CN108520316A - A kind of data-optimized processing method of overload alarm - Google Patents

A kind of data-optimized processing method of overload alarm Download PDF

Info

Publication number
CN108520316A
CN108520316A CN201810267084.3A CN201810267084A CN108520316A CN 108520316 A CN108520316 A CN 108520316A CN 201810267084 A CN201810267084 A CN 201810267084A CN 108520316 A CN108520316 A CN 108520316A
Authority
CN
China
Prior art keywords
flow
data
engine
processing
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810267084.3A
Other languages
Chinese (zh)
Inventor
胡志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Zhi Ge Electric Power Technology Co Ltd
Original Assignee
Nanjing Zhi Ge Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Zhi Ge Electric Power Technology Co Ltd filed Critical Nanjing Zhi Ge Electric Power Technology Co Ltd
Priority to CN201810267084.3A priority Critical patent/CN108520316A/en
Publication of CN108520316A publication Critical patent/CN108520316A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/5038Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/505Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/48Indexing scheme relating to G06F9/48
    • G06F2209/484Precedence
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/50Indexing scheme relating to G06F9/50
    • G06F2209/5021Priority
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/50Indexing scheme relating to G06F9/50
    • G06F2209/503Resource availability

Abstract

The present invention provides a kind of data-optimized processing method of overload alarm.The present invention method be:(1)Establish data-optimized processing system;(2)Establish standardization flow;(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;(4)After monitoring alert event, warning information is generated, system starts corresponding disposal process according to alarm event type and event information matching;(5)Workflow engine is responsible for flow startup and flow redirects;(6)After O&M department flow management and control server receives process distribution data, flow Pending tasks are sent to designated treatment personnel;(7)Each treatment people receives processing of the completion to task after process distribution message;(8)After operation maintenance personnel has handled current task, flow jumps to next node;(9)Workflow engine terminates flow after the completion of the last one node processing, and history of forming records subsequently to check.This method is handled for the fast automatic configuration of extensive alert data, improves event handling efficiency.

Description

A kind of data-optimized processing method of overload alarm
Technical field:
The present invention relates to a kind of data-optimized processing methods of overload alarm, belong to energy consumption data analyzing processing technical field.
Background technology:
With the continuous development of computer technology, requirement of the enterprise to data O&M efficiency is higher and higher.In many companies, with The increase of number of devices and the growth of service life, maintenance engineering amount is more and more, and needing the workflow managed also becomes more next Bigger, the inside is flooded with a large amount of scheduler task:Some rely on some time point and go to execute, some rely on data or outside Alert event executes.High, situation is required to change fast feature, existing data timeliness for energy consumption data acquisition disposition Processing method cannot be satisfied demand.
Invention content:
It, will be related soft the purpose of the present invention is providing a kind of data-optimized processing method of overload alarm in view of the above problems Part function and gathered data are interrelated, form standardization disposal process for overload alarm data processing, and unite One coordinates control so that and each system unit cooperates with the element for needing to dispose, and co-ordination improves emergency disposal efficiency, The personnel depaly and quick response being optimal.
Above-mentioned purpose is realized by following technical scheme:
A kind of data-optimized processing method of overload alarm, this method include:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module, The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at Reason;
(2)Establish standardization flow:Using visible process programming facility, operation maintenance personnel will be at the alert event that summed up Contents of program, method and step are set, layout, solidification are carried out by workflow tool, form sequencing, standardized process flow;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing, And record all processing information in flow disposal process, history of forming records subsequently to check.
The data-optimized processing method of the overload alarm, the workflow engine include flow parsing module, flow Management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in In flow history library;The inquiry of support process historical data is had access to.
The data-optimized processing method of the overload alarm, what the workflow engine preserved in operation process For data for realizing flow monitoring function, concrete methods of realizing is to indicate that disposition terminates and unclosed section using different colours Point, while showing the disposition end time of each node, processing result information, for grasping flow processing progress to user.
The data-optimized processing method of the overload alarm, the workflow engine are touched in operation process using cycle Hair mechanism, is at regular intervals scanned flow tasks, such as finds the unfinished task of time-out, then when user logs in into Row warning is reminded.
The data-optimized processing method of the overload alarm, the distribution of the workflow engine distributed by idle degrees or Person presses task amount equilibrium assignment or according to priority order-assigned;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high The flow of priority will be assigned, and priority it is low then need to wait for.
Advantageous effect:
The present invention is disposed process layout to the overload alarm data in energy consumption monitoring data, and Establishing process disposes node and industry Then the incidence relation of function of being engaged in and equipment management personnel utilizes alarm event and flow path match model, according to event type Etc. information quickly start emergency preplan, so that processing procedure is quickly circulated in O&M department, effectively collect information, make full use of The processing capacity of each element system in O&M department completes the quick disposition to alert event.Method proposed by the present invention can have It imitates ground tissue multi-user collaborative and disposes alert event, fully organize and utilize O&M resource, the sound to alert event is rapidly completed It should and dispose.
Description of the drawings:Fig. 1 is the flow chart of the present invention.
Specific implementation mode:
The data-optimized processing method of overload alarm of the present embodiment, this method include:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module, The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at Reason;This system is developed based on Web, is logged in by user and permission control is realized.
(2)Establish standardization flow:Using visible process programming facility, alarm thing that operation maintenance personnel will sum up Part treatment procedures content, method and step carry out layout, solidification by workflow tool, form sequencing, standardized processing stream Journey;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing, And record all processing information in flow disposal process, history of forming records subsequently to check.
The data-optimized processing method of the overload alarm, workflow engine are the core composition moulds of procedure business disposition Block is responsible for realizing the Core Features such as disposal process redirects automatically, flow state machine is safeguarded.The workflow engine includes flow Parsing module, flow management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in In flow history library;The inquiry of support process historical data is had access to.
Workflow engine includes three main algorithm modules, is flow startup, selection follow-up link disposition people and Ren respectively Business node is sent.
The data-optimized processing method of the overload alarm, what the workflow engine preserved in operation process For data for realizing flow monitoring function, concrete methods of realizing is to indicate that disposition terminates and unclosed section using different colours Point, while showing the disposition end time of each node, processing result information, for grasping flow processing progress to user.
The data-optimized processing method of the overload alarm, the workflow engine are touched in operation process using cycle Hair mechanism, is at regular intervals scanned flow tasks, such as finds the unfinished task of time-out, then when user logs in into Row warning is reminded.
The data-optimized processing method of the overload alarm, the distribution of the workflow engine distributed by idle degrees or Person presses task amount equilibrium assignment or according to priority order-assigned;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high The flow of priority will be assigned, and priority it is low then need to wait for.
The technical means disclosed in the embodiments of the present invention is not limited to the technical means disclosed in the above technical means, and further includes The technical solution being made of the above technical characteristic equivalent replacement.The unaccomplished matter of the present invention, belongs to those skilled in the art's Common knowledge.

Claims (5)

1. a kind of data-optimized processing method of overload alarm, it is characterized in that:This method includes:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module, The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at Reason;
(2)Establish standardization flow:Using visible process programming facility, operation maintenance personnel will be at the alert event that summed up Contents of program, method and step are set, layout, solidification are carried out by workflow tool, form sequencing, standardized process flow;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing, And record all processing information in flow disposal process, history of forming records subsequently to check.
2. the data-optimized processing method of overload alarm according to claim 1, it is characterized in that:The workflow engine packet Include flow parsing module, flow management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in In flow history library;The inquiry of support process historical data is had access to.
3. the data-optimized processing method of overload alarm according to claim 1 or 2, it is characterized in that:The workflow is drawn The data preserved in operation process are held up for realizing flow monitoring function, concrete methods of realizing is to use different colours table Show disposition end and unclosed node, while showing the disposition end time of each node, processing result information, is used for giving Grasp flow processing progress in family.
4. the data-optimized processing method of overload alarm according to claim 1 or 2, it is characterized in that:The workflow is drawn It holds up in operation process using cycle trigger mechanism, flow tasks is scanned at regular intervals, such as find that time-out is not complete At task, then warning prompting is carried out when user logs in.
5. the data-optimized processing method of overload alarm according to claim 1 or 2, the distribution of the workflow engine are pressed Task amount equilibrium assignment or according to priority order-assigned are either pressed in idle degrees distribution;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high The flow of priority will be assigned, and priority it is low then need to wait for.
CN201810267084.3A 2018-03-28 2018-03-28 A kind of data-optimized processing method of overload alarm Pending CN108520316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810267084.3A CN108520316A (en) 2018-03-28 2018-03-28 A kind of data-optimized processing method of overload alarm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810267084.3A CN108520316A (en) 2018-03-28 2018-03-28 A kind of data-optimized processing method of overload alarm

Publications (1)

Publication Number Publication Date
CN108520316A true CN108520316A (en) 2018-09-11

Family

ID=63430721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810267084.3A Pending CN108520316A (en) 2018-03-28 2018-03-28 A kind of data-optimized processing method of overload alarm

Country Status (1)

Country Link
CN (1) CN108520316A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109242442A (en) * 2018-09-27 2019-01-18 拉扎斯网络科技(上海)有限公司 Task monitoring method, device, electronic equipment and computer readable storage medium
CN109376054A (en) * 2018-09-25 2019-02-22 广州虎牙信息科技有限公司 A kind of method, apparatus of data distribution, terminal device and storage medium
CN109460934A (en) * 2018-11-19 2019-03-12 国网四川省电力公司眉山供电公司 The affairs of facing to manufacture teams and groups plan as a whole regulation method
CN110008258A (en) * 2019-01-28 2019-07-12 国网山东省电力公司物资公司 A kind of full information visualized data processing method based on business driving
CN110730215A (en) * 2019-09-20 2020-01-24 上海东方富联科技有限公司 Transfer engine, data transfer method, medium and terminal for alarm event
CN111516623A (en) * 2020-04-17 2020-08-11 长城汽车股份有限公司 Monitoring method and device, medium and equipment for vehicle storage battery
CN111885126A (en) * 2020-07-08 2020-11-03 泰康保险集团股份有限公司 Task pushing method and device
CN111898899A (en) * 2020-07-25 2020-11-06 江苏锐创软件技术有限公司 Flow management and control method, device and system for automatically triggering workflow and storage medium
CN111915275A (en) * 2020-07-31 2020-11-10 上海燕汐软件信息科技有限公司 Application operation process management method, device and system
CN112132300A (en) * 2020-09-30 2020-12-25 国网智能科技股份有限公司 Transformer substation maintenance method, device and system
CN112507168A (en) * 2020-12-17 2021-03-16 武汉卓尔信息科技有限公司 Application workflow processing method and framework
CN113220497A (en) * 2021-05-31 2021-08-06 挂号网(杭州)科技有限公司 System abnormity alarm method, device, equipment and storage medium
CN113919757A (en) * 2021-11-22 2022-01-11 重庆允成互联网科技有限公司 Workflow-based backlog handler matching method and system
CN115022154A (en) * 2022-06-21 2022-09-06 深圳市商汤科技有限公司 Alarm flow processing method, device, equipment, storage medium and program product
CN115086146A (en) * 2022-06-10 2022-09-20 深圳市商汤科技有限公司 Alarm processing method, device, equipment and storage medium
CN115378792A (en) * 2021-05-18 2022-11-22 腾讯云计算(北京)有限责任公司 Alarm processing method, device and storage medium
CN116664102A (en) * 2023-05-12 2023-08-29 上海天玑科技股份有限公司 Monitoring and warning method for operation and maintenance flow

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496088A (en) * 2011-12-14 2012-06-13 河北省电力公司通信中心 Method for improving executive force of power communication overhaul core flow
CN102999816A (en) * 2012-12-05 2013-03-27 福建邮科通信技术有限公司 Workflow engine capable of being personalized in business process customization
CN103065223A (en) * 2012-12-28 2013-04-24 新奥特(北京)视频技术有限公司 Method and device of rich media data content creation
CN103368760A (en) * 2012-03-31 2013-10-23 北京泰乐德信息技术有限公司 Railway electric service and communication signal integrated operation and maintenance system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496088A (en) * 2011-12-14 2012-06-13 河北省电力公司通信中心 Method for improving executive force of power communication overhaul core flow
CN103368760A (en) * 2012-03-31 2013-10-23 北京泰乐德信息技术有限公司 Railway electric service and communication signal integrated operation and maintenance system and method
CN102999816A (en) * 2012-12-05 2013-03-27 福建邮科通信技术有限公司 Workflow engine capable of being personalized in business process customization
CN103065223A (en) * 2012-12-28 2013-04-24 新奥特(北京)视频技术有限公司 Method and device of rich media data content creation

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109376054A (en) * 2018-09-25 2019-02-22 广州虎牙信息科技有限公司 A kind of method, apparatus of data distribution, terminal device and storage medium
CN109376054B (en) * 2018-09-25 2023-02-28 广州虎牙信息科技有限公司 Data distribution method and device, terminal equipment and storage medium
CN109242442A (en) * 2018-09-27 2019-01-18 拉扎斯网络科技(上海)有限公司 Task monitoring method, device, electronic equipment and computer readable storage medium
CN109460934A (en) * 2018-11-19 2019-03-12 国网四川省电力公司眉山供电公司 The affairs of facing to manufacture teams and groups plan as a whole regulation method
CN110008258A (en) * 2019-01-28 2019-07-12 国网山东省电力公司物资公司 A kind of full information visualized data processing method based on business driving
CN110730215B (en) * 2019-09-20 2022-05-24 上海东方富联科技有限公司 Transfer engine, data transfer method, medium and terminal for alarm event
CN110730215A (en) * 2019-09-20 2020-01-24 上海东方富联科技有限公司 Transfer engine, data transfer method, medium and terminal for alarm event
CN111516623A (en) * 2020-04-17 2020-08-11 长城汽车股份有限公司 Monitoring method and device, medium and equipment for vehicle storage battery
CN111885126A (en) * 2020-07-08 2020-11-03 泰康保险集团股份有限公司 Task pushing method and device
CN111898899A (en) * 2020-07-25 2020-11-06 江苏锐创软件技术有限公司 Flow management and control method, device and system for automatically triggering workflow and storage medium
CN111915275A (en) * 2020-07-31 2020-11-10 上海燕汐软件信息科技有限公司 Application operation process management method, device and system
CN112132300A (en) * 2020-09-30 2020-12-25 国网智能科技股份有限公司 Transformer substation maintenance method, device and system
CN112507168A (en) * 2020-12-17 2021-03-16 武汉卓尔信息科技有限公司 Application workflow processing method and framework
CN115378792A (en) * 2021-05-18 2022-11-22 腾讯云计算(北京)有限责任公司 Alarm processing method, device and storage medium
CN113220497A (en) * 2021-05-31 2021-08-06 挂号网(杭州)科技有限公司 System abnormity alarm method, device, equipment and storage medium
CN113919757A (en) * 2021-11-22 2022-01-11 重庆允成互联网科技有限公司 Workflow-based backlog handler matching method and system
CN113919757B (en) * 2021-11-22 2022-11-15 重庆允成互联网科技有限公司 Workflow-based backlog handler matching method and system
CN115086146A (en) * 2022-06-10 2022-09-20 深圳市商汤科技有限公司 Alarm processing method, device, equipment and storage medium
CN115022154A (en) * 2022-06-21 2022-09-06 深圳市商汤科技有限公司 Alarm flow processing method, device, equipment, storage medium and program product
CN116664102A (en) * 2023-05-12 2023-08-29 上海天玑科技股份有限公司 Monitoring and warning method for operation and maintenance flow

Similar Documents

Publication Publication Date Title
CN108520316A (en) A kind of data-optimized processing method of overload alarm
CN107886238B (en) Business process management system and method based on mass data analysis
CN108459939A (en) A kind of log collecting method, device, terminal device and storage medium
CN102739802B (en) Service application-oriented IT centralized operation and maintenance analyzing system
CN107566498A (en) A kind of method for monitoring numerical control machine and system based on Internet of Things
CN107294764A (en) Intelligent supervision method and intelligent monitoring system
CN110581773A (en) automatic service monitoring and alarm management system
CN105843182A (en) Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS
CN106202346A (en) A kind of data load and clean engine, dispatch and storage system
CN107508722A (en) A kind of business monitoring method and device
CN106230985B (en) One kind is based on Internet of Things big data processing method, system and service processing end
CN107577748A (en) Building trade information acquisition system and its method based on big data
CN107993004A (en) A kind of power information processing system and method
JP5003084B2 (en) Business monitoring device, business monitoring system, business monitoring method and program
CN112749060A (en) Power system service bus monitoring method
KR20150058709A (en) Integrated system for research productivity and operation managment based on big date technology, and method thereof
CN113821538B (en) Stream data processing system based on metadata
CN111680892A (en) Research and development management system of integrated systematized tool chain
CN109302459B (en) Service compiling device and method of service-oriented intelligent power grid dispatching control system
CN114372105A (en) ETL tool based method for realizing system automatic inspection
Wen-Yue et al. Semantic web service discovery algorithm and its application on the intelligent automotive manufacturing system
CN112948353A (en) Data analysis method, system and storage medium applied to DAstudio
CN110390466A (en) A kind of multidimensional visualized O&M managing device based on cloud SOA framework
CN115081679A (en) CDC-based industrial data dynamic change automatic perception processing system
JP2002288403A (en) Method, system, and program for project management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 505, No.11, software Avenue, Yuhuatai District, Nanjing City, Jiangsu Province, 210000

Applicant after: Jiangsu Zhige Hi Tech Co.,Ltd.

Address before: 210000 room 402, Huashen building, No. 11, software Avenue, Yuhuatai District, Nanjing City, Jiangsu Province

Applicant before: NANJING CHIGE POWER TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911

RJ01 Rejection of invention patent application after publication