CN106930528B - The production method of the architectural engineering processing workshop of top cover lifting - Google Patents

The production method of the architectural engineering processing workshop of top cover lifting Download PDF

Info

Publication number
CN106930528B
CN106930528B CN201710083399.8A CN201710083399A CN106930528B CN 106930528 B CN106930528 B CN 106930528B CN 201710083399 A CN201710083399 A CN 201710083399A CN 106930528 B CN106930528 B CN 106930528B
Authority
CN
China
Prior art keywords
workshop
top cover
column
architectural engineering
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710083399.8A
Other languages
Chinese (zh)
Other versions
CN106930528A (en
Inventor
王铁
殷述学
黄赛帅
彭鹏
张熠
朱海明
刘斌
沈巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Publication of CN106930528A publication Critical patent/CN106930528A/en
Application granted granted Critical
Publication of CN106930528B publication Critical patent/CN106930528B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a kind of production methods of the architectural engineering processing workshop of top cover lifting, comprising: step 1, the bottom end of several workshop columns is connect with workshop bottom beam, workshop top beam is connect with the top of the workshop column;Step 2, locking pin is set to the top specified altitude assignment position of workshop column, and locking spanner is set to the bottom end of the workshop column;Step 3, lifting device is set, by top cover after the workshop upright lifting to specified altitude assignment, it controls locking pin by the locking spanner top cover is locked on the workshop column, wherein, the top cover includes top cover body and the top cover support for connecting the top cover body and the workshop column.Top cover is dropped to ground, is effectively prevented the destruction of typhoon by the program before strong wind day or typhoon day arrive;Top cover, frame sectional making, on-site assembly build, remove convenient, flexible, can repeatedly be used in turn, and overall cost is low, more save, is more environmentally friendly.

