CN205777594U - A kind of roofing large-span steel girder steel construction twin beams purlin car - Google Patents

A kind of roofing large-span steel girder steel construction twin beams purlin car Download PDF

Info

Publication number
CN205777594U
CN205777594U CN201620743049.0U CN201620743049U CN205777594U CN 205777594 U CN205777594 U CN 205777594U CN 201620743049 U CN201620743049 U CN 201620743049U CN 205777594 U CN205777594 U CN 205777594U
Authority
CN
China
Prior art keywords
steel
beams
purlin
span
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620743049.0U
Other languages
Chinese (zh)
Inventor
赵阳
左京力
包妍
张继龙
侯建平
张凯
武钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201620743049.0U priority Critical patent/CN205777594U/en
Application granted granted Critical
Publication of CN205777594U publication Critical patent/CN205777594U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

This utility model provides a kind of roofing large-span steel girder steel construction twin beams purlin car, including two truss being set in parallel on beams of concrete and two straddle trucks being separately positioned on upper surface, truss two ends;Straddle truck includes two timbering with rafter arch sets's beams being vertically arranged, and timbering with rafter arch sets's beam is made up of two intilted cant beams in upper end, and cant beam lower end is fixed on a bottom girder, and two herringbone support beam upper ends are fixed on a crossbeam;A steel plate is vertically welded in lower surface, crossbeam centre position, and the centre position of steel plate is provided with jack;Bottom girder lower surface welds an angle steel.The beneficial effects of the utility model are: this utility model easy construction, when indoor large-span steel structure vestibule and the construction of roof light large-span steel girder, reduce the dependency to tower crane, form independent high-altitude and steel construction operating platform is installed, reduce the interference of other factors, under guaranteeing construction safety and quality premise, accelerate construction speed.

