CN108520316A - A kind of data-optimized processing method of overload alarm - Google Patents
A kind of data-optimized processing method of overload alarm Download PDFInfo
- Publication number
- CN108520316A CN108520316A CN201810267084.3A CN201810267084A CN108520316A CN 108520316 A CN108520316 A CN 108520316A CN 201810267084 A CN201810267084 A CN 201810267084A CN 108520316 A CN108520316 A CN 108520316A
- Authority
- CN
- China
- Prior art keywords
- flow
- data
- engine
- processing
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/5038—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/505—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/48—Indexing scheme relating to G06F9/48
- G06F2209/484—Precedence
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/5021—Priority
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/503—Resource availability
Abstract
The present invention provides a kind of data-optimized processing method of overload alarm.The present invention method be:(1)Establish data-optimized processing system;(2)Establish standardization flow;(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;(4)After monitoring alert event, warning information is generated, system starts corresponding disposal process according to alarm event type and event information matching;(5)Workflow engine is responsible for flow startup and flow redirects;(6)After O&M department flow management and control server receives process distribution data, flow Pending tasks are sent to designated treatment personnel;(7)Each treatment people receives processing of the completion to task after process distribution message;(8)After operation maintenance personnel has handled current task, flow jumps to next node;(9)Workflow engine terminates flow after the completion of the last one node processing, and history of forming records subsequently to check.This method is handled for the fast automatic configuration of extensive alert data, improves event handling efficiency.
Description
Technical field:
The present invention relates to a kind of data-optimized processing methods of overload alarm, belong to energy consumption data analyzing processing technical field.
Background technology:
With the continuous development of computer technology, requirement of the enterprise to data O&M efficiency is higher and higher.In many companies, with
The increase of number of devices and the growth of service life, maintenance engineering amount is more and more, and needing the workflow managed also becomes more next
Bigger, the inside is flooded with a large amount of scheduler task:Some rely on some time point and go to execute, some rely on data or outside
Alert event executes.High, situation is required to change fast feature, existing data timeliness for energy consumption data acquisition disposition
Processing method cannot be satisfied demand.
Invention content:
It, will be related soft the purpose of the present invention is providing a kind of data-optimized processing method of overload alarm in view of the above problems
Part function and gathered data are interrelated, form standardization disposal process for overload alarm data processing, and unite
One coordinates control so that and each system unit cooperates with the element for needing to dispose, and co-ordination improves emergency disposal efficiency,
The personnel depaly and quick response being optimal.
Above-mentioned purpose is realized by following technical scheme:
A kind of data-optimized processing method of overload alarm, this method include:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module,
The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at
Reason;
(2)Establish standardization flow:Using visible process programming facility, operation maintenance personnel will be at the alert event that summed up
Contents of program, method and step are set, layout, solidification are carried out by workflow tool, form sequencing, standardized process flow;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching
Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine
Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes
Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks
The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives
After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing,
And record all processing information in flow disposal process, history of forming records subsequently to check.
The data-optimized processing method of the overload alarm, the workflow engine include flow parsing module, flow
Management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node
Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined
Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state
Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks
Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in
In flow history library;The inquiry of support process historical data is had access to.
The data-optimized processing method of the overload alarm, what the workflow engine preserved in operation process
For data for realizing flow monitoring function, concrete methods of realizing is to indicate that disposition terminates and unclosed section using different colours
Point, while showing the disposition end time of each node, processing result information, for grasping flow processing progress to user.
The data-optimized processing method of the overload alarm, the workflow engine are touched in operation process using cycle
Hair mechanism, is at regular intervals scanned flow tasks, such as finds the unfinished task of time-out, then when user logs in into
Row warning is reminded.
The data-optimized processing method of the overload alarm, the distribution of the workflow engine distributed by idle degrees or
Person presses task amount equilibrium assignment or according to priority order-assigned;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust
Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added
New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute
Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time
As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high
The flow of priority will be assigned, and priority it is low then need to wait for.
