CN107366234A - 一种利用电动葫芦辅助挂篮的施工装置 - Google Patents
一种利用电动葫芦辅助挂篮的施工装置 Download PDFInfo
- Publication number
- CN107366234A CN107366234A CN201710617925.4A CN201710617925A CN107366234A CN 107366234 A CN107366234 A CN 107366234A CN 201710617925 A CN201710617925 A CN 201710617925A CN 107366234 A CN107366234 A CN 107366234A
- Authority
- CN
- China
- Prior art keywords
- electric block
- track girder
- walking
- main couple
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及大跨径箱梁挂篮施工,尤其涉及一种利用电动葫芦辅助挂篮的施工装置。它具有焊接在主桁架上的行走轨道梁,在行走轨道梁上可活动的连接有的电动葫芦,电动葫芦上连接有电缆线,电缆线上连接有用于固定电缆线的固定端,所述电动葫芦上方固定有电动小车,在所述电动小车的一侧连接有行走驱动电机。本发明的有益之处是:可以有效解决大跨径挂篮悬浇施工中,较远的节段无法利用塔吊进行吊装的难题,可以吊运整体预制的钢筋骨架、大块模板、油泵、千斤顶等工具,极大地提高了现场施工效率,也使施工安全得到更大保证。
Description
技术领域:
本发明涉及大跨径箱梁挂篮施工,尤其涉及一种利用电动葫芦辅助挂篮的施工装置。
背景技术:
随着桥梁建设行业的不断发展,大跨径桥梁也越来越多。针对大跨径挂篮悬浇施工的桥梁,塔吊大臂长度有限,施工半径无法覆盖整个桥梁挂篮施工周期,导致后续块段施工时吊运困难,叉车等小型机具功能有限且效率不高。如果一味通过增大塔吊大臂长度,或者在挂篮中间块段重新设置塔吊,但这两种方式的效益均比较差,且无法保证现场施工安全。
发明内容:
本发明的目的是提供一种安全效果好,能够快速运送施工材料的利用电动葫芦辅助挂篮的施工装置。
针对以上技术问题,本发明涉及的一种利用电动葫芦辅助挂篮的施工装置,具有焊接在主桁架上的行走轨道梁,在所述行走轨道梁上可活动的连接有的电动葫芦,所述电动葫芦上连接有电缆线,所述电缆线上连接有用于固定电缆线的固定端,所述电动葫芦上方固定有连接在行走轨道梁上的电动小车,在所述电动小车的一侧连接有行走驱动电机。
作为优选,所述行走轨道梁倾斜焊接在主桁架之间 ,行走轨道梁与主桁架的夹角a为30°—60°。
作为优选,所述主桁架上设有连接钢板,主桁架和行走轨道梁分别焊接在连接钢板上,通过连接钢板实现主桁架和行走轨道梁的连接,通过连接钢板来连接主桁架和行走轨道梁,可以使主桁架和行走轨道梁的连接更加稳固,便于焊接。
作为优选,所述行走轨道梁垂直焊接在主桁架上,行走轨道梁与主桁架相互垂直设置。
作为优选,所述主桁架与行走轨道梁之间设有用于加强结构强度的斜拉杆,有效加强跨度较大的行走轨道梁的连接强度,提高电动葫芦的安全性,进而提高整体结构的稳定性和运行效率。
作为优选,所述固定端设置在行走轨道梁的两侧,可以实现对电缆线的固定。
与现有技术相比,本发明的有益之处是:可以有效解决大跨径挂篮悬浇施工中,较远的节段无法利用塔吊进行吊装的难题,可以帮助吊运整体预制的钢筋骨架、大块模板、油泵、千斤顶等工具,极大地提高了现场施工效率,也使施工安全得到更大保证。
附图说明:
下面结合附图对本发明进一步说明。
图1是本发明第一种实施方式的结构示意图;
图2是本发明第二种实施方式的结构示意图;
图3是电动葫芦的结构示意图;
图4是电动葫芦的侧视图。
图中:1、主桁架;11、连接钢板;2、行走轨道梁;3、电动葫芦;4、电缆线;5、固定端;6、电动小车;7、行走驱动电机;8、斜拉杆。
具体实施方式:
本发明涉及的一种利用电动葫芦辅助挂篮的施工装置,如图1、图2和图3所示:具有焊接在主桁架1上的行走轨道梁2,在所述行走轨道梁2上可活动的连接有的电动葫芦3,所述电动葫芦3上连接有电缆线4,所述电缆线4上连接有用于固定电缆线4的固定端5,所述电动葫芦3上方固定有连接在行走轨道梁2上的电动小车6,在所述电动小车6的一侧连接有行走驱动电机7。
作为优选,如图1所示:所述行走轨道梁2倾斜焊接在主桁架1上,行走轨道梁2与主桁架1的夹角a为30°—60°,所述主桁架1上设有连接钢板11,主桁架1和行走轨道梁2分别焊接在连接钢板11上,通过连接钢板11实现主桁架1和行走轨道梁2的连接,通过连接钢板11来连接主桁架1和行走轨道梁2,可以使主桁架1和行走轨道梁2的连接更加稳固,便于焊接。
作为优选,如图2所示:所述行走轨道梁2垂直焊接在主桁架1之间,行走轨道梁2与主桁架1相互垂直设置;主桁架1与行走轨道梁2之间设有用于加强结构强度的斜拉杆8,有效加强跨度较大的行走轨道梁2的连接强度,提高电动葫芦3的安全性,进而提高整体结构的稳定性和运行效率。
作为优选,如图1和图2所示:所述固定端5设置在行走轨道梁2的两侧,可以实现对电缆线4的固定。