Description

The production method of the architectural engineering processing workshop of top cover lifting
Technical field
The present invention relates to a kind of architectural engineering processing workshop applied to building engineering construction field more particularly to a kind of tops The production method for covering the architectural engineering processing workshop of lifting.
Background technique
In construction industry field, with the development of society, the standard of safety construction is also higher and higher, to worker Personal safety and career safety & health requirement it is also higher and higher, material machining shed has become building engineering construction scene not Can or one of scarce facility.Building-site is mostly using the fixed material machining shed built in designated position at present, There is specific construction site using telescopic material machining shed, mainly protection, rain-proof, sunshade effect.
Major defect is:
(1) wind-proof performance is poor: what machining shed was generally temporarily set up, mostly more simple, the security performance of structure is poor, Strong wind day, especially typhoon day need to take machining shed relatively firm measure to be fixed, if fixation less than The phenomenon that position, the top cover of machining shed is blown off by typhoon frequent occurrence;
(2) revolving not strong: generally to set up the expense of a fixed machining shed at 50,000 yuan or so, wherein terrace is hard Change, erection of equipment and removal cost are disposable investment, machining shed substantially regards waste disposal after removing, it is revolving not By force, waste of material is caused, it is not environmentally friendly enough, and also overall cost is also higher.
Therefore, today higher and higher in safety in production, civilized construction standardisation requirements, how to carry out security performance can It leans on, standardization level is high, material machining shed flexible and convenient to use is crucial.
Summary of the invention
In order to solve the problems such as architectural engineering scene material machining shed wind-proof performance is not poor, revolving strong, machining shed is improved Security reliability, it is ensured that the career safety & health of worker provides a kind of top cover for the production method of construction site machining shed The top cover of the production method of the architectural engineering processing workshop of lifting, the processing workshop can be gone up and down, and be answered more reasonablely with reaching With construction site, the stronger purpose reliable, typhoon protection measure is more efficient, overall cost is relatively low of processing workshop.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of production method of the architectural engineering processing workshop of top cover lifting, includes the following steps:
Step 1, the bottom end of several workshop columns is connect with workshop bottom beam, by workshop top beam and the workshop column Top connection;
Step 2, locking pin is set to the top specified altitude assignment position of workshop column, and locking spanner is set to institute State the bottom end of workshop column;
Step 3, setting lifting device passes through the locking by top cover after the workshop upright lifting to specified altitude assignment The top cover is locked on the workshop column by spanner control locking pin, wherein the top cover includes top cover body and company Connect the top cover support of the top cover body and the workshop column.
It preferably, further include setting roller shutter in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting Step, by the setting of walking girder steel in the workshop top, steel beam rail is arranged in the walking girder steel lower end, by the first electric block It is set on the walking girder steel, the roller shutter is set to the workshop surrounding, by the way that the roller shutter to be unfolded, so that described Workshop forms enclosure space.
Preferably, in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting, in the step 3, by institute It states top cover and is set as bi-layer tip cap.
Preferably, described in the step 3 in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting Bi-layer tip cap uses the truss of angle steel production.
It preferably, further include that setting walks wheel always in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting At the step of, by it is described walk wheel assembly be set to workshop bottom beam lower surface and correspond on the position of the workshop column, it is described Walk and rail clamping device be set on wheel assembly, the rail clamping device by it is described walk wheel assembly be fixed on sliding rail.
It preferably, further include that setting top cover is anti-in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting The top cover waterproof is set between the bi-layer tip cap and the workshop column by the step of water.
Preferably, in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting, in the step 1, institute Workshop column is stated to be made of H profile steel.
It preferably,, will in the step 1 in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting The bottom end of the workshop column is bolted with workshop bottom beam, and the top of the workshop column is bolted with workshop top beam.
Preferably, in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting, in the step 3, institute Stating lifting device is chain block, and the chain block is set to the top of each workshop column, by the top cover along The workshop column is raised to specified height.
Preferably, in the production method of the architectural engineering processing workshop of above-mentioned top cover lifting, in the step 3, institute Stating lifting device is the second electric block, and second electric block is set on the workshop top beam, by the top cover along The workshop column is raised to specified height.
The architectural engineering processing workshop of top cover lifting of the invention uses liftable top cover, when strong wind day or typhoon day arrive Before coming, top cover is dropped into ground, is effectively prevented the destruction of typhoon;Top cover, frame sectional making, on-site assembly are built, are torn open Except convenient, flexible, can repeatedly be used in turn, 100,000 yuan or so of the disposable processing charges of this processing workshop, if turnover 2 times with On, overall cost can be lower than the fixed machining shed set up, and more saves, is more environmentally friendly;In addition, processing cart of the invention Between, surrounding installation roller shutter, internal installation boom hoisting can also be realized, so that entire workshop becomes enclosed top cover lift Processing workshop, this has just had both protection, sunshade, rain-proof, radix saposhnikoviae, the function of lifting in one, has more met current architectural engineering and apply The Safety standardization requirement at work scene;Meanwhile workshop can integrally be slided in orbit, be conducive to the comprehensive benefit of construction site The handling that processing stand carries out material can be directly reached with, material-conveying vehicle, after the completion of handling, then workshop are moved on into material along track Expect to reduce the rehandling of material above processing stand, save artificial.