Description

A kind of roofing large-span steel girder steel construction twin beams purlin car
Technical field
This utility model relates to a kind of Architectural Equipment, particularly relates to a kind of roofing large-span steel girder steel construction twin beams Purlin car.
Background technology
At present in items in commerce big scale of construction complex roof work progress, as the biggest in roof particular design and roofing span Megastore etc., owing to common building has enough to meet the need operation frequently with multiple small-sized tower cranes, and construct especially for large-span steel The installation exercise effect of girder steel is little, need to call large-scale tower crane and could meet construction demand, and because of line production, load of constructing Greatly, each profession coordination machinery uses the time loaded down with trivial details, reduces the construction speed of entirety.
Utility model content
The purpose of this utility model is to provide a kind of easy construction, reduce the dependence to large-scale tower crane and quickening construct into The roofing large-span steel construction twin beams purlin car of degree.
This utility model is realized by following measure: a kind of roofing large-span steel girder steel construction twin beams purlin Car, is separately positioned on gantry of upper surface, described truss two ends including two truss being set in parallel on beams of concrete and two Hang;Described straddle truck includes two timbering with rafter arch sets's beams being vertically arranged, and described timbering with rafter arch sets's beam is lean-in by two upper ends Oblique cant beam composition, described cant beam lower end is fixed on a bottom girder, and two described timbering with rafter arch sets's beam upper ends are fixed on a crossbeam On;A steel plate is vertically welded in lower surface, described crossbeam centre position, and the centre position of described steel plate is provided with jack;Described bottom girder Lower surface welds an angle steel.Distance between two described truss is 800mm.
It is provided with horizontal reinforcing plates, described horizontal reinforcing plates and described horizontal stroke between two cant beams of described timbering with rafter arch sets's beam Oblique stiffening plate it is provided with between beam.
Described bottom girder, described cant beam, described crossbeam, described horizontal reinforcing plates and described oblique stiffening plate are H profile steel.
The model of described cant beam is H300*200*8*12;The model of described oblique buttress brace is H100*100*6*8;Described Steel plate is 500*75mm;The model of described crossbeam is H200*200*8*12.
The a length of 40m of described truss.
Described truss is the cuboid being bolted by horizontal long steel pipe, vertical short steel pipes and horizontal short steel pipes Framework, is provided with several intermediate lateral short steel pipes between the described horizontal long steel pipe of same level, be positioned at described in Between be laterally provided with oblique short steel pipes between the described horizontal long steel pipe in two, short steel pipes both sides.
Two described truss upper surfaces are placed with several for the cross-brace frame supporting described girder steel.
Described cross-brace frame is H profile steel, and model is: H200*200*8*12mm.
The beneficial effects of the utility model are: this utility model easy construction, in indoor large-span steel structure vestibule and daylighting During the large-span steel girder construction of skylight, reduce the dependency to tower crane, form independent high-altitude and steel construction operating platform is installed, reduce it He disturbs factor, under guaranteeing construction safety and quality premise, accelerates construction speed.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment.
Fig. 2 is the structural representation of straddle truck in this utility model embodiment.
Fig. 3 is the left view of Fig. 2.
Wherein, reference is: 1, bottom girder;2, cross-brace frame;3, girder steel;4, crossbeam;5, jack;6, cant beam;7, purlin Frame;8, steel plate;9, oblique stiffening plate;10, angle steel;11, horizontal reinforcing plates.
Detailed description of the invention
For the technical characterstic of this programme can be clearly described, below by detailed description of the invention, this programme is illustrated.
Seeing Fig. 1, Fig. 2 and Fig. 3, this utility model is a kind of roofing large-span steel girder steel construction twin beams purlin car, Including two truss being set in parallel on beams of concrete 7 and two straddle trucks being separately positioned on upper surface, truss 7 two ends;Dragon Gantry crane includes two timbering with rafter arch sets's beams being vertically arranged, and timbering with rafter arch sets's beam is made up of two intilted cant beams in upper end 6, Cant beam 6 lower end is fixed on a bottom girder 1, and two herringbone support beam upper ends are fixed on a crossbeam 4;Under crossbeam 4 centre position End face vertical welds a steel plate 8, and the centre position of steel plate 8 is provided with jack 5;Bottom girder 1 lower surface welds an angle steel 10.
It is provided with horizontal reinforcing plates 11, between horizontal reinforcing plates 11 and crossbeam 4 between two cant beams 6 of timbering with rafter arch sets's beam It is provided with oblique stiffening plate 9.
Bottom girder 1, cant beam 6, crossbeam 4, horizontal reinforcing plates 11 and oblique stiffening plate 9 are H profile steel;Wherein, the model of cant beam For H300*200*8*12;The model of oblique buttress brace is H100*100*6*8;Steel plate is 500*75mm;The model of crossbeam is H200*200*8*12.The a length of 40m of truss 7.
Truss 7 is the cuboid frame being bolted by horizontal long steel pipe, vertical short steel pipes and horizontal short steel pipes Frame, is provided with several intermediate lateral short steel pipes between the horizontal long steel pipe of same level, is positioned at described intermediate lateral It is provided with oblique short steel pipes between the horizontal long steel pipe in two, short steel pipes both sides.
Two truss 7 upper surfaces are placed with several cross-brace framves for support steel beam 3;Cross-brace frame is H type Steel, model is: H200*200*8*12mm.
Small-sized tower crane drives straddle truck to move forward and backward, and wherein angle steel plays spacing effect, it is to avoid straddle truck departs from truss; During construction, first truss 7 and straddle truck are completed;Small-sized tower crane is utilized to be placed on beams of concrete by two truss 7, two Truss 7 is spaced 800mm, the most parallel;After truss 7 has disposed, two straddle trucks are individually positioned on truss 7; Jack 5 is suspended on the steel plate 8 of straddle truck respectively, and debugs jack 5 and put in place;Truss 7 is placed several cross-brace Frame 2;Being divided into the girder steel of two sections in processing factory and be transported to scene, two sections of two sections of girder steels are carried on a shoulder pole on cross-brace frame 2, at two groups respectively Truss space middle, regulation puts in place, and two sections of girder steel butt welding are connected into entirety;Recycling jack 5 is by the girder steel 3 after welding Overall promote 500mm, then cross-brace frame 2 is all removed, finally need peace utilizing jack 5 slowly to be fallen to by girder steel Holding position.This utility model is particularly well-suited to indoor and roofing large-scale girder steel installation, and girder steel tonnage is at 5-15 ton, and girder steel is long Degree is within 40 meters;Wherein, jack 5 is motor-driven chain hoist, automatic lifting girder steel 3 after switching on power, and motor-driven chain hoist is prior art, Concrete structure does not repeats them here.
This utility model can pass through or use prior art to realize without the technical characteristic described, and does not repeats them here, Certainly, described above is not to restriction of the present utility model, and this utility model is also not limited to the example above, and this technology is led Change that the those of ordinary skill in territory is made in essential scope of the present utility model, retrofit, add or replace, also should belong to Protection domain of the present utility model.

