CN107341623A - 一种计及网络重构的有源配电网源储荷孤岛运行方法 - Google Patents
一种计及网络重构的有源配电网源储荷孤岛运行方法 Download PDFInfo
- Publication number
- CN107341623A CN107341623A CN201710771782.2A CN201710771782A CN107341623A CN 107341623 A CN107341623 A CN 107341623A CN 201710771782 A CN201710771782 A CN 201710771782A CN 107341623 A CN107341623 A CN 107341623A
- Authority
- CN
- China
- Prior art keywords
- mrow
- msubsup
- msub
- node
- msup
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 240000002853 Nelumbo nucifera Species 0.000 title claims abstract description 32
- 235000006508 Nelumbo nucifera Nutrition 0.000 title claims abstract description 32
- 235000006510 Nelumbo pentapetala Nutrition 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000004146 energy storage Methods 0.000 claims abstract description 57
- 238000000638 solvent extraction Methods 0.000 claims abstract description 13
- 230000009977 dual effect Effects 0.000 claims abstract description 5
- 238000002347 injection Methods 0.000 claims description 8
- 239000007924 injection Substances 0.000 claims description 8
- 230000014509 gene expression Effects 0.000 claims description 7
- 238000011084 recovery Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 4
- 238000004088 simulation Methods 0.000 claims description 3
- 238000005192 partition Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 5
- 230000005611 electricity Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
Abstract
本发明涉及一种计及网络重构的有源配电网源储荷孤岛运行方法,其步骤:根据选定的配电系统,输入配电系统结构及参数初始值;依据配电系统结构及参数初始值,建立计及网络重构的有源配电网源储荷孤岛划分模型;采用原对偶内点法对有源配电网源储荷孤岛划分模型进行求解;输出求解结果,包括目标函数值、各节点电压幅值、各节点恢复负荷系数、分布式电源的运行策略、储能系统的充放电功率值、储能系统的荷电状态、分段开关及联络开关开断状态。本发明能有效解决有源配电网孤岛划分问题,全面提高配电系统供电可靠性。
Description
技术领域
本发明涉及一种有源配电网源储荷孤岛运行方法,特别是涉及一种计及网络重构的有源配电网源储荷孤岛运行方法。
背景技术
智能配电系统自愈控制是智能电网体系的关键环节。其中,采用分布式电源(distributed generator,DG)实现配电系统孤岛运行是自愈控制的核心技术。随着配电系统中分布式电源的渗透率越来越高,在配电系统故障情况下,可以形成以可控分布式电源为主电源的电力孤岛,从而恢复部分重要负荷,将极大地提高配电系统的供电可靠性。同时,储能系统(energy storage system,ESS)通过其在时间上对能量的转移,可以有效地降低由于分布式电源出力间歇性和随机性所带来的影响,并参与配电系统潮流调节和优化,提高配电系统运行的经济性和可靠性。在配电系统故障情况下,通过与分布式电源的协调配合,将全面改善配电系统负荷恢复水平。故障发生后,受限于分布式电源、储能系统的容量,系统中的失电负荷往往不能全部恢复,通过网络重构改变网络结构,调整配电系统运行方式,优化电源与负荷的配合方案,提高分布式电源利用率,进一步提高配电系统负荷恢复水平。
发明内容
针对上述有源配电网孤岛划分问题,本发明的目的是提供一种计及网络重构的有源配电网源储荷孤岛运行方法,该方法能有效解决有源配电网孤岛划分问题,全面提高配电系统供电可靠性。
为实现上述目的,本发明采取以下技术方案:一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于包括以下步骤:1)根据选定的配电系统,输入配电系统结构及参数初始值;2)依据步骤1)提供的配电系统结构及参数初始值,建立计及网络重构的有源配电网源储荷孤岛划分模型;3)采用原对偶内点法对有源配电网源储荷孤岛划分模型进行求解;4)输出求解结果,包括目标函数值、各节点电压幅值、各节点恢复负荷系数、分布式电源的运行策略、储能系统的充放电功率值、储能系统的荷电状态、分段开关及联络开关开断状态。
进一步,所述步骤2)中,所述有源配电网源储荷孤岛划分模型建立过程包括设定配电系统恢复有功负荷最大为目标函数,分别考虑系统辐射状约束、系统潮流约束、运行电压约束、支路电流约束、不可控/可控分布式电源运行约束和储能系统运行约束。
进一步,所述配电系统恢复有功负荷量最大为目标函数为:
式中,NT为配电系统孤岛运行的时间;tF为配电系统发生故障的时刻;NN为示配电系统中的节点集合;为t时刻节点i上的有功负荷;λi为节点i上负荷的恢复系数。
进一步,所述系统辐射状约束为:
αij=βij+βji,ij∈ΩB
αij∈{0,1}
0≤βij≤1,0≤βji≤1
式中,ΩB表示所有接有分段开关或联络开关的支路集合;NS表示系统的源节点;αij表示支路ij上开关的开断状态;βij表示节点i和节点j的关系。
进一步,所述潮流约束为:
-Mαij≤Pt,ij≤Mαij
-Mαij≤Qt,ij≤Mαij
式中,Iij,t为t时段节点i流向节点j的电流幅值;Ui,t为t时段节点i的电压幅值;rij为支路ij的电阻,xij为支路ij的电抗;Pt,ij为t时段支路ij上流过的有功功率、Qt,ij为t时段支路ij上流过的无功功率;Pt,i为t时段节点i上注入的有功功率之和、Qt,i为t时段节点i上注入的无功功率之和,k∈j;为t时段节点i上负荷的有功功率、为t时段节点i上负荷的无功功率;为t时段节点i上可控分布式电源注入的有功功率、为t时段节点i上可控分布式电源注入的无功功率、为t时段节点i上不可控分布式电源注入的有功功率、为t时段节点i上不可控分布式电源注入的无功功率;参数M表示一个极大的常量;Ut,i表示t时刻节点i的电压幅值;为t时段接在节点i接入储能系统的充放电功率;为t时段接在节点i上储能系统的无功功率。
进一步,所述运行电压约束为:
式中,和分别为节点i的电压上下限。
进一步,所述支路电流约束为:式中,为支路ij的电流上限。
进一步,所述不可控分布式电源运行约束为:
式中,为t时段节点i所接不可控分布式电源的有功出力的上限;表示节点i所接不可控分布式电源的容量;为节点i上分布式电源的运行的最大功率因数角。
进一步,所述可控分布式电源运行约束为:
式中,表示节点i所接可控分布式电源的容量。
进一步,所述储能系统运行约束为:
式中,为t时段接在节点i接入储能系统的充放电功率;为t时段接在节点i上储能系统的无功功率;为节点i上储能系统的容量;为节点i上储能系统的无功功率上限;为t时段初始时刻节点i上储能系统的荷电状态;Δt为仿真步长;为t时段节点i上储能系统的损耗;为节点i上储能系统的损耗系数;为节点i上储能系统荷电状态的上限、为节点i上储能系统荷电状态的下限。
本发明由于采取以上技术方案,其具有以下优点:本发明针对不同的故障发生时刻和故障持续时间,充分考虑分布式电源、储能系统和负荷的时序运行特性,以及配电网络结构变化带来的影响,建立一种计及网络重构的有源配电网源储荷孤岛划分模型,其数学本质是非线性规划模型,采用原对偶内点法进行求解,得到有源配电网孤岛划分方法。
附图说明
图1是本发明的整体流程示意图;
图2是改进的IEEE 33节点算例结构图;
图3是系统8时发生故障,故障持续时间为4小时方案1的孤岛划分方法的示意图;
图4是系统8时发生故障,故障持续时间为4小时方案2的孤岛划分方法的示意图;
图5是负荷一天24小时运行特性曲线;
图6是光伏发电系统一天24小时出力曲线;
图7是方案1储能系统荷电状态时序图(8时-12时);
图8是方案2储能系统荷电状态时序图(8时-12时)。
具体实施方式
下面结合附图和实施例对本发明进行详细的描述。
如图1所示,本发明提供一种计及网络重构的有源配电网源储荷孤岛运行方法,其包括以下步骤:
1)根据选定的配电系统,输入配电系统结构及参数初始值;
其中,初始值包括线路参数、负荷水平、网络拓扑连接关系,系统运行电压水平和支路电流限制,可控和不可控分布式电源接入位置、容量和最大功率因数角,储能系统接入位置、容量及损耗系数,负荷和不可控分布式电源运行曲线,系统故障时刻和持续时间,基准电压和基准功率初值。
2)依据步骤1)提供的配电系统结构及参数初始值,建立计及网络重构的有源配电网源储荷孤岛划分模型;
该有源配电网源储荷孤岛划分模型建立过程包括:设定配电系统恢复有功负荷最大为目标函数,分别考虑系统辐射状约束、系统潮流约束、运行电压约束、支路电流约束、不可控/可控分布式电源运行约束和储能系统运行约束。
有源配电网源储荷孤岛划分模型建立过程具体如下:
2.1)配电系统恢复有功负荷量最大为目标函数为:
式中,NT为配电系统孤岛运行的时间;tF为配电系统发生故障的时刻;NN为示配电系统中的节点集合;为t时刻节点i上的有功负荷;λi为节点i上负荷的恢复系数,λi∈{0,1}为0-1变量,λi=1表示节点i上负荷恢复,λi=0表示节点i上负荷未恢复。
2.2)系统辐射状约束为:
αij=βij+βji,ij∈ΩB (2)
αij∈{0,1} (5)
0≤βij≤1,0≤βji≤1 (6)
式中,ΩB表示所有接有分段开关或联络开关的支路集合;NS表示系统的源节点;αij表示支路ij上开关的开断状态,αij=1表示开关闭合,αij=0表示开关断开;βij表示节点i和节点j的关系,βij=1表示节点j是节点i的父节点,βij=0表示节点j不是节点i的父节点。通过系统辐射状约束不仅可以对系统进行网络重构,还可以对可控分布式电源的运行策略进行选择,当节点i上的可控分布式电源满足式时,该分布式电源选取PQ控制方式;当节点i上的可控分布式电源满足式时,该分布式电源选取V/f控制方式。
2.3)潮流约束为:
-Mαij≤Pt,ij≤Mαij (14)
-Mαij≤Qt,ij≤Mαij (15)
式中,Iij,t为t时段节点i流向节点j的电流幅值;Ui,t为t时段节点i的电压幅值;rij为支路ij的电阻,xij为支路ij的电抗;Pt,ij为t时段支路ij上流过的有功功率、Qt,ij为t时段支路ij上流过的无功功率;Pt,i为t时段节点i上注入的有功功率之和、Qt,i为t时段节点i上注入的无功功率之和,k∈j;为t时段节点i上负荷的有功功率、为t时段节点i上负荷的无功功率;为t时段节点i上可控分布式电源注入的有功功率、为t时段节点i上可控分布式电源注入的无功功率、为t时段节点i上不可控分布式电源注入的有功功率、为t时段节点i上不可控分布式电源注入的无功功率;参数M表示一个极大的常量,通常取9999;Ut,i表示t时刻节点i的电压幅值;为t时段接在节点i接入储能系统的充放电功率,其中放电功率为正,充电功率为负;为t时段接在节点i上储能系统的无功功率。
2.4)运行电压约束为:
式中,和分别为节点i的电压上下限。
2.5)支路电流约束为:
式中,为支路ij的电流上限。
2.6)不可控分布式电源运行约束为:
式中,为t时段节点i所接不可控分布式电源的有功出力的上限;表示节点i所接不可控分布式电源的容量;为节点i上分布式电源的运行的最大功率因数角。
2.7)可控分布式电源运行约束为:
式中,表示节点i所接可控分布式电源的容量。
2.8)储能系统运行约束为:
式中,为t时段接在节点i接入储能系统的充放电功率,其中放电功率为正,充电功率为负;为t时段接在节点i上储能系统的无功功率;为节点i上储能系统的容量;为节点i上储能系统的无功功率上限;为t时段初始时刻节点i上储能系统的荷电状态;Δt为仿真步长;为t时段节点i上储能系统的损耗;为节点i上储能系统的损耗系数;为节点i上储能系统荷电状态的上限、为节点i上储能系统荷电状态的下限。
3)将步骤2)得到的有源配电网源储荷孤岛划分模型采用原对偶内点法进行求解;
4)输出步骤3)的求解结果,包括目标函数值、各节点电压幅值、各节点恢复负荷系数、可控/不可控分布式电源的运行策略、储能系统的充放电功率、储能系统的荷电状态、分段/联络开关开断状态。
实施例:在本实施例中,首先输入IEEE 33节点系统中线路阻抗值,负荷有功/无功功率,分布式电源参数,储能系统参数,负荷及分布式电源运行曲线,网络拓扑连接关系,算例结构如图2所示,详细参数见表1-4、图5-6所示。
表1 IEEE33节点算例负荷接入位置及功率
表2 IEEE33节点算例线路参数
表3分布式电源配置情况
表4储能系统配置情况
设置支路1-2于8时发生永久性三相故障,故障时间持续4小时;设定系统的基准电压为12.66kV、基准功率为1MVA。
为充分验证本发明的先进性,采取如下两种方案进行对比分析:
方案1:不考虑网络重构,进行孤岛划分;
方案2:考虑网络重构,进行孤岛划分,即本发明方法。
执行优化计算的计算机硬件环境为Intel(R)Core(TM)i5-3470CPU,主频为3.20GHz,内存为4GB;软件环境为Windows 7操作系统。
方案1孤岛划分结果如图3所示、方案2孤岛划分结果如图4所示,其中实心节点表示该节点负荷恢复,空心节点表示该节点负荷未恢复;负荷恢复情况和可控分布式电源运行策略如表5-6所示。
表5负荷恢复情况
表6可控分布式电源的运行策略
节点 | 13 | 20 | 23 | 30 |
方案1 | PQ控制 | V/f控制 | V/f控制 | PQ控制 |
方案2 | V/f控制 | PQ控制 | PQ控制 | PQ控制 |
方案1和方案2储能系统的荷电状态分别如图7和图8所示。采用网络重构后,配电系统负荷恢复比例提高了3.2%,改善了系统负荷恢复水平。通过采用网络重构改变配电网络结构,调整配电系统运行方式,优化分布式电源、储能系统与负荷的配合方案,将有助于提高配电系统供电恢复能力,从而提高供电可靠性。
上述各实施例仅用于说明本发明,各个步骤都是可以有所变化的,在本发明技术方案的基础上,凡根据本发明原理对个别步骤进行的改进和等同变换,均不应排除在本发明的保护范围之外。
Claims (10)
1.一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于包括以下步骤:
1)根据选定的配电系统,输入配电系统结构及参数初始值;
2)依据步骤1)提供的配电系统结构及参数初始值,建立计及网络重构的有源配电网源储荷孤岛划分模型;
3)采用原对偶内点法对有源配电网源储荷孤岛划分模型进行求解;
4)输出求解结果,包括目标函数值、各节点电压幅值、各节点恢复负荷系数、分布式电源的运行策略、储能系统的充放电功率值、储能系统的荷电状态、分段开关及联络开关开断状态。
2.如权利要求1所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述步骤2)中,所述有源配电网源储荷孤岛划分模型建立过程包括设定配电系统恢复有功负荷最大为目标函数,分别考虑系统辐射状约束、系统潮流约束、运行电压约束、支路电流约束、不可控/可控分布式电源运行约束和储能系统运行约束。
3.如权利要求2所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述配电系统恢复有功负荷量最大为目标函数为:
<mrow>
<mi>f</mi>
<mo>=</mo>
<msubsup>
<mi>max&Sigma;</mi>
<mrow>
<mi>t</mi>
<mo>=</mo>
<msup>
<mi>t</mi>
<mi>F</mi>
</msup>
</mrow>
<msub>
<mi>N</mi>
<mi>T</mi>
</msub>
</msubsup>
<msubsup>
<mi>&Sigma;</mi>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mi>N</mi>
</msub>
</msubsup>
<msub>
<mi>&lambda;</mi>
<mi>i</mi>
</msub>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>L</mi>
<mi>O</mi>
<mi>A</mi>
<mi>D</mi>
</mrow>
</msubsup>
</mrow>
式中,NT为配电系统孤岛运行的时间;tF为配电系统发生故障的时刻;NN为示配电系统中的节点集合;为t时刻节点i上的有功负荷;λi为节点i上负荷的恢复系数。
4.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述系统辐射状约束为:
αij=βij+βji,ij∈ΩB
<mrow>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<msub>
<mi>&beta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mn>1</mn>
<mo>,</mo>
<mo>&ForAll;</mo>
<mi>i</mi>
<mo>&Element;</mo>
<msub>
<mi>N</mi>
<mi>N</mi>
</msub>
<mo>\</mo>
<msub>
<mi>N</mi>
<mi>S</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<msub>
<mi>&beta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mn>0</mn>
<mo>,</mo>
<mo>&ForAll;</mo>
<mi>i</mi>
<mo>&Element;</mo>
<msub>
<mi>N</mi>
<mi>S</mi>
</msub>
</mrow>
αij∈{0,1}
0≤βij≤1,0≤βji≤1
式中,ΩB表示所有接有分段开关或联络开关的支路集合;NS表示系统的源节点;αij表示支路ij上开关的开断状态;βij表示节点i和节点j的关系。
5.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述潮流约束为:
<mrow>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>i</mi>
<mi>k</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>k</mi>
</mrow>
</msub>
<mo>=</mo>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>j</mi>
<mi>i</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>r</mi>
<mrow>
<mi>j</mi>
<mi>i</mi>
</mrow>
</msub>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
<mi>i</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>i</mi>
<mi>k</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>k</mi>
</mrow>
</msub>
<mo>=</mo>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>j</mi>
<mi>i</mi>
<mo>&Element;</mo>
<msub>
<mi>&Omega;</mi>
<mi>B</mi>
</msub>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>x</mi>
<mrow>
<mi>j</mi>
<mi>i</mi>
</mrow>
</msub>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
<mi>i</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
</mrow>
<mrow>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>-</mo>
<msub>
<mi>&lambda;</mi>
<mi>i</mi>
</msub>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>L</mi>
<mi>O</mi>
<mi>A</mi>
<mi>D</mi>
</mrow>
</msubsup>
</mrow>
<mrow>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>-</mo>
<msub>
<mi>&lambda;</mi>
<mi>i</mi>
</msub>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>L</mi>
<mi>O</mi>
<mi>A</mi>
<mi>D</mi>
</mrow>
</msubsup>
</mrow>
<mrow>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>=</mo>
<mfrac>
<mrow>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
</mrow>
<msubsup>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mn>2</mn>
</msubsup>
</mfrac>
</mrow>
<mrow>
<msubsup>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<msubsup>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<mn>2</mn>
<mrow>
<mo>(</mo>
<msub>
<mi>r</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>x</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msubsup>
<mi>r</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>x</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<mi>M</mi>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&alpha;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>&GreaterEqual;</mo>
<mn>0</mn>
</mrow>
1
<mrow>
<msubsup>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<msubsup>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<mn>2</mn>
<mrow>
<mo>(</mo>
<msub>
<mi>r</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>x</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msubsup>
<mi>r</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>x</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<mi>M</mi>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&alpha;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>&le;</mo>
<mn>0</mn>
</mrow>
-Mαij≤Pt,ij≤Mαij
-Mαij≤Qt,ij≤Mαij
<mrow>
<mn>0</mn>
<mo>&le;</mo>
<msubsup>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>&le;</mo>
<msub>
<mi>M&alpha;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
</mrow>
式中,Iij,t为t时段节点i流向节点j的电流幅值;Ui,t为t时段节点i的电压幅值;rij为支路ij的电阻,xij为支路ij的电抗;Pt,ij为t时段支路ij上流过的有功功率、Qt,ij为t时段支路ij上流过的无功功率;Pt,i为t时段节点i上注入的有功功率之和、Qt,i为t时段节点i上注入的无功功率之和,k∈j;为t时段节点i上负荷的有功功率、为t时段节点i上负荷的无功功率;为t时段节点i上可控分布式电源注入的有功功率、为t时段节点i上可控分布式电源注入的无功功率、为t时段节点i上不可控分布式电源注入的有功功率、为t时段节点i上不可控分布式电源注入的无功功率;参数M表示一个极大的常量;Ut,i表示t时刻节点i的电压幅值;为t时段接在节点i接入储能系统的充放电功率;为t时段接在节点i上储能系统的无功功率。
6.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述运行电压约束为:
<mrow>
<msubsup>
<mi>U</mi>
<mi>i</mi>
<mi>min</mi>
</msubsup>
<mo>&le;</mo>
<msub>
<mi>U</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>&le;</mo>
<msubsup>
<mi>U</mi>
<mi>i</mi>
<mi>max</mi>
</msubsup>
</mrow>
式中,和分别为节点i的电压上下限。
7.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述支路电流约束为:
<mrow>
<mo>-</mo>
<msubsup>
<mi>I</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mi>max</mi>
</msubsup>
<mo>&le;</mo>
<msub>
<mi>I</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>&le;</mo>
<msubsup>
<mi>I</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
<mi>max</mi>
</msubsup>
</mrow>
式中,为支路ij的电流上限。
8.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述不可控分布式电源运行约束为:
<mrow>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>&le;</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
<mo>,</mo>
<mi>m</mi>
<mi>a</mi>
<mi>x</mi>
</mrow>
</msubsup>
</mrow>
<mrow>
<mo>|</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>|</mo>
<mo>&le;</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mi>t</mi>
<mi>a</mi>
<mi>n</mi>
<mrow>
<mo>(</mo>
<msup>
<mi>cos</mi>
<mrow>
<mo>-</mo>
<mn>1</mn>
</mrow>
</msup>
<msubsup>
<mi>&theta;</mi>
<mi>i</mi>
<mi>max</mi>
</msubsup>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msqrt>
<mrow>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
</msqrt>
<mo>&le;</mo>
<msubsup>
<mi>S</mi>
<mi>i</mi>
<mrow>
<mi>N</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
</mrow>
式中,为t时段节点i所接不可控分布式电源的有功出力的上限;表示节点i所接不可控分布式电源的容量;为节点i上分布式电源的运行的最大功率因数角。
9.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述可控分布式电源运行约束为:
<mrow>
<mo>|</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>|</mo>
<mo>&le;</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mi>t</mi>
<mi>a</mi>
<mi>n</mi>
<mrow>
<mo>(</mo>
<msup>
<mi>cos</mi>
<mrow>
<mo>-</mo>
<mn>1</mn>
</mrow>
</msup>
<msubsup>
<mi>&theta;</mi>
<mi>i</mi>
<mi>max</mi>
</msubsup>
<mo>)</mo>
</mrow>
</mrow>
2
<mrow>
<msqrt>
<mrow>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
</msqrt>
<mo>&le;</mo>
<msubsup>
<mi>S</mi>
<mi>i</mi>
<mrow>
<mi>C</mi>
<mi>D</mi>
<mi>G</mi>
</mrow>
</msubsup>
</mrow>
式中,表示节点i所接可控分布式电源的容量。
10.如权利要求2或3所述的一种计及网络重构的有源配电网源储荷孤岛运行方法,其特征在于:所述储能系统运行约束为:
<mrow>
<msqrt>
<mrow>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
</msqrt>
<mo>&le;</mo>
<msubsup>
<mi>S</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
</mrow>
<mrow>
<mo>-</mo>
<msubsup>
<mi>Q</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>max</mi>
</mrow>
</msubsup>
<mo>&le;</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>&le;</mo>
<msubsup>
<mi>Q</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>m</mi>
<mi>a</mi>
<mi>x</mi>
</mrow>
</msubsup>
</mrow>
<mrow>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>L</mi>
</mrow>
</msubsup>
<mo>=</mo>
<msubsup>
<mi>A</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<msqrt>
<mrow>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
</msqrt>
</mrow>
<mrow>
<msubsup>
<mi>E</mi>
<mrow>
<mi>t</mi>
<mo>+</mo>
<mi>&Delta;</mi>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>=</mo>
<msubsup>
<mi>E</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>+</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>L</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mi>&Delta;</mi>
<mi>t</mi>
</mrow>
<mrow>
<msubsup>
<mi>E</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>m</mi>
<mi>i</mi>
<mi>n</mi>
</mrow>
</msubsup>
<mo>&le;</mo>
<msubsup>
<mi>E</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
</mrow>
</msubsup>
<mo>&le;</mo>
<msubsup>
<mi>E</mi>
<mi>i</mi>
<mrow>
<mi>E</mi>
<mi>S</mi>
<mi>S</mi>
<mo>,</mo>
<mi>m</mi>
<mi>a</mi>
<mi>x</mi>
</mrow>
</msubsup>
</mrow>
式中,为t时段接在节点i接入储能系统的充放电功率;为t时段接在节点i上储能系统的无功功率;为节点i上储能系统的容量;为节点i上储能系统的无功功率上限;为t时段初始时刻节点i上储能系统的荷电状态;Δt为仿真步长;为t时段节点i上储能系统的损耗;为节点i上储能系统的损耗系数;为节点i上储能系统荷电状态的上限、为节点i上储能系统荷电状态的下限。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771782.2A CN107341623A (zh) | 2017-08-31 | 2017-08-31 | 一种计及网络重构的有源配电网源储荷孤岛运行方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771782.2A CN107341623A (zh) | 2017-08-31 | 2017-08-31 | 一种计及网络重构的有源配电网源储荷孤岛运行方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107341623A true CN107341623A (zh) | 2017-11-10 |
Family
ID=60214500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710771782.2A Pending CN107341623A (zh) | 2017-08-31 | 2017-08-31 | 一种计及网络重构的有源配电网源储荷孤岛运行方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107341623A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109038560A (zh) * | 2018-08-03 | 2018-12-18 | 国家电网有限公司 | 基于运行策略的配电网分布式储能经济性评价方法和系统 |
CN109617132A (zh) * | 2018-12-12 | 2019-04-12 | 国网江苏省电力有限公司电力科学研究院 | 提升弹性配电网恢复力的资源配置与网络重构优化方法 |
CN110391660A (zh) * | 2018-04-17 | 2019-10-29 | 中国电力科学研究院有限公司 | 一种提升配电网供电能力的网络重构方法及装置 |
CN111210169A (zh) * | 2020-02-29 | 2020-05-29 | 华南理工大学 | 基于branch矩阵的无环网无孤岛配电网络生成方法 |
CN112598159A (zh) * | 2020-12-02 | 2021-04-02 | 广西大学 | 一种基于多源网络重构的孤岛融合恢复方法 |
CN112909935A (zh) * | 2021-02-03 | 2021-06-04 | 国网福建省电力有限公司宁德供电公司 | 一种配电网故障恢复的动态重构方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105023058A (zh) * | 2015-07-07 | 2015-11-04 | 天津大学 | 一种同时考虑开关动作的配电网智能软开关运行优化方法 |
CN105740973A (zh) * | 2016-01-25 | 2016-07-06 | 天津大学 | 基于混合整数锥规划的智能配电网综合电压无功优化方法 |
CN105977934A (zh) * | 2016-06-21 | 2016-09-28 | 天津大学 | 一种考虑负荷重要性的配电网智能软开关供电恢复方法 |
CN106099964A (zh) * | 2016-06-16 | 2016-11-09 | 南京工程学院 | 一种储能系统参与主动配电网运行调节计算方法 |
-
2017
- 2017-08-31 CN CN201710771782.2A patent/CN107341623A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105023058A (zh) * | 2015-07-07 | 2015-11-04 | 天津大学 | 一种同时考虑开关动作的配电网智能软开关运行优化方法 |
CN105740973A (zh) * | 2016-01-25 | 2016-07-06 | 天津大学 | 基于混合整数锥规划的智能配电网综合电压无功优化方法 |
CN106099964A (zh) * | 2016-06-16 | 2016-11-09 | 南京工程学院 | 一种储能系统参与主动配电网运行调节计算方法 |
CN105977934A (zh) * | 2016-06-21 | 2016-09-28 | 天津大学 | 一种考虑负荷重要性的配电网智能软开关供电恢复方法 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110391660A (zh) * | 2018-04-17 | 2019-10-29 | 中国电力科学研究院有限公司 | 一种提升配电网供电能力的网络重构方法及装置 |
CN110391660B (zh) * | 2018-04-17 | 2023-01-24 | 中国电力科学研究院有限公司 | 一种提升配电网供电能力的网络重构方法及装置 |
CN109038560A (zh) * | 2018-08-03 | 2018-12-18 | 国家电网有限公司 | 基于运行策略的配电网分布式储能经济性评价方法和系统 |
CN109038560B (zh) * | 2018-08-03 | 2020-08-28 | 国家电网有限公司 | 基于运行策略的配电网分布式储能经济性评价方法和系统 |
CN109617132A (zh) * | 2018-12-12 | 2019-04-12 | 国网江苏省电力有限公司电力科学研究院 | 提升弹性配电网恢复力的资源配置与网络重构优化方法 |
CN111210169A (zh) * | 2020-02-29 | 2020-05-29 | 华南理工大学 | 基于branch矩阵的无环网无孤岛配电网络生成方法 |
CN111210169B (zh) * | 2020-02-29 | 2023-05-23 | 华南理工大学 | 基于branch矩阵的无环网无孤岛配电网络生成方法 |
CN112598159A (zh) * | 2020-12-02 | 2021-04-02 | 广西大学 | 一种基于多源网络重构的孤岛融合恢复方法 |
CN112598159B (zh) * | 2020-12-02 | 2022-04-19 | 广西大学 | 一种基于多源网络重构的孤岛融合恢复方法 |
CN112909935A (zh) * | 2021-02-03 | 2021-06-04 | 国网福建省电力有限公司宁德供电公司 | 一种配电网故障恢复的动态重构方法 |
CN112909935B (zh) * | 2021-02-03 | 2022-08-02 | 国网福建省电力有限公司宁德供电公司 | 一种配电网故障恢复的动态重构方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107341623A (zh) | 一种计及网络重构的有源配电网源储荷孤岛运行方法 | |
CN105119280B (zh) | 基于锥优化的交直流混合结构有源配电网运行优化方法 | |
CN107800155A (zh) | 考虑智能软开关的有源配电网多时段孤岛运行方法 | |
CN105740973A (zh) | 基于混合整数锥规划的智能配电网综合电压无功优化方法 | |
CN105846461A (zh) | 一种大规模储能电站自适应动态规划的控制方法和系统 | |
CN109659980A (zh) | 集成混合储能与光伏装置的牵引供电系统能量管理优化方法 | |
CN106208102B (zh) | 一种基于辅助问题原理的主动配电网分布式无功优化方法 | |
CN105977934B (zh) | 一种考虑负荷重要性的配电网智能软开关供电恢复方法 | |
CN104300538B (zh) | 厂站协调自动电压控制中协调约束限值的更新方法和系统 | |
CN103544656B (zh) | 一种面向最小碳排放的主动配电网运行控制方法 | |
CN108988322A (zh) | 考虑系统时变性的微网运行策略优化方法 | |
CN107069814A (zh) | 配网分布式电源容量布点的模糊机会约束规划方法与系统 | |
CN107394775A (zh) | 一种计及负荷优先级的有源配电网时序孤岛运行方法 | |
CN105162144B (zh) | 一种配电网电压无功优化的线性逼近求解方法 | |
CN105186500B (zh) | 一种基于重加权加速Lagrangian的配电网能量分散协调优化方法 | |
Jiang et al. | A hierarchical control structure for distributed energy storage system in DC micro-grid | |
CN103904646A (zh) | 一种考虑三相潮流的微电网多目标能量优化方法 | |
CN107134789A (zh) | 基于拓展qv节点的光储最优潮流控制方法 | |
CN109149586A (zh) | 面向智能软开关的有源配电网分区分散式电压控制方法 | |
Chen et al. | Impact of smart transformer voltage and frequency support in a high renewable penetration system | |
CN107644118A (zh) | 一种集成储能的智能配电软开关时序优化方法 | |
CN107332277A (zh) | 一种考虑源储荷运行特性的有源配电网孤岛运行方法 | |
CN106026169A (zh) | 一种基于多微电网并入配电网的分解协调优化方法 | |
CN106159955A (zh) | 基于连续惩罚对偶分解的电力系统分布式最优潮流方法 | |
CN106329520B (zh) | 一种基于psasp的upfc建模方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171110 |