CN206503392U - The architectural engineering job shop of top cover lifting - Google Patents

The architectural engineering job shop of top cover lifting Download PDF

Info

Publication number
CN206503392U
CN206503392U CN201621191569.1U CN201621191569U CN206503392U CN 206503392 U CN206503392 U CN 206503392U CN 201621191569 U CN201621191569 U CN 201621191569U CN 206503392 U CN206503392 U CN 206503392U
Authority
CN
China
Prior art keywords
top cover
workshop
column
lifting
architectural engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621191569.1U
Other languages
Chinese (zh)
Inventor
王铁
殷述学
黄赛帅
彭鹏
张熠
朱海明
刘斌
沈巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201621191569.1U priority Critical patent/CN206503392U/en
Application granted granted Critical
Publication of CN206503392U publication Critical patent/CN206503392U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of architectural engineering job shop of top cover lifting, including:Some workshop columns, top cover and lifting device, wherein, the bottom of the workshop column is connected with workshop bottom girder, and the top of the workshop column is connected with workshop back timber;The top specified altitude assignment position of the workshop column sets locking pin, and the bottom of the workshop column sets locking spanner;The top cover includes top cover body and connects the top cover bearing of the top cover body and the workshop column;The lifting device, along top cover described in the workshop upright lifting to specified altitude assignment after, by it is described locking spanner control locking pin the top cover is locked on the workshop column.Top cover is dropped to ground, effectively prevents the destruction of typhoon by the program before strong wind day or typhoon day arrive;Top cover, framework sectional making, Assembling are built, remove convenient, flexible, can repeatedly be used in turn, integrated cost is low, more save, it is more environmentally friendly.

Description

The architectural engineering job shop of top cover lifting
Technical field
The utility model is related to a kind of architectural engineering job shop applied to building engineering construction field, more particularly to one Plant the architectural engineering job shop of top cover lifting.
Background technology
In construction industry field, with the development of society, the standard of safety construction also more and more higher, to workman Personal safety and career safety & health requirement also more and more higher, material machining shed has become building engineering construction scene not One of facility that can or lack.Current building-site uses the fixed material machining shed built in specified location mostly, There is specific job site to use telescopic material machining shed, mainly protection, rain-proof, sunshade effect.
Major defect is:
(1) wind-proof performance is poor:Machining shed is generally what is set up temporarily, and mostly more simple, the security performance of structure is poor, Strong wind day, especially typhoon day, it is necessary to take more firm measure to be fixed machining shed, if fixation less than Position, often occurs the phenomenon that the top cover of machining shed is blown off by typhoon;
(2) it is revolving not strong:The expense of a fixed machining shed is typically set up at 50,000 yuan or so, wherein, terrace is hard Change, erection of equipment and removal cost are disposable input, machining shed substantially regards waste disposal after removing, it is revolving not By force, waste of material is caused, it is not environmentally friendly enough, and also integrated cost is also higher.
Therefore, in safety in production, civilized construction standardisation requirements higher and higher today, how to carry out security performance can Lean on, standardization level is high, material machining shed flexible and convenient to use is crucial.
Utility model content
In order to solve the live material machining shed wind-proof performance of architectural engineering it is poor, it is revolving not strong the problems such as, improve machining shed Security reliability, it is ensured that the career safety & health of workman, for the preparation method of job site machining shed, there is provided a kind of top cover The architectural engineering job shop of lifting, the top cover of the job shop can be lifted, with reach more reasonably application and construction place, The purpose that job shop is more solid and reliable, typhoon protection measure is more efficient, integrated cost is relatively low.
In order to solve the above technical problems, the utility model provides following technical scheme:
A kind of architectural engineering job shop of top cover lifting, including:Some workshop columns, top cover and lifting device, its In, the bottom of the workshop column is connected with workshop bottom girder, and the top of the workshop column is connected with workshop back timber;The workshop The top specified altitude assignment position of column sets locking pin, and the bottom of the workshop column sets locking spanner;The top cover bag Include top cover body and connect the top cover bearing of the top cover body and the workshop column;The lifting device, along the workshop The top cover is locked in described by top cover described in upright lifting to after specified altitude assignment by the locking spanner control locking pin On the column of workshop.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, in addition to walking girder steel, the walking steel Beam is arranged at the top of the workshop, and the walking girder steel lower end sets setting first on steel beam rail, the walking girder steel electronic Cucurbit, the workshop surrounding sets roller shutter, passes through the expansion of the roller shutter so that the workshop forms closing space.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the top cover is bi-layer tip cap.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the bi-layer tip cap is made using angle steel Truss.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, in addition to wheel assembly is walked, it is described to walk to take turns total Into being arranged on the position of the workshop bottom girder lower surface correspondence workshop column, it is described walk wheel assembly on rail clamping device is set, The rail clamping device by it is described walk wheel assembly be fixed on sliding rail.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, in addition to top cover waterproof, the top cover is prevented Water is arranged between the bi-layer tip cap and the workshop column.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the workshop column uses H profile steel system Make.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the bottom and workshop of the workshop column Bottom girder bolt connection, top and the workshop back timber bolt connection of the workshop column.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the lifting device is chain block, institute The top that chain block is arranged at each workshop column is stated, the top cover is raised to the height specified along the workshop column Degree.
It is preferred that, in the architectural engineering job shop that above-mentioned top cover is lifted, the lifting device is the second electronic calabash Reed, second electric block is arranged on the workshop back timber, and the top cover is raised into what is specified along the workshop column Highly.
The architectural engineering job shop of top cover lifting of the present utility model uses liftable top cover, when strong wind day or typhoon Before it arrives, top cover is dropped into ground, the destruction of typhoon is effectively prevented;Top cover, framework sectional making, Assembling are taken Build, remove convenient, flexible, can repeatedly be used in turn, 100,000 yuan or so of the disposable processing charges of this job shop, as long as turnover 2 More than secondary, integrated cost just can be lower than the fixed machining shed set up, more save, it is more environmentally friendly;In addition, of the present utility model Job shop, can also realize that surrounding installs roller shutter, internal installation boom hoisting so that whole workshop becomes enclosed top cover Lift job shop, this has just had protection, sunshade, rain-proof, windproof, lifting function concurrently in one, has more met current building The Safety standardization requirement at engineering construction scene;Meanwhile, workshop can integrally be slided in orbit, be conducive to the comprehensive of construction site Close and utilize, material-conveying vehicle can directly reach the handling that processing stand carries out material, after the completion of handling, then workshop is moved along track Above to material processing stand, the rehandling of material is reduced, is saved artificial.
Brief description of the drawings
The front view for the architectural engineering job shop that Fig. 1 lifts for the top cover of the utility model first embodiment;
The side view for the architectural engineering job shop that Fig. 2 lifts for the top cover of the utility model first embodiment;
The top view for the architectural engineering job shop that Fig. 3 lifts for the top cover of the utility model first embodiment;
The front view for the architectural engineering job shop that Fig. 4 lifts for the top cover of the utility model second embodiment;
The side view for the architectural engineering job shop that Fig. 5 lifts for the top cover of the utility model second embodiment;
The top view for the architectural engineering job shop that Fig. 6 lifts for the top cover of the utility model second embodiment;
Fig. 7 is the skeleton structure shaft side figure for the architectural engineering job shop that top cover of the present utility model is lifted;
Wheel assembly front view is walked by the architectural engineering job shop that Fig. 8-1 lifts for top cover of the present utility model
Wheel assembly side view is walked by the architectural engineering job shop that Fig. 8-2 lifts for top cover of the present utility model;
In figure:1- top cover bodies, 2- workshops column, 3- workshops bottom girder, 4- wheel sets, 5- sliding rails, 6- rail clamping devices, 7- lockings spanner, 8- bottle gouards moved by hands, 8 '-the second electric blocks, 9- top covers waterproof, 10- top covers bearing, 11- roller shutters, 12- walkings Girder steel, 13- steel beam rails, the electric blocks of 14- first, 15- workshops back timber, 16- locking pins
Embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes top cover lifting architectural engineering job shop It is described in further detail.According to following explanation and claims, advantages and features of the present utility model will become apparent from.Need Bright, accompanying drawing is using very simplified form and uses non-accurately ratio, only conveniently, lucidly to aid in illustrating The purpose of the utility model embodiment.
Fig. 1 to Fig. 3 is referred to, present embodiment discloses a kind of architectural engineering job shop of top cover lifting, including:It is some Root workshop column 2, bi-layer tip cap and bottle gouard moved by hands 8, wherein, the bottom of the workshop column is connected with workshop bottom girder, the car Between the top of column be connected with workshop back timber;The top specified altitude assignment position of the workshop column 2 sets locking pin 16, described The bottom of workshop column 2 sets locking spanner 7;The top cover includes top cover body 1 and connects the top cover body 1 and the car Between column 2 top cover bearing 10;The lifting device, along top cover described in the workshop upright lifting to specified altitude assignment after, pass through The top cover is locked on the workshop column 2 by the locking spanner 7 control locking pin 16.
It is so designed that, before strong wind day or typhoon day arrive, top cover is dropped into ground, effectively prevents the broken of typhoon It is bad;Top cover, framework sectional making, Assembling are built, remove convenient, flexible, can repeatedly be used in turn, this job shop one Secondary 100,000 yuan or so of property processing charges, as long as having enough to meet the need more than 2 times, integrated cost can just be wanted than the fixed machining shed set up It is low, more save, it is more environmentally friendly.
Referring again to Fig. 4 to Fig. 6 second embodiment, with differing only in for first embodiment, lifted in the present embodiment The not described bottle gouard moved by hands 8 of the lifting device of the bi-layer tip cap, but electric block 8 '.
Design of cover is bi-layer tip cap, can be safer reliable, may be designed in individual layer top cover.
In the above-described embodiments, in addition to walking girder steel 12, the walking girder steel 12 is arranged at the top of the workshop, described Walking girder steel 12 lower end sets and sets the first electric block 14, the workshop surrounding on steel beam rail 13, the walking girder steel 12 Roller shutter 11 is set, passes through the expansion of the roller shutter 11 so that the workshop forms closing space.
Being so designed that can realize that surrounding installs roller shutter 11, internal installation boom hoisting so that whole workshop becomes closing The top cover lift job shop of formula, this has just had protection, sunshade, rain-proof, windproof, lifting function concurrently in one, more met The Safety standardization requirement at current building engineering construction scene
In the above-described embodiments, the bi-layer tip cap uses the truss that angle steel makes.
In the above-described embodiments, in addition to walk wheel assembly 4, it is described walk wheel assembly 4 be arranged at the lower surface of workshop bottom girder 3 On the position of the correspondence workshop column 2, it is described walk wheel assembly 4 on rail clamping device 6 is set, the rail clamping device 6 by it is described walk wheel it is total It is fixed on into 4 on sliding rail 5.
It is so designed that, workshop can integrally be slided in orbit, is conducive to the comprehensive utilization of construction site, material-conveying vehicle The handling that processing stand carries out material can be directly reached, after the completion of handling, then workshop are moved on to above material processing stand along track, The rehandling of material is reduced, is saved artificial.
In the above-described embodiments, in addition to top cover waterproof 9, the top cover waterproof 9 be arranged at the bi-layer tip cap with it is described Between workshop column 2.
In the above-described embodiments, the workshop column 2 is made using H profile steel.
In the above-described embodiments, the bottom of the workshop column 2 and the bolt connection of workshop bottom girder 3, the workshop column 2 Top and the bolt connection of workshop back timber 15.
It is so designed that, is more convenient dismounting.
In the above-described embodiments, the lifting device is chain block 8, and the chain block 8 is arranged at each car Between column top, the top cover is raised to the height specified along the workshop column.
In the above-described embodiments, the lifting device is the second electric block 8 ', and second electric block 8 ' is arranged at On the workshop back timber 15, the top cover is raised to the height specified along the workshop column 2.
Fig. 7 is the skeleton structure shaft side figure for the architectural engineering job shop that top cover of the present utility model is lifted;
Wheel assembly front view is walked by the architectural engineering job shop that Fig. 8-1 lifts for top cover of the present utility model
Wheel assembly side view is walked by the architectural engineering job shop that Fig. 8-2 lifts for top cover of the present utility model;
The present embodiment also discloses a kind of preparation method of the architectural engineering job shop of top cover lifting as described above, bag Include following steps:
Step 1, the bottom of some workshop columns 2 is connected with workshop bottom girder 3, workshop back timber 15 is stood with the workshop The top connection of post 2;
Step 2, pin 16 will be locked and is arranged at the top specified altitude assignment position of workshop column 2, and locking spanner 7 is set In the bottom of the workshop column 2;
Step 3, lifting device is set, top cover is lifted after specified altitude assignment along the workshop column 2, passes through the locking The top cover is locked on the workshop column 2 by the control locking pin 16 of spanner 7, wherein, the top cover includes top cover body 1 And connect the top cover bearing 10 of the top cover body 1 and the workshop column 2.
In above-mentioned preparation method, in addition to the step of setting roller shutter 11, walking girder steel 12 is arranged on the workshop top Portion, the lower end of walking girder steel 12 sets steel beam rail 13, and the first electric block 14 is arranged on the walking girder steel 12, will The roller shutter 11 is arranged at the workshop surrounding, by the way that the roller shutter 11 is deployed so that the workshop forms closing space.
In the step 3 of above-mentioned preparation method, the top cover is set to bi-layer tip cap.
In the step 3 of above-mentioned preparation method, the bi-layer tip cap uses the truss that angle steel makes.
In above-mentioned preparation method, in addition to the step of set wheel assembly 4, by it is described walk wheel assembly 4 be arranged at it is described On the position of the lower surface of the workshop bottom girder 3 correspondence workshop column 2, it is described walk wheel assembly 4 on rail clamping device 6, the folder rail are set Device 6 by it is described walk wheel assembly 4 be fixed on sliding rail 5.
In above-mentioned preparation method, in addition to the step of setting top cover waterproof 9, the top cover waterproof 9 is arranged at described Between bi-layer tip cap and the workshop column 2.
In the step 1 of above-mentioned preparation method, the workshop column 2 is made using H profile steel.
In the step 1 of above-mentioned preparation method, by the bottom of the workshop column 2 and the bolt connection of workshop bottom girder 3, by institute State top and the bolt connection of workshop back timber 15 of workshop column 2.
In the step 3 of above-mentioned preparation method, the lifting device is chain block 8, and the chain block 8 is arranged at often The top of the individual workshop column 2, the top cover is raised to along the workshop column 2 height specified.
In the step 3 of above-mentioned preparation method, the lifting device is the second electric block 8 ', second electric block 8 ' are arranged on the workshop back timber 15, and the top cover is raised to the height specified along the workshop column 2.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the utility model scope Calmly, the those of ordinary skill in the utility model field does according to the disclosure above content any change, modification, belonging to right will Seek the protection domain of book.

Claims (10)

1. a kind of architectural engineering job shop of top cover lifting, it is characterised in that including:
Some workshop columns, the bottom of the workshop column is connected with workshop bottom girder, the top and workshop of the workshop column Back timber is connected;The top specified altitude assignment position of the workshop column sets locking pin, and the bottom of the workshop column sets lock Determine spanner;
The top cover includes top cover body and connects the top cover bearing of the top cover body and the workshop column;
Lifting device, along top cover described in the workshop upright lifting to specified altitude assignment after, pass through it is described locking spanner control locking The top cover is locked on the workshop column by pin.
2. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that also including walking girder steel, The walking girder steel is arranged at the top of the workshop, and the walking girder steel lower end is set to be set on steel beam rail, the walking girder steel The first electric block is put, the workshop surrounding sets roller shutter, passes through the expansion of the roller shutter so that it is empty that the workshop forms closing Between.
3. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that the top cover pushes up to be double-deck Lid.
4. the architectural engineering job shop of top cover lifting as claimed in claim 3, it is characterised in that the bi-layer tip cap is used The truss that angle steel makes.
5. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that also include walking wheel assembly, It is described walk wheel assembly be arranged on the position of the workshop bottom girder lower surface correspondence workshop column, it is described walk wheel assembly on set Put rail clamping device, the rail clamping device by it is described walk wheel assembly be fixed on sliding rail.
6. the architectural engineering job shop of top cover lifting as claimed in claim 3, it is characterised in that also including top cover waterproof, The top cover waterproof is arranged between the bi-layer tip cap and the workshop column.
7. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that the workshop column is used H profile steel makes.
8. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that the bottom of the workshop column End and workshop bottom girder bolt connection, top and the workshop back timber bolt connection of the workshop column.
9. the architectural engineering job shop of top cover lifting as claimed in claim 1, it is characterised in that the lifting device is hand Cucurbit is drawn, the chain block is arranged at the top of each workshop column, by the top cover along the workshop column liter To the height specified.
10. the architectural engineering job shop of top cover as claimed in claim 1 lifting, it is characterised in that the lifting device is Second electric block, second electric block is arranged on the workshop back timber, by the top cover along the workshop column It is raised to the height specified.
CN201621191569.1U 2016-10-31 2016-10-31 The architectural engineering job shop of top cover lifting Active CN206503392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621191569.1U CN206503392U (en) 2016-10-31 2016-10-31 The architectural engineering job shop of top cover lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621191569.1U CN206503392U (en) 2016-10-31 2016-10-31 The architectural engineering job shop of top cover lifting

Publications (1)

Publication Number Publication Date
CN206503392U true CN206503392U (en) 2017-09-19

Family

ID=59842696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621191569.1U Active CN206503392U (en) 2016-10-31 2016-10-31 The architectural engineering job shop of top cover lifting

Country Status (1)

Country Link
CN (1) CN206503392U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481106A (en) * 2016-10-31 2017-03-08 上海市政工程设计研究总院(集团)有限公司 Slidingtype architectural engineering job shop
CN106639396A (en) * 2016-10-31 2017-05-10 上海市政工程设计研究总院(集团)有限公司 Constructional engineering machining workshop with liftable roof
CN111023492A (en) * 2019-11-28 2020-04-17 合肥通用制冷设备有限公司 Fresh air temperature and humidity control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481106A (en) * 2016-10-31 2017-03-08 上海市政工程设计研究总院(集团)有限公司 Slidingtype architectural engineering job shop
CN106639396A (en) * 2016-10-31 2017-05-10 上海市政工程设计研究总院(集团)有限公司 Constructional engineering machining workshop with liftable roof
CN111023492A (en) * 2019-11-28 2020-04-17 合肥通用制冷设备有限公司 Fresh air temperature and humidity control method
CN111023492B (en) * 2019-11-28 2021-04-27 合肥通用制冷设备有限公司 Fresh air temperature and humidity control method

Similar Documents

Publication Publication Date Title
CN106481106A (en) Slidingtype architectural engineering job shop
CN206503392U (en) The architectural engineering job shop of top cover lifting
CN106639396A (en) Constructional engineering machining workshop with liftable roof
CN106930528B (en) The production method of the architectural engineering processing workshop of top cover lifting
CN206189928U (en) Between slidingtype building engineering processing vehicle
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN105863030B (en) A kind of inspection shaft well lid and the inspection shaft for pipe gallery internal drainage pipeline
CN106593032A (en) Manufacturing method of sliding type building engineering machining workshop
CN205873834U (en) High empty wagon control box protection casing
CN107386646A (en) A kind of sliding architectural engineering job shop of top cover integral elevating
CN104533001A (en) Electric rotary temporary roof for reactor building of nuclear power station
CN107461059A (en) A kind of steel-structure factory building
CN207686361U (en) A kind of semiclosed reinforcing steel processing shed of packaged type
CN1109176C (en) Construction working method for nuclear electric power generation installation
CN108487726A (en) A kind of wireless energy-storage system of underground cellar concealed
CN207194019U (en) One kind lifting slide invisible well lid
CN205998484U (en) A kind of buried waste transfer station
CN207553605U (en) A kind of sliding architectural engineering processing workshop of head cover integral elevating
CN207332385U (en) A kind of steel-structure factory building
CN207792528U (en) Open-air automatic rainproof type explosion-proof crane
CN205422030U (en) Filling station uses canopy
CN205955248U (en) Construction weather enclosure in open cut foundation ditch
CN209352823U (en) A kind of transport support for dry quenching furnace constructing
CN204435643U (en) For the electronic rotation temporary roof cover of nuclear power plant reactor factory building