick picking manipulators position to aerated blocks
The first clamping jaw and the second clamping jaw of brick picking manipulators are accurately positioned to aerated blocks;
S6:Complete location determination
After positioning of the brick picking manipulators to aerated blocks reaches expected operation purpose, perform and operate in next step, work as brick picking manipulators Positioning to aerated blocks can not reach expected operation purpose, return to S4 steps;
S7:Brick picking manipulators capture aerated blocks
Aerated blocks are captured in the presence of brick picking manipulators hydraulic cylinder, with the help of double four-axle linked systems are given, positioning takes Brick manipulator is to the position of brick folding pallet;
S8:The aerated blocks that brick picking manipulators are captured are placed into brick folding pallet
After the positioning to brick folding pallet is completed, the aerated blocks captured are placed on brick folding pallet by brick picking manipulators, brick folding Pallet positions to aerated blocks, under the control of brick folding pallet servomotor, passes through the roller bearing screw mandrel on brick folding tray bottom Movement, brick folding pallet is sent to automatic claying device;
S9:Computer assigns claying operational order
Control program in computer sends claying order to control centre;
S10:Claying
Mud is housed in automatic claying device in hopper, motor control impeller rotation, the mud in hopper is applied to aerating On block,
S11:Computer assigns excision aerating block command
Control program in computer sends excision aerating block command to control centre;
S12:Excision
The length for carrying out accurately calculating the length of aerated blocks and needs are built a wall by PLC control assemblies, hydraulic pressure brick cutter pass through it In the presence of the fixation blade and moving blade of upper setting, the part unnecessary to aerated blocks is cut off,
S13:Computer is assigned to brick picking manipulators puts back to aerating block command
Control program in computer sends the life that the aerated blocks after claying, removal procedure are put back to brick folding pallet to control centre Order;
S14:Aerated blocks after processing put back to brick folding pallet
In the presence of double four-axle linked control systems, space orientation, the first clamping jaw and the second clamping jaw are carried out to brick picking manipulators To aerated blocks positioning, the crawl after claying, excision, then it is put back into brick folding pallet;
S15:Computer assigns aerated blocks transfer order to lifting, translation mechanism
Control program in computer sends the order of transfer aerated blocks to control centre, and transverse axis is mechanical in lifting, translation mechanism Arm promotes steel wire rope to tense in the presence of stepper motor, transverse axis mechanical arm is moved in the horizontal direction, meanwhile, longitudinal axis machinery Arm is in longitudinal axis servomotor(Not shown in figure)Driving under control manipulator for laying brick, and then adjust in manipulator for laying brick longitudinal axis side To position, by determining the position of manipulator for laying brick both horizontally and vertically, and then manipulator for laying brick is carried out empty Between position, manipulator for laying brick by hinge adjust the distance between the 3rd clamping jaw and the 4th clamping jaw be positioned to crawl aerated blocks, Manipulator for laying brick hydraulic cylinder is driven by PLC control assemblies, manipulator for laying brick is captured aerated blocks;
S16:Computer assigns order of laying bricks to lifting, translation mechanism
The aerated blocks of crawl are placed into the position for needing to build a wall by manipulator for laying brick;
S17:Completion is laid bricks judgement
When no longer needing to lay bricks, then operational order is completed, when needing to repeat order, then step repeats S3, when laying bricks Generation is abnormal, does not complete when laying bricks operation, then step returns to S16;
S18:Terminate.
The invention has the advantages that:
1st, the space orientation of brick picking manipulators is realized by using double four-axle linked control systems, determines the space of brick picking manipulators Coordinate, registration, error are small.
2nd, brick picking manipulators carry out automation crawl aerated blocks, and it can carry out 90 ° of rotations, and accurate positioning, crawl is flexible, Automaticity is high, easily operated.
3rd, the position horizontally and vertically of manipulator for laying brick is realized using lifting, translation mechanism, can determine The coordinate position of manipulator for laying brick in space, manipulator for laying brick can adjust the distance between clamping jaw as needed, and then can Different length is captured, different size of aerated blocks are with strong applicability.
4th, manipulator for laying brick can realize building a wall for the automation of overall process, no dead angle, also can freely build a wall around the corner, Automaticity is high, and topology layout is reasonable, and method is easily operated, mechanical gripper conveniently moving, efficiency high.
5th, lifting, translation mechanism use way moving guide rail, and lifting, the two-way shifting of translation mechanism in the horizontal direction can be achieved Dynamic, motion direction is various, can be moved freely in space plane.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of stereogram of wall-building robot of the present invention;
Fig. 2 is a kind of partial enlarged drawing of wall-building robot manipulator for laying brick of the present invention;
Fig. 3 is an a kind of structural perspective of wall-building robot hydraulic pressure brick cutter of the present invention;
Fig. 4 is a kind of another structural perspective of wall-building robot hydraulic pressure brick cutter of the invention;
Fig. 5 is a kind of structural perspective of the automatic claying device of wall-building robot of the present invention;
Fig. 6 is a kind of flow chart of the method for work of wall-building robot of the present invention.
In figure:
1- work stage body, 2- liftings, translation mechanism, 3- brick cars transfer mechanism, 4- double four-axle linked control system, the automatic clayings of 5- Device, 6- hydraulic pressure brick cutter, 7- brick folding pallets
101- work tops, 102- stage bodies base, 103- work tops support frame, the first guide rail of 104- stage bodies support, 105- platforms The guide rail of body support frame second
201- longitudinal axis mechanical arm, 202- longitudinal axis mechanical arms set, 203- manipulator for laying brick installing plate, 204- manipulator for laying brick, 205- Transverse axis mechanical arm support base, 206- transverse axis mechanical arm, 207- transverse axis mechanical arm sets
2041- installing arms, 2042- manipulator for laying brick hydraulic cylinder, 2043- hinges, the clamping jaws of 2044- the 3rd, the clamping jaws of 2045- the 4th
301- necks
The X-axis guide rails of 401- first, the X-axis guide rails of 402- second, 403-Y axis rails, 404-Z axles telescopic arm, 405-Y axles sliding block, 406- installing plates, 407- brick picking manipulators installing plate, 408- brick picking manipulators, 409- brick picking manipulators hydraulic cylinder, 410- One X-axis guide rail support frame, 411- the second X-axis guide rail support frames
The clamping jaws of 4081- first, the clamping jaws of 4082- second
501- hoppers, 502- impellers, hopper support plate 503, fixing hole 504
601- blade supports, 602- fix blade, 603- moving blades, 604- insert adapters, 605- blade hydraulic cylinders 606- blade hydraulic cylinder installing plates
The supporting plates of 6011- first, the supporting plates of 6012- second
701- brick folding pallets servomotor, 702- roller bearings screw mandrel, 703- tray rails, the pallets of 704- first are kept off along 705- second Pallet is kept off along 706- tray bottoms
S0:Start
S1:Brick car is in place
S2:Aerated blocks are in place
S3:Computer is assigned to brick picking manipulators takes brick order
S4:By double four-axle linked systems to taking table manipulator to position
S5:Brick picking manipulators position to aerated blocks
S6:Complete location determination
S7:Brick picking manipulators capture aerated blocks
S8:The aerated blocks that brick picking manipulators are captured are placed into brick folding pallet
S9:Computer assigns claying operational order
S10:Claying
S11:Computer assigns excision aerating block command
S12:Excision
S13:Computer is assigned to brick picking manipulators puts back to aerating block command
S14:Aerated blocks after processing put back to brick folding pallet
S15:Computer assigns aerated blocks transfer order to lifting, translation mechanism
S16:Computer assigns order of laying bricks to lifting, translation mechanism
S17:Completion is laid bricks judgement
S18:Terminate.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As Figure 1-Figure 5, a kind of wall-building robot, including work stage body 1, work stage body 1 include work top 101, Stage body base 102, work top support frame 103, the first guide rail of stage body support 104, the second guide rail of stage body support 105, its feature It is, the brick car transfer mechanism 3 of transfer brick car is provided with the stage body 1 that works, and brick car transfer mechanism 3 is led by stage body support first Rail 104 and the second guide rail of stage body support 105 1 are moved up and down on the table, in work top support frame 103 and stage body bottom The hollow parts that are formed of seat 104, which are provided with, to be performed aerated blocks and builds a wall the lifting of action, translation mechanism 2, on work top 101 It is provided with and aerated blocks is carried out with double four-axle linked control systems 4 of space coordinates positioning, the automatic of the automatic claying of aerated blocks is smeared Mud device 5, the hydraulic pressure brick cutter 6 for cutting off unnecessary aerated blocks automatically, carrying aerated blocks and the brick folding pallet 7 that aerated blocks are positioned, its In, automatic claying device 5 is parallel to each other with hydraulic pressure brick cutter 6 and is set across brick folding pallet 7, double four-axle linked control systems 4 It is arranged on the side of automatic claying device 5, hydraulic pressure brick cutter 6, the top of brick folding pallet 7 and the stage body 1 that works.In specific embodiment In, the brick car of carrying aerated blocks is placed around in brick car transfer mechanism 3, the brick car for carrying aerated blocks is manually placed neck On 301, under the driving of servomotor, brick car transfer mechanism 3 moves brick car along work stage body 1 upwards, moves brick car To near brick folding pallet 7, it is placed into by brick picking manipulators 408 on brick folding pallet 7, the claying and clip for carrying out next step are moved Make.
In the particular embodiment, the interlayer of the settable 3 layers of placement aerated blocks of brick car, each interlayer can place 7 pieces of aeratings Block.
In a particular embodiment, as shown in figure 1, double four-axle linked control systems 4 include the first X-axis guide rail 401 and set The first X-servo motor in the first X-axis guide rail 401(Not shown in figure)And first X-axis slide block(Not shown in figure), second X-axis guide rail 402 and the second X-axis servomotor being arranged in the second X-axis guide rail 402(Not shown in figure)And second X-axis slide Block(Not shown in figure), Y-axis guide rail 403 and the Y-axis servomotor being arranged in Y-axis guide rail 403(Not shown in figure)Slided with Y-axis Block 405, Z axis telescopic arm 404 and the brick picking manipulators being arranged on Z axis telescopic arm 404(408), the first X-axis guide rail(401)It is logical Cross and be arranged on the first X-axis guide rail(401)The first interior X-axis slide block(Not shown in figure)It is slidably connected with Y-axis guide rail 403, the Two X-axis guide rails 402 pass through the second X-axis slide block for being arranged in the second X-axis guide rail 402(Not shown in figure)With stating Y-axis guide rail 403 It is slidably connected, the first X-axis guide rail 401, Y-axis guide rail 403 are connected by the first X-axis guide rail support frame 410 with work stage body 1, Second X-axis guide rail 402, Y-axis guide rail 403 are connected by the second X-axis guide rail support frame 411 with work stage body 1, Z axis telescopic arm 404 It is slidably connected via installing plate 406 by Y-axis sliding block 405 and Y-axis guide rail 404.
In a particular embodiment, brick picking manipulators 408 with the brick picking manipulators being arranged on Z axis telescopic arm 404 by pacifying Loading board 407 and brick picking manipulators hydraulic cylinder 409 are connected with Z axis telescopic arm 404, and brick picking manipulators 408 include gripping and added Air parcel and the first clamping jaw 4081 and the second clamping jaw 4082 being oppositely arranged in parallel.In a particular embodiment, the He of the first clamping jaw 4081 Second clamping jaw 4082 can perform by the driving of brick picking manipulators hydraulic cylinder 409 and take brick to operate.
As shown in Figure 3 and Figure 4, brick folding pallet 7 is arranged in tray rail 703 and including the first pallet gear along 704, with the One pallet gear is along 704 the second pallets gears being oppositely arranged in parallel along 705, the first pallet of connection gear along 704 and second pallet keep off edge 705 tray bottom 706, the first tray rail, the first pallet for being arranged at tray bottom 706 and being connected with roller bearing screw mandrel 702 Guide rail slide block, the second tray rail and the second tray rail sliding block and the pallet servomotor for driving the movement of roller bearing screw mandrel 702 701。
