CN203308131U - Movable workshop made of arc steel pipe frames - Google Patents

Movable workshop made of arc steel pipe frames Download PDF

Info

Publication number
CN203308131U
CN203308131U CN2013203535860U CN201320353586U CN203308131U CN 203308131 U CN203308131 U CN 203308131U CN 2013203535860 U CN2013203535860 U CN 2013203535860U CN 201320353586 U CN201320353586 U CN 201320353586U CN 203308131 U CN203308131 U CN 203308131U
Authority
CN
China
Prior art keywords
steel
arc
welding
pipe
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203535860U
Other languages
Chinese (zh)
Inventor
成自飞
王文忠
蒋仕涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN2013203535860U priority Critical patent/CN203308131U/en
Application granted granted Critical
Publication of CN203308131U publication Critical patent/CN203308131U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a movable workshop made of arc steel pipe frames, which is suitable for outdoor welding during manufacturing of steel pipes, as well as welding of small-scale metal structures. The movable workshop comprises a plurality of four-pipe-type column groups; beams of which two ends are mounted on corresponding four-pipe-type columns are mounted on the corresponding side surfaces of wall frames; an arc roof is arranged at the top of the wall; a roller is mounted on a roller carrier of each four-pipe-type column. The movable workshop can be manufactured conveniently, be used for preventing wind and rain, be used for replacing a workshop with the light steel structure using function, and be used conveniently, is movable, and cannot influence the follow-up process after the manufacturing process of the pressure pipe and hoisting operation, thereby having a wider application range.

Description

The removable factory building of arc-shaped steel pipe support
Technical field:
The utility model relates to a kind of when being applicable to penstock and making outdoor weld job and small-sized gold knot make the removable factory building of arc-shaped steel pipe support of welding.
Background technology:
At present, make in work progress at middle-size and small-size penstock, because penstock making amount is little, consider that factory building faces factors such as building the duration and whole total duration is shorter.Construction party is built the construction cost input for reducing to face, and generally can not plan comparatively expensive Lightweight metal plant or fixed welding shop; And penstock making welding quality is very strict to windproof, the rainproof measure requirement of on-the-spot actual condition, be to guarantee penstock welding quality, construction speed.Need special frock or veil to weld and carry out windproof, rainproof protection penstock, be convenient to the welder and carry out weld job; After the penstock welding, require veil is removed, removed fast, carry out follow-up construction or lifting operation.
The utility model content:
The purpose of this utility model is in order to overcome above-mentioned shortcoming, provide a kind of easy to make, not only can solve windproof, rainproof problem, and but also can substitute Lightweight metal plant and use function, simultaneously can also conveniently use, can move, do not affect penstock and make the operations such as subsequent handling and lifting, the removable factory building of arc-shaped steel pipe support in larger use space is arranged.
The purpose of this utility model is achieved like this:
The removable factory building of the utility model arc-shaped steel pipe support, comprise the wall frame that several four cast columns form, wall frame corresponding side surface has respectively two ends to be contained in respectively the crossbeam on corresponding four cast columns, the wall top of the trellis has the arc roof, on every four cast column bottom roller framves, roller is housed, adopt steel pipe to carry out frame manufacture, agent structure is four tubular column shapes, framework is firmly attractive in appearance, the outside adopts color steel watt to seal with C shaped steel with top, and monnolithic case is quite attractive in appearance, coordination, and base arranges the rolling train, need to lay track, track overburden pressure steel pipe circle zone; Both sides do not arrange gable, if in the time of need covering steel pipe, utilize manpower that this factory building is pushed into to use location, after work completes; This factory building is removed along covering track, completed the operations such as follow-up construction or lifting.
Four above-mentioned cast column cross-sections are shaped as square, and four cast columns are by four steel pipes and are positioned between four steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, form respectively.
Above-mentioned crossbeam shape of cross section is triangle, and crossbeam is by three steel pipes and is positioned between three steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, forms respectively.
Above-mentioned arc roof shape of cross section is square, and the arc roof is by four steel pipes and is positioned between four steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, forms respectively, has good height requirement; From heavy and light, the characteristics such as intensity is large, span is large.
The utility model not only possesses all characteristics of Lightweight metal plant, but also possess shock resistance good, make that simple and fast, shock resistance are good, good rigidly, deformability be strong.The utility model has solved medium and small penstock and has made the work items that factory should not arrange the large-scale steel structure factory building; The problem such as windproof, rainproof that can solve that when welding run into, make design and construction little (1500t is following) for penstock; And On-site Welding Technology requires high place to arrange in field.The investment of the removable factory building of the utility model arc-shaped steel pipe support is low, it is convenient to remove, it is simple to install, and can repeatedly recycle, the feature of environmental protection is good, the life-span used long.The utility model has solved the problem of the penstock welding procedure that should not plan steel-structure factory building.The removable factory building overall weight of the utility model arc-shaped steel pipe support is little, and fabrication cycle is very short.The removable factory building floor installation of the utility model has the rolling train, only needs to lay 2 tracks, can complete the movement of factory building, strengthened the usable floor area of the removable factory building of arc-shaped steel pipe support, indirectly increased economic benefit, can move with track reusable, safe and efficient.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is four cast pillar construction schematic diagrames.
Fig. 4 is that the A of Fig. 3 is to view.
Fig. 5 is the scroll wheel scheme of installation.
Fig. 6 is the beam structure schematic diagram.
Fig. 7 is that the B of Fig. 6 is to view.
Fig. 8 is figure curved layer shelf structure schematic diagram.
The specific embodiment:
Referring to Fig. 1, Fig. 2, Fig. 5, the removable factory building of the present embodiment arc-shaped steel pipe support, comprise the wall frame that several four cast columns 1 form.Wall frame corresponding side surface has respectively two ends to be contained in respectively the crossbeam 2 on corresponding four cast columns.The wall top of the trellis has arc roof 3.On every four cast column bottom roller framves 4, roller 5 is housed.
Referring to Fig. 3, Fig. 4, four cast column cross-sections are shaped as square.Four cast columns are by four steel pipes 6 and are positioned between four steel pipes and with some reinforced steels 7 Combination Welding of adjacent steel-pipe welding, form respectively.
Referring to Fig. 6, Fig. 7, the crossbeam shape of cross section is triangle.Crossbeam is by three steel pipes 8 and is positioned between three steel pipes and with some reinforced steels 9 Combination Welding of adjacent steel-pipe welding, forms respectively.
Referring to Fig. 8, arc roof shape of cross section is square.The arc roof is by four steel pipes 10 and is positioned between four steel pipes and with some reinforced steels 11 Combination Welding of adjacent steel-pipe welding, forms respectively.
Penstock stiffening ring maximum gauge 11.86m in the present embodiment, more than the removable factory building camber ratio of arc-shaped steel pipe support was set to 1:7m, span was 14m, maximum height 4.5m.
The removable factory building service routine of the utility model arc-shaped steel pipe support is as follows:
(1) the 38kg/m track is installed in penstock group circle, welding region, the factory building overall structure is positioned on track.During use, utilize manpower or hoist engine that the removable factory building of the utility model arc-shaped steel pipe support is moved to and uses position.
(2), after penstock has welded, utilize manpower or hoist engine that the removable factory building of the utility model arc-shaped steel pipe support is moved to steel pipe plant area clear area and get final product.

Claims (4)

1. the removable factory building of arc-shaped steel pipe support, it is characterized in that the wall frame that comprises that several four cast columns form, wall frame corresponding side surface has respectively two ends to be contained in respectively the crossbeam on corresponding four cast columns, and the wall top of the trellis has the arc roof, on every four cast column bottom roller framves, roller is housed.
2. the removable factory building of arc-shaped steel pipe support as claimed in claim 1, it is characterized in that four cast column cross-sections are shaped as square, four cast columns are by four steel pipes and are positioned between four steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, form respectively.
3. the removable factory building of arc-shaped steel pipe support as claimed in claim 1 or 2, is characterized in that the crossbeam shape of cross section is triangle, and crossbeam is by three steel pipes and is positioned between three steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, forms respectively.
4. the removable factory building of arc-shaped steel pipe support as claimed in claim 1 or 2, it is characterized in that arc roof shape of cross section is square, the arc roof is by four steel pipes and is positioned between four steel pipes and with some reinforced steel Combination Welding of adjacent steel-pipe welding, forms respectively.
CN2013203535860U 2013-06-20 2013-06-20 Movable workshop made of arc steel pipe frames Expired - Lifetime CN203308131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203535860U CN203308131U (en) 2013-06-20 2013-06-20 Movable workshop made of arc steel pipe frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203535860U CN203308131U (en) 2013-06-20 2013-06-20 Movable workshop made of arc steel pipe frames

Publications (1)

Publication Number Publication Date
CN203308131U true CN203308131U (en) 2013-11-27

Family

ID=49614349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203535860U Expired - Lifetime CN203308131U (en) 2013-06-20 2013-06-20 Movable workshop made of arc steel pipe frames

Country Status (1)

Country Link
CN (1) CN203308131U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986684A (en) * 2015-02-15 2016-10-05 徐进勇 Mobile type multifunctional component machining workshop
CN106930528A (en) * 2016-10-31 2017-07-07 上海市政工程设计研究总院(集团)有限公司 The preparation method of the architectural engineering job shop of top cover lifting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986684A (en) * 2015-02-15 2016-10-05 徐进勇 Mobile type multifunctional component machining workshop
CN106930528A (en) * 2016-10-31 2017-07-07 上海市政工程设计研究总院(集团)有限公司 The preparation method of the architectural engineering job shop of top cover lifting

Similar Documents

Publication Publication Date Title
CN202325547U (en) Working jumbo for continuously variable section tunnel lining
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN206296898U (en) A kind of welding beam formula heavy type truss robot
CN202031470U (en) Movable hook ladder for construction of steel structure
CN107031790A (en) Three-dimensional adjustment instrument closes up large-scale total group of segment process method
CN203308131U (en) Movable workshop made of arc steel pipe frames
CN202509681U (en) C-type steel of reinforced structure
CN204691326U (en) Multifunctional mobile component processing plant
CN109317911A (en) A kind of cross column welding production line
CN205257792U (en) Bridge crane with triangular support girder
CN202090483U (en) Round structure with prestressed sheet metal roof
CN204954156U (en) Railcar side wall friction stir welding flexibility frock
CN203247703U (en) Steel structural plant frame
CN203454780U (en) Modular steel structure in radiation section of industrial furnace
CN202542697U (en) Truss type flexible leg of portal crane
CN202718421U (en) Mongolian yurt type movable and sealed workshop
CN103470077A (en) Novel steel-structured plant
CN204590258U (en) A kind ofly be suitable for the lower end that box-shaped support is connected with i-shaped roof beam and build node
CN202291932U (en) Automatic welding device for plate unit
CN204040431U (en) Movable triangular frame
CN202388183U (en) Lifting equipment for H-shaped steel numerical control cutting machine
CN103758022B (en) A kind of truss-like Deck Arch Bridges widening quick-assembling
CN206337832U (en) Suitable for 3 d space coordinate system quick assembling multifunctional regulation device
CN205777594U (en) A kind of roofing large-span steel girder steel construction twin beams purlin car
CN206318632U (en) A kind of bridge crane large span supporting mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA GE ZHOU BA GROUP IS SECOND PROJECT CO., LTD.

Free format text: FORMER NAME: GEZHOUBA GROUP NO.2 ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder

Address after: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee after: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Address before: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee before: GEZHOUBA GROUP NO.2 ENGINEERING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131127