Detailed description of the invention
Fig. 1 is the front view for the architectural engineering processing workshop that the top cover of first embodiment of the invention is gone up and down;
Fig. 2 is the side view for the architectural engineering processing workshop that the top cover of first embodiment of the invention is gone up and down;
Fig. 3 is the top view for the architectural engineering processing workshop that the top cover of first embodiment of the invention is gone up and down;
Fig. 4 is the front view for the architectural engineering processing workshop that the top cover of second embodiment of the invention is gone up and down;
Fig. 5 is the side view for the architectural engineering processing workshop that the top cover of second embodiment of the invention is gone up and down;
Fig. 6 is the top view for the architectural engineering processing workshop that the top cover of second embodiment of the invention is gone up and down;
Fig. 7 is the skeleton structure shaft side figure for the architectural engineering processing workshop that top cover of the invention is gone up and down;
The architectural engineering processing workshop that Fig. 8-1 goes up and down for top cover of the invention walks wheel assembly front view
The architectural engineering processing workshop that Fig. 8-2 goes up and down for top cover of the invention walks wheel assembly side view;
In figure: 1- top cover body, the workshop 2- column, the workshop 3- bottom beam, 4- wheel set, 5- sliding rail, 6- rail clamping device, 7- locks spanner, 8- bottle gouard moved by hands, 8 '-the second electric blocks, 9- top cover waterproof, 10- top cover support, 11- roller shutter, 12- walking Girder steel, 13- steel beam rail, the first electric block of 14-, the workshop 15- top beam,
16- locks pin
Specific embodiment
Below in conjunction with the system for the architectural engineering processing workshop that the drawings and specific embodiments go up and down top cover proposed by the present invention It is described in further detail as method.According to following explanation and claims, advantages and features of the invention will be become apparent from.It needs Illustrate, attached drawing is all made of very simplified form and using non-accurate ratio, only to convenient, lucidly auxiliary is said The purpose of the bright embodiment of the present invention.
It please refers to Fig.1 to Fig.3, present embodiment discloses a kind of architectural engineering processing workshops of top cover lifting, comprising: several Root workshop column 2, bi-layer tip cap and bottle gouard moved by hands 8, wherein the bottom end of the workshop column is connect with workshop bottom beam, the vehicle Between the top of column connect with workshop top beam;The top specified altitude assignment position setting locking pin 16 of the workshop column 2, it is described The bottom end setting locking spanner 7 of workshop column 2;The top cover includes top cover body 1 and the connection top cover body 1 and the vehicle Between column 2 top cover support 10;The lifting device passes through after top cover to specified altitude assignment described in the workshop upright lifting The top cover is locked on the workshop column 2 by the control of the locking spanner 7 locking pin 16.
It is designed in this way, before strong wind day or typhoon day arrive, top cover is dropped into ground, be effectively prevented the broken of typhoon It is bad;Top cover, frame sectional making, on-site assembly build, remove convenient, flexible, can repeatedly be used in turn, this processing workshop one Secondary 100,000 yuan of property processing charges or so, as long as turnover 2 times or more, overall cost can be than the fixed machining shed set up It is low, it more saves, is more environmentally friendly.
Referring again to the second embodiment of fig. 4 to fig. 6, the difference with first embodiment is only that, is promoted in the present embodiment The lifting device of the bi-layer tip cap is not the bottle gouard moved by hands 8, but the second electric block 8 '.
Design of cover is bi-layer tip cap, can be safer reliable, may be designed in single layer top cover.
It in the above-described embodiments, further include walking girder steel 12, the walking girder steel 12 is arranged in the workshop top, described Steel beam rail 13 is arranged in walking 12 lower end of girder steel, and the first electric block 14, the workshop surrounding is arranged on the walking girder steel 12 Roller shutter 11 is set, by the expansion of the roller shutter 11, so that the workshop forms enclosure space.
It is designed in this way and surrounding installation roller shutter 11, internal installation boom hoisting may be implemented, so that entire workshop becomes to close The top cover lift processing workshop of formula, this has just had both protection, sunshade, rain-proof, radix saposhnikoviae, the function of lifting in one, has more met The Safety standardization requirement at building engineering construction scene at present
In the above-described embodiments, the bi-layer tip cap uses the truss of angle steel production.
In the above-described embodiments, further include walking wheel assembly 4, it is described walk wheel assembly 4 be set to 3 lower surface of workshop bottom beam On the position of the corresponding workshop column 2, it is described walk wheel assembly 4 on rail clamping device 6 is set, the rail clamping device 6 by it is described walk wheel it is total It is fixed on sliding rail 5 at 4.
It is designed in this way, workshop can integrally be slided in orbit, be conducive to the comprehensive utilization of construction site, material-conveying vehicle The handling that processing stand carries out material can be directly reached, after the completion of handling, then workshop are moved on to above material processing stand along track, The rehandling for reducing material saves artificial.
In the above-described embodiments, further include top cover waterproof 9, the top cover waterproof 9 be set to the bi-layer tip cap with it is described Between workshop column 2.
In the above-described embodiments, the workshop column 2 is made of H profile steel.
In the above-described embodiments, the bottom end of the workshop column 2 is bolted with workshop bottom beam 3, the workshop column 2 Top is bolted with workshop top beam 15.
It is designed in this way, is more convenient disassembly.
In the above-described embodiments, the lifting device is chain block 8, and the chain block 8 is set to each vehicle Between column top, the top cover is raised to specified height along the workshop column.
In the above-described embodiments, the lifting device is the second electric block 8 ', and second electric block 8 ' is set to On the workshop top beam 15, the top cover is raised to specified height along the workshop column 2.
Fig. 7 is the skeleton structure shaft side figure for the architectural engineering processing workshop that top cover of the invention is gone up and down;
The architectural engineering processing workshop that Fig. 8-1 goes up and down for top cover of the invention walks wheel assembly front view
The architectural engineering processing workshop that Fig. 8-2 goes up and down for top cover of the invention walks wheel assembly side view;
The present embodiment also discloses a kind of production method of the architectural engineering processing workshop of top cover lifting as described above, packet Include following steps:
Step 1, the bottom end of several workshop columns 2 is connect with workshop bottom beam 3, workshop top beam 15 and the workshop is stood The top of column 2 connects;
Step 2, locking pin 16 is set to the top specified altitude assignment position of workshop column 2, and locking spanner 7 is arranged In the bottom end of the workshop column 2;
Step 3, lifting device is set, top cover is promoted along the workshop column 2 to after specified altitude assignment, the locking is passed through The top cover is locked on the workshop column 2 by the control locking pin 16 of spanner 7, wherein the top cover includes top cover body 1 And connect the top cover support 10 of the top cover body 1 and the workshop column 2.
In above-mentioned production method, further include the steps that roller shutter 11 is arranged, the setting of walking girder steel 12 is pushed up in the workshop Portion, 12 lower end of walking girder steel are arranged steel beam rail 13, the first electric block 14 are set on the walking girder steel 12, will The roller shutter 11 is set to the workshop surrounding, by the way that the roller shutter 11 to be unfolded, so that the workshop forms enclosure space.
In the step 3 of above-mentioned production method, bi-layer tip cap is set by the top cover.
In the step 3 of above-mentioned production method, the bi-layer tip cap uses the truss of angle steel production.
In above-mentioned production method, further include the steps that wheel assembly 4 is walked in setting, by it is described walk wheel assembly 4 be set to it is described Bottom beam 3 lower surface in workshop corresponds on the position of the workshop column 2, it is described walk wheel assembly 4 on be arranged rail clamping device 6, the folder rail Device 6 by it is described walk wheel assembly 4 be fixed on sliding rail 5.
In above-mentioned production method, further include the steps that top cover waterproof 9 is arranged, the top cover waterproof 9 is set to described Between bi-layer tip cap and the workshop column 2.
In the step 1 of above-mentioned production method, the workshop column 2 is made of H profile steel.
In the step 1 of above-mentioned production method, the bottom end of the workshop column 2 is bolted with workshop bottom beam 3, by institute The top and workshop top beam 15 for stating workshop column 2 are bolted.
In the step 3 of above-mentioned production method, the lifting device is chain block 8, and the chain block 8 is set to often The top cover is raised to specified height along the workshop column 2 by the top of a workshop column 2.
In the step 3 of above-mentioned production method, the lifting device is the second electric block 8 ', second electric block 8 ' are set on the workshop top beam 15, and the top cover is raised to specified height along the workshop column 2.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of production method of the architectural engineering processing workshop of top cover lifting, which comprises the steps of:
Step 1, the bottom end of several workshop columns is connect with workshop bottom beam, by the top of workshop top beam and the workshop column Connection;
Step 2, locking pin is set to the top specified altitude assignment position of workshop column, and locking spanner is set to the vehicle Between column bottom end;
Step 3, setting lifting device passes through the locking spanner by top cover after the workshop upright lifting to specified altitude assignment The top cover is locked on the workshop column by control locking pin, wherein the top cover includes top cover body and connection institute State the top cover support of top cover body and the workshop column.
2. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that further include The step of roller shutter is set, will walking girder steel setting in the workshop top, the walking girder steel lower end setting steel beam rail, by the One electric block is set on the walking girder steel, and the roller shutter is set to the workshop surrounding, by by the roller shutter exhibition It opens, so that the workshop forms enclosure space.
3. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that described In step 3, the top cover is bi-layer tip cap.
4. the production method of the architectural engineering processing workshop of top cover lifting as claimed in claim 3, which is characterized in that described In step 3, the bi-layer tip cap is the truss made of angle steel.
5. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that further include The step of wheel assembly, is walked in setting, by it is described walk wheel assembly be set to the position that workshop bottom beam lower surface corresponds to the workshop column Set, it is described walk wheel assembly on rail clamping device is set, the rail clamping device by it is described walk wheel assembly be fixed on sliding rail.
6. the production method of the architectural engineering processing workshop of top cover lifting as claimed in claim 3, which is characterized in that further include The step of top cover waterproof is arranged, the top cover waterproof is set between the bi-layer tip cap and the workshop column.
7. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that described In step 1, the workshop column is made of H profile steel.
8. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that described In step 1, the bottom end of the workshop column is bolted with workshop bottom beam, by the top of the workshop column and workshop top beam It is bolted.
9. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that described In step 3, the lifting device is chain block, and the chain block is set to the top of each workshop column, by institute It states top cover and is raised to specified height along the workshop column.
10. the production method of the architectural engineering processing workshop of top cover lifting as described in claim 1, which is characterized in that in institute It states in step 3, the lifting device is the second electric block, and second electric block is set on the workshop top beam, will The top cover is raised to specified height along the workshop column.
CN201710083399.8A 2016-10-31 2017-02-16 The production method of the architectural engineering processing workshop of top cover lifting Active CN106930528B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016109746740 2016-10-31
CN201610974674 2016-10-31