As shown in Figure 3 and Figure 4, hydraulic pressure brick cutter 6 is provided with by the first supporting plate 6011, parallel with the first supporting plate 6011 The second supporting plate 6012 for being oppositely arranged, the first supporting plate 6011 of connection and the second supporting plate 6012 supporting plate crossbeam 6013, The fixation blade 602 that is arranged in the first supporting plate 6011, the blade hydraulic cylinder 605 being arranged in the second supporting plate 6012, The moving blade 603 of the end of blade hydraulic cylinder 605 is arranged on, blade hydraulic cylinder 605 crosses the second supporting plate 6012 and set Put and the second supporting plate 6012 is arranged on by blade hydraulic cylinder installing plate 606).In a particular embodiment, in blade hydraulic pressure Under the driving of cylinder 605, insert adapter 604 drives mobile knife to cut off unnecessary aerated blocks.Preferably, the fixed He of blade 602 Moving blade 603 uses 65 steel manganese materials.
In a particular embodiment, as shown in figure 1, lifting, translation mechanism 2 include transverse axis mechanical arm 206, longitudinal axis mechanical arm 201st, manipulator for laying brick 204, transverse axis mechanical arm 206, longitudinal axis mechanical arm 201 are connected by transverse axis mechanical arm support base 205, the longitudinal axis Mechanical arm 201 is connected with manipulator for laying brick 204 by manipulator for laying brick installing plate 203.Preferably, on longitudinal axis mechanical arm 201 also Longitudinal axis mechanical arm set 202 is provided with, transverse axis mechanical arm set 207 is provided with transverse axis mechanical arm 206, it is advantageous to longitudinal axis mechanical arm 201st, the movement of the vertical and horizontal in concrete operations of transverse axis mechanical arm 206, it is not easy to make mechanical arm wander off, while also have resistance to The characteristic of mill.
In specific implementation, transverse axis mechanical arm 206 is the mechanical arm and transverse axis mechanical arm that can carry out way moving(206) Inside it is provided with transverse axis mechanical arm servomotor and steel wire rope.
In a particular embodiment, as shown in Fig. 2 manipulator for laying brick 206 includes what is be connected with manipulator for laying brick installing plate 203 Installing arm 2041, hinge 2043, the manipulator for laying brick hydraulic cylinder 2043 for adjusting the length of hinge 2043 and the hinged 3rd Clamping jaw 2044, the 4th clamping jaw 2045 being connected with installing arm 2041.In a particular embodiment, manipulator for laying brick hydraulic cylinder 2042 Hinge 2043 can be driven, the distance between the 3rd clamping jaw 2044 and the 4th clamping jaw 2045 are adjusted by the stretching of hinge 2043.
In a particular embodiment, as shown in figure 1, brick car transfer mechanism 3 is arranged to lead by being arranged on stage body support first The first brick car transfer sliding block in rail 104 and the second brick car transfer sliding block and platform being arranged in the second guide rail of stage body support 105 The rectangle profile structure that the first guide rail of body support frame 104 and the second guide rail of stage body support 105 are engaged, on brick car transfer mechanism 3 Side is provided with semicircle parallel a pair of relative sheet materials, and the neck 301 of fastening brick car is formed between the pair of sheet material.
As shown in figure 5, the hopper 501 of carrying sposh is set across brick folding pallet 7, the impeller 502 set in hopper 501 The impeller motor rotated with driving impeller 502 connects, and impeller 502 passes through impeller silk axle(Not shown in figure)It is fixed, impeller motor (Not shown in figure)With the silk axle(Not shown in figure)Connection, the hopper 501 is by 2 hopper support plates 503 via spiral shell Bolt is fixed on the work top 101 by fixing hole 504.The setting of the lower section of hopper 501 is rectangular, and 501 mouthfuls of hopper is arranged to Bell mouth shape, the supporting plate of hopper 501 are provided with the triangular support floor of 3 parallel spaced-aparts and are provided with the branch of bolt hole 504 Fagging substrate 506, it is hollow between triangular support floor adjacent to each other, this structure type contributes to support bearing mud Hopper 501.
As shown in fig. 6, a kind of method of work of wall-building robot, comprises the following steps:
S0:Start;
S1:Brick car is in place
It is artificial to promote brick car to be moved to work stage body 1, aerated blocks entrucking is piled up neatly, brick car is placed into brick car transfer mechanism On 3;
S2:Aerated blocks are in place
Make brick car card firm by the neck 301 on brick car transfer mechanism 3, brick car transfer mechanism 3 is in the first guide rail of stage body support 104 With the second guide rail of stage body support 105 in pass through transfer mechanism servomotor(Not shown in figure)Driving, makes brick car along workbench Body 1 moves upwards, and aerated blocks are by transfer to work top 101;
S3:Computer is assigned to brick picking manipulators 408 and takes brick order
Control program in computer is sent to control centre takes brick order, orders double four-axle linked systems 44 to brick picking manipulators 408 carry out space orientation;
S4:Brick picking manipulators 408 are positioned by double four-axle linked systems 4
Y-axis guide rail 403 passes through the first X-axis servomotor(Not shown in figure), the second X-axis servomotor(Not shown in figure)Drive Move and moved in the first X-axis guide rail 401, the second X-axis guide rail 402, can determine the position of Y-axis guide rail 403, and then described in determination The X-axis coordinate points of brick picking manipulators 408, Z axis telescopic arm 404 is in Z axis servomotor(Not shown in figure)Driving under led in Y-axis Slided on rail 403, can determine the Y-axis coordinate points of the brick picking manipulators 408, brick picking manipulators 408 are in Z axis telescopic arm 404 On can be moved up and down along Z axis telescopic arm 404, and then determine brick picking manipulators 408 Z axis coordinate points, complete to fetching brick machine The positioning of tool hand 408;
S5:Brick picking manipulators 408 position to aerated blocks
The first clamping jaw 4081 and the second clamping jaw 4082 of brick picking manipulators 408 are accurately positioned to aerated blocks;
S6:Complete location determination
After positioning of the brick picking manipulators 408 to aerated blocks reaches expected operation purpose, perform and operate in next step, when fetching brick machine tool Positioning of the hand 408 to aerated blocks can not reach expected operation purpose, return to S4 steps;
S7:Brick picking manipulators 408 capture aerated blocks
Aerated blocks are captured in the presence of the hydraulic cylinder of brick picking manipulators 408, with the help of double four-axle linked systems 4, positioning Brick picking manipulators 408 arrive the position of brick folding pallet 7;
S8:The aerated blocks that brick picking manipulators 408 are captured are placed into brick folding pallet 7
After the positioning to brick folding pallet 7 is completed, the aerated blocks captured are placed on brick folding pallet 7 by brick picking manipulators 408, Brick folding pallet 7 positions to aerated blocks, in brick folding pallet servomotor(Not shown in figure)Control under, pass through brick folding pallet Roller bearing screw mandrel on 7 bottoms(Not shown in figure)Movement, brick folding pallet 7 is sent to automatic claying device 5;
S9:Computer assigns claying operational order
Control program in computer sends claying order to control centre;
S10:Claying
Mud is housed, the motor of impeller 502 control impeller 502 rotates, and makes the mud in hopper in automatic claying device 5 in hopper It is applied on aerated blocks,
S11:Computer assigns excision aerating block command
Control program in computer sends excision aerating block command to control centre;
S12:Excision
The length for carrying out accurately calculating the length of aerated blocks and needs are built a wall by PLC control assemblies, hydraulic pressure brick cutter pass through it In the presence of the fixation blade and moving blade of upper setting, the part unnecessary to aerated blocks is cut off,
S13:Computer is assigned to brick picking manipulators 408 and puts back to aerating block command
Control program in computer is sent to control centre puts back to brick folding pallet 7 by the aerated blocks after claying, removal procedure Order;
S14:Aerated blocks after processing put back to brick folding pallet 7
In the presence of double four-axle linked systems 4, space orientation, the first clamping jaw 4081 and second are carried out to brick picking manipulators 408 Then clamping jaw 4082 is put back into brick folding pallet 7 to aerated blocks positioning, crawl after claying, excision;
S15:Computer assigns aerated blocks transfer order to lifting, translation mechanism 2
Control program in computer sends the order of transfer aerated blocks to control centre, and transverse axis is mechanical in lifting, translation mechanism 2 Arm 206 promotes steel wire rope to tense in the presence of stepper motor, transverse axis mechanical arm 206 is moved in the horizontal direction, meanwhile, indulge Shaft mechanical arm 201 is in longitudinal axis servomotor(Not shown in figure)Driving under control manipulator for laying brick 204, and then adjust laying bricks The position of the y direction of manipulator 204, by determining the position of manipulator for laying brick 204 both horizontally and vertically, and then Space orientation is carried out to manipulator for laying brick 204, manipulator for laying brick 204 passes through the clamping jaw 2044 of the adjustment of hinge 2043 the 3rd and the 4th folder The distance between pawl 2045 is positioned to the aerated blocks of crawl, and manipulator for laying brick hydraulic cylinder 2042 is driven by PLC control assemblies, Manipulator for laying brick 204 is set to capture aerated blocks;
S16:Computer assigns order of laying bricks to lifting, translation mechanism 2
The aerated blocks of crawl are placed into the position for needing to build a wall by manipulator for laying brick 204;
S17:Completion is laid bricks judgement
When no longer needing to lay bricks, then operational order is completed, when needing to repeat order, then step repeats S3, when laying bricks Generation is abnormal, does not complete when laying bricks operation, then step returns to S16;
S18:Terminate.
The present invention working method be:
When brick car is moved to work stage body 1, aerated blocks entrucking is piled up neatly, brick car is placed on brick car transfer mechanism 3, Make brick car card firm by the neck 301 on brick car transfer mechanism 3, brick car transfer mechanism 3 is in the first guide rail of stage body support 104 and platform Pass through transfer mechanism servomotor in the second guide rail of body support frame 105(Not shown in figure)Driving, make brick car along work stage body 1 to Upper motion, brick picking manipulators 408 move to brick car transfer mechanism 3 to the aerating on brick car transfer mechanism 3 in Y-axis guide rail 403 Block is positioned, and aerated blocks are captured in the presence of brick picking manipulators hydraulic cylinder 409, is allowed to be placed on brick folding pallet 7, folder Brick pallet 7 positions to aerated blocks, under the control of brick folding pallet servomotor 701, by brick folding tray bottom 706 The movement of roller bearing screw mandrel 702, brick folding pallet 7 is sent to automatic claying device 5, mud is housed in hopper 501 in automatic claying device 5, Motor control impeller 502 is rotated, and the mud in hopper 501 is applied on aerated blocks, and essence is carried out by PLC control assemblies The length that really length of calculating aerated blocks and needs are built a wall, hydraulic pressure brick cutter 6 pass through the fixation blade 602 set thereon and movement In the presence of blade 603, the part unnecessary to aerated blocks is cut off, after excision, transverse axis mechanical arm in lifting, translation mechanism 2 Stepper motor and steel wire rope are provided with 206, in the presence of stepper motor, steel wire rope tenses, and makes transverse axis mechanical arm 206 in water Square to motion, meanwhile, longitudinal axis mechanical arm 201 is in longitudinal axis servomotor(Not shown in figure)Driving under control manipulator for laying brick 204, and then adjust in the position of the y direction of manipulator for laying brick 204, by determining manipulator for laying brick 204 in the horizontal direction and hanging down Nogata to position, and then to manipulator for laying brick 204 carry out space orientation.Manipulator for laying brick 204 passes through the adjustment of hinge 2,043 the The distance between three clamping jaws 2044 and the 4th clamping jaw 2045 are positioned to the aerated blocks of crawl, are laid bricks by the driving of PLC control assemblies Mechanical hand hydraulic cylinder 2042, aerated blocks are captured, then the aerated blocks of crawl are placed into by manipulator for laying brick 204 and wait to build a wall Position, completion builds a wall action.
Although the foregoing describing the embodiment of the present invention, it will be appreciated by those of skill in the art that these Embodiment is merely illustrative of, those skilled in the art do not depart from the present invention principle and essence in the case of, Various omissions, substitutions and changes can be carried out to the details of the above method and system.For example, merge above method step, so as to Substantially identical function is performed according to substantially identical method to realize that substantially identical result then belongs to the scope of the present invention.Cause This, the scope of the present invention is only limited by the claims that follow.

Claims (10)

1. a kind of wall-building robot, including work stage body(1), the work stage body(1)Including work top(101), stage body bottom Seat(102), work top support frame(103), the guide rail of stage body support first(104), the guide rail of stage body support second(105), it is special Sign is, the work stage body(1)On be provided with the brick car transfer mechanism of transfer brick car(3), the brick car transfer mechanism(3)It is logical Cross the guide rail of stage body support first(104)With the guide rail of stage body support second(105)On the workbench(1)Moved up and down, In the work top support frame(103)With the stage body base(104)The hollow part formed is provided with execution aerated blocks Build a wall the lifting of action, translation mechanism(2), in described work top(101)On be provided with to aerated blocks carry out space coordinates Double four-axle linked control systems of positioning(4), to the automatic claying device of the automatic claying of aerated blocks(5), cut off unnecessary aerating automatically The hydraulic pressure brick cutter of block(6), carrying aerated blocks and to aerated blocks positioning brick folding pallet(7), wherein, the automatic claying device (5)With the hydraulic pressure brick cutter(6)It is parallel to each other and across the brick folding pallet(7)Set, double four-axle linked controls System(4)It is arranged on the automatic claying device(5), the hydraulic pressure brick cutter(6), the brick folding pallet(7)Top and institute State work stage body(1)Side.
A kind of 2. wall-building robot according to claim 1, it is characterised in that double four-axle linked control systems(4) Including the first X-axis guide rail(401)Be arranged on first X-axis guide rail(401)On the first X-servo motor(Not shown in figure) And first X-axis slide block(Not shown in figure), the second X-axis guide rail(402)Be arranged on second X-axis guide rail(402)On Second X-axis servomotor(Not shown in figure)And second X-axis slide block(Not shown in figure), Y-axis guide rail(403)Be arranged on institute State Y-axis guide rail(403)On Y-axis servomotor(Not shown in figure)With Y-axis sliding block(405), Z axis telescopic arm(404)And setting In the Z axis telescopic arm(404)On brick picking manipulators(408), first X-axis guide rail(401)By being arranged on described One X-axis guide rail(401)Interior first X-axis slide block(Not shown in figure)With the Y-axis guide rail(403)It is slidably connected, institute State the second X-axis guide rail(402)By being arranged on second X-axis guide rail(402)Interior second X-axis slide block(Do not show in figure Go out)With the Y-axis guide rail(403)It is slidably connected, first X-axis guide rail(401), the Y-axis guide rail(403)Pass through first X-axis guide rail support frame(410)With the work stage body(1)It is connected, second X-axis guide rail(402), Y-axis guide rail(403)Pass through Second X-axis guide rail support frame(411)With the work stage body(1)It is connected, the Z axis telescopic arm(404)Via installing plate(406) Pass through Y-axis sliding block(405)With the Y-axis guide rail(404)It is slidably connected.
A kind of 3. wall-building robot according to claim 2, it is characterised in that brick picking manipulators(408)By with setting In the Z axis telescopic arm(404)On brick picking manipulators installing plate(407)And brick picking manipulators hydraulic cylinder(409)With institute State Z axis telescopic arm(404)Connection, and the brick picking manipulators(408)Including gripping aerated blocks and be oppositely arranged in parallel first Clamping jaw(4081)With the second clamping jaw(4082).
A kind of 4. wall-building robot according to claim 1, it is characterised in that the brick folding pallet(7)It is arranged on pallet Guide rail(703)In and including the first pallet keep off edge(704)And first pallet gear edge(704)Second be oppositely arranged in parallel Pallet keeps off edge(705), connection first pallet gear edge(704)Edge is kept off with second pallet(705)Tray bottom (706), be arranged at the tray bottom(706)And with roller bearing screw mandrel(702)The first tray rail, the first tray rail of connection Sliding block, the second tray rail and the second tray rail sliding block and the drive roller bearing screw mandrel(702)Mobile pallet servo electricity Machine(701).
A kind of 5. wall-building robot according to claim 1, it is characterised in that the automatic claying device(5)It is provided with and holds Carry the hopper of mud(501), be arranged on the hopper(501)Interior impeller(502)With the driving impeller(502)The leaf of rotation Wheel drive motor(Not shown in figure).
A kind of 6. wall-building robot according to claim 1, it is characterised in that the hydraulic pressure brick cutter(6)Be provided with by First supporting plate(6011)And first supporting plate(6011)The second supporting plate being oppositely arranged in parallel(6012), connection institute State the first supporting plate 6011)With second supporting plate(6012)Supporting plate crossbeam(6013), be arranged on it is described first support Plate(6011)On fixation blade(602), be arranged on second supporting plate(6012)On blade hydraulic cylinder(605), set Put in the blade hydraulic cylinder(605)The moving blade of end(603), the blade hydraulic cylinder(605)Cross described Two supporting plates(6012)And set and pass through blade hydraulic cylinder installing plate(606)Installed in second supporting plate(6012) On.
7. a kind of wall-building robot according to claim 1, it is characterised in that the lifting, translation mechanism(2)Including horizontal stroke Shaft mechanical arm(206), longitudinal axis mechanical arm(201), manipulator for laying brick(204), the transverse axis mechanical arm(206), longitudinal axis mechanical arm (201)Pass through transverse axis mechanical arm support base(205)Connection, the longitudinal axis mechanical arm(201)With the manipulator for laying brick(204)It is logical Cross manipulator for laying brick installing plate(203)Connection, the transverse axis mechanical arm(206)For the mechanical arm of way moving and institute can be carried out State transverse axis mechanical arm(206)Inside it is provided with transverse axis mechanical arm servomotor and steel wire rope.
A kind of 8. wall-building robot according to claim 6 or 7, it is characterised in that the manipulator for laying brick(206)Including With the manipulator for laying brick installing plate(203)The installing arm of connection(2041), hinge(2043), the regulation hinge(2043)It is long The manipulator for laying brick hydraulic cylinder of degree(2043)And hinged 3rd clamping jaw(2044)And the installing arm (2041)4th clamping jaw of connection(2045).
A kind of 9. wall-building robot according to claim 1, it is characterised in that the brick car transfer mechanism(3)It is arranged to By being arranged on the guide rail of stage body support first(104)Interior first brick car transfer sliding block and it is arranged on the stage body support second Guide rail(105)The second interior brick car transfer sliding block and the guide rail of stage body support first(104)Led with the stage body support second Rail(105)The rectangle profile structure being engaged, the brick car transfer mechanism(3)Top is provided with semicircle parallel relative one To sheet material, the neck of fastening brick car is formed between the pair of sheet material(301).
10. a kind of method of work of wall-building robot, it is characterised in that comprise the following steps:
S0:Start;
S1:Brick car is in place
It is artificial to promote brick car to be moved to the work stage body(1), aerated blocks entrucking is piled up neatly, brick car is placed into the brick Car transfer mechanism(3)On;
S2:Aerated blocks are in place
Pass through the neck on the brick car transfer mechanism (3)(301)Make brick car card firm, the brick car transfer mechanism(3) The guide rail of stage body support first(104)With the guide rail of stage body support second(105)It is interior to be driven by transfer mechanism servomotor It is dynamic, make brick car along the work stage body(1)Motion upwards, aerated blocks are by transfer to the work top(101)On;
S3:Computer is to brick picking manipulators(408)Assign and take brick order
Control program in computer is sent to control centre takes brick order, orders double four-axle linked systems 44 to be taken to described Brick manipulator(408)Carry out space orientation;
S4:By double four-axle linked systems 4 to brick picking manipulators(408)Positioning
The Y-axis guide rail(403)Led by the driving of the first X-axis servomotor, the second X-axis servomotor in first X-axis Rail(401), second X-axis guide rail(402)Upper motion, it can determine the Y-axis guide rail(403)Position, and then determine institute State brick picking manipulators(408)X-axis coordinate points, the Z axis telescopic arm(404)In institute under the driving of the Z axis servomotor State Y-axis guide rail(403)Upper slip, it can determine the brick picking manipulators(408)Y-axis coordinate points, the brick picking manipulators (408)In the Z axis telescopic arm(404)On can be along the Z axis telescopic arm(404)Move up and down, and then brick is taken described in determination Manipulator(408)Z axis coordinate points, complete to the brick picking manipulators(408)Positioning;
S5:Brick picking manipulators(408)Aerated blocks are positioned
The brick picking manipulators(408)First clamping jaw(4081)Essence is carried out to aerated blocks with second clamping jaw (4082) It is determined that position;
S6:Complete location determination
After positioning of the brick picking manipulators (408) to aerated blocks reaches expected operation purpose, perform and operate in next step, work as institute Expected operation purpose can not be reached by stating positioning of the brick picking manipulators (408) to aerated blocks, return to S4 steps;
S7:Brick picking manipulators (408) capture aerated blocks
Aerated blocks are captured in the presence of the brick picking manipulators (408) hydraulic cylinder, in the side of double four-axle linked systems 4 Help down, the positioning brick picking manipulators (408) arrive the position of the brick folding pallet (7);
S8:The aerated blocks that brick picking manipulators (408) are captured are placed into brick folding pallet (7)
After the positioning to the brick folding pallet (7) is completed, the aerated blocks captured are placed into by the brick picking manipulators (408) On the brick folding pallet (7), the brick folding pallet (7) positions to aerated blocks, under the control of brick folding pallet servomotor, Pass through the roller bearing screw mandrel on brick folding pallet (7) bottom(702)Movement, the brick folding pallet (7) is sent to described automatic Claying device (5);
S9:Computer assigns claying operational order
Control program in computer sends claying order to control centre;
S10:Claying
Mud is housed, impeller (502) motor controls the leaf in the hopper (501) in automatic claying device (5) (502) rotation is taken turns, the mud in the hopper (501) is applied on aerated blocks;
S11:Computer assigns excision aerating block command
Control program in computer sends excision aerating block command to control centre;
S12:Excision
The length for carrying out accurately calculating the length of aerated blocks and needs are built a wall by PLC control assemblies, the hydraulic pressure brick cutter (6) It is right in the presence of the fixed blade (602) set on the hydraulic pressure brick cutter (6) and the moving blade (603) The unnecessary part of aerated blocks is cut off,
S13:Computer is assigned to brick picking manipulators (408) and puts back to aerating block command
Control program in computer is sent to control centre puts back to the brick folding pallet by the aerated blocks after claying, removal procedure (7) order;
S14:Aerated blocks after processing put back to brick folding pallet (7)
In the presence of double four-axle linked systems (4), the brick picking manipulators (408) are carried out with space orientation, described the Then one clamping jaw (4081) and second clamping jaw (4082) are put back into aerated blocks positioning, crawl after claying, excision In the brick folding pallet (7);
S15:Computer to lifting, translation mechanism(2)Assign aerated blocks transfer order
Control program in computer sends the order of transfer aerated blocks, the lifting, translation mechanism to control centre(2)Middle institute Transverse axis mechanical arm (206) is stated in the presence of stepper motor, promotes steel wire rope to tense, makes the transverse axis mechanical arm (206) in water Square to motion, meanwhile, the longitudinal axis mechanical arm (201) controls the manipulator for laying brick under the driving of longitudinal axis servomotor (204), and then adjust in the position of the manipulator for laying brick (204) y direction, by determining the manipulator for laying brick (204) Position both horizontally and vertically, and then space orientation, the machinery of laying bricks are carried out to the manipulator for laying brick (204) Hand (204) adjusts the distance between the 3rd clamping jaw (2044) and the 4th clamping jaw (2045) by the hinge (2043) The aerated blocks of crawl are positioned to, the manipulator for laying brick hydraulic cylinder (2042) is driven by PLC control assemblies, make described lay bricks Manipulator (204) captures aerated blocks;
S16:Computer to lifting, translation mechanism(2)Assign order of laying bricks
The manipulator for laying brick(204)The aerated blocks of crawl are placed into the position for needing to build a wall;
S17:Completion is laid bricks judgement
When no longer needing to lay bricks, then operational order is completed, when needing to repeat order, then step repeats S3, when laying bricks Generation is abnormal, does not complete when laying bricks operation, then step returns to S16;
S18:Terminate.
CN201610368659.1A 2016-05-30 2016-05-30 A kind of wall-building robot and its method of work Pending CN107443353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610368659.1A CN107443353A (en) 2016-05-30 2016-05-30 A kind of wall-building robot and its method of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610368659.1A CN107443353A (en) 2016-05-30 2016-05-30 A kind of wall-building robot and its method of work

Publications (1)

Publication Number Publication Date
CN107443353A true CN107443353A (en) 2017-12-08

Family

ID=60485572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610368659.1A Pending CN107443353A (en) 2016-05-30 2016-05-30 A kind of wall-building robot and its method of work

Country Status (1)

Country Link
CN (1) CN107443353A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975245A (en) * 2017-12-27 2018-05-01 重庆心机械制造有限公司 Building decoration numerically controlled intelligent multi-function robot
CN108560557A (en) * 2018-01-10 2018-09-21 庄平凡 A kind of river builds gap processing and pours device
CN108708560A (en) * 2018-08-30 2018-10-26 开封大学 Wall building machine
CN108915310A (en) * 2018-08-06 2018-11-30 湖南易兴建筑有限公司 The method that movable building factory and its house are built
CN109812033A (en) * 2019-02-21 2019-05-28 温州开源建设工程有限公司 A kind of house is built with automatic wall-building machine
CN110842949A (en) * 2020-01-14 2020-02-28 广东博智林机器人有限公司 Brick laying robot
CN111088895A (en) * 2020-03-20 2020-05-01 广东博智林机器人有限公司 Bricklaying device and bricklaying robot
CN111155771A (en) * 2020-01-07 2020-05-15 广东博智林机器人有限公司 Rotary conveying mechanism and brick laying robot
CN111219069A (en) * 2020-04-20 2020-06-02 广东博智林机器人有限公司 Brick laying robot
CN111287475A (en) * 2020-02-13 2020-06-16 广东博智林机器人有限公司 Plastering device, plastering robot and masonry equipment
CN111519918A (en) * 2020-04-30 2020-08-11 广东博智林机器人有限公司 Bricklaying equipment
CN112144902A (en) * 2020-09-25 2020-12-29 中物智建(武汉)科技有限公司 Wall building robot capable of cutting bricks
CN112824625A (en) * 2019-11-21 2021-05-21 厦门华蔚物联网科技有限公司 Automatic wall building method and system for improving bonding force of wall brick and mortar

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3292310A (en) * 1964-02-20 1966-12-20 Internat Diamond Products Ltd Apparatus for grinding bricks or the like
CN102649510A (en) * 2012-04-27 2012-08-29 武汉理工大学 Intelligent brick unloading machine
CN203046003U (en) * 2012-11-06 2013-07-10 中天建设集团有限公司中山分公司 Aerated concrete block cutting machine
CN103741955A (en) * 2014-01-21 2014-04-23 鄂大锐 Automatic wall building machine
CN104175309A (en) * 2014-09-05 2014-12-03 许博 Wall building robot
CN204800870U (en) * 2015-07-03 2015-11-25 浙江工业职业技术学院 Drive arrangement of multi -functional automatic brick cutting machine
CN204804364U (en) * 2015-07-03 2015-11-25 浙江工业职业技术学院 Multi -functional automatic brick cutting machine
CN105544998A (en) * 2015-11-25 2016-05-04 浙江壳王机器人有限公司 Automatic bricklaying device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3292310A (en) * 1964-02-20 1966-12-20 Internat Diamond Products Ltd Apparatus for grinding bricks or the like
CN102649510A (en) * 2012-04-27 2012-08-29 武汉理工大学 Intelligent brick unloading machine
CN203046003U (en) * 2012-11-06 2013-07-10 中天建设集团有限公司中山分公司 Aerated concrete block cutting machine
CN103741955A (en) * 2014-01-21 2014-04-23 鄂大锐 Automatic wall building machine
CN104175309A (en) * 2014-09-05 2014-12-03 许博 Wall building robot
CN204800870U (en) * 2015-07-03 2015-11-25 浙江工业职业技术学院 Drive arrangement of multi -functional automatic brick cutting machine
CN204804364U (en) * 2015-07-03 2015-11-25 浙江工业职业技术学院 Multi -functional automatic brick cutting machine
CN105544998A (en) * 2015-11-25 2016-05-04 浙江壳王机器人有限公司 Automatic bricklaying device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975245A (en) * 2017-12-27 2018-05-01 重庆心机械制造有限公司 Building decoration numerically controlled intelligent multi-function robot
CN107975245B (en) * 2017-12-27 2023-11-14 重庆一心机械制造有限公司 Numerical control intelligent multifunctional robot for architectural decoration
CN108560557A (en) * 2018-01-10 2018-09-21 庄平凡 A kind of river builds gap processing and pours device
CN108915310A (en) * 2018-08-06 2018-11-30 湖南易兴建筑有限公司 The method that movable building factory and its house are built
CN108708560A (en) * 2018-08-30 2018-10-26 开封大学 Wall building machine
CN109812033A (en) * 2019-02-21 2019-05-28 温州开源建设工程有限公司 A kind of house is built with automatic wall-building machine
CN112824625A (en) * 2019-11-21 2021-05-21 厦门华蔚物联网科技有限公司 Automatic wall building method and system for improving bonding force of wall brick and mortar
CN111155771B (en) * 2020-01-07 2022-07-08 广东博智林机器人有限公司 Brick laying robot
CN111155771A (en) * 2020-01-07 2020-05-15 广东博智林机器人有限公司 Rotary conveying mechanism and brick laying robot
CN110842949A (en) * 2020-01-14 2020-02-28 广东博智林机器人有限公司 Brick laying robot
WO2021143236A1 (en) * 2020-01-14 2021-07-22 广东博智林机器人有限公司 Bricklaying robot
CN111287475A (en) * 2020-02-13 2020-06-16 广东博智林机器人有限公司 Plastering device, plastering robot and masonry equipment
CN111088895A (en) * 2020-03-20 2020-05-01 广东博智林机器人有限公司 Bricklaying device and bricklaying robot
CN111219069A (en) * 2020-04-20 2020-06-02 广东博智林机器人有限公司 Brick laying robot
CN111219069B (en) * 2020-04-20 2020-07-28 广东博智林机器人有限公司 Brick laying robot
CN111519918A (en) * 2020-04-30 2020-08-11 广东博智林机器人有限公司 Bricklaying equipment
CN112144902A (en) * 2020-09-25 2020-12-29 中物智建(武汉)科技有限公司 Wall building robot capable of cutting bricks

Similar Documents

Publication Publication Date Title
CN107443353A (en) A kind of wall-building robot and its method of work
CN205894721U (en) Wall building robot
CN104785944A (en) Cylinder end plate installing and welding workstation
CN103056532A (en) Laser cutter standalone automatic feeding and discharging device and laser cutter standalone automatic feeding and discharging method
CN104785938A (en) Assembling and welding working station for cylinders and end plates of steam-injection machine
CN105234650A (en) Compressor automatic assembly system
CN208544870U (en) A kind of copper foil and the automatic lay-up system of aluminum substrate
CN106592991A (en) Light and movable bricklaying robot
CN207698759U (en) Prefabricated rods conveyer
CN103213849A (en) Automatic stacking device of concrete blocks and stacking process thereof
CN202499526U (en) Automatic brick unloading device
CN105197610A (en) Automatic brick stacking machine
CN102756302A (en) Operating platform exchange device, laser cutting machine with same and operating method
CN205074734U (en) Automatic equipment system of compressor
CN204771197U (en) Prefabricated workstation of convection zone frame of steam turbine group is annotated to high pressure
CN211037884U (en) Automatic wall building workstation of robot
CN204735857U (en) Barrel end plate assembly welding workstation
CN105863284A (en) Automatic wall building machine
CN206010540U (en) A kind of cutter-exchange mechanism of drilling and tapping machine
CN212502890U (en) Automatic stacking device for sound barrier plates
CN109577236A (en) A kind of Intelligent road automatic deploying and retracting vehicle
CN204748610U (en) Unloading air -balance helping hand manipulator on hub blank
CN113696283B (en) Intelligent production line for curtain wall stand column and processing method thereof
CN205685114U (en) A kind of multi-station manipulator conveyer device
CN206032704U (en) TV backplate pile up neatly system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Lei Yongqiang

Inventor after: Xu Hongyan

Inventor after: Huang Huimin

Inventor before: Lei Yongqiang

Inventor before: Xu Hongyan

CB03 Change of inventor or designer information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171208

WD01 Invention patent application deemed withdrawn after publication