Advantageous effect:
The present invention is disposed process layout to the overload alarm data in energy consumption monitoring data, and Establishing process disposes node and industry
Then the incidence relation of function of being engaged in and equipment management personnel utilizes alarm event and flow path match model, according to event type
Etc. information quickly start emergency preplan, so that processing procedure is quickly circulated in O&M department, effectively collect information, make full use of
The processing capacity of each element system in O&M department completes the quick disposition to alert event.Method proposed by the present invention can have
It imitates ground tissue multi-user collaborative and disposes alert event, fully organize and utilize O&M resource, the sound to alert event is rapidly completed
It should and dispose.
Description of the drawings:Fig. 1 is the flow chart of the present invention.
Specific implementation mode:
The data-optimized processing method of overload alarm of the present embodiment, this method include:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module,
The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at
Reason;This system is developed based on Web, is logged in by user and permission control is realized.
(2)Establish standardization flow:Using visible process programming facility, alarm thing that operation maintenance personnel will sum up
Part treatment procedures content, method and step carry out layout, solidification by workflow tool, form sequencing, standardized processing stream
Journey;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching
Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine
Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes
Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks
The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives
After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing,
And record all processing information in flow disposal process, history of forming records subsequently to check.
The data-optimized processing method of the overload alarm, workflow engine are the core composition moulds of procedure business disposition
Block is responsible for realizing the Core Features such as disposal process redirects automatically, flow state machine is safeguarded.The workflow engine includes flow
Parsing module, flow management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node
Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined
Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state
Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks
Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in
In flow history library;The inquiry of support process historical data is had access to.
Workflow engine includes three main algorithm modules, is flow startup, selection follow-up link disposition people and Ren respectively
Business node is sent.
The data-optimized processing method of the overload alarm, what the workflow engine preserved in operation process
For data for realizing flow monitoring function, concrete methods of realizing is to indicate that disposition terminates and unclosed section using different colours
Point, while showing the disposition end time of each node, processing result information, for grasping flow processing progress to user.
The data-optimized processing method of the overload alarm, the workflow engine are touched in operation process using cycle
Hair mechanism, is at regular intervals scanned flow tasks, such as finds the unfinished task of time-out, then when user logs in into
Row warning is reminded.
The data-optimized processing method of the overload alarm, the distribution of the workflow engine distributed by idle degrees or
Person presses task amount equilibrium assignment or according to priority order-assigned;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust
Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added
New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute
Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time
As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high
The flow of priority will be assigned, and priority it is low then need to wait for.
The technical means disclosed in the embodiments of the present invention is not limited to the technical means disclosed in the above technical means, and further includes
The technical solution being made of the above technical characteristic equivalent replacement.The unaccomplished matter of the present invention, belongs to those skilled in the art's
Common knowledge.
Claims (5)
1. a kind of data-optimized processing method of overload alarm, it is characterized in that:This method includes:
(1)Data-optimized processing system is established, the processing system includes having the server and mobile terminal for monitoring module,
The monitoring module is used to monitor the warning information of gathered data, after flow processing by terminal notification personnel at
Reason;
(2)Establish standardization flow:Using visible process programming facility, operation maintenance personnel will be at the alert event that summed up
Contents of program, method and step are set, layout, solidification are carried out by workflow tool, form sequencing, standardized process flow;
(3)Be arranged operation maintenance personnel, alert event, disposal process incidence relation;
(4)After monitoring alert event, warning information is generated, system starts phase according to alarm event type and event information matching
Answer disposal process;
(5)Workflow engine is responsible for flow startup and flow redirects, and after flow startup, downstream is disposed ring by workflow engine
Section information is sent to the flow management and control service of O&M department;
(6)After O&M department flow management and control server receives process distribution data, it can be believed according to the associated personnel of flow nodes
Flow Pending tasks, are sent to designated treatment personnel by breath;
(7)Each treatment people is prompted after receiving process distribution message, and operation maintenance personnel enters flow disposition client, checks
The task of oneself shows business processing interface according to task definition, completes the processing to task;
(8)Operation maintenance personnel, which has handled to complete message sending after current task, gives flow management and control server, and management and control server receives
After forward messages to workflow engine, flow jumps to next node;
(9)Transmission flow end message terminates flow to workflow engine, workflow engine after the completion of the last one node processing,
And record all processing information in flow disposal process, history of forming records subsequently to check.