Publications (2)

Publication Number Publication Date
CN106930528A CN106930528A (en) 2017-07-07
CN106930528B true CN106930528B (en) 2019-07-05

Family

ID=59424209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710083399.8A Active CN106930528B (en) 2016-10-31 2017-02-16 The production method of the architectural engineering processing workshop of top cover lifting

Country Status (1)

Country Link
CN (1) CN106930528B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639396A (en) * 2016-10-31 2017-05-10 上海市政工程设计研究总院(集团)有限公司 Constructional engineering machining workshop with liftable roof
CN106481106A (en) * 2016-10-31 2017-03-08 上海市政工程设计研究总院(集团)有限公司 Slidingtype architectural engineering job shop

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3961712A (en) * 1974-10-31 1976-06-08 International Paper Company Industrial building structure system
JPH0821105A (en) * 1994-07-06 1996-01-23 Maeda Corp Self-propelling type roof device for all weather construction
CN203308131U (en) * 2013-06-20 2013-11-27 葛洲坝集团第二工程有限公司 Movable workshop made of arc steel pipe frames
CN104895356B (en) * 2015-06-08 2017-09-08 北京陆桥商检新技术公司 A kind of closed ceiling of wood fumigation
CN204876070U (en) * 2015-08-06 2015-12-16 杭州众赢科技有限公司 Liftable formula top cap structure

Also Published As

Publication number Publication date
CN106930528A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN106481106A (en) Slidingtype architectural engineering job shop
CN103526949B (en) A kind of sliding and lifting construction method of attached wall vertical structure
US10011979B1 (en) House having aluminum alloy structure
CN106930528B (en) The production method of the architectural engineering processing workshop of top cover lifting
CN204804298U (en) Building material hoist and mount construction scaffold
CN206503392U (en) The architectural engineering job shop of top cover lifting
CN106639396A (en) Constructional engineering machining workshop with liftable roof
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN206189928U (en) Between slidingtype building engineering processing vehicle
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN201050200Y (en) Sentry box possessing rotary wind screen cover
CN104533001B (en) A kind of electronic rotation temporary roof cover for nuclear power plant reactor factory building
CN207700068U (en) A kind of modularization Bridge Pier Construction job platform
CN103541300A (en) Railway concrete continuous beam implemented based on flat-pushing method and construction method thereof
CN107461059A (en) A kind of steel-structure factory building
CN205873834U (en) High empty wagon control box protection casing
CN207553605U (en) A kind of sliding architectural engineering processing workshop of head cover integral elevating
CN106593032A (en) Manufacturing method of sliding type building engineering machining workshop
CN207686361U (en) A kind of semiclosed reinforcing steel processing shed of packaged type
CN115095269B (en) Novel insulating operation platform
CN108750135A (en) A kind of turning type telescopic connecting bridge
CN202731321U (en) Multifunctional movable shack at construction site
CN212250138U (en) Construction operation vehicle in railway tunnel
CN207332385U (en) A kind of steel-structure factory building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant