CN107356167B CN201710848130.4A CN201710848130A CN107356167B CN 107356167 B CN107356167 B CN 107356167B CN 201710848130 A CN201710848130 A CN 201710848130A CN 107356167 B CN107356167 B CN 107356167B
Authority
CN
China
Prior art keywords
tunnel
hole
blasting
mapping
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710848130.4A
Other languages
Chinese (zh)
Other versions
CN107356167A (en
Inventor
程玉泉
王文德
谷世平
王铁法
牛海喜
叶派平
范代强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201710848130.4A priority Critical patent/CN107356167B/en
Publication of CN107356167A publication Critical patent/CN107356167A/en
Application granted granted Critical
Publication of CN107356167B publication Critical patent/CN107356167B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of equidistant fan transfer blasting construction methods in the area tunnel Tao Kuocao, including, step S1, designing and mapping: reasonable Arrangement blasthole is required according to tunnel lithology grade, tunnel blasting design, CAD software mapping is carried out using equidistant fan transfer method;Step S2, instrument sets up surveying and locating: using the mapping of step S1, a vertical line is vertically made on the contoured surface of blasthole joint position, and sets on vertical line and fixes a setting-out bar or ready-made anchor pole, hangs nylon rope as Loft Line of drilling;Step S3, it drills: using the mapping of step S1, using reference point construction method construction of drilling;Step S4, powder charge, blocking, blasting network connection, warning, detonation charge explosion: are carried out according to the segmentation of each hole charge of design, the specific requirement of charge constitution.Construction method of the invention is easy association, and simple to operation, the cloth hole setting-out of the area face Tao Kuocao is accurate.

Description

A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao
Technical field
The present invention relates to Tunnel Blasting technical field of construction, and in particular to a kind of equidistant fan transfer in the area tunnel Tao Kuocao is quick-fried Broken construction method.
Background technique
Tunnel and underground engineering have important role in the development of the national economy, with the rapid hair of nation-building cause Exhibition, Tunnel Engineering construction have increasing need for solving the problems, such as to get twice the result with half the effort.It is current and it is following in a short time, drilling and blasting method will be The main means of tunnel piercing, and whether the success of explosion depends on slotting and succeeds, the size of drilling depth depends on the depth of slotting, So the slotting technology of suitable wall rock condition should be studied, farthest improved under the premise of guaranteeing adjoining rock stability explosion into Ruler.Cut Blasting is related to blast action, Stress Field Distribution, catalase and throwing overall process, and blast action belongs to three-dimensional again and asks Topic, and Cut Blasting is Near Blasting problem, mechanical behavior of the blasting medium under Explosion Loading has nonlinear characteristic. So mathematical analysis, numerical simulation and physical analogy have larger difficulty in Cut Blasting mechanism study, go deep into system Research is few, and document common at present is mostly the summary of experience carried out according to site operation situation.The mechanism of straight hole slotting at present has Some preliminary theoretical researches, its essence is the column powder stick powder charges under Single free-face with certain arrangement regulation and firing order A population hole explosion, and straight hole Cut Blasting parameter can also pass through part of theory calculation formula calculate determine.V-cut Blast mechanism there is presently no the research achievement of relative maturity, slotting mechanism and blasting parameter research be still in summary of experience and Experimental stage.
As tunnel constantly tunnels, top mountain height locating for excavation face is continuously increased, and rock crustal stress increases, simultaneously The ductile strength of country rock is continuously increased, and rock integrity improves, and explosiveness reduces, and it is undesirable slotting effect often occur, equally Drilling depth, cyclic advance after explosion reduce, or even country rock clipping power occur excessive, Cut Blasting asphyxia by external pressure on the chest and abdomen and half of non-explosion Removing needs redrilling to mend big gun phenomenon.Therefore, in order to improve, Tunnel Blasting drilling depth is low, slot clipping asphyxia by external pressure on the chest and abdomen, the area Kuo Cao are expanded in slotting The situations such as rock bank is serious, face is uneven are stayed in explosion.Therefore, in conjunction with domestic project experience and all kinds of slotting technical research at Fruit optimizes tunnel Long span tunneling boring Cut Blasting construction, to how proper use of V-cut carries out Tunnel Blasting is studied, it appears very necessary.
Summary of the invention
In order to solve the above-mentioned technical problem, it is big to be primarily adapted for use in each tunnel cross-section to construction method of the invention, and span is big, vehicle The various complicated geological massif vcehicular tunnels such as road is more, country rock hardness is big, explosiveness is poor or railway, water power and underground space engineering are each Kind tunnel, cave depot strabismus wedge shot construction;It can be suitably used for the construction of the Cut Blasting of various bores;It is also applied for outdoor Cut Blasting construction;Construction method of the invention can be improved tunnel Cut Blasting effect, improve blast hole utilizing factor, increase explosion Cyclic advance reduces by every kilometer of Blasting Excavation number, reduces priming system usage amount, accelerate speed of application, improve work efficiency.
Technical scheme is as follows:
A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao, comprising the following steps:
Step S1, designing and mapping: Tunnel Blasting drilling includes periphery hole, cushion hole, via hole, cut spreader hole, keyhole, The blasting parameter for carrying out selecting various blastholes in construction according to the actual situation, is wanted according to tunnel lithology grade, tunnel blasting design Seek reasonable Arrangement blasthole;CAD software mapping is carried out using equidistant fan transfer method;
Step S2, instrument sets up surveying and locating: using the mapping of step S1, hanging down on the contoured surface of blasthole joint position A vertical line directly is made, and is set on vertical line and fixes a setting-out bar or ready-made anchor pole, hangs nylon rope as setting-out of drilling Line;
Step S3, it drills: using the mapping of step S1, using reference point construction method construction of drilling;
Step S4, it charge explosion: is filled according to the segmentation of each hole charge of design, the specific requirement of charge constitution Medicine, blocking, blasting network connection, warning, detonation.
Preferably, in step sl, the equidistant fan transfer method includes: according to design Hole pattern parameters and country rock feelings Condition, the aperture of the area face Tao Kuocao blasthole, bottom hole press equidistant placement, make the blasthole extended line joint of fan transfer, As accurate reference point of drilling.
Preferably, in step s3, the reference point construction method of drilling includes: using trolley length 6m outer edge in tunnel Road contoured surface corresponding position is drilled as level-one referring generally to point, preparatory aperture;Using each blasthole extended line joint as two Grade is drilled precision reference point, and laying-down nailing fixes hanging wire at joint, then horizontal tenses survey line check and correction bore angle essence Degree, appropriate adjustment blowing angle and direction, it is ensured that hole bottom distance is of substantially equal, in the horizontal plane equidistant fan-shaped setting-out, according to Buddhist nun The angle and direction of dragon rope is drilled to design hole depth.
A kind of technical effect of the equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao of the invention are as follows:
1) construction method is easy association, simple to operation, does not need too accurate surveying and locating instrument and equipment, face The cloth hole setting-out of the area Tao Kuocao can be relatively accurate.
