CN108763745A - 贯流式水轮机电站空化系数计算方法 - Google Patents

贯流式水轮机电站空化系数计算方法 Download PDF

Info

Publication number
CN108763745A
CN108763745A CN201810522874.1A CN201810522874A CN108763745A CN 108763745 A CN108763745 A CN 108763745A CN 201810522874 A CN201810522874 A CN 201810522874A CN 108763745 A CN108763745 A CN 108763745A
Authority
CN
China
Prior art keywords
max
cavitation coefficient
plant cavitation
tubular turbine
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810522874.1A
Other languages
English (en)
Inventor
董宏成
蒋登云
田迅
孙文彬
刘丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201810522874.1A priority Critical patent/CN108763745A/zh
Publication of CN108763745A publication Critical patent/CN108763745A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Hydraulic Turbines (AREA)

Abstract

本发明涉及水电站水轮机,公开了一种贯流式水轮机电站空化系数计算方法,对贯流式水轮机电站空化系数进行更合理的计算,以满足新的水电工程要求。本发明方法如下:确定贯流式水轮机的比转速,所述比转速记为ns;确定贯流式水轮机的最大应用水头,所述最大应用水头记为Hmax,并判断Hmax所处的范围;根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,所述范围的电站空化系数计算公式为:当Hmax≤15m时,σp=3.7004×ln(ns)‑23.135;当Hmax>15m时,σp=3.6575×ln(ns)‑22.84。本发明适用于贯流式水轮机电站空化系数的计算,能更好地满足新的水电工程要求。

Description

贯流式水轮机电站空化系数计算方法
技术领域
本发明涉及水电站水轮机,特别涉及贯流式水轮机电站空化系数计算方法。
背景技术
在装置有贯流式水轮机的水电站中,水轮机安装高程即为水轮机主轴中心线高程,水轮机吸出高度为转轮叶片最高点处至电站尾水位的高程差。抬高水轮机的吸出高度和安装高程,可减少主厂房水下工程量和投资;而降低水轮机的吸出高度和安装高程,可改善水轮机空化性能,有利于机组的稳定运行,延长机组使用寿命。因此,如何合理确定水轮机的吸出高度和安装高程是水电工程设计的重要内容。
贯流式水轮机安装高程Z的计算公式为吸出高度Hs的计算公式为式中为电站设计尾水位,h为转轮叶片最高点处至主轴中心线的高程差,H为水头,σp为电站空化系数。对于某一水电站及选定的水轮机,h和H为确定值,因此水轮机安装高程Z取决于吸出高度Hs,而如何合理确定水轮机的吸出高度和安装高程就变成了如何合理确定水轮机电站空化系数σp
目前通常有两种方法可以估算贯流式水轮机电站空化系数σp。方法一:若设计的水电工程中,水轮机的水头、出力等参数与已设计制造的水轮机参数相同或接近,则利用已有模型转轮参数和综合特性曲线估算电站空化系数σp。由于该方法是基于某一已有的模型转轮资料,受当时技术条件的限制,一般很难对转轮特性做全面、深入的试验研究,因而估算出的电站空化系数σp一般难以满足新的水电工程要求;特别是大、中型或有特殊要求的水电工程,通常要求依据工程的具体条件和运行要求,运用CFD等新技术开发研制新转轮。方法二:当没有合适的模型转轮资料时,则按统计公式估算电站空化系数σp。由于该方法是按统计公式估算电站空化系数σp,目前这种统计公式较多,由于各统计公式所依据的水轮机参数样本数据是上世纪七十、八十年代之前的或是某一水头段的或是某一比转速ns范围的,存在一定的局限性,同一水电工程用不同的统计公式估算的结果不同,有些甚至相差较大,无法正确选取。因此方法一、二均无法满足水电工程对新技术、新材料、新工艺、新结构等不断发展的要求,估算出的电站空化系数σp一般亦难以满足新的水电工程要求。
发明内容
本发明要解决的技术问题是:提供一种贯流式水轮机电站空化系数计算方法,对贯流式水轮机电站空化系数进行更合理的计算,以满足新的水电工程要求。
为解决上述问题,本发明采用的技术方案是:贯流式水轮机电站空化系数计算方法,包括以下步骤:
a.确定贯流式水轮机的比转速,所述比转速记为ns;ns为水轮机比转速,单位为m·kW,计算公式为式中n为水轮机额定转速,单位为r/min;Pr为水轮机额定出力,单位kW;Hr为水轮机额定水头,单位为m。
b.确定贯流式水轮机的最大应用水头,所述最大应用水头记为Hmax,并判断Hmax所处的范围;本发明中Hmax可能所处的范围共有Hmax≤15m和Hmax>15m两组。
c.根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,电站空化系数计算公式为:
当Hmax≤15m时,σp=3.7004×ln(ns)-23.135 (1);
当Hmax>15m时,σp=3.6575×ln(ns)-22.84 (2)。
本发明的有益效果是:本发明通过整理现有运行良好的贯流式水轮机发电机组资料,按水轮机最大应用水头Hmax对将资料进行,以对应不同水头范围的贯流式水轮机具有不同的电站空化系数特性。利用最小二乘法,用大量的水轮机参数做样本数据,回归统计得到贯流式水轮机在两个水头段的电站空化系数σp计算公式,在前期做了大量计算、推导工作之后,为贯流式水轮机电站空化系数创造性的总结出了一个更为合理的计算方法,更好地满足了新的水电工程要求,为后续水电工程建设提供了有力的技术支撑。并且,不管有无相同或者相近的水轮机模型,本发明都适用。
具体实施方式
本发明首先通过收集整理近30年国内、外大量运行良好的贯流式水轮机发电机组资料,按水轮机最大应用水头Hmax,将资料分成Hmax≤15m和Hmax>15m两组,再利用最小二乘法,用大量的水轮机参数做样本数据,回归统计得到贯流式水轮机在两个水头段的电站空化系数σp计算公式:当Hmax≤15m时,σp=3.7004×ln(ns)-23.135(1);当Hmax>15m时,σp=3.6575×ln(ns)-22.84(2),在前期做了大量计算、推导工作之后,为贯流式水轮机电站空化系数创造性的总结出了一个更为合理的计算方法。由于本发明将Hmax的范围进行了划分,因此可对应不同水头范围的贯流式水轮机具有不同的电站空化系数特性;并且由于回归统计得到的电站空化系数σp计算公式(1)(2)是以大量运行良好的贯流式水轮机发电机组的数据为基础进行推导的,因此电站空化系数σp计算公式(1)(2)具有普遍性和合理性。
下面通过实施例子对本发明做进一步说明。
实施例提供一种贯流式水轮机电站空化系数计算方法,包括以下步骤:
a.确定贯流式水轮机的比转速,所述比转速记为ns;ns为水轮机比转速,单位为m·kW,计算公式为式中n为水轮机额定转速,单位为r/min;Pr为水轮机额定出力,单位kW;Hr为水轮机额定水头,单位为m。
b.确定贯流式水轮机的最大应用水头,所述最大应用水头记为Hmax,并判断Hmax所处的范围;本发明中Hmax可能所处的范围共有Hmax≤15m和Hmax>15m两组。
c.根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,电站空化系数计算公式为:
当Hmax≤15m时,σp=3.7004×ln(ns)-23.135 (1);
当Hmax>15m时,σp=3.6575×ln(ns)-22.84 (2)
目前普遍采用的贯流式水轮机电站空化系数统计估算公式,主要有①下面将本发明公式(1)、(2)和常用的统计估算公式①、②应用到样本数据中,得到各公式计算结果与真实值的误差,表1~表3为其中几组样本数据及其计算误差的对比。
表1几组样本数据(水轮机真实参数)
表2本发明与目前普遍采用的统计估算公式计算误差对比(Hmax≤15m)
表3本发明公式与目前普遍采用的统计估算公式计算误差对比(Hmax>15m)
表2、表3计算结果表明,公式(1)、(2)计算得到的误差的平方和在各水头段中均为最小,即为最优,可更好地应用于新的水电工程中贯流式水轮机电站空化系数的计算与选择。

Claims (2)

1.贯流式水轮机电站空化系数计算方法,其特征在于,包括以下步骤:
a.确定贯流式水轮机的比转速,所述比转速记为ns
b.确定贯流式水轮机的最大应用水头,所述最大应用水头记为Hmax,并判断Hmax是处于Hmax≤15m范围还是Hmax>15m范围;
c.根据Hmax对应范围的电站空化系数计算公式计算电站空化系数,所述电站空化系数记为σp,电站空化系数计算公式为:
当Hmax≤15m时,σp=3.7004×ln(ns)-23.135;
当Hmax>15m时,σp=3.6575×ln(ns)-22.84。
2.如权利要求1所述的贯流式水轮机电站空化系数计算方法,其特征在于,ns通过以下公式确定:
式中,n为水轮机额定转速,Pr为水轮机额定出力,Hr为水轮机额定水头。
CN201810522874.1A 2018-05-28 2018-05-28 贯流式水轮机电站空化系数计算方法 Pending CN108763745A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810522874.1A CN108763745A (zh) 2018-05-28 2018-05-28 贯流式水轮机电站空化系数计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810522874.1A CN108763745A (zh) 2018-05-28 2018-05-28 贯流式水轮机电站空化系数计算方法

Publications (1)

Publication Number Publication Date
CN108763745A true CN108763745A (zh) 2018-11-06

Family

ID=64002925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810522874.1A Pending CN108763745A (zh) 2018-05-28 2018-05-28 贯流式水轮机电站空化系数计算方法

Country Status (1)

Country Link
CN (1) CN108763745A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977356A (zh) * 2019-01-29 2019-07-05 武汉大学 一种混流式水轮机电站空化系数统计计算方法
CN112067181A (zh) * 2020-09-15 2020-12-11 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN114841022A (zh) * 2022-07-04 2022-08-02 中国长江三峡集团有限公司 变速机组吸出高度确定方法和装置、电子设备和存储介质

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57154577A (en) * 1981-03-18 1982-09-24 Hitachi Ltd Monitoring method of cavitation in reducing valve
US20110221200A1 (en) * 2010-03-09 2011-09-15 Alexander Gokhman Two-way generation tidal power plant with bypasses
CN106971019A (zh) * 2017-02-22 2017-07-21 江苏大学 一种高比转速轴流泵导叶水力设计方法
CN107239637A (zh) * 2017-06-26 2017-10-10 中国电建集团成都勘测设计研究院有限公司 轴流式水轮机基本参数计算方法
CN107329940A (zh) * 2017-07-19 2017-11-07 中国电建集团成都勘测设计研究院有限公司 立轴混流式水轮机电站空化系数计算方法
CN107503874A (zh) * 2017-08-22 2017-12-22 中国电建集团成都勘测设计研究院有限公司 贯流式水轮机基本参数计算方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57154577A (en) * 1981-03-18 1982-09-24 Hitachi Ltd Monitoring method of cavitation in reducing valve
US20110221200A1 (en) * 2010-03-09 2011-09-15 Alexander Gokhman Two-way generation tidal power plant with bypasses
CN106971019A (zh) * 2017-02-22 2017-07-21 江苏大学 一种高比转速轴流泵导叶水力设计方法
CN107239637A (zh) * 2017-06-26 2017-10-10 中国电建集团成都勘测设计研究院有限公司 轴流式水轮机基本参数计算方法
CN107329940A (zh) * 2017-07-19 2017-11-07 中国电建集团成都勘测设计研究院有限公司 立轴混流式水轮机电站空化系数计算方法
CN107503874A (zh) * 2017-08-22 2017-12-22 中国电建集团成都勘测设计研究院有限公司 贯流式水轮机基本参数计算方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
伍志军: "水泵水轮机空化系数选择", 《抽水蓄能电站工程建设文集2012》 *
姜红伟 等: "安徽绩溪抽水蓄能电站水泵水轮机模型验收试验及性能分析", 《水泵水轮机及其附属设备》 *
戴曙光: "水轮机空化安全系数与比转速", 《水利电技水》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977356A (zh) * 2019-01-29 2019-07-05 武汉大学 一种混流式水轮机电站空化系数统计计算方法
CN109977356B (zh) * 2019-01-29 2023-05-16 武汉大学 一种混流式水轮机电站空化系数统计计算方法
CN112067181A (zh) * 2020-09-15 2020-12-11 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN112067181B (zh) * 2020-09-15 2021-08-31 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN114841022A (zh) * 2022-07-04 2022-08-02 中国长江三峡集团有限公司 变速机组吸出高度确定方法和装置、电子设备和存储介质

Similar Documents

Publication Publication Date Title
CN104408260B (zh) 一种潮流能水轮机叶片翼型设计方法
CN108763745A (zh) 贯流式水轮机电站空化系数计算方法
CN109101770B (zh) 立轴水斗式水轮机额定比转速计算方法
CN105863948B (zh) 一种带变顶高尾水隧洞水轮机调速器变参数控制方法
CN107563538B (zh) 大电网平台下的面向关键水位控制的多目标水库群调度优化方法
CN107329940A (zh) 立轴混流式水轮机电站空化系数计算方法
CN110516321B (zh) 一种变速水轮机转轮选型计算方法
CN108416527A (zh) 立轴轴流转桨式水轮机电站空化系数计算方法
CN104901341A (zh) 基于机组出力及变负荷速率的火力发电煤耗量计算方法
CN107153753A (zh) 一种混流式水轮机基本参数估算的方法
CN110704982B (zh) 卧轴单转轮双喷嘴水斗式水轮机额定比转速计算方法
CN103926079A (zh) 一种混流式水电机组出力异常检测方法
CN107239637A (zh) 轴流式水轮机基本参数计算方法
CN107503874B (zh) 贯流式水轮机基本参数计算方法
CN116738841A (zh) 一种用于水电站水能动态模拟的算法及装置
CN113642133B (zh) 水斗式水轮机转轮内宽计算方法
CN111396229B (zh) 兼顾转轮效率和磨损情况的叶片安放角度非线性设计方法
CN112302736B (zh) 一种基于监视段参数的汽轮机主蒸汽压力控制方法
Fu et al. Multi-objective co-optimization of the guide vane closure law and rotor inertia in pumped-storage power system
CN211474322U (zh) 一种轴流式水轮机配水装置
CN106194552A (zh) 一种利用海洋能发电的轴流式水轮机
CN108915938B (zh) 一种减轻抽水蓄能电站机组和厂房振动的电站运行方法
CN113673062B (zh) 水斗式水轮机转轮外径、水斗外宽及转轮重量的计算方法
CN112067181B (zh) 单级可逆式混流式水泵水轮机比转速计算方法
CN204878042U (zh) 一种新型轴流式叶轮

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106