2. the data-optimized processing method of overload alarm according to claim 1, it is characterized in that:The workflow engine packet
Include flow parsing module, flow management and control module, flow tasks processing module and flow historical data management module;
The flow parsing module is used for being associated between process of analysis element, including flow nodes information and node and node
Information, the judgement of implementation process logic branch;
The flow management and control module is for realizing flow startup and termination, when flow startup, the input of whole flow process can be joined
Number passes to flow management and control module;According to the logical organization of flow nodes, automatic implementation process node redirects automatically to be tieed up with state
Shield;
The flow tasks processing module is used to inquire current Pending tasks according to flow unique mark;By current Pending tasks
Related data is sent to flow management and control service, and related personnel is notified to handle;Inquiry current process handles record;
The flow historical data management module is used for after the completion of flow disposition, flow can be disposed related data and is saved in
In flow history library;The inquiry of support process historical data is had access to.
3. the data-optimized processing method of overload alarm according to claim 1 or 2, it is characterized in that:The workflow is drawn
The data preserved in operation process are held up for realizing flow monitoring function, concrete methods of realizing is to use different colours table
Show disposition end and unclosed node, while showing the disposition end time of each node, processing result information, is used for giving
Grasp flow processing progress in family.
4. the data-optimized processing method of overload alarm according to claim 1 or 2, it is characterized in that:The workflow is drawn
It holds up in operation process using cycle trigger mechanism, flow tasks is scanned at regular intervals, such as find that time-out is not complete
At task, then warning prompting is carried out when user logs in.
5. the data-optimized processing method of overload alarm according to claim 1 or 2, the distribution of the workflow engine are pressed
Task amount equilibrium assignment or according to priority order-assigned are either pressed in idle degrees distribution;
Described is distributed by idle degrees, is distributed unitedly by idle degrees specifically within the scope of distributable engine, total to adjust
Engine traversal all assignable engines are spent, calculate most idle engine, and the distance between treatment people and fault point is added
New process is distributed to relevant treatment personnel by optimization algorithm;
It is described to press task amount equilibrium assignment, it specifically balances the flow instance number executed on each engine, when distribution, can distribute
Engine within the scope of, search the minimum engine of operational process instance number, assign its and execute the flow to be activated;
The according to priority order-assigned specifically if two or more flows asks to start simultaneously, but only has at this time
As soon as engine is for distribution, then scheduler program needs the priority level according to flow to determine which flow first distributed, it is high
The flow of priority will be assigned, and priority it is low then need to wait for.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810267084.3A CN108520316A (en) | 2018-03-28 | 2018-03-28 | A kind of data-optimized processing method of overload alarm |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810267084.3A CN108520316A (en) | 2018-03-28 | 2018-03-28 | A kind of data-optimized processing method of overload alarm |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108520316A true CN108520316A (en) | 2018-09-11 |
Family
ID=63430721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810267084.3A Pending CN108520316A (en) | 2018-03-28 | 2018-03-28 | A kind of data-optimized processing method of overload alarm |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108520316A (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109242442A (en) * | 2018-09-27 | 2019-01-18 | 拉扎斯网络科技(上海)有限公司 | Task monitoring method, device, electronic equipment and computer readable storage medium |