在其中一种实施例中,如图1所示:主要由电动葫芦3,行走轨道梁2、固定端5、电缆线4组成。电动葫芦3系统固定在挂篮主桁架2上,牢固可靠。电动葫芦3通过自带的电动小车6与行走轨道梁2固定。行走轨道梁2与挂篮主桁架1通过焊接固定,焊缝要饱满可靠。行走轨道梁2一般采用工钢设置,焊接时注意与主桁架1倾斜面接触的位置要加塞钢板或者型钢构成的连接钢板11,再进行焊接。电缆线4两端固定于焊接在行走轨道梁2上。行走轨道梁2应根据挂篮悬浇段的长度及宽度,合理设置布置的高度及位置,电动葫芦3通过其吊钩可以实现对材料、工具等的三维运输功能。
在第二种实施例中,如图2所示:如图1所示:主要由电动葫芦3,行走轨道梁2、固定端5、电缆线4组成。电动葫芦3系统固定在挂篮主桁架2上,牢固可靠。电动葫芦3通过自带的电动小车6与行走轨道梁2固定。行走轨道梁2与挂篮主桁架1通过焊接固定,焊缝要饱满可靠。行走轨道梁2一般采用工钢设置,焊接时注意与主桁架1倾斜面接触的位置要加塞钢板或者型钢构成的连接钢板11,再进行焊接。主桁架1之间采用斜拉杆8对行走轨道梁2与主桁架1之间的连接进行加固处理。电动葫芦3与平行于行走轨道梁2设置的电缆线4连接。电缆线4两端固定于焊接在行走轨道梁2上的固定端5上。行走轨道梁2应根据挂篮悬浇段的长度及宽度,合理设置布置的高度及位置,电动葫芦3通过其吊钩可以实现对材料、工具等的三维运输功能。
以上通过实施例对本发明进行了详细的说明,但是这些并非构成对本发明的限制。在不脱离本发明原理的情况下本领域的技术人员还可做出若干变形和改进,这些也应视为属于本发明的保护范围。
Claims (5)
1.一种利用电动葫芦辅助挂篮的施工装置,其特征在于:具有焊接在主桁架(1)上的行走轨道梁(2),在所述行走轨道梁(2)上可活动的连接有的电动葫芦(3),所述电动葫芦(3)上连接有电缆线(4),所述电缆线(4)上连接有用于固定电缆线(4)的固定端(5),所述电动葫芦(3)上方固定有连接在行走轨道梁(2)上的电动小车(6),在所述电动小车(6)的一侧连接有行走驱动电机(7)。
2.根据权利要求1所述的利用电动葫芦辅助挂篮的施工装置,其特征在于:所述行走轨道梁(2)倾斜焊接在主桁架(1)上 ,行走轨道梁(2)与主桁架的(1)夹角a为30°—60°。
3.根据权利要求2所述的利用电动葫芦辅助挂篮的施工装置,其特征在于:所述主桁架(1)上设有连接钢板(11),主桁架(11)和行走轨道梁(2)分别焊接在连接钢板(11)上,通过连接钢板(11)实现主桁架(1)和行走轨道梁(2)的连接。
4.根据权利要求1所述的利用电动葫芦辅助挂篮的施工装置,其特征在于:所述行走轨道梁(2)垂直焊接在主桁架(1)之间,行走轨道梁(2)与主桁架(1)垂直设置。
5.根据权利要求4所述的利用电动葫芦辅助挂篮的施工装置,其特征在于:所述主桁架(1)与行走轨道梁(2)之间设有用于加强结构强度的斜拉杆(8)。
根据权利要求1所述的利用电动葫芦辅助挂篮的施工装置,其特征在于:所述固定端(5)设置在行走轨道梁(2)的两侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710617925.4A CN107366234A (zh) | 2017-07-26 | 2017-07-26 | 一种利用电动葫芦辅助挂篮的施工装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710617925.4A CN107366234A (zh) | 2017-07-26 | 2017-07-26 | 一种利用电动葫芦辅助挂篮的施工装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107366234A true CN107366234A (zh) | 2017-11-21 |
Family
ID=60307088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710617925.4A Withdrawn CN107366234A (zh) | 2017-07-26 | 2017-07-26 | 一种利用电动葫芦辅助挂篮的施工装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107366234A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729360A (zh) * | 2018-08-08 | 2018-11-02 | 中铁十局集团第工程有限公司 | 一种悬灌梁挂篮张拉千斤顶移动装置 |
CN111778876A (zh) * | 2020-07-29 | 2020-10-16 | 中建七局交通建设有限公司 | 一种宽挂篮施工方法 |
WO2023193827A1 (en) * | 2022-03-30 | 2023-10-12 | Overseas Engineering Company Of China Railway No.5 Engineering Group Co., Ltd. | Intelligent control of electric hoist mobile hanging basket walking device and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10298931A (ja) * | 1997-04-28 | 1998-11-10 | P S Co Ltd | 張出架設作業装置 |
CN105421249A (zh) * | 2015-12-15 | 2016-03-23 | 中铁十四局集团第二工程有限公司 | 一种拖吊结合式新型挂篮结构及施工方法 |
CN205474871U (zh) * | 2016-01-22 | 2016-08-17 | 湖南中铁五新钢模有限责任公司 | 用于波形钢腹板连续梁施工挂篮的主桁系统 |
CN206319262U (zh) * | 2016-12-19 | 2017-07-11 | 中铁七局集团郑州工程有限公司 | 自带运输和吊装系统的菱形挂篮 |
CN206956568U (zh) * | 2017-07-26 | 2018-02-02 | 中交一公局第二工程有限公司 | 利用电动葫芦辅助挂篮的施工装置 |
-
2017
- 2017-07-26 CN CN201710617925.4A patent/CN107366234A/zh not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10298931A (ja) * | 1997-04-28 | 1998-11-10 | P S Co Ltd | 張出架設作業装置 |
CN105421249A (zh) * | 2015-12-15 | 2016-03-23 | 中铁十四局集团第二工程有限公司 | 一种拖吊结合式新型挂篮结构及施工方法 |
CN205474871U (zh) * | 2016-01-22 | 2016-08-17 | 湖南中铁五新钢模有限责任公司 | 用于波形钢腹板连续梁施工挂篮的主桁系统 |
CN206319262U (zh) * | 2016-12-19 | 2017-07-11 | 中铁七局集团郑州工程有限公司 | 自带运输和吊装系统的菱形挂篮 |
CN206956568U (zh) * | 2017-07-26 | 2018-02-02 | 中交一公局第二工程有限公司 | 利用电动葫芦辅助挂篮的施工装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729360A (zh) * | 2018-08-08 | 2018-11-02 | 中铁十局集团第工程有限公司 | 一种悬灌梁挂篮张拉千斤顶移动装置 |
CN111778876A (zh) * | 2020-07-29 | 2020-10-16 | 中建七局交通建设有限公司 | 一种宽挂篮施工方法 |
WO2023193827A1 (en) * | 2022-03-30 | 2023-10-12 | Overseas Engineering Company Of China Railway No.5 Engineering Group Co., Ltd. | Intelligent control of electric hoist mobile hanging basket walking device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102797226B (zh) | 60米钢箱梁整体架设施工方法 | |
CN107366234A (zh) | 一种利用电动葫芦辅助挂篮的施工装置 | |
CN103306205A (zh) | 一种预制t梁或箱梁纵向湿接缝模板施工方法 | |
CN107201719B (zh) | 高架桥防撞墙模板吊装转运机及防撞墙施工方法 | |
CN111533003A (zh) | 一种斜拉桥缆索安装提升装置 | |
CN201214597Y (zh) | 双梁双小车龙门吊 | |
CN206956568U (zh) | 利用电动葫芦辅助挂篮的施工装置 | |
JP5918056B2 (ja) | 橋梁架設方法 | |
CN212315371U (zh) | 一种斜拉桥缆索安装提升装置 | |
CN210884951U (zh) | 一种用于幕墙的双环轨吊装装置 | |
CN202913338U (zh) | 一种钢桁梁全焊桁片 | |
CN210061545U (zh) | 一种预制t梁混凝土浇筑台车 | |
CN204126297U (zh) | 一种钢桁架屋顶的临时支撑架 | |
CN207671531U (zh) | 一种砌块吊装笼 | |
CN105603882A (zh) | 一种接触网不停电连续梁中跨合拢施工方法及其结构 | |
CN203668857U (zh) | 用于ss级护栏模板连接、加固的可行走操作平台架 | |
CN203334186U (zh) | 一种用于斜拉索桥面压锚的轮式装置 | |
CN101664963B (zh) | 大体积预应力砼箱梁张拉多功能操作平台 | |
CN206057094U (zh) | 一种用于高空架设完成后梁板的静力试验加载系统 | |
CN205973582U (zh) | 电缆盖板简易起吊装置 | |
CN208701520U (zh) | 一种悬灌梁挂篮张拉千斤顶移动装置 | |
CN205348731U (zh) | 一种核心筒钢骨柱自提升式操作平台 | |
CN203782619U (zh) | 一种施工台车 | |
CN205474639U (zh) | 一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车 | |
CN108729360A (zh) | 一种悬灌梁挂篮张拉千斤顶移动装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171121 |