CN107329940B - 立轴混流式水轮机电站空化系数计算方法 - Google Patents
立轴混流式水轮机电站空化系数计算方法 Download PDFInfo
- Publication number
- CN107329940B CN107329940B CN201710590735.8A CN201710590735A CN107329940B CN 107329940 B CN107329940 B CN 107329940B CN 201710590735 A CN201710590735 A CN 201710590735A CN 107329940 B CN107329940 B CN 107329940B
- Authority
- CN
- China
- Prior art keywords
- max
- water turbine
- power station
- cavitation coefficient
- vertical shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Physics (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Life Sciences & Earth Sciences (AREA)
- Operations Research (AREA)
- Probability & Statistics with Applications (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Algebra (AREA)
- Evolutionary Biology (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Bioinformatics & Computational Biology (AREA)
- Hydraulic Turbines (AREA)
Abstract
Description
技术领域
本发明涉及水电站水轮机,特别涉及立轴混流式水轮机电站空化系数计算方法。
背景技术
在立轴混流式水轮机的水电站中,水轮机吸出高度Hs为导叶中心线(即水轮机安装高程)至电站尾水位的高程差。抬高水轮机的吸出高度和安装高程,可减少主厂房水下工程量和投资;而降低水轮机的吸出高度和安装高程,可改善水轮机空化性能,有利于机组的稳定运行,延长机组使用寿命。因此如何合理确定水轮机吸出高度,是水电工程设计的重要内容。由立轴混流式水轮机的吸出高度Hs计算公式知,由于水电站设计尾水位▽和水头H一定,因此如何合理确定立轴混流式水轮机吸出高度Hs就变成了如何合理确定立轴混流式水轮机电站空化系数σp。
目前通常有两种方法可以估算立轴混流式水轮机电站空化系数σp。方法一:若设计的水电工程中,水轮机水头、出力等参数与已设计制造的水轮机参数相同或接近,则利用已有模型转轮参数和综合特性曲线估算电站空化系数σp。由于该方法是基于某一已有的模型转轮资料,受当时技术条件的限制,一般很难对转轮特性做全面、深入的试验研究,因而估算出的电站空化系数σp一般难以满足新的水电工程要求;特别是大、中型或有特殊要求的水电工程,通常要求依据工程的具体条件和运行要求,运用CFD等新技术开发研制新转轮。方法二:当没有合适的模型转轮资料时,则按统计公式估算电站空化系数σp。由于该方法是按统计公式估算电站空化系数σp,目前这种统计公式较多,由于各统计公式所依据的水轮机参数样本数据是上世纪七、八十年代之前的或是某一水头段的或是某一比转速ns范围的,存在一定的局限性,同一水电工程用不同的统计公式估算的结果不同,有些甚至相差较大,无法正确选取。因此方法一、二均无法满足水电工程对新技术、新材料、新工艺、新结构等不断发展的要求,估算出的电站空化系数σp一般亦难以满足新的水电工程要求。
本发明在收集整理国内、外近30年来大量的运行良好的立轴混流式水轮发电机组及电站资料的基础上,利用最小二乘法原理,用大量的水轮机和电站参数做样本数据,回归统计得到新的电站空化系数σp计算公式,以得出合理的电站空化系数σp计算值来满足新的水电工程要求。
发明内容
本发明要解决的技术问题是:提供一种立轴混流式水轮机电站空化系数计算方法,对立轴混流式水轮机电站空化系数进行计算。
为解决上述问题,本发明采用的技术方案是:立轴混流式水轮机电站空化系数计算方法,包括以下步骤:
a.确定立轴混流式水轮机的比转速,所述比转速记为ns;ns为水轮机比转速,单位为m·kW,计算公式为其中n为水轮机额定转速,单位为r/min;Pr为水轮机额定出力,单位kW;Hr为水轮机额定水头,单位为m。
b.确定立轴混流式水轮机的最大应用水头,所述最大应用水头记为Hmax,并判断Hmax所处的范围;本发明中Hmax可能所处的范围共有Hmax≤100m、100m<Hmax≤200m、200m<Hmax≤300m、Hmax>300m四组。
c.根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,电站空化系数计算公式为:
本发明的有益效果是:本发明通过收集整理近30年国内、外大量运行良好的立轴混流式水轮发电机组资料,按水轮机最大应用水头Hmax,将资料分成Hmax≤100m、100m<Hmax≤200m、200m<Hmax≤300m、Hmax>300m四组,以对应不同水头范围的立轴混流式水轮机具有不同的电站空化系数特性。利用最小二乘法,用大量的水轮机参数做样本数据,回归统计得到立轴混流式水轮机在四个水头段的电站空化系数σp计算公式,在前期做了大量计算、推导工作之后,为立轴混流式水轮机电站空化系数创造性的总结出了一个更为合理的计算方法,更好地满足了新的水电工程要求,为后续国内、外水电工程建设提供了有力的技术支撑。并且,不管有无相同或者相近的水轮机模型,本发明都适用。
具体实施方式
下面通过实施例子对本发明做进一步说明。
目前普遍采用的立轴混流式水轮机电站空化系数统计估算公式,主要有 下面将本发明公式(1)~(4)和常用的统计估算公式①、②应用到样本数据中,得到各公式计算结果与真实值的误差,表1~表5为其中几组样本数据及其计算误差的对比。
表1几组样本数据(水轮机真实参数)
表2本发明与目前普遍采用的统计估算公式计算误差对比(Hmax≤100m)
表3本发明与目前普遍采用的统计估算公式计算误差对比(100m<Hmax≤200m)
表4本发明与目前普遍采用的统计估算公式计算误差对比(200m<Hmax≤300m)
表5本发明公式与目前普遍采用的统计估算公式计算误差对比(Hmax>300m)
表2~表5计算结果表明,公式(1)~(4)计算得到的误差的平方和在各水头段中均为最小,即为最优,可更好地应用于新的水电工程中立轴混流式水轮机电站空化系数的计算选择。
以上描述了本发明的基本原理和主要的特征,说明书的描述只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。
Claims (1)
1.一种确定立轴混流式水轮机吸出高度的方法,其特征在于,包括以下步骤:
a.确定立轴混流式水轮机的比转速,所述比转速记为ns,单位为m·kW;
b.确定立轴混流式水轮机的最大应用水头,所述最大应用水头记为Hmax,单位为m,并判断Hmax所处的范围;
