CN109460934A - The affairs of facing to manufacture teams and groups plan as a whole regulation method - Google Patents
The affairs of facing to manufacture teams and groups plan as a whole regulation method Download PDFInfo
- Publication number
- CN109460934A CN109460934A CN201811376858.2A CN201811376858A CN109460934A CN 109460934 A CN109460934 A CN 109460934A CN 201811376858 A CN201811376858 A CN 201811376858A CN 109460934 A CN109460934 A CN 109460934A
- Authority
- CN
- China
- Prior art keywords
- task
- teams
- groups
- flow
- mobile terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
Abstract
The invention discloses the affairs of facing to manufacture teams and groups to plan as a whole regulation method, comprising the following steps: S1, acquisition all flow of transactions nodal informations of production team establish Task Scheduling Model;S2, task distribution is carried out by task scheduling server, and flow of task line is generated by Task Scheduling Model, be sent to mobile terminal;The task definition that S3, teams and groups personnel prompt according to mobile terminal passes sequentially through each flow nodes according to flow of task line and completes task, and one flow nodes of every completion, sends the confirmation message of corresponding flow nodes;S4, task scheduling server carry out record preservation to confirmation message;The task of completion is registered in performance electrical form together with corresponding teams and groups' personnel identity information and saves by S5, task scheduling server.It is realized supervision prompting and the content record of work, improves working efficiency in application, easily unified rationally overall planning can be carried out the treatment process to teams and groups' affairs.
Description
Technical field
The present invention relates to production team control technique fields, and in particular to the affairs of facing to manufacture teams and groups plan as a whole regulation side
Method.
Background technique
At the regulation center of electric system, production team can all have various big and small affairs to need to handle daily
And record, it is easy to appear work and intersects the case where carrying out, reduce the working efficiency of teams and groups, can not be completed in work in the stipulated time
Hold, the case where work is forgotten and omitted is easy to happen in the case where working at the same time excessively, being badly in need of one kind can be to production team thing
Business plan as a whole the technological means of regulation, Lai Tigao working efficiency.
Summary of the invention
The present invention in view of the deficienciess of the prior art, provide facing to manufacture teams and groups affairs plan as a whole regulation method, answer
Used time easily the treatment process to teams and groups' affairs can carry out unified rationally overall planning, realize that the supervision of work is reminded
And content record, improve working efficiency.
The invention is realized by the following technical scheme:
The affairs of facing to manufacture teams and groups plan as a whole regulation method, comprising the following steps:
S1, acquisition all flow of transactions nodal informations of production team, and each flow nodes information is imported into task schedule clothes
Business device, establishes Task Scheduling Model;
S2, task distribution is carried out by task scheduling server, and task definition importing Task Scheduling Model is given birth to automatically
At flow of task line, the task of distribution and its flow of task line are then sent to by corresponding people from teams and groups by task scheduling server
The mobile terminal of member;
The task definition that S3, teams and groups personnel prompt according to mobile terminal passes sequentially through each process section according to flow of task line
Point completion task, and one flow nodes of every completion, teams and groups personnel will pass through mobile terminal to task scheduling server transmission pair
Answer the confirmation message of flow nodes;
S4, task scheduling server carry out record preservation to the confirmation message that mobile terminal is fed back, and according to confirmation message
It follows up to the flow of task of teams and groups personnel, until task is completed;
The task of completion is registered in performance electricity by S5, task scheduling server together with corresponding teams and groups' personnel identity information
It is saved in sub-table, and to teams and groups' personnel assignment next task and its corresponding flow of task line.
In application, it is by the unified distribution of task scheduling server progress task and the planning of execution process, can be very
Concentration overall management easily is carried out to teams and groups' affairs, while the confirmation message that administrative staff can feed back by mobile terminal is real
When grasp the Task Progress of corresponding mobile terminal teams and groups personnel, one task of every completions can be carried out next task and distribute,
Teams and groups personnel can orderly carry out when handling affairs in this way, avoid to work because caused by affairs are excessive and intersect chaotic feelings
Condition, working efficiency greatly improve.
Preferably, the flow nodes information includes location information corresponding to flow nodes, passes through task schedule service
The task of device distribution includes sequential node task and random node task, when the task of distribution is sequential node task, then task
Dispatch server according to its fix flow nodes sequence setting flow of task line, when distribution task be random node task,
Then task scheduling server, will using the position of task the last one flow nodes on the mobile terminal of distribution as reference point
A task node nearest from reference point carries out flow of task line gauge stroke as initial point in this subtask.
It preferably, can be by task scheduling server to mobile terminal during the existing task execution of mobile terminal
Distributing emergency task and its flow of task line, mobile terminal is received existing task suspension after emergency task and is cached,
Then it is carried out an urgent task according to the content of emergency task and flow of task line, after completing emergency task, mobile terminal opens again
Dynamic stopped task.
Preferably, in step s 2, task scheduling server sets adjacent two tasks section according to the flow of task line of generation
The deadline interval threshold of point, and it is sent to mobile terminal together with flow of task line.
Preferably, it is mobile when the used time of certain node is more than its corresponding time interval threshold value in teams and groups personnel execution task
Terminal issues prompt information.
Preferably, the mobile terminal be equipped with human-computer interaction interface, for show task definition, current task node and
Current task time on node.
Preferably, the mobile terminal is stored with the identity information of corresponding teams and groups personnel, and sets fingerprint identification module, often
A task node is completed, teams and groups personnel carry out authentication, after authentication, mobile terminal by fingerprint identification module
The identity information of corresponding teams and groups personnel is sent to task scheduling server together with the confirmation message of corresponding node.
Preferably, task scheduling server is the individual performance electrical form of each teams and groups' personnel assignment.
Preferably, it is respectively provided with speech talkback unit in task scheduling server and mobile terminal, passes through both ends speech talkback
Unit distributes the preceding cooperation and communication with during task execution to carry out task.
The present invention has the advantage that and the utility model has the advantages that
1, the affairs of facing to manufacture teams and groups of the present invention plan as a whole regulation method, can easily process to teams and groups' affairs
The unified rationally overall planning of Cheng Jinhang, avoids the occurrence of the mess that affairs excessively cause work intersection.
2, facing to manufacture teams and groups of the present invention affairs plan as a whole regulation method, can be effectively prevented affairs it is excessively miscellaneous and occur work
Make to forget and process omits phenomenon.
3, the affairs of facing to manufacture teams and groups of the present invention plan as a whole regulation method, and the work to each teams and groups personnel may be implemented
Supervision is reminded and content record, improves working efficiency.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application
Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is implementation steps schematic diagram of the invention;
Fig. 2 is the overall planning step of sequential node task and random node task in embodiment.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made
For limitation of the invention.
Embodiment
As shown in Figure 1, the affairs of facing to manufacture teams and groups plan as a whole regulation method, comprising the following steps:
S1, acquisition all flow of transactions nodal informations of production team, and each flow nodes information is imported into task schedule clothes
Business device, establishes Task Scheduling Model;
S2, task distribution is carried out by task scheduling server, and task definition importing Task Scheduling Model is given birth to automatically
At flow of task line, the task of distribution and its flow of task line are then sent to by corresponding people from teams and groups by task scheduling server
The mobile terminal of member;
The task definition that S3, teams and groups personnel prompt according to mobile terminal passes sequentially through each process section according to flow of task line
Point completion task, and one flow nodes of every completion, teams and groups personnel will pass through mobile terminal to task scheduling server transmission pair
Answer the confirmation message of flow nodes;
S4, task scheduling server carry out record preservation to the confirmation message that mobile terminal is fed back, and according to confirmation message
It follows up to the flow of task of teams and groups personnel, until task is completed;
The task of completion is registered in performance electricity by S5, task scheduling server together with corresponding teams and groups' personnel identity information
It is saved in sub-table, and to teams and groups' personnel assignment next task and its corresponding flow of task line.
As shown in Fig. 2, flow nodes information includes location information corresponding to flow nodes, pass through task scheduling server
The task of distribution includes sequential node task and random node task, when the task of distribution is sequential node task, then task tune
Spend server according to its fix flow nodes sequence setting flow of task line, when distribution task be random node task, then
Task scheduling server incite somebody to action this using the position of task the last one flow nodes on the mobile terminal of distribution as reference point
A task node nearest from reference point carries out flow of task line gauge stroke as initial point in subtask.Administrative staff exist in advance
The carrying out fixed format in task scheduling server of the task is write, if task scheduling server judges that writing out for task is each
There are logical order associations for flow nodes, then are considered as sequential node task, if what task scheduling server was judged to write out
There is no logical order associations to be then considered as random node task for each flow nodes of task.Task Scheduling Model includes each flow nodes
Between spatial relation, carrying out that reasonable flow of task line gauge draws to random node task by Task Scheduling Model can be with
Effectively save the distance of walking about of teams and groups personnel.
During the existing task execution of mobile terminal, it can be distributed by task scheduling server to mobile terminal urgent
Task and its flow of task line, mobile terminal are received existing task suspension after emergency task and are cached, then basis
The content and flow of task line of emergency task carry out an urgent task, after completing emergency task, mobile terminal restarting pause
Task.All emergency tasks set specific coding, are immediately performed emergency task if mobile terminal reads specific coding,
To cope with the sudden emergency occurred in teams and groups' affairs regulation process.
In step s 2, task scheduling server sets the completion of adjacent two task node according to the flow of task line of generation
Time interval threshold value, and it is sent to mobile terminal together with flow of task line, the use of certain node in teams and groups personnel execution task
When be more than its corresponding time interval threshold value when, mobile terminal issue prompt information.The administrative staff at task scheduling server end
It was found that can also actively trigger mobile terminal by task scheduling server when mobile terminal task execution is slow and issue prompt letter
Breath.
Mobile terminal is equipped with human-computer interaction interface, for showing task definition, current task node and current task section
The point used time.
Mobile terminal is stored with the identity information of corresponding teams and groups personnel, and sets fingerprint identification module, every to complete one
Business node, teams and groups personnel carry out authentication by fingerprint identification module, and after authentication, mobile terminal will corresponding teams and groups
The identity information of personnel is sent to task scheduling server together with the confirmation message of corresponding node.
Task scheduling server is the individual performance electrical form of each teams and groups' personnel assignment.
Be respectively provided with speech talkback unit in task scheduling server and mobile terminal, by both ends speech talkback unit come into
Cooperation and communication before the distribution of row task and during task execution.
Later period generates if there is new flow of transactions node, then can continue to import task scheduling server to constantly improve
Task Scheduling Model also needs in time to be modified Task Scheduling Model if there is flow of transactions node changes, to guarantee
Its timeliness prevents from affecting subsequent task schedule and execution.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects
It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention
Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (9)
1. the affairs of facing to manufacture teams and groups plan as a whole regulation method, which comprises the following steps:
S1, acquisition all flow of transactions nodal informations of production team, and each flow nodes information is imported into task scheduling server,
Establish Task Scheduling Model;
S2, task distribution is carried out by task scheduling server, and task definition importing Task Scheduling Model is automatically generated and is appointed
Business flowline, is then sent to corresponding teams and groups personnel's for the task of distribution and its flow of task line by task scheduling server
Mobile terminal;
It is complete to pass sequentially through each flow nodes according to flow of task line for the task definition that S3, teams and groups personnel prompt according to mobile terminal
At task, and one flow nodes of every completion, teams and groups personnel will pass through mobile terminal and send corresponding stream to task scheduling server
The confirmation message of Cheng Jiedian;
S4, task scheduling server carry out record preservation to the confirmation message that mobile terminal is fed back, and according to confirmation message to class
The flow of task of group personnel follows up, until task is completed;
The task of completion is registered in performance electronic watch together with corresponding teams and groups' personnel identity information by S5, task scheduling server
It is saved in lattice, and to teams and groups' personnel assignment next task and its corresponding flow of task line.
2. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that the process section
Point information includes location information corresponding to flow nodes, includes that sequential node is appointed by the task that task scheduling server is distributed
Business and random node task, when the task of distribution is sequential node task, the then process that task scheduling server is fixed according to it
Node sequence sets flow of task line, and when the task of distribution is random node task, then task scheduling server is by the shifting of distribution
The position of task the last one flow nodes is used as reference point in dynamic terminal, by this subtask from reference point recently one
A task node carries out flow of task line gauge as initial point and draws.
3. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that in mobile terminal
Existing task execution during, emergency task and its flow of task can be distributed to mobile terminal by task scheduling server
Line, mobile terminal are received existing task suspension after emergency task and are cached, then according to the content of emergency task and
Flow of task line carries out an urgent task, and after completing emergency task, mobile terminal restarts stopped task.
4. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that in step S2
In, task scheduling server sets the deadline interval threshold of adjacent two task node according to the flow of task line of generation, and
It is sent to mobile terminal together with flow of task line.
5. the affairs of facing to manufacture teams and groups according to claim 4 plan as a whole regulation method, which is characterized in that teams and groups personnel hold
When the used time of certain node is more than its corresponding time interval threshold value in row task, mobile terminal issues prompt information.
6. the affairs of facing to manufacture teams and groups according to claim 5 plan as a whole regulation method, which is characterized in that described mobile whole
End is equipped with human-computer interaction interface, for showing task definition, current task node and current task time on node.
7. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that described mobile whole
End is stored with the identity information of corresponding teams and groups personnel, and sets fingerprint identification module, one task node of every completion, teams and groups personnel
Authentication is carried out by fingerprint identification module, after authentication, mobile terminal will correspond to the identity information of teams and groups personnel
Task scheduling server is sent to together with the confirmation message of corresponding node.
8. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that task schedule clothes
Business device is the individual performance electrical form of each teams and groups' personnel assignment.
9. the affairs of facing to manufacture teams and groups according to claim 1 plan as a whole regulation method, which is characterized in that in task schedule
Server and mobile terminal are respectively provided with speech talkback unit, and task is carried out by both ends speech talkback unit and distributes preceding and task
Cooperation and communication in implementation procedure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811376858.2A CN109460934A (en) | 2018-11-19 | 2018-11-19 | The affairs of facing to manufacture teams and groups plan as a whole regulation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811376858.2A CN109460934A (en) | 2018-11-19 | 2018-11-19 | The affairs of facing to manufacture teams and groups plan as a whole regulation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109460934A true CN109460934A (en) | 2019-03-12 |
Family
ID=65610904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811376858.2A Pending CN109460934A (en) | 2018-11-19 | 2018-11-19 | The affairs of facing to manufacture teams and groups plan as a whole regulation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109460934A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110705861A (en) * | 2019-09-26 | 2020-01-17 | 山东鲁能软件技术有限公司 | Management method and system based on mobile internet |
CN112801319A (en) * | 2021-02-01 | 2021-05-14 | 神州数码融信云技术服务有限公司 | Operation and maintenance workflow propelling method |
CN113705943A (en) * | 2020-05-22 | 2021-11-26 | 纬创资通股份有限公司 | Task management method and system based on voice talkback function and mobile device |
CN116757562A (en) * | 2023-08-22 | 2023-09-15 | 国联江森自控绿色科技(无锡)有限公司 | Intelligent manufacturing scheduling method with self-learning capability |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN106549495A (en) * | 2016-11-03 | 2017-03-29 | 合肥华义电气科技有限公司 | A kind of power system method of real-time |
CN106557471A (en) * | 2015-09-24 | 2017-04-05 | 上海汽车集团股份有限公司 | Method for scheduling task and device |
CN107316146A (en) * | 2017-06-27 | 2017-11-03 | 上海应用技术大学 | A kind of production scheduling System and method for of resources of production scheduling |
CN108520316A (en) * | 2018-03-28 | 2018-09-11 | 南京智格电力科技有限公司 | A kind of data-optimized processing method of overload alarm |
-
2018
- 2018-11-19 CN CN201811376858.2A patent/CN109460934A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN106557471A (en) * | 2015-09-24 | 2017-04-05 | 上海汽车集团股份有限公司 | Method for scheduling task and device |
CN106549495A (en) * | 2016-11-03 | 2017-03-29 | 合肥华义电气科技有限公司 | A kind of power system method of real-time |
CN107316146A (en) * | 2017-06-27 | 2017-11-03 | 上海应用技术大学 | A kind of production scheduling System and method for of resources of production scheduling |
CN108520316A (en) * | 2018-03-28 | 2018-09-11 | 南京智格电力科技有限公司 | A kind of data-optimized processing method of overload alarm |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110705861A (en) * | 2019-09-26 | 2020-01-17 | 山东鲁能软件技术有限公司 | Management method and system based on mobile internet |
CN113705943A (en) * | 2020-05-22 | 2021-11-26 | 纬创资通股份有限公司 | Task management method and system based on voice talkback function and mobile device |
CN113705943B (en) * | 2020-05-22 | 2024-04-26 | 纬创资通股份有限公司 | Task management method and system based on voice intercom function and mobile device |
CN112801319A (en) * | 2021-02-01 | 2021-05-14 | 神州数码融信云技术服务有限公司 | Operation and maintenance workflow propelling method |
CN116757562A (en) * | 2023-08-22 | 2023-09-15 | 国联江森自控绿色科技(无锡)有限公司 | Intelligent manufacturing scheduling method with self-learning capability |
CN116757562B (en) * | 2023-08-22 | 2023-12-05 | 国联江森自控绿色科技(无锡)有限公司 | Intelligent manufacturing scheduling method with self-learning capability |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109460934A (en) | The affairs of facing to manufacture teams and groups plan as a whole regulation method | |
CN105354762B (en) | Power customer service work order identification and distribution system and method | |
CN106874087A (en) | A kind of block chain intelligence contract timed task dispatching method | |
CN103747092B (en) | Vehicle after-sale management system and method | |
CN103886398B (en) | Business monitoring method and system under a kind of cross-system isomerous environment | |
CN109345072A (en) | Dispatching method for distribution branch line scheduling scenario | |
CN110706363A (en) | Attendance scheduling system based on face recognition | |
CN103544060B (en) | A kind of service dispatch system and method based on WEBSERVICE | |
CN106022487A (en) | Intelligent device operation and maintenance management system | |
CN106127526A (en) | Intelligent robot system and method for work thereof | |
CN104951863A (en) | Method for intelligently extracting bid evaluation experts | |
CN108391022A (en) | A kind of call processing method, electronic device and computer readable storage medium | |
CN110610319A (en) | Intelligent scheduling system and method based on gas station user classification guidance | |
CN111598417A (en) | Natural language processing-based electric power non-emergency repair order distribution method | |
CN101436065A (en) | Substrate production plan generating method | |
CN106790678A (en) | A kind of Transmission system and method for ensureing the consumption of significant data prioritised transmission | |
CN103326935B (en) | The method and system that a kind of intelligence based on microblog is waited in turn | |
CN107330608B (en) | Production scheduling method based on neuron network technology | |
CN102629345B (en) | Chain type links up collaboration method, Apparatus and system | |
CN102664941A (en) | Terminal reminding system and method | |
CN106530474A (en) | Achievement method of queuing system management platform | |
CN102984272A (en) | System and method for remotely controlling communication capacity of mobile terminal | |
CN109388482A (en) | Dispatching method, device and the storage medium of task | |
CN107424405A (en) | A kind of vehicle dispatch system and its application method | |
CN102750751B (en) | Handover control system and method for railway crossing duty room of industrial and mining enterprises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190312 |