2) notable feature of equidistant fan transfer method are as follows: graphing method is used, face aperture, bottom hole distinguish equidistant cloth hole, The blasthole extended line joint for making fan transfer, as accurate reference point of drilling.Using mapping achievement, in joint position A vertical line is vertically made on contoured surface, and sets on vertical line and fixes a setting-out bar or ready-made anchor pole, is hung nylon rope and is made For Loft Line of drilling, fan-shaped setting-out is used in the horizontal plane, using fan-shaped characteristic, so that the hole between keyhole, cut spreader hole Bottom burden is also uniformly equidistant, and drill direction, angle, depth, position of every artillery salvo hole has something to base on, theoretical method and practice It can corroborate each other and examine.
3) equidistant fan transfer method is eliminated inclined hole V-cut area and is expanded between three-dimensional " blind area " hole in slot section blasthole bottom Cloth hole non-uniform phenomenon.So that inclined hole V-cut expands explosive energy in slot region apertures and is evenly distributed rationally, between Kong Yukong Synergy effect further enhances.Can ensure that and parent rock is sufficiently disengaged from each hole bottom by quick-fried country rock, by explosion rock crushing without Bulk is slagged tap convenient for mechanization.
4) because being practiced using theoretical diagraphy guiding construction, elimination Tunnel Blasting drilling setting-out blindness is random, not only Steel for shot is uniform, can also promote blasthole bottom that can fall substantially in one plane, and face is more smooth after explosion, can mention High single blasting hole utilization rate increases the explosion cyclic advance of same drilling depth, improves work efficiency.
This method construction effect is high, safe and reliable, the construction period is short, construction investment economical rationality.
The present invention compares conventional tunnel Cut Blasting method, also has the advantage that
1) innovative " equidistant fan transfer method " is used in engineering practice, the mapping guiding construction practice of CAD theory, simply Understandable setting out method of drilling greatly improves the area Tao Kuocao in three-dimensional space blasthole direction, angle, deep-controlled accurate Property and operability;The aperture bottom hole equidistant placement of fining, explosive energy are more equal in Upon Blasting for Tunnel Driving three-dimensional spatial distribution It is even reasonable, improve explosive energy utilization rate.
2) upgrading synergy is innovated: because promoting explosive energy in tunnel piercing three using the Cut Blasting technology after optimization Dimension space rationally utilizes, and relative to " indigenous method " for not adding scientific guidance, face is more smooth after explosion, follows in design driving On ring drilling depth, the cyclic advance actually obtained is not only bigger and more guaranteed, to reduce the tunnel boring of unit milimeter number, dress Medicine, the times such as warning, divulge information, slag tap, getting rid of the danger, reduce the waste of priming system, while reducing hard rock clipping asphyxia by external pressure on the chest and abdomen and mending big gun number, drop This synergy is obvious, moves upgrading synergy with innovation.
Detailed description of the invention
Fig. 1 is that each blasthole of preferred embodiments of the present invention is drilled state modulator schematic diagram;
Fig. 2 is the wedge shot blasthole floor plan of preferred embodiments of the present invention;
Fig. 3 is the wedge shot blasthole facade layout drawing of preferred embodiments of the present invention.
Specific embodiment
Referring to Fig. 1-3, a kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao, comprising the following steps:
Step S1, designing and mapping: Tunnel Blasting drilling form be generally divided into periphery hole, cushion hole (two circle eye), via hole, Cut spreader hole, keyhole etc. should carry out selecting according to the actual situation the blasting parameter of various blastholes, according to tunnel lithology in construction The reasonable Arrangements blastholes such as grade, tunnel blasting design requirement.To meet boring direction and Hole pattern parameters required precision, using " etc. Away from fan transfer method " carry out CAD software mapping, it may be assumed that according to design Hole pattern parameters and country rock situation, the area face Tao Kuocao By equidistant placement, the blasthole for making fan transfer is prolonged for the aperture of (other region steel for shot are not described here in detail) blasthole, bottom hole Long line joint, as accurate reference point of drilling.
Step S2, instrument sets up surveying and locating: using mapping achievement, vertically doing on the contoured surface of blasthole joint position A vertical line out, and set on vertical line and fix a setting-out bar or ready-made anchor pole, nylon rope is hung as Loft Line of drilling.
Step S3, it drills: using mapping achievement, using reference point construction method of drilling: " level-one reference point of drilling spuds in, Second level drill reference point adjustment " construction method.That is: reinforce field management, using trolley length 6m outer edge in tunnel contour face Corresponding position is drilled as level-one referring generally to point, preparatory aperture;It drills essence using each blasthole extended line joint as second level Reference point is spent, laying-down nailing fixes hanging wire at joint, then the horizontal survey line that tenses proofreads bore angle precision, appropriate to adjust Whole blowing angle and direction can ensure that hole bottom distance is of substantially equal, in the horizontal plane equidistant fan-shaped setting-out, and drilling machine hand is according to Buddhist nun The angle and direction of dragon rope is drilled to design hole depth;Scene can be solved very well causes blowing angle, side without high-precision measuring tool To that can not position and precision problem, each equal equidistant placement of round, voluntarily cloth hole setting-out is simple and convenient by drilling personnel, also solve because Cloth hole is unreasonable to cause the area Tunnel Blasting Zhu Bao explosive energy irrational distribution, self folder of slot blast hole bottom hard surrounding rock is expanded in slotting Asphyxia by external pressure on the chest and abdomen phenomenon processed, can effectively improve cyclic advance.
Step S4, it charge explosion: is filled according to specific requirements such as each hole charge segmentation of design, charge constitutions Medicine, blocking, blasting network connection, warning, detonation.
It above are only a specific embodiment of the invention, but the design concept of the present invention is not limited to this, all utilizations This design makes a non-material change to the present invention, and should all belong to behavior that violates the scope of protection of the present invention.

Claims (2)

1. a kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao, it is characterised in that: the following steps are included:
Step S1, designing and mapping: Tunnel Blasting drilling includes periphery hole, cushion hole, via hole, cut spreader hole, keyhole, is being constructed In carry out selecting the blasting parameters of various blastholes according to the actual situation, require to close according to tunnel lithology grade, tunnel blasting design Removing the work sets blasthole;CAD software mapping is carried out using equidistant fan transfer method, the equidistant fan transfer method includes: basis Design Hole pattern parameters and country rock situation, the aperture of the area face Tao Kuocao blasthole, bottom hole press equidistant placement, make fan transfer Blasthole extended line joint, as accurate reference point of drilling;
Step S2, instrument sets up surveying and locating: using the mapping of step S1, vertically doing on the contoured surface of blasthole joint position A vertical line out, and set on vertical line and fix a setting-out bar or ready-made anchor pole, nylon rope is hung as Loft Line of drilling;
Step S3, it drills: using the mapping of step S1, using reference point construction method construction of drilling;
Step S4, charge explosion: powder charge is carried out according to the segmentation of each hole charge of design, the specific requirement of charge constitution, is blocked up Plug, blasting network connection, warning, detonation.
2. the equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao according to claim 1, it is characterised in that: in step In rapid S3, the reference point construction method of drilling includes:
It is drilled as level-one referring generally to point, preparatory aperture using trolley length 6m outer edge in tunnel contour face corresponding position; It drills precision reference point using each blasthole extended line joint as second level, laying-down nailing fixes hanging wire at joint, The horizontal survey line that tenses proofreads bore angle precision, appropriate adjustment blowing angle and direction again, it is ensured that hole bottom distance is equal, in level Equidistant sector setting-out on face, drills according to the angle and direction of nylon rope to design hole depth.
CN201710848130.4A 2017-09-19 2017-09-19 A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao Active CN107356167B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710848130.4A CN107356167B (en) 2017-09-19 2017-09-19 A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710848130.4A CN107356167B (en) 2017-09-19 2017-09-19 A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao

Publications (2)

Publication Number Publication Date
CN107356167A CN107356167A (en) 2017-11-17
CN107356167B true CN107356167B (en) 2019-01-15

Family

ID=60290310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710848130.4A Active CN107356167B (en) 2017-09-19 2017-09-19 A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao

Country Status (1)

Country Link
CN (1) CN107356167B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108398064A (en) * 2018-03-21 2018-08-14 福建海峡科化富兴建设工程有限公司 A kind of room-and-pillar method goaf partition board construction of explosion setting out method
CN109682270A (en) * 2019-01-18 2019-04-26 湖北宜化江家墩矿业有限公司 A kind of construction technology for tunneling keyhole
CN111623677B (en) * 2020-05-27 2022-04-12 山东省淮海工程建设监理有限公司 Pilot hole smooth blasting construction method and blast hole positioning device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102506622A (en) * 2011-11-02 2012-06-20 中铁隧道集团有限公司 Full-face blasting vibration control construction method for tunnel electronic millisecond electric detonator
CN102914226A (en) * 2012-11-08 2013-02-06 中国矿业大学(北京) Hollow-hole rhombic parallel cut blasting damping method
CN102927867A (en) * 2012-11-16 2013-02-13 中国矿业大学(北京) Vibration absorbing method for cut presplitting blasting
CN103344154A (en) * 2013-07-05 2013-10-09 武汉科技大学 Carbonaceous schist tunnel blasting method and construction method
CN105606000A (en) * 2016-01-11 2016-05-25 德阳坚兵工程技术有限公司 Partition control blasting method for tunnel rock drilling project
CN105888624A (en) * 2016-04-26 2016-08-24 煤科集团沈阳研究院有限公司 Carbon dioxide phase-change coal seam cracking guiding perforating device and outburst-preventing and scour-preventing method
CN205537372U (en) * 2016-01-11 2016-08-31 德阳坚兵工程技术有限公司 Tunnel rock drilling engineering big gun hole subregion arrangement structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102506622A (en) * 2011-11-02 2012-06-20 中铁隧道集团有限公司 Full-face blasting vibration control construction method for tunnel electronic millisecond electric detonator
CN102914226A (en) * 2012-11-08 2013-02-06 中国矿业大学(北京) Hollow-hole rhombic parallel cut blasting damping method
CN102927867A (en) * 2012-11-16 2013-02-13 中国矿业大学(北京) Vibration absorbing method for cut presplitting blasting
CN103344154A (en) * 2013-07-05 2013-10-09 武汉科技大学 Carbonaceous schist tunnel blasting method and construction method
CN105606000A (en) * 2016-01-11 2016-05-25 德阳坚兵工程技术有限公司 Partition control blasting method for tunnel rock drilling project
CN205537372U (en) * 2016-01-11 2016-08-31 德阳坚兵工程技术有限公司 Tunnel rock drilling engineering big gun hole subregion arrangement structure
CN105888624A (en) * 2016-04-26 2016-08-24 煤科集团沈阳研究院有限公司 Carbon dioxide phase-change coal seam cracking guiding perforating device and outburst-preventing and scour-preventing method

Also Published As

Publication number Publication date
CN107356167A (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN107356167B (en) A kind of equidistant fan transfer blasting construction method in the area tunnel Tao Kuocao
CN108458634A (en) A kind of equidistant fan transfer blasting construction method in the areas tunnel Tao Kuocao
CN111043926B (en) 400m is realized based on electron detonator2Blasting excavation method for tunnel with large cross section
CN105781560B (en) A kind of construction method of the remote base tunnel look-ahead explosion in super low coverage superimposing thread tunnel
CN103528444B (en) A kind of stope rockburst pressure relief prevention method
CN104074543A (en) Method for processing large-scale underground goaf
CN106247877A (en) A kind of hypervelocity forces kerve method without cutting hole deviation line symmetry
CN113720226A (en) Small-section upward blind raise one-shot blasting well-forming blast hole arrangement structure and method
KR101000570B1 (en) Tunnel high speed excavating method using center-cut hole double charge and dispersing charge
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN110260735A (en) A kind of diamond shape major diameter emptying aperture burn cut structure and lane construction technique
CN107227976B (en) A kind of underground pressure management method suitable for underground mine deep mining
CN104807381B (en) Method for forming cutting surface in deep hole blasting
CN209230424U (en) A kind of compound burn cut
CN102435114A (en) Explosion vibration control construction method of advance and following expanding excavation method of lower large heading of tunnel
CN109539915B (en) Cutting raise blasting construction method
CN102777179B (en) Method for controlling mine power capacity source by using region power planning
CN106908047A (en) To the accurate laying out apparatus of fan shape cloth hole and its application method in one kind
CN104930937B (en) Circular divided blasting tunnel construction method capable of effectively controlling blasting vibration velocity
CN103410513B (en) Uneasily mining orebody mechanization process for stoping
CN103791789B (en) Blasting construction method based on certain angle formed between boreholes and joints
CN108709467A (en) It is lower that the method that vertical long hole refines explosion is replaced to fan-shaped deep hole
CN105823388A (en) Blasting network structure used for slight dynamite
CN108592716A (en) A kind of method of underground stope fining blasting excavation
CN107462118A (en) Large cross-section tunnel circulates development blasting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 361021 Yinjiang Road 139, Jimei District, Xiamen City, Fujian Province

Co-patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.

Patentee after: CCCC FIRST HIGHWAY XIAMEN ENGINEERING Co.,Ltd.

Address before: 361021 Yinjiang Road 139, Jimei District, Xiamen City, Fujian Province

Co-patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee before: CCCC FIRST HIGHWAY XIAMEN ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder