CN1073571A - Prevent the domatic construction method that is washed away - Google Patents

Prevent the domatic construction method that is washed away Download PDF

Info

Publication number
CN1073571A
CN1073571A CN 92113327 CN92113327A CN1073571A CN 1073571 A CN1073571 A CN 1073571A CN 92113327 CN92113327 CN 92113327 CN 92113327 A CN92113327 A CN 92113327A CN 1073571 A CN1073571 A CN 1073571A
Authority
CN
China
Prior art keywords
domatic
bundle
greenbelt
fast
fiber bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 92113327
Other languages
Chinese (zh)
Inventor
黄尊景
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92113327 priority Critical patent/CN1073571A/en
Publication of CN1073571A publication Critical patent/CN1073571A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

A kind ofly prevent the domatic construction method that is washed away, this method is earlier on domatic after smooth the reinforcement rope to be installed vertically, lay the bundle that dams along domatic contour again, this bundle that dams is made of the fast greenbelt that both sides accompany fiber bundle, fiber bundle is tied up by the fibrous materials such as straw that are mixed with controlled-release fertilizer and water-loss reducer and is formed, the speed greenbelt is one to contain the pocket of seed, fertilizer and water-loss reducer, and the bundle that dams fuses with the reinforcement rope, all lays the straw seats then on domatic.Utilization of the present invention is fixed on current-carrying bundle and the straw on domatic, and one side has relaxed slope wash, has held back nutrition and moisture simultaneously, helps germination and the growth of plant, protects domatic.

Description

Prevent the domatic construction method that is washed away
The present invention relates to prevent in the civil engineering the domatic construction method that is washed away.
The massif abrupt slope, geology is bad mostly, and laccolite is exposed, and plant is difficult to growth, for guaranteeing safety, reduce water and soil loss, the always employing beaten Chinese toon more on domatic, compile grid, muck haulage, methods such as fertilising are improved its plant growing condition, yet when on large tracts of land, adopting this method, course of work complexity not only, expend a large amount of manpower and materials, and after the construction, often because after beating Chinese toon volume grid, with former domatic formation height fall, surface water is flow through produce great impulsive force, elutriation is washed away domatic, and effect is unsatisfactory, haves much room for improvement and improves.
Purpose of the present invention is that a kind of improved domatic construction method that is washed away that prevents will be provided, and this method can be improved the domatic plant growing condition of going up, and reduces work hours significantly and cost, and the protection of construction back is domatic effective.
The object of the present invention is achieved like this: this method is carried out according to following operation.
1. smooth domatic 1, on domatic top or domatic intermediate step 11 places, with holdfast 12 along domatic vertical binding reinforcement rope 2;
2. lay the bundle that dams along domatic contour sequential lateral, this bundle that dams is formed by fast greenbelt 4 encirclings that both sides accompany erosion control fiber bundle 3, and top, fast greenbelt is the 1st erosion control fiber bundle 31, and below, fast greenbelt is the 2nd erosion control fiber bundle 32; This fiber bundle 3 is to be pricked or repeatedly pricked by fibrous materials such as straw, thin nylon volume to form, and its inner inclusion has the controlled-release fertilizer and the even water-loss reducer of spreading; Speed greenbelt 4 is in the bag of multi-void fiber braiding, is provided with seed and sprouts tooth district A, growth district B, reaches three zones of water conservation district C, separates with porous crack fabric each other, sprouts tooth district A at seed and contains peat soil, an amount of water-loss reducer, fertilizer and plant seed; Grow up and distinguish peat soil, controlled-release fertilizer and the water-loss reducer that includes high organic principle in the B; The water-loss reducer and the controlled-release fertilizer that include polyacrylic in the water conservation district C.
3. in the reinforcement rope 2 and the bundle intersection of damming, in the Shu Shangfang that dams, be provided with fixedly cingulum 6, the fastener 61 on this cingulum 6 is connected with fastener 21 on the reinforcement rope 2, and making dams restraints to fix and do not advise, and fuses with reinforcement rope 2.
4. between the bottom and the second erosion control fiber bundle 32 in fast greenbelt 4, can set up L shaped backer board 5, to improve fast greenbelt 4 opposing runoff intensitys, favourable plant growing.
5. on domatic, lay the straw seat comprehensively.
Construction method of the present invention has following advantage:
1. prevent that the slope wash performance is good: because of the bundle that dams that is fixed on the reinforcement rope can be laid traveling along domatic hypsography, the second erosion control fiber bundle can relax and reduce fast greenbelt and former domatic formed drop, especially be between bottom, fast greenbelt and the fast greenbelt and the second erosion control fiber bundle, when setting up L shaped backer board, more strengthened the function of its protection against erosion.
2. help plant growing; protect domatic: because of the first road erosion control fiber bundle can effectively be held back the soil that runoff is carried secretly; organic matter and moisture, and with the second erosion control fiber bundle together, itself with fertilizer; water-loss reducer can effectively promote plant growing; and all peat soil of greenbelt itself, water-loss reducer, fertilizer seed etc. can make the smooth germinating growth of seed, and be vast domatic topped by the straw seat; also can play and keep preferable ground temperature, water and soil is difficult for the effect of loss.
3. once shop nail can be finished the slope protection task, and technology is simple, and is easy to maintenance, labor and material saving, and lay good basis for natural plants from now on protects.
Specific embodiments of the invention are shown in following accompanying drawing:
Figure 1A~1D is the invention process programme diagram.
Fig. 2 is the present invention's speed greenbelt section internal zone dividing schematic diagram.
Fig. 3 is erosion control fiber bundle and mutual alignment, fast greenbelt schematic diagram.
Reinforcement rope 2 every 50cm are provided with one, and the interfascicular of damming distance is by 50~100 centimetres of layings.

Claims (4)

1, a kind ofly prevent the domatic construction method that is washed away, it is characterized in that carrying out according to following operation:
1) smooth domatic 1, on domatic top or domatic intermediate step 11 places, with holdfast 12 along domatic vertical binding reinforcement rope 2;
2) lay the bundle that dams along domatic contour sequential lateral, the fast greenbelt 4 that this bundle that dams accompanies erosion control fiber bundle 3 by both sides is tied up and is formed, and top, fast greenbelt is the first erosion control fiber bundle 31, is the second erosion control fiber bundle 32 below the fast greenbelt;
3) in the reinforcement rope 2 and the bundle intersection of damming, in the top of fast greenbelt 4, be provided with fixedly cingulum 6 with erosion control fiber bundle 3, the fastener 61 on this cingulum 6 links with the fastener 21 on the reinforcement rope 2 and connects, and the bundle that dams is maintained static, and fuse with reinforcement rope 2;
4) on domatic, lay the straw seat comprehensively.
2, according to claim 1ly prevent the domatic construction method that is washed away, it is characterized in that described erosion control fiber bundle 3 is to be pricked or repeatedly pricked by fibrous materials such as straw, thin nylon volume to form, its inner inclusion has the controlled-release fertilizer and the even water-loss reducer of spreading.
3, according to claim 1ly prevent the domatic construction method that is washed away, it is characterized in that described fast greenbelt 4 is in multi-void fiber braiding bag, be provided with seed germination district A, grow up and distinguish B and water conservation district C, three zones separate with porous crack fabric each other, wherein seed germination district A contains peat soil, an amount of water-loss reducer, fertilizer and plant seed; Grow up and distinguish peat soil, controlled-release fertilizer and the water-loss reducer that includes high organic principle in the B; The water-loss reducer and the controlled-release fertilizer that include polyacrylic in the water conservation district C.
4, according to claim 1ly prevent the domatic construction method that is washed away, it is characterized in that between the bottom in fast greenbelt 4 and itself and the second erosion control fiber bundle 32, can setting up L shaped backer board 5, to improve the intensity of fast greenbelt 4 opposing runoffs.
CN 92113327 1992-11-28 1992-11-28 Prevent the domatic construction method that is washed away Withdrawn CN1073571A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92113327 CN1073571A (en) 1992-11-28 1992-11-28 Prevent the domatic construction method that is washed away

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92113327 CN1073571A (en) 1992-11-28 1992-11-28 Prevent the domatic construction method that is washed away

Publications (1)

Publication Number Publication Date
CN1073571A true CN1073571A (en) 1993-06-30

Family

ID=4946362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92113327 Withdrawn CN1073571A (en) 1992-11-28 1992-11-28 Prevent the domatic construction method that is washed away

Country Status (1)

Country Link
CN (1) CN1073571A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104221702A (en) * 2014-10-21 2014-12-24 宏大国源(芜湖)资源环境治理有限公司 Spray-seeding moisturizing and topdressing device for slope greening
US9745253B2 (en) 2015-03-13 2017-08-29 Forma Therapeutics, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104221702A (en) * 2014-10-21 2014-12-24 宏大国源(芜湖)资源环境治理有限公司 Spray-seeding moisturizing and topdressing device for slope greening
CN104221702B (en) * 2014-10-21 2016-05-25 宏大国源(芜湖)资源环境治理有限公司 A kind of moisturizing of sowing grass seeds by duster for greening side slope device that topdresses
US9745253B2 (en) 2015-03-13 2017-08-29 Forma Therapeutics, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors
US10266487B2 (en) 2015-03-13 2019-04-23 Forma Therapeutics, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors
US10508077B2 (en) 2015-03-13 2019-12-17 Forma Therapeutics, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors
US10988441B2 (en) 2015-03-13 2021-04-27 Valo Early Discovery, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors
US11919839B2 (en) 2015-03-13 2024-03-05 Valo Health, Inc. Alpha-cinnamide compounds and compositions as HDAC8 inhibitors

Similar Documents

Publication Publication Date Title
JP3053071B2 (en) Natural ecological self-restoration type slope construction method and slope structure
CN103340114B (en) The multilayer vegetation bag that a kind of burlap is made
CN2919846Y (en) Slope greening vegetation mat
CN107964963B (en) Repair technology and construction method for high-steep slope wound surface fiber skeleton aggregate structure
CN107439335A (en) A kind of large-scale tree implantation method
CN204539762U (en) A kind of numb coconut palm geotechnical grid stereo plant carpet repaired for side slope
CN101518186A (en) Method of recovering and reconstructing vegetation of mining land
CN109371986A (en) A kind of ecological bank protecting method conducive to slope plant growth
CN207331716U (en) A kind of double nets plant raw rod ecological slope protection structure
CN206267161U (en) A kind of three-dimension vegetative net slope protection construction structure suitable for soil-slope
CN111576453A (en) Slope anchor hanging net and exposed rock mass ecological restoration method using same
US6012251A (en) Pourable vegetation soil substrate process for the production thereof and the use thereof
CN1097033A (en) Prevent the domatic construction method that is washed away
CN1073571A (en) Prevent the domatic construction method that is washed away
CN110485381A (en) Rock-fill dams downstream dam facing protective slope structure
CN212983901U (en) Rock surface of a wound ecological remediation plants living device
CN212896409U (en) Three-dimensional geotechnique's net pad grass planting slope protection structure
JPH10338934A (en) Method of greening construction of soilless slope face
CN217389571U (en) Three-dimensional vegetation net of side slope
JP2002363991A (en) Seeding and planting works for hard steep slope
JP2000120070A (en) Greening slope and greening mat
CN2177335Y (en) Honeycomb type frame for stabilizing and planting green trees, etc. of rock slope
CN219547826U (en) Ecological pad for slope vegetation recovery
CN217923648U (en) Ecological bank protection of hard rock high side slope
JP2717368B2 (en) Slope planting method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C03 Withdrawal of patent application (patent law 1993)
WW01 Invention patent application withdrawn after publication