CN107335963B - 输变电钢管杆横担纵缝焊接变位工装 - Google Patents
输变电钢管杆横担纵缝焊接变位工装 Download PDFInfo
- Publication number
- CN107335963B CN107335963B CN201710535650.XA CN201710535650A CN107335963B CN 107335963 B CN107335963 B CN 107335963B CN 201710535650 A CN201710535650 A CN 201710535650A CN 107335963 B CN107335963 B CN 107335963B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- power transmission
- longitudinal seam
- pedestal
- pipe pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 title claims abstract description 66
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 29
- 239000010959 steel Substances 0.000 title claims abstract description 29
- 230000005540 biological transmission Effects 0.000 title claims abstract description 25
- 230000009466 transformation Effects 0.000 title claims abstract description 24
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 23
- 230000007306 turnover Effects 0.000 claims abstract description 34
- 230000007246 mechanism Effects 0.000 claims abstract description 28
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 25
- 230000000630 rising effect Effects 0.000 claims abstract description 3
- 239000007787 solid Substances 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/047—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
固定机构1 | 焊接机构2 | 安装架20 | 焊机滑轨201 |
焊接机21 | 机箱210 | 焊枪211 | 调节杆212 |
轮子213 | 固定支座3 | 安装座30 | 活动支座4 |
底座40 | 升举机构41 | 升举丝杆410 | 支撑板411 |
升降板412 | 升降导杆413 | 手轮42 | 滚轮43 |
翻转夹具5 | 转轴50 | 横导杆51 | 滑槽510 |
夹钳52 | 滑轮53 | 锁紧螺栓54 | 阻转挡板55 |
翻转手柄56 | 定位销57 | 导轨6 | 安装槽7 |
定位孔8 | 横担管9 |
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710535650.XA CN107335963B (zh) | 2017-07-04 | 2017-07-04 | 输变电钢管杆横担纵缝焊接变位工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710535650.XA CN107335963B (zh) | 2017-07-04 | 2017-07-04 | 输变电钢管杆横担纵缝焊接变位工装 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107335963A CN107335963A (zh) | 2017-11-10 |
CN107335963B true CN107335963B (zh) | 2019-01-11 |
Family
ID=60218230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710535650.XA Active CN107335963B (zh) | 2017-07-04 | 2017-07-04 | 输变电钢管杆横担纵缝焊接变位工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107335963B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108723565B (zh) * | 2018-05-25 | 2020-07-03 | 湖南蓝天机器人科技有限公司 | 一种移动式水冷背衬垫 |
CN109514158B (zh) * | 2018-12-26 | 2023-10-17 | 北京京诚之星科技开发有限公司 | 梯子筋焊接设备 |
CN111421286B (zh) * | 2020-05-18 | 2022-05-13 | 中电建武汉铁塔有限公司 | 一种钢管杆横担焊接工装 |
CN115008058B (zh) * | 2022-08-08 | 2022-10-25 | 中国能源建设集团山西电力建设有限公司 | 中大口径金属钢管对口焊接方法 |
CN115815902B (zh) * | 2023-02-03 | 2023-06-02 | 江苏豪林能源科技有限公司 | 一种灯杆纵缝焊合机构 |
CN116532902B (zh) * | 2023-06-26 | 2024-01-26 | 任丘市恒阳电讯器材有限公司 | 一种电力铁附件合缝焊接设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6355906B1 (en) * | 1998-07-07 | 2002-03-12 | Nissan Motor Co., Ltd. | Production system using combination jigs and jig replacement method and apparatus therefor |
CN102728982A (zh) * | 2012-07-23 | 2012-10-17 | 杭州和泰机电工业有限公司 | 一种料斗拼焊工装 |
CN203184855U (zh) * | 2013-03-29 | 2013-09-11 | 广州创研自动化设备有限公司 | 1000kV输变电塔关键焊缝组对与智能焊接装备 |
CN205587892U (zh) * | 2016-04-28 | 2016-09-21 | 广州增立钢管结构股份有限公司 | 一种输变电铁塔十字对接板焊接工装 |
CN106825973A (zh) * | 2017-03-10 | 2017-06-13 | 广州增立钢管结构股份有限公司 | 一种输变电构架a字柱头组对焊接装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59147780A (ja) * | 1983-02-09 | 1984-08-24 | Honda Motor Co Ltd | ワ−クの加工装置 |
-
2017
- 2017-07-04 CN CN201710535650.XA patent/CN107335963B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6355906B1 (en) * | 1998-07-07 | 2002-03-12 | Nissan Motor Co., Ltd. | Production system using combination jigs and jig replacement method and apparatus therefor |
CN102728982A (zh) * | 2012-07-23 | 2012-10-17 | 杭州和泰机电工业有限公司 | 一种料斗拼焊工装 |
CN203184855U (zh) * | 2013-03-29 | 2013-09-11 | 广州创研自动化设备有限公司 | 1000kV输变电塔关键焊缝组对与智能焊接装备 |
CN205587892U (zh) * | 2016-04-28 | 2016-09-21 | 广州增立钢管结构股份有限公司 | 一种输变电铁塔十字对接板焊接工装 |
CN106825973A (zh) * | 2017-03-10 | 2017-06-13 | 广州增立钢管结构股份有限公司 | 一种输变电构架a字柱头组对焊接装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107335963A (zh) | 2017-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107335963B (zh) | 输变电钢管杆横担纵缝焊接变位工装 | |
CN208601037U (zh) | 铝合金集装箱生产线 | |
CN106002011A (zh) | 一种智能柔性焊接系统 | |
CN104057209B (zh) | 自动焊接系统及哈芬槽自动焊接系统 | |
KR101022771B1 (ko) | 대형 가공물 용접장치 | |
CN207205628U (zh) | 一种多角度钢管焊接装置 | |
CN203466691U (zh) | 一种用于发电机定子的自动翻转设备 | |
CN105436809B (zh) | 一种主管的水平支撑装置 | |
KR100929967B1 (ko) | 펌프축 정비용 작업대 | |
CN106363324A (zh) | 一种焊接装置的焊接台 | |
CN209366214U (zh) | 电力设备运输用手推车 | |
CN210549254U (zh) | 一种五金配件加工用焊接辅助装置 | |
CN213470146U (zh) | 一种汽车零部件焊装夹具 | |
CN208644595U (zh) | 螺丝自动装配机 | |
CN107335842B (zh) | 对汽车大梁进行打孔操作的摇臂钻打孔工装装置 | |
CN207447648U (zh) | 智能交通杆自动焊接装备 | |
CN219899879U (zh) | 一种钢结构加工冲孔设备 | |
CN206335315U (zh) | 一种自动焊接变位机 | |
CN110587214B (zh) | 一种双面焊接工装 | |
CN206435886U (zh) | 一种自动焊接装置 | |
CN104724635A (zh) | 火车车门拆装机构 | |
CN218612374U (zh) | 一种钢管环形焊接机 | |
CN207205595U (zh) | 一种底盘合拼机器人焊接系统 | |
CN207771204U (zh) | 一种钢管焊接对接工装 | |
CN217096424U (zh) | 一种双向吸附加工件的直流缝焊机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Welding and displacement tooling for longitudinal seam of cross arm of transmission and transformation steel pipe pole Effective date of registration: 20220610 Granted publication date: 20190111 Pledgee: Shanghai Pudong Development Bank Limited by Share Ltd. Guangzhou branch Pledgor: GUANGZHOU ZENGLI STEEL STRUCTURE Co.,Ltd. Registration number: Y2022980007501 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20231113 Granted publication date: 20190111 Pledgee: Shanghai Pudong Development Bank Limited by Share Ltd. Guangzhou branch Pledgor: GUANGZHOU ZENGLI STEEL STRUCTURE Co.,Ltd. Registration number: Y2022980007501 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Welding and positioning fixture for longitudinal joints of steel pipe poles for power transmission and transformation Effective date of registration: 20231115 Granted publication date: 20190111 Pledgee: Shanghai Pudong Development Bank Limited by Share Ltd. Guangzhou branch Pledgor: GUANGZHOU ZENGLI STEEL STRUCTURE Co.,Ltd. Registration number: Y2023980065646 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |