CN107386646A - A kind of sliding architectural engineering job shop of top cover integral elevating - Google Patents
A kind of sliding architectural engineering job shop of top cover integral elevating Download PDFInfo
- Publication number
- CN107386646A CN107386646A CN201710731139.7A CN201710731139A CN107386646A CN 107386646 A CN107386646 A CN 107386646A CN 201710731139 A CN201710731139 A CN 201710731139A CN 107386646 A CN107386646 A CN 107386646A
- Authority
- CN
- China
- Prior art keywords
- workshop
- column
- top cover
- job shop
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000003028 elevating effect Effects 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 38
- 239000010959 steel Substances 0.000 claims description 38
- 239000000463 material Substances 0.000 claims description 23
- 238000000034 method Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 abstract description 11
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 239000007787 solid Substances 0.000 abstract description 2
- 238000003754 machining Methods 0.000 description 14
- 238000009434 installation Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 240000009087 Crescentia cujete Species 0.000 description 1
- 235000005983 Crescentia cujete Nutrition 0.000 description 1
- 235000009797 Lagenaria vulgaris Nutrition 0.000 description 1
- 235000014676 Phragmites communis Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/16—Roof structures with movable roof parts
- E04B7/166—Roof structures with movable roof parts characterised by a translation movement of the movable roof part, with or without additional movements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention discloses a kind of sliding architectural engineering job shop of top cover integral elevating, it is characterised in that the job shop includes workshop column, and four workshop columns are multisection type workshop column;Bi-layer tip cap, bi-layer tip cap are fixed on the top of four workshop columns by top cover bearing, make the workshop column formation one of bi-layer tip cap, top cover bearing and most the preceding paragraph can be with the entirety of a lifting;Roller shutter, the roller shutter are fixed on four sides of bi-layer tip cap;Wheel set, wheel set are arranged on workshop column bottom so that whole job shop can be fixed on sliding rail on sliding rail slidably after being moved to specified location by rail clamping device.The sliding architectural engineering job shop of the top cover integral elevating of the present invention can slide along track, the top cover of Double-protection can lift, to reach more reasonably application and construction place, the purpose that job shop is more solid and reliable, typhoon protection measure is more efficient, integrated cost is relatively low.
Description
Technical field
The present invention relates to a kind of sliding architectural engineering job shop of top cover integral elevating, more particularly to one kind to be applied to
Building engineering construction field, integrate protection, sunshade, rain-proof, the top cover integral elevating of windproof, hoisting function Double-protection
Sliding architectural engineering job shop.
Background technology
In construction industry field, with the development of society, the standard of safety construction also more and more higher, to worker
Personal safety and the requirement of career safety & health also more and more higher, material machining shed have become building engineering construction scene not
One of facility that can or lack.Building-site is mostly using the fixed material machining shed built in specified location at present,
There is specific job site to use telescopic material machining shed, mainly protection, rain-proof, sunshade effect.
Major defect is:
(1)Can not flexibly it move:Due to using plane fixed and arranged form, it can not move, occupancy fixed venue, material disengaging,
Handling can not be settled at one go, it is necessary to rehandling;
(2)Wind-proof performance is poor:What machining shed was generally set up temporarily, mostly more simple, the security performance of structure is poor, strong wind
My god, especially typhoon day is, it is necessary to take more firm measure to be fixed machining shed, if fixation is not in place, warp
The phenomenon that the top cover of machining shed is blown off by typhoon often occurs;
(3)It is revolving not strong:The expense of a fixed machining shed is typically set up at 50,000 yuan or so, wherein, terrace hardening, set
It is disposable input to apply installation and removal cost, and machining shed substantially regards waste disposal after removing, revolving not strong, causes
Waste of material, it is not environmentally friendly enough, and also integrated cost is also higher.
Therefore, in safety in production, civilized construction standardisation requirements higher and higher today, how to carry out security performance can
Lean on, the material machining shed that standardization level is high, flexible and convenient to use is crucial.
The content of the invention
It is an object of the invention to provide a kind of sliding architectural engineering job shop of top cover integral elevating, solves building
The problems such as engineering site material machining shed can not move freely, wind-proof performance is poor, revolving not strong, the safety for improving machining shed can
By property, it is ensured that the career safety & health of worker.