Claims (8)

1. a roofing large-span steel girder steel construction twin beams purlin car, including two purlins being set in parallel on beams of concrete Frame and two straddle trucks being separately positioned on upper surface, described truss two ends;Described straddle truck includes two herringbones being vertically arranged Shape support beam, described timbering with rafter arch sets's beam is made up of two intilted cant beams in upper end, and described cant beam lower end is fixed on an end Liang Shang, two described timbering with rafter arch sets's beam upper ends are fixed on a crossbeam;Lower surface, described crossbeam centre position vertically welds one Steel plate, the centre position of described steel plate is provided with jack;Described bottom girder lower surface welds an angle steel.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 1 car, it is characterised in that described people It is provided with horizontal reinforcing plates between two cant beams of font support beam, is provided with between described horizontal reinforcing plates and described crossbeam tiltedly To reinforcing plate.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 2 car, it is characterised in that the described end Beam, described cant beam, described crossbeam, described horizontal reinforcing plates and described oblique stiffening plate are H profile steel.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 3 car, it is characterised in that described tiltedly The model of beam is H300*200*8*12;The model of described oblique buttress brace is H100*100*6*8;Described steel plate is 500* 75mm;The model of described crossbeam is H200*200*8*12.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 4 car, it is characterised in that described purlin The a length of 40m of frame.
6., according to the roofing large-span steel girder steel construction twin beams purlin car described in any one of claim 1-5, its feature exists In, described truss is the cuboid framework being bolted by horizontal long steel pipe, vertical short steel pipes and horizontal short steel pipes, Between the described horizontal long steel pipe of same level, it is provided with several intermediate lateral short steel pipes, is positioned at described intermediate lateral It is provided with oblique short steel pipes between the described horizontal long steel pipe in two, short steel pipes both sides.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 6 car, it is characterised in that two institutes State truss upper surface and be placed with several for the cross-brace frame supporting described girder steel.
Roofing large-span steel girder steel construction twin beams purlin the most according to claim 7 car, it is characterised in that described horizontal stroke Being H profile steel to bracing frame, model is: H200*200*8*12mm.
CN201620743049.0U 2016-07-15 2016-07-15 A kind of roofing large-span steel girder steel construction twin beams purlin car Expired - Fee Related CN205777594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620743049.0U CN205777594U (en) 2016-07-15 2016-07-15 A kind of roofing large-span steel girder steel construction twin beams purlin car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620743049.0U CN205777594U (en) 2016-07-15 2016-07-15 A kind of roofing large-span steel girder steel construction twin beams purlin car

Publications (1)

Publication Number Publication Date
CN205777594U true CN205777594U (en) 2016-12-07

Family

ID=58121934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620743049.0U Expired - Fee Related CN205777594U (en) 2016-07-15 2016-07-15 A kind of roofing large-span steel girder steel construction twin beams purlin car

Country Status (1)

Country Link
CN (1) CN205777594U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456461A (en) * 2020-04-22 2020-07-28 中国十七冶集团有限公司 Simple and quick horizontal and vertical transport tool and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456461A (en) * 2020-04-22 2020-07-28 中国十七冶集团有限公司 Simple and quick horizontal and vertical transport tool and construction method

Similar Documents

Publication Publication Date Title
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN202031470U (en) Movable hook ladder for construction of steel structure
CN203531445U (en) Novel steel structure workshop
CN202578055U (en) Height and width adjustable greenhouse for coke oven building construction
CN201746779U (en) Prestressed tension jack moving frame
CN205777594U (en) A kind of roofing large-span steel girder steel construction twin beams purlin car
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN202882375U (en) Elevator shaftway tool type scaffold operation platform
CN201052944Y (en) Combined truss type steel crane beam
CN201729631U (en) Truss type platform lifting device for constructing on top portions of tall and big spaces
CN210794552U (en) Net rack color steel plate profiling rapid conveying device
CN215289748U (en) T roof beam transverse connection board seam construction equipment
CN201722937U (en) Sliding platform for installation of net rack
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
CN214656435U (en) Movable truss type bridge construction operation platform
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN214269948U (en) Lifting device for dismantling wet joint formwork of bridge
CN213683371U (en) Movable greenhouse
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN203924655U (en) Novel elevator shaft operating platform frame
CN203879059U (en) Lift type protection shed for machining steel bar
CN103470077A (en) Novel steel-structured plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207