c.根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,电站空化系数计算公式为:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710590735.8A CN107329940B (zh) | 2017-07-19 | 2017-07-19 | 立轴混流式水轮机电站空化系数计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710590735.8A CN107329940B (zh) | 2017-07-19 | 2017-07-19 | 立轴混流式水轮机电站空化系数计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107329940A CN107329940A (zh) | 2017-11-07 |
CN107329940B true CN107329940B (zh) | 2020-12-29 |
Family
ID=60226406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710590735.8A Active CN107329940B (zh) | 2017-07-19 | 2017-07-19 | 立轴混流式水轮机电站空化系数计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107329940B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416527B (zh) * | 2018-03-15 | 2021-08-10 | 中国电建集团成都勘测设计研究院有限公司 | 立轴轴流转桨式水轮机电站空化系数计算方法 |
CN108763745A (zh) * | 2018-05-28 | 2018-11-06 | 中国电建集团成都勘测设计研究院有限公司 | 贯流式水轮机电站空化系数计算方法 |
CN109977356B (zh) * | 2019-01-29 | 2023-05-16 | 武汉大学 | 一种混流式水轮机电站空化系数统计计算方法 |
CN109902382B (zh) * | 2019-02-27 | 2022-05-24 | 武汉大学 | 一种大中型混流式水轮机比转速的统计计算方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160084218A1 (en) * | 2011-05-16 | 2016-03-24 | Henry Obermeyer | Systems and Methods for Hydromotive Machines |
CN106438455A (zh) * | 2016-11-18 | 2017-02-22 | 江苏省水利勘测设计研究院有限公司 | 一种带副翼的低空化系数轴流式叶片泵 |
-
2017
- 2017-07-19 CN CN201710590735.8A patent/CN107329940B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160084218A1 (en) * | 2011-05-16 | 2016-03-24 | Henry Obermeyer | Systems and Methods for Hydromotive Machines |
CN106438455A (zh) * | 2016-11-18 | 2017-02-22 | 江苏省水利勘测设计研究院有限公司 | 一种带副翼的低空化系数轴流式叶片泵 |
Non-Patent Citations (2)
Title |
---|
A Research of Axial-Flow Pump Design with Method of Variable Circulation;Li Zhong et al.;《2011 International Conference on Consumer Electronics, Communications and Networks》;20110416;第3859-3862页 * |
南欧江二级水电站贯流式水轮机稳定性分析;王胜华;《水利水电施工》;20151031(第5期);第53-56页 * |
Also Published As
Publication number | Publication date |
---|---|
CN107329940A (zh) | 2017-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107329940B (zh) | 立轴混流式水轮机电站空化系数计算方法 | |
Li et al. | Review of positive slopes on pump performance characteristics of pump-turbines | |
CN108416527B (zh) | 立轴轴流转桨式水轮机电站空化系数计算方法 | |
CN105485057B (zh) | 一种斜流泵径向导叶的水力设计方法 | |
CN108301955B (zh) | 轴流式pat发电模式最优效率点参数和性能曲线预估方法 | |
CN110516321B (zh) | 一种变速水轮机转轮选型计算方法 | |
CN109101770B (zh) | 立轴水斗式水轮机额定比转速计算方法 | |
CN107153753B (zh) | 一种混流式水轮机基本参数估算的方法 | |
CN109902382B (zh) | 一种大中型混流式水轮机比转速的统计计算方法 | |
CN111756039B (zh) | 基于概率统计的新能源电力系统惯量估计方法 | |
CN108763745A (zh) | 贯流式水轮机电站空化系数计算方法 | |
CN107503874B (zh) | 贯流式水轮机基本参数计算方法 | |
CN110704982B (zh) | 卧轴单转轮双喷嘴水斗式水轮机额定比转速计算方法 | |
CN107239637A (zh) | 轴流式水轮机基本参数计算方法 | |
CN109977356B (zh) | 一种混流式水轮机电站空化系数统计计算方法 | |
CN113642133B (zh) | 水斗式水轮机转轮内宽计算方法 | |
Quaranta et al. | Efficiency of traditional water wheels | |
CN202991335U (zh) | 一种六工况双向潮汐发电水轮机 | |
CN106971019B (zh) | 一种高比转速轴流泵导叶水力设计方法 | |
CN202140236U (zh) | 一种六工况双向潮汐发电水轮机 | |
CN110242476B (zh) | 超低比转速斜流式水轮机转轮 | |
CN107829873A (zh) | 一种基于双转轮的潮流能水轮机 | |
CN108915938B (zh) | 一种减轻抽水蓄能电站机组和厂房振动的电站运行方法 | |
CN112067181B (zh) | 单级可逆式混流式水泵水轮机比转速计算方法 | |
CN106194552A (zh) | 一种利用海洋能发电的轴流式水轮机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |