CN107316146A - A kind of production scheduling System and method for of resources of production scheduling - Google Patents

A kind of production scheduling System and method for of resources of production scheduling Download PDF

Info

Publication number
CN107316146A
CN107316146A CN201710498417.9A CN201710498417A CN107316146A CN 107316146 A CN107316146 A CN 107316146A CN 201710498417 A CN201710498417 A CN 201710498417A CN 107316146 A CN107316146 A CN 107316146A
Authority
CN
China
Prior art keywords
management module
production
module
production scheduling
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710498417.9A
Other languages
Chinese (zh)
Inventor
吴雁
王彦瑞
张杰人
郑刚
王犁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Technology
Original Assignee
Shanghai Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Technology filed Critical Shanghai Institute of Technology
Priority to CN201710498417.9A priority Critical patent/CN107316146A/en
Publication of CN107316146A publication Critical patent/CN107316146A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of production scheduling System and method for of resources of production scheduling, including account management module, workform management module, production technology management module and Gantt chart display module, account management module is to the authority that controls the personnel of login system and its have;Workform management module is connected with account management module, the machining status of it checks corresponding work order to the personnel according to login system and its authority setting type, the technological procedure called and work order;Production technology management module is connected with workform management module, to teams and groups, work centre group, work centre and the production required time and process time for setting corresponding process to call;Gantt chart display module is connected with production technology management module, and the work order to be intended to production is shown by way of domination.The system can combine the factor for influenceing production with Gantt chart, the actual production status of comprehensive display, real-time, interactive, it is easy to administrative staff to understand production scene production status with dispatcher, foundation is provided for follow-up work order schedule, the scheduling level of dispatcher is improved, abundant effective utilization of ERM is realized.

Description

A kind of production scheduling System and method for of resources of production scheduling
Technical field
The present invention relates to production scheduling technical field, the production scheduling system of more particularly to a kind of resources of production scheduling and side Method.
Background technology
Development and production agility, the requirement of high efficiency with information technology, and small lot multi-item production pattern The market demand, traditional order management mode and the statistical of creation data are difficult the demand for meeting market, production scheduling System as get through ERP (Enterprises Resources Planning, abbreviation ERP) and manufacture perform system The bridge of system (Manufacturing Execution System, abbreviation MES), can effectively domination production procedure and life Production process, provides data supporting, so that clear and definite bottleneck device, realizes effective utilization of ERM for enterprise's production reform.
In the prior art, the scheduling scheduling of manufacturing enterprise is that being met enterprise of the task is reasonably planned and is arranged into Production.On the premise of energy force-summing device is considered, in the case where material quantity is certain, arrange the production of each production task suitable Sequence, optimizes production sequence, optimum choice production equipment so that reduce the stand-by period, balances each machine and the produce load of workman, Realize that the maximization of delivery delivery rate, stock minimum, lead time minimum, live load equilibrating, equipment use optimization With the idle minimum of personnel, so as to optimize production capacity, production efficiency is improved, shortens the production time.
The content of the invention
In order to overcome deficiency of the prior art, the present invention provides production scheduling system and the side of a kind of resources of production scheduling Method, can allow the administrative staff and dispatcher of enterprise clearly to know the real-time status of enterprise staff and equipment, be further Enterprise reform provides data supporting, to improve production optimization managerial ability and the production efficiency in production process.
In order to reach foregoing invention purpose, the technical scheme that its technical problem used is solved as follows:
The invention discloses a kind of production scheduling system of resources of production scheduling, including account management module, workform management Module, production technology management module and Gantt chart display module, wherein:
The account management module is to the authority that controls the personnel of login system and its have;
The workform management module is connected with the account management module, to the personnel according to login system and its authority The technological procedure and the machining status of work order for set type that it checks corresponding work order, calling;
The production technology management module is connected with the workform management module, to the class for setting corresponding process to call Time and process time needed for group, work centre group, work centre and production;
The Gantt chart display module is connected with the production technology management module, and the work order to be intended to production passes through The mode of domination is shown.
Further, in addition to shift management module, the shift management module connects with the production technology management module Connect, to set teams and groups' type and teams and groups personnel.
Further, in addition to work centre group module, the work centre group module manages mould with the production technology Block is connected, and the work centre will be provided with identical working ability is incorporated into together.
Further, in addition to demographic data's management module, demographic data's management module is shown with the Gantt chart Module is connected, to set the affiliated teams and groups of personnel and order of classes or grades at school.
Further, in addition to enterprise's calendaring module, enterprise's calendaring module is connected with the Gantt chart display module, Normal workday to set enterprise.
The present invention discloses a kind of production scheduling method of resources of production scheduling in addition, comprises the following steps:
Step 1:In account management module, the personnel with corresponding account and authority can be with login system;
Step 2:In workform management module, existing work order and its corresponding process, and the accordingly execution feelings of work order are checked Condition, if in the new work order of the module creation, corresponding technological procedure can be selected on the interface of ejection;
Step 3:In production technology management module, all techniques existed are checked, and can be with newly-increased technique Work centre group and teams and groups are selected, and set process time and process time;
Step 4:In Gantt chart display module, work order, demographic data and the enterprise's calendar of production are intended to Production scheduling is carried out, and shows with double dimensional matrix of time and equipment the arrangement situation of process.
Further, work centre group module is further comprised in step 3, can be with the work centre group module Increase, delete, changing, looking into the work centre group information existed, and can select and add work centre.
Further, shift management module is further comprised in step 3, can increase in the shift management module, Delete, change, looking into the teams and groups' information existed.
Further, demographic data's management module is further comprised in step 4, in demographic data's management module It can increase, delete, changing, looking into the personal information existed, and the affiliated teams and groups of personnel can be set.
Further, enterprise's calendaring module is further comprised in step 4, can be set in enterprise's calendaring module The normal workday of enterprise and overtime.
The present invention is allowed to compared with prior art, have the following advantages that and actively imitate due to using above technical scheme Really:
1st, the present invention effectively optimizes the use of resource by the scheduling scheduling of science, reduce equipment production line wait or The time of shutdown, improve equipment material and the utilization rate of Personnel Resources;
2nd, the present invention improves the transparence of production management, visualization, can be predicted and can quantify, and improves the punctual of delivery Rate, has been obviously improved CSAT and the market competitiveness;
3rd, production scheduling system of the invention can combine the factor for influenceing production with Gantt chart, comprehensive The actual production status of display, real-time, interactive is easy to administrative staff to understand production scene production status with dispatcher, after being Continuous work order schedule provides foundation, improves the scheduling level of dispatcher, realizes abundant effective utilization of ERM;
4th, the present invention can realize the combing to enterprise's existing resource, and can by way of domination by equipment and The real time load situation of personnel is shown, by the operation of a period of time, can be changed by way of data analysis for enterprise Leather provides data supporting, promotes the production regularization and high efficiency of enterprise.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, being used required in being described below to embodiment Accompanying drawing be briefly described.It is clear that drawings in the following description are only some embodiments of the present invention, for ability For field technique personnel, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.It is attached In figure:
Fig. 1 is a kind of relation flow chart of the production scheduling system of resources of production scheduling of the invention;
Fig. 2 is a kind of production scheduling devices in system of resources of production scheduling of the invention and double dimensional matrix figures of time;
Fig. 3 is a kind of schematic flow sheet of the production scheduling method of resources of production scheduling of the invention.
【Primary symbols explanation】
1- account management modules;
2- workform management modules;
3- production technology management modules;
4- Gantt chart display modules;
5- shift management modules;
6- work centre group modules;
7- demographic data's management modules;
8- enterprises calendaring module.
Embodiment
Below with reference to the accompanying drawing of the present invention, clear, complete description is carried out to the technical scheme in the embodiment of the present invention And discussion, it is clear that as described herein is only a part of example of the present invention, is not whole examples, based on the present invention In embodiment, the every other implementation that those of ordinary skill in the art are obtained on the premise of creative work is not made Example, belongs to protection scope of the present invention.
Embodiment one
As illustrated in fig. 1 and 2, the invention discloses a kind of production scheduling system of resources of production scheduling, including account management Module 1, workform management module 2, production technology management module 3 and Gantt chart display module 4, wherein:
The account management module 1 is to the authority that controls the personnel of login system and its have;
The workform management module 2 is connected with the account management module 1, to the personnel according to login system and its power Limit sets the machining status of its type for checking corresponding work order, the technological procedure called and work order;
The production technology management module 3 is connected with the workform management module 2, is called to set corresponding process Time and process time needed for teams and groups, work centre group, work centre and production;
The Gantt chart display module 4 is connected with the production technology management module 3, and the work order to be intended to production is led to The mode of overdominance is shown.
Further, the production scheduling system also include shift management module 5, the shift management module 5 with it is described Production technology management module 3 is connected, to set teams and groups' type and teams and groups personnel.
Further, the production scheduling system also include work centre group module 6, the work centre group module 6 with The production technology management module 3 is connected, and the work centre will be provided with identical working ability is incorporated into together.
Further, the production scheduling system also includes demographic data's management module 7, demographic data's management module 7 are connected with the Gantt chart display module 4, to set the affiliated teams and groups of personnel and order of classes or grades at school.
Further, the production scheduling system also include enterprise's calendaring module 8, enterprise's calendaring module 8 with it is described Gantt chart display module 4 is connected, the normal workday to set enterprise.
Embodiment two
As shown in figure 3, the present invention discloses a kind of production scheduling method of resources of production scheduling, including following step in addition Suddenly:
Step 1:In account management module 1, the personnel with corresponding account and authority can be with login system;
Step 2:In workform management module 2, existing work order and its corresponding process, and the accordingly execution feelings of work order are checked Condition, if in the new work order of the module creation, corresponding technological procedure can be selected on the interface of ejection;
Step 3:In production technology management module 3, all techniques existed are checked, and can be with newly-increased technique Work centre group and teams and groups are selected, and set process time and process time;
Step 4:In Gantt chart display module 4, work order, demographic data and the enterprise's calendar of production are intended to Production scheduling is carried out, and shows with double dimensional matrix of time and equipment the arrangement situation of process.
Wherein, work centre group module 6 is further comprised in step 3, can be with the work centre group module 6 Increase, delete, changing, looking into the work centre group information existed, and can select and add work centre.
In addition, further comprising shift management module 5 in step 3, can increase in the shift management module 5, delete, Change, look into the teams and groups' information existed.
And further comprise demographic data's management module 7 in step 4, can be with demographic data's management module 7 Increase, delete, changing, looking into the personal information existed, and the affiliated teams and groups of personnel can be set.
Further, enterprise's calendaring module 8 is further comprised in step 4, can be set in enterprise's calendaring module 8 Determine normal workday and the overtime of enterprise.
When carrying out production scheduling, it is necessary to according between at the beginning of work order layer setting and the end time, and work order is excellent First level, considers, and carries out optimal process path scheduling, it is ensured that work order can be completed within the defined time.
The present invention is allowed to compared with prior art, have the following advantages that and actively imitate due to using above technical scheme Really:
1st, the present invention effectively optimizes the use of resource by the scheduling scheduling of science, reduce equipment production line wait or The time of shutdown, improve equipment material and the utilization rate of Personnel Resources;
2nd, the present invention improves the transparence of production management, visualization, can be predicted and can quantify, and improves the punctual of delivery Rate, has been obviously improved CSAT and the market competitiveness;
3rd, production scheduling system of the invention can combine the factor for influenceing production with Gantt chart, comprehensive The actual production status of display, real-time, interactive is easy to administrative staff to understand production scene production status with dispatcher, after being Continuous work order schedule provides foundation, improves the scheduling level of dispatcher, realizes abundant effective utilization of ERM;
4th, the present invention can realize the combing to enterprise's existing resource, and can by way of domination by equipment and The real time load situation of personnel is shown, by the operation of a period of time, can be changed by way of data analysis for enterprise Leather provides data supporting, promotes the production regularization and high efficiency of enterprise.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in, It should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with scope of the claims It is defined.

Claims (10)

1. the production scheduling system of a kind of resources of production scheduling, it is characterised in that including account management module, workform management mould Block, production technology management module and Gantt chart display module, wherein:
The account management module is to the authority that controls the personnel of login system and its have;
The workform management module is connected with the account management module, to the personnel according to login system and its authority setting The machining status of its type for checking corresponding work order, the technological procedure called and work order;
The production technology management module is connected with the workform management module, to set teams and groups that corresponding process calls, Time and process time needed for work centre group, work centre and production;
The Gantt chart display module is connected with the production technology management module, and the work order to be intended to produce passes through dominant The mode of change is shown.
2. the production scheduling system of a kind of resources of production scheduling according to claim 1, it is characterised in that also including teams and groups Management module, the shift management module is connected with the production technology management module, to set teams and groups' type and teams and groups people Member.
3. the production scheduling system of a kind of resources of production scheduling according to claim 1, it is characterised in that also including work Central. set module, the work centre group module is connected with the production technology management module, will be provided with identical processing energy The work centre of power is incorporated into together.
4. the production scheduling system of a kind of resources of production scheduling according to claim 1, it is characterised in that also including personnel Data management module, demographic data's management module is connected with the Gantt chart display module, to set class belonging to personnel Group and order of classes or grades at school.
5. the production scheduling system of a kind of resources of production scheduling according to claim 1, it is characterised in that also including enterprise Calendaring module, enterprise's calendaring module is connected with the Gantt chart display module, the normal workday to set enterprise.
6. a kind of production scheduling method of resources of production scheduling, it is characterised in that comprise the following steps:
Step 1:In account management module, the personnel with corresponding account and authority can be with login system;
Step 2:In workform management module, existing work order and its corresponding process, and the accordingly implementation status of work order are checked, such as Fruit can select corresponding technological procedure in the new work order of the module creation on the interface of ejection;
Step 3:In production technology management module, all techniques existed are checked, and can select in newly-increased technique Work centre group and teams and groups, and set process time and process time;
Step 4:In Gantt chart display module, work order, demographic data and the enterprise's calendar for being intended to production get up to carry out Scheduling is produced, and shows with double dimensional matrix of time and equipment the arrangement situation of process.
7. the production scheduling method of a kind of resources of production scheduling according to claim 6, it is characterised in that in step 3 Further comprise work centre group module, can increase in the work centre group module, delete, changing, looking into the work existed Center group information, and can select and add work centre.
8. the production scheduling method of a kind of resources of production scheduling according to claim 6, it is characterised in that in step 3 Further comprise shift management module, can increase in the shift management module, delete, changing, looking into the teams and groups' information existed.
9. the production scheduling method of a kind of resources of production scheduling according to claim 6, it is characterised in that in step 4 Further comprise demographic data's management module, can increase in demographic data's management module, delete, change, look into what is existed Personal information, and the affiliated teams and groups of personnel can be set.
10. the production scheduling method of a kind of resources of production scheduling according to claim 6, it is characterised in that in step 4 Further comprise enterprise's calendaring module, when normal workday and the overtime work of enterprise can be set in enterprise's calendaring module Between.
CN201710498417.9A 2017-06-27 2017-06-27 A kind of production scheduling System and method for of resources of production scheduling Pending CN107316146A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710498417.9A CN107316146A (en) 2017-06-27 2017-06-27 A kind of production scheduling System and method for of resources of production scheduling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710498417.9A CN107316146A (en) 2017-06-27 2017-06-27 A kind of production scheduling System and method for of resources of production scheduling

Publications (1)

Publication Number Publication Date
CN107316146A true CN107316146A (en) 2017-11-03

Family

ID=60179530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710498417.9A Pending CN107316146A (en) 2017-06-27 2017-06-27 A kind of production scheduling System and method for of resources of production scheduling

Country Status (1)

Country Link
CN (1) CN107316146A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109460934A (en) * 2018-11-19 2019-03-12 国网四川省电力公司眉山供电公司 The affairs of facing to manufacture teams and groups plan as a whole regulation method
CN111260322A (en) * 2020-01-16 2020-06-09 襄阳航泰动力机器厂 Discrete manufacturing industry work order scheduling improvement method
CN111768072A (en) * 2020-05-19 2020-10-13 东华大学 Printing and dyeing workshop scheduling system
CN112767513A (en) * 2020-12-31 2021-05-07 浙江中控技术股份有限公司 Visual flow chart, event synchronous configuration tool and flow chart drawing method
CN114139911A (en) * 2021-11-24 2022-03-04 上海民艳信息科技有限公司 Method for high-grade production scheduling in manufacturing industry

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103699105A (en) * 2013-12-30 2014-04-02 北京施达优技术有限公司 Data processing method and device for production scheduling
CN105321042A (en) * 2015-10-19 2016-02-10 金航数码科技有限责任公司 Genetic algorithm-based advanced plan scheduling system and method
CN105488602A (en) * 2014-09-19 2016-04-13 上海宝信软件股份有限公司 Multi-process scheduling method for improving contract demand rate by utilizing aggregate production rule
CN106033558A (en) * 2015-03-11 2016-10-19 宁夏巨能机器人系统有限公司 Communication interface device used between MES system and ERP system and communication method thereof
CN106779308A (en) * 2016-11-23 2017-05-31 智能云科信息科技有限公司 A kind of System and method for of the shop Planning scheduling towards discrete manufacture

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103699105A (en) * 2013-12-30 2014-04-02 北京施达优技术有限公司 Data processing method and device for production scheduling
CN105488602A (en) * 2014-09-19 2016-04-13 上海宝信软件股份有限公司 Multi-process scheduling method for improving contract demand rate by utilizing aggregate production rule
CN106033558A (en) * 2015-03-11 2016-10-19 宁夏巨能机器人系统有限公司 Communication interface device used between MES system and ERP system and communication method thereof
CN105321042A (en) * 2015-10-19 2016-02-10 金航数码科技有限责任公司 Genetic algorithm-based advanced plan scheduling system and method
CN106779308A (en) * 2016-11-23 2017-05-31 智能云科信息科技有限公司 A kind of System and method for of the shop Planning scheduling towards discrete manufacture

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘 轩 等: "基于混合集合规划的作业车间生产排程模型研究", 《制造业自动化》 *
文小芒: "《企业运营实战案例》", 30 November 2014, 海南出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109460934A (en) * 2018-11-19 2019-03-12 国网四川省电力公司眉山供电公司 The affairs of facing to manufacture teams and groups plan as a whole regulation method
CN111260322A (en) * 2020-01-16 2020-06-09 襄阳航泰动力机器厂 Discrete manufacturing industry work order scheduling improvement method
CN111768072A (en) * 2020-05-19 2020-10-13 东华大学 Printing and dyeing workshop scheduling system
CN112767513A (en) * 2020-12-31 2021-05-07 浙江中控技术股份有限公司 Visual flow chart, event synchronous configuration tool and flow chart drawing method
CN114139911A (en) * 2021-11-24 2022-03-04 上海民艳信息科技有限公司 Method for high-grade production scheduling in manufacturing industry

Similar Documents

Publication Publication Date Title
CN107316146A (en) A kind of production scheduling System and method for of resources of production scheduling
CN104751269A (en) Engineering maintenance scheduling management system
CN110516897A (en) A kind of water utilities nested type micro services system
US20230230018A1 (en) Methods and internet of things systems for gas repair-reporting management based on call centers of smart gas
CN101364284A (en) Production management system for electrical power system
CN112668740B (en) Management platform of wisdom shipyard
CN103500375A (en) EM-Plant-based MES (Manufacturing Execution Systems) dispatching control method
CN111598496A (en) Reinforcing steel bar processing management system and processing management method
CN110009202A (en) A kind of intelligent scheduled production program system and method for fertilizer factory
CN109190995B (en) Multi-agent-based maintenance resource bidirectional joint scheduling strategy decision method
CN112819652A (en) Data center applied to power system and method thereof
CN116993022A (en) Method and device for overhauling unit and allocating hydroelectric power
CN116192906A (en) Industrial park comprehensive energy digital monitoring method based on cloud edge end cooperation
CN110826926A (en) Intelligent manufacturing execution system for surface assembly production line
CN105955038A (en) Enterprise intelligent office PDA (Personal Digital Assistant) control system and reimbursement method
CN116187772A (en) Group-level low-carbon transformation decision support system
CN105574065A (en) Method for counting leakage point rate of real-time data
CN101398923A (en) Service flowpath modelling approach and system based on order number
Zhu Research on Enterprise Accounting Informationization and Integration of Industry and Finance
Zhao et al. Research on edge cloud architecture of intelligent power plant
CN105741123A (en) Customer relation management system applied to service industry
CN113589770A (en) Production system based on MES
CN106530110A (en) Big-data-based oceanographic engineering management system and method
CN113011641B (en) Electric power system generator set overhaul marketization arrangement method
CN202486766U (en) M2M-based supply chain intelligent panel system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171103

RJ01 Rejection of invention patent application after publication