To achieve the above object, technical scheme is as follows:A kind of sliding architectural engineering of top cover integral elevating
Job shop, it is characterised in that the job shop includes
Four workshop columns, four workshop columns are multisection type workshop column, and multisection type workshop column passes through very heavy
The jacking on top and realization of retracting freely are stretched;
Top cover bearing, the upper end of every workshop column are fixed with a top cover bearing;
Bi-layer tip cap, bi-layer tip cap are fixed on the top of four workshop columns by top cover bearing, make bi-layer tip cap, top cover
The workshop column of bearing and most the preceding paragraph forms one can be with the entirety of a lifting;
Workshop bottom girder, the workshop bottom girder are arranged between two corresponding workshop columns, the workshop bottom girder and workshop column
It is connected by screw bolts;
Steel beam rail, the job shop are provided with two parallel steel beam rails, and the steel beam rail is fixed on top cover bearing
On;
Roller shutter, the roller shutter are fixed on four sides of bi-layer tip cap;
Wheel set, wheel set are arranged on workshop column bottom so that whole job shop can be on sliding rail freely
Slide, be fixed in after being moved to specified location by rail clamping device on sliding rail.
According to a preferred embodiment of the invention, walking girder steel, the walking steel are provided between two steel beam rails
The both ends of beam set the walking roller coordinated with steel beam rail, and the electronic calabash that can be moved along walking girder steel is provided with girder steel of walking
Reed.
According to a preferred embodiment of the invention, bi-layer tip cap uses the truss that angle steel makes, and is bound using sandwich color steel plate.
According to a preferred embodiment of the invention, multisection type workshop column is three-stage workshop column, including three sections of cars
Between column, respectively first paragraph workshop column, second segment workshop column and the 3rd section of workshop column, three sections of workshop columns it
Between be fixed by upstanding studs, when three-stage workshop column is retracted, the first paragraph workshop column retraction second
In the column of section workshop, in the 3rd section of workshop column of second segment workshop column retraction, when jack ejects first paragraph workshop column
Afterwards, first and second sections of workshop columns are fixed using upstanding studs, after jack ejects second segment workshop column,
Second and the 3rd section of workshop column are fixed using upstanding studs.
Another object of the present invention is to the user for the sliding architectural engineering job shop for providing top cover integral elevating
Method, before strong wind day or typhoon day arrive, top cover is dropped into ground, effectively prevents the destruction of typhoon.
To achieve these goals, technical scheme is as follows:A kind of sliding building work of top cover integral elevating
The application method of journey job shop, it is characterised in that remove upstanding studs, the mode retracted using jack so that second segment
In the 3rd section of workshop column of workshop column retraction, in the column of first paragraph workshop column retraction second segment workshop, so that double-deck
Top cover drops to extreme lower position;After jack ejects first paragraph workshop column, using upstanding studs by first and second sections of cars
Between column be fixed, after jack ejects second segment workshop column, using upstanding studs by second and the 3rd section of workshop
Column is fixed, so that bi-layer tip cap rises to highest position.
Another object of the present invention is to the user for the sliding architectural engineering job shop for providing top cover integral elevating
Method, workshop can integrally be slided in orbit, be advantageous to the comprehensive utilization of construction site.
To achieve these goals, technical scheme is as follows:A kind of sliding building work of top cover integral elevating
The application method of journey job shop, it is characterised in that the job shop only sets the two workshop bottom parallel with sliding rail
Beam, passage is avoided so as to be formed between two workshop bottom girders, the application method comprises the following steps:A, by job shop material
Material is moved away from processing stand along sliding rail;B, transport vehicle directly reaches the handling that processing stand carries out material;C, after the completion of loading and unloading, then will
The job shop is moved on to above material processing stand along sliding rail, is processed operation.
The sliding architectural engineering job shop of the top cover integral elevating of the present invention can enter for different place demands
Row is set, and capping bilayer protection is safer reliable, and top cover can be dropped into ground before the arriving of typhoon day fixes, typhoon protection
Measure is more effective, than traditional fixed material machining shed using safer, more convenient, more flexible, simultaneously
In job shop surrounding installation roller shutter, electric block, walking girder steel, steel beam rail are installed at the top of workshop and make it that whole workshop can
Closed, moveable top cover integrally-lifting job shop is become with moment, has protection, sunshade, rain-proof, wind sheltering, lifting concurrently
Function in the effect of one, while workshop use segmented assembly formula structure, can repeatedly recycle, more saving, more environmentally friendly,
Integrated cost reduces.
The sliding architectural engineering job shop of the top cover integral elevating of the present invention can slide along track, Double-protection
Top cover can lift, with reach more reasonably application and construction place, job shop be more solid and reliable, typhoon protection measure more
Effectively, the relatively low purpose of integrated cost.The beneficial effects of the invention are as follows:The sliding architectural engineering processing of top cover integral elevating
Workshop using Double-protection, can integral elevating top cover, before strong wind day or typhoon day arrive, by top cover together with column
Position is preferably minimized, effectively prevents the destruction of typhoon;Meanwhile workshop can integrally be slided in orbit, be advantageous to construction site
Comprehensive utilization, material-conveying vehicle can directly reach the handling that processing stand carries out material, after the completion of handling, then by workshop along rail
Road is moved on to above material processing stand, reduces the rehandling of material, is saved artificial;Top cover, framework sectional making, live group
Dress, build, remove convenient, flexible, can repeatedly be used in turn, 100,000 yuan or so of the disposable processing charges of this job shop, as long as
Turnover more than 2 times, integrated cost can is lower than the fixed machining shed set up, and more saves, be more environmentally friendly;It is in addition, of the invention
Job shop, surrounding installation roller shutter, internal installation boom hoisting can also be realized so that whole workshop become it is closed, can
Mobile top cover integrally-lifting job shop, this has just had protection, sunshade, rain-proof, windproof, lifting function concurrently in one,
More meet the Safety standardization requirement at current building engineering construction scene.
Brief description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the segmentation lifting schematic diagram of the present invention;
Fig. 4 is the skeleton structure shaft side figure of the present invention;
Fig. 5 be the present invention walk wheel figure;
Fig. 6 is Fig. 5 side view.
Figure includes:1st, bi-layer tip cap, 2, workshop column, 3, workshop bottom girder, 4, wheel set, 5, sliding rail, 6, folder
Rail device, 7, jack, 8, upstanding studs, 9, electric block, 10, top cover bearing, 11, roller shutter, 12, walking girder steel, 13, girder steel rail
Road, 14, main couple, 15, jack truss.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
The sliding architectural engineering job shop of a kind of top cover integral elevating, it is characterised in that the job shop includes
Four workshop columns 2, four workshop columns 2 are made using seamless steel pipe, and four workshop columns 2 are multisection type
Workshop column, multisection type workshop column are freely stretched by the jacking and realization of retracting of jack;
Top cover bearing 3, the upper end of every workshop column 2 are fixed with a top cover bearing 10;
Bi-layer tip cap 1, bi-layer tip cap 1 are fixed on the top of four workshop columns 2 by top cover bearing 10, make bi-layer tip cap
1st, the workshop column 2 of top cover bearing 10 and most the preceding paragraph formation one can be with the entirety of a lifting;
Workshop bottom girder 3, the workshop bottom girder 3 are arranged between two corresponding workshop columns 2, and the workshop bottom girder is stood with workshop
Post is connected by screw bolts;
Steel beam rail 13, the job shop are provided with two parallel steel beam rails 13, and the steel beam rail 13 is fixed on top
On lid bearing 10;
Roller shutter 11, the roller shutter 11 are fixed on four sides of bi-layer tip cap 1;
Wheel set 4, wheel set 4 are arranged on the bottom of workshop column 2 so that whole job shop can be on sliding rail 5
Slidably, it is fixed in after being moved to specified location by rail clamping device 6 on sliding rail 5.
According to a preferred embodiment of the invention, walking girder steel 12, the row are provided between two steel beam rails 13
The both ends for walking girder steel 12 set the walking roller coordinated with steel beam rail 13, and being provided with girder steel 12 of walking can be along walking girder steel 12
Mobile electric block 9.
According to a preferred embodiment of the invention, the truss that bi-layer tip cap 1 is made using angle steel, is sealed using sandwich color steel plate
Top.
According to a preferred embodiment of the invention, multisection type workshop column is three-stage workshop column, including three sections of cars
Between column, respectively first paragraph workshop column, second segment workshop column and the 3rd section of workshop column, three sections of workshop columns it
Between be fixed by upstanding studs 8, when three-stage workshop column is retracted, the first paragraph workshop column retraction second
In the column of section workshop, in the 3rd section of workshop column of second segment workshop column retraction, the jack 7 is fixed on the 3rd section of workshop and stood
On post, after jack 7 ejects first paragraph workshop column, first and second sections of workshop columns are carried out using upstanding studs 8
It is fixed, after jack 7 ejects second segment workshop column, second and the 3rd section of workshop column are carried out using upstanding studs 8
It is fixed.
It can unload on roller shutter or volume after roller shutter, dismounting upstanding studs, be retracted using jack before the arriving of typhoon day
Mode so that in the 3rd section of workshop column of second segment workshop column retraction, first paragraph workshop column retraction second segment workshop is stood
In post, so that bi-layer tip cap drops to extreme lower position, top cover is dropped into ground fixes, and can cause typhoon protection measure more
Effectively, than traditional fixed material machining shed using safer, more convenient, more flexible.
The segmentation that Fig. 3 is the present invention lifts schematic diagram.As shown in the first step, bi-layer tip cap is located at minimum position, very heavy
After top ejects first paragraph workshop column, first and second sections of workshop columns are fixed using upstanding studs, now such as the
Two steps illustrate.Then after jack ejects second segment workshop column, using upstanding studs by second and the 3rd section of workshop column
It is fixed, so that bi-layer tip cap rises to highest position, now as shown in the 3rd step.In order to ensure its stress more
Reliably, danger caused by avoiding when upstanding studs are damaged, jack is not recalled after completing to jack, and upstanding studs divide jointly
Stress is carried on a shoulder pole, plays the purpose of double shield.When the hop count using multistage workshop column is more(Such as 10 sections)When, can be according to weather
Situation, it is elevated to proper height(Such as 6 ~ 10 sections of height), to be constructed in the case where ensureing safety.
Workshop can integrally be slided in orbit, be advantageous to the comprehensive utilization of construction site, excellent according to one of the present invention
Select embodiment, the job shop only sets the two workshop bottom girders parallel with sliding rail, so as to two workshop bottom girders it
Between formed avoid passage, when in use, job shop material is moved away from processing stand along sliding rail;Transport vehicle directly reaches processing
Point carries out the handling of material;After the completion of handling, then the job shop moved on to above material processing stand along sliding rail, carried out
Operation is processed, so as to reduce the rehandling of material, is saved artificial.
Although giving detailed description and explanation to the embodiment of the present invention above, it should be noted that
We can carry out various equivalent changes and modification to above-mentioned embodiment according to the conception of the present invention, and its caused function is made
, all should be within protection scope of the present invention during with the spirit still covered without departing from specification.
Claims (6)
1. the sliding architectural engineering job shop of a kind of top cover integral elevating, it is characterised in that the job shop includes
Four workshop columns, four workshop columns are multisection type workshop column, and multisection type workshop column passes through very heavy
The jacking on top and realization of retracting freely are stretched;
Top cover bearing, the upper end of every workshop column are fixed with a top cover bearing;
Bi-layer tip cap, bi-layer tip cap are fixed on the top of four workshop columns by top cover bearing, make bi-layer tip cap, top cover
The workshop column of bearing and most the preceding paragraph forms one can be with the entirety of a lifting;
Workshop bottom girder, the workshop bottom girder are arranged between two corresponding workshop columns, the workshop bottom girder and workshop column
It is connected by screw bolts;
Steel beam rail, the job shop are provided with two parallel steel beam rails, and the steel beam rail is fixed on top cover bearing
On;
Roller shutter, the roller shutter are fixed on four sides of bi-layer tip cap;
Wheel set, wheel set are arranged on workshop column bottom so that whole job shop can be on sliding rail freely
Slide, be fixed in after being moved to specified location by rail clamping device on sliding rail.
A kind of 2. sliding architectural engineering job shop of top cover integral elevating as claimed in claim 1, it is characterised in that institute
State and walking girder steel is provided between two steel beam rails, the both ends of the walking girder steel set the walking coordinated with steel beam rail to roll
Take turns, the electric block that can be moved along walking girder steel is provided with girder steel of walking.
3. the sliding architectural engineering job shop of a kind of top cover integral elevating as claimed in claim 1, it is characterised in that double
Layer top cover uses the truss that angle steel makes, and is bound using sandwich color steel plate.
4. a kind of sliding architectural engineering job shop of top cover integral elevating as claimed in claim 1, it is characterised in that institute
It is three-stage workshop column to state multisection type workshop column, including three sections of workshop columns, respectively first paragraph workshop column, second segment
Workshop column and the 3rd section of workshop column, it is fixed by upstanding studs between three sections of workshop columns, when described three sections
During the retraction of formula workshop column, in the column of the first paragraph workshop column retraction second segment workshop, second segment workshop column retraction the
In three sections of workshop columns, after jack ejects first paragraph workshop column, using upstanding studs by first and second sections of workshops
Column is fixed, and after jack ejects second segment workshop column, is stood second and the 3rd section of workshop using upstanding studs
Post is fixed.
5. a kind of application method of the sliding architectural engineering job shop of top cover integral elevating as claimed in claim 1, its
It is characterised by, after unloading roller shutter or the upper roller shutter of volume, removes upstanding studs, the mode retracted using jack so that second segment car
Between in the 3rd section of workshop column of column retraction, in the column of first paragraph workshop column retraction second segment workshop, so that double-deck top
Lid drops to extreme lower position;After jack ejects first paragraph workshop column, using upstanding studs by first and second sections of workshops
Column is fixed, and after jack ejects second segment workshop column, is stood second and the 3rd section of workshop using upstanding studs
Post is fixed, so that bi-layer tip cap rises to highest position.
6. a kind of application method of the sliding architectural engineering job shop of top cover integral elevating as claimed in claim 1, its
Be characterised by, the job shop only sets the two workshop bottom girders parallel with sliding rail, so as to two workshop bottom girders it
Between formed and avoid passage, the application method comprises the following steps:A, job shop material is moved away from processing stand along sliding rail;
B, transport vehicle directly reaches the handling that processing stand carries out material;C, after the completion of loading and unloading, then by the job shop along sliding rail
Move on to above material processing stand, be processed operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710731139.7A CN107386646B (en) | 2017-08-23 | 2017-08-23 | Sliding type construction engineering processing workshop with integrally lifting top cover |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710731139.7A CN107386646B (en) | 2017-08-23 | 2017-08-23 | Sliding type construction engineering processing workshop with integrally lifting top cover |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107386646A true CN107386646A (en) | 2017-11-24 |
CN107386646B CN107386646B (en) | 2024-07-05 |
Family
ID=60346547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710731139.7A Active CN107386646B (en) | 2017-08-23 | 2017-08-23 | Sliding type construction engineering processing workshop with integrally lifting top cover |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107386646B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111561139A (en) * | 2019-11-21 | 2020-08-21 | 江苏跃界装配式建筑科技有限公司 | Method for constructing roof of fabricated building |
CN115680292A (en) * | 2022-11-07 | 2023-02-03 | 中国一冶集团有限公司 | Jacking sliding unloading vehicle for steel structure gallery and mounting method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2113968U (en) * | 1992-03-11 | 1992-08-26 | 吴审言 | Hydraulic jack |
US20100327241A1 (en) * | 2009-06-25 | 2010-12-30 | Tractive Ab | Jacking column for concrete drilling and cutting |
CN103089286A (en) * | 2013-01-22 | 2013-05-08 | 山东科技大学 | Driving face self-moving temporary support hydraulic support and support method thereof |
CN205398003U (en) * | 2016-03-09 | 2016-07-27 | 西华大学 | Multistage combination formula hoist mechanism |
CN205421023U (en) * | 2015-12-21 | 2016-08-03 | 代森林 | Public road bridge roof beam strutting arrangement |
CN106481106A (en) * | 2016-10-31 | 2017-03-08 | 上海市政工程设计研究总院(集团)有限公司 | Slidingtype architectural engineering job shop |
CN207553605U (en) * | 2017-08-23 | 2018-06-29 | 上海市政工程设计研究总院(集团)有限公司 | A kind of sliding architectural engineering processing workshop of head cover integral elevating |
-
2017
- 2017-08-23 CN CN201710731139.7A patent/CN107386646B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2113968U (en) * | 1992-03-11 | 1992-08-26 | 吴审言 | Hydraulic jack |
US20100327241A1 (en) * | 2009-06-25 | 2010-12-30 | Tractive Ab | Jacking column for concrete drilling and cutting |
CN103089286A (en) * | 2013-01-22 | 2013-05-08 | 山东科技大学 | Driving face self-moving temporary support hydraulic support and support method thereof |
CN205421023U (en) * | 2015-12-21 | 2016-08-03 | 代森林 | Public road bridge roof beam strutting arrangement |
CN205398003U (en) * | 2016-03-09 | 2016-07-27 | 西华大学 | Multistage combination formula hoist mechanism |
CN106481106A (en) * | 2016-10-31 | 2017-03-08 | 上海市政工程设计研究总院(集团)有限公司 | Slidingtype architectural engineering job shop |
CN207553605U (en) * | 2017-08-23 | 2018-06-29 | 上海市政工程设计研究总院(集团)有限公司 | A kind of sliding architectural engineering processing workshop of head cover integral elevating |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111561139A (en) * | 2019-11-21 | 2020-08-21 | 江苏跃界装配式建筑科技有限公司 | Method for constructing roof of fabricated building |
CN115680292A (en) * | 2022-11-07 | 2023-02-03 | 中国一冶集团有限公司 | Jacking sliding unloading vehicle for steel structure gallery and mounting method |
CN115680292B (en) * | 2022-11-07 | 2024-05-17 | 中国一冶集团有限公司 | Steel structure corridor jacking sliding unloading and mounting method |
Also Published As
Publication number | Publication date |
---|---|
CN107386646B (en) | 2024-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108265977B (en) | Large-span space latticed shell assembly jig frame construction method under complex working condition | |
CN106481106A (en) | Slidingtype architectural engineering job shop | |
CN104986171B (en) | Perforation job platform for railway engineering vehicle | |
CN107386646A (en) | A kind of sliding architectural engineering job shop of top cover integral elevating | |
CN108798727B (en) | Tunnel self-propelled waterproof board cloth hanging steel bar positioning integrated multifunctional trolley and application | |
WO2020062968A1 (en) | Weatherproof steel platform system for integral steel platform formwork construction and method | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN103481805A (en) | Beam transporting vehicle with automatic lifting device | |
CN103010404B (en) | Segmental general assembly method for aluminum alloy superstructure | |
CN106760561A (en) | The assembling method of segmental slipping roof system steel truss | |
CN206503392U (en) | The architectural engineering job shop of top cover lifting | |
CN106639396A (en) | Constructional engineering machining workshop with liftable roof | |
CN207293987U (en) | The railway track construction for possessing support arm Telescopic is hung with just beam is traversing | |
CN207553605U (en) | A kind of sliding architectural engineering processing workshop of head cover integral elevating | |
CN206189928U (en) | Between slidingtype building engineering processing vehicle | |
CN106930528B (en) | The production method of the architectural engineering processing workshop of top cover lifting | |
CN102913014A (en) | Method for realizing three-dimensional parking of trains through rain lifting platform | |
CN106593032A (en) | Manufacturing method of sliding type building engineering machining workshop | |
CN208455483U (en) | A kind of large span composite material-metallic combination truss-type bridges push stringer | |
CN207686361U (en) | Movable semi-closed reinforcing bar processing canopy | |
CN2890237Y (en) | Multifunctional concrete conveying and distributing apparatus | |
CN207293991U (en) | The railway track construction for possessing lifting beam end support function is hung with just beam is traversing | |
CN210850737U (en) | Precast beam quick detach type line production steel form | |
CN206625635U (en) | A kind of multi-storied garage is parked plate anti-shaking device | |
CN206917297U (en) | A kind of large-span steel girder upper air installing system in place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||