CN109376054A (en) * | 2018-09-25 | 2019-02-22 | 广州虎牙信息科技有限公司 | A kind of method, apparatus of data distribution, terminal device and storage medium |
CN109460934A (en) * | 2018-11-19 | 2019-03-12 | 国网四川省电力公司眉山供电公司 | The affairs of facing to manufacture teams and groups plan as a whole regulation method |
CN110008258A (en) * | 2019-01-28 | 2019-07-12 | 国网山东省电力公司物资公司 | A kind of full information visualized data processing method based on business driving |
CN110730215A (en) * | 2019-09-20 | 2020-01-24 | 上海东方富联科技有限公司 | Transfer engine, data transfer method, medium and terminal for alarm event |
CN111516623A (en) * | 2020-04-17 | 2020-08-11 | 长城汽车股份有限公司 | Monitoring method and device, medium and equipment for vehicle storage battery |
CN111885126A (en) * | 2020-07-08 | 2020-11-03 | 泰康保险集团股份有限公司 | Task pushing method and device |
CN111898899A (en) * | 2020-07-25 | 2020-11-06 | 江苏锐创软件技术有限公司 | Flow management and control method, device and system for automatically triggering workflow and storage medium |
CN111915275A (en) * | 2020-07-31 | 2020-11-10 | 上海燕汐软件信息科技有限公司 | Application operation process management method, device and system |
CN112132300A (en) * | 2020-09-30 | 2020-12-25 | 国网智能科技股份有限公司 | Transformer substation maintenance method, device and system |
CN112507168A (en) * | 2020-12-17 | 2021-03-16 | 武汉卓尔信息科技有限公司 | Application workflow processing method and framework |
CN113220497A (en) * | 2021-05-31 | 2021-08-06 | 挂号网(杭州)科技有限公司 | System abnormity alarm method, device, equipment and storage medium |
CN113919757A (en) * | 2021-11-22 | 2022-01-11 | 重庆允成互联网科技有限公司 | Workflow-based backlog handler matching method and system |
CN115022154A (en) * | 2022-06-21 | 2022-09-06 | 深圳市商汤科技有限公司 | Alarm flow processing method, device, equipment, storage medium and program product |
CN115086146A (en) * | 2022-06-10 | 2022-09-20 | 深圳市商汤科技有限公司 | Alarm processing method, device, equipment and storage medium |
CN115378792A (en) * | 2021-05-18 | 2022-11-22 | 腾讯云计算(北京)有限责任公司 | Alarm processing method, device and storage medium |
CN116664102A (en) * | 2023-05-12 | 2023-08-29 | 上海天玑科技股份有限公司 | Monitoring and warning method for operation and maintenance flow |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN102999816A (en) * | 2012-12-05 | 2013-03-27 | 福建邮科通信技术有限公司 | Workflow engine capable of being personalized in business process customization |
CN103065223A (en) * | 2012-12-28 | 2013-04-24 | 新奥特(北京)视频技术有限公司 | Method and device of rich media data content creation |
CN103368760A (en) * | 2012-03-31 | 2013-10-23 | 北京泰乐德信息技术有限公司 | Railway electric service and communication signal integrated operation and maintenance system and method |
-
2018
- 2018-03-28 CN CN201810267084.3A patent/CN108520316A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102496088A (en) * | 2011-12-14 | 2012-06-13 | 河北省电力公司通信中心 | Method for improving executive force of power communication overhaul core flow |
CN103368760A (en) * | 2012-03-31 | 2013-10-23 | 北京泰乐德信息技术有限公司 | Railway electric service and communication signal integrated operation and maintenance system and method |
CN102999816A (en) * | 2012-12-05 | 2013-03-27 | 福建邮科通信技术有限公司 | Workflow engine capable of being personalized in business process customization |
CN103065223A (en) * | 2012-12-28 | 2013-04-24 | 新奥特(北京)视频技术有限公司 | Method and device of rich media data content creation |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109376054A (en) * | 2018-09-25 | 2019-02-22 | 广州虎牙信息科技有限公司 | A kind of method, apparatus of data distribution, terminal device and storage medium |
CN109376054B (en) * | 2018-09-25 | 2023-02-28 | 广州虎牙信息科技有限公司 | Data distribution method and device, terminal equipment and storage medium |
CN109242442A (en) * | 2018-09-27 | 2019-01-18 | 拉扎斯网络科技(上海)有限公司 | Task monitoring method, device, electronic equipment and computer readable storage medium |
CN109460934A (en) * | 2018-11-19 | 2019-03-12 | 国网四川省电力公司眉山供电公司 | The affairs of facing to manufacture teams and groups plan as a whole regulation method |
CN110008258A (en) * | 2019-01-28 | 2019-07-12 | 国网山东省电力公司物资公司 | A kind of full information visualized data processing method based on business driving |
CN110730215B (en) * | 2019-09-20 | 2022-05-24 | 上海东方富联科技有限公司 | Transfer engine, data transfer method, medium and terminal for alarm event |
CN110730215A (en) * | 2019-09-20 | 2020-01-24 | 上海东方富联科技有限公司 | Transfer engine, data transfer method, medium and terminal for alarm event |
CN111516623A (en) * | 2020-04-17 | 2020-08-11 | 长城汽车股份有限公司 | Monitoring method and device, medium and equipment for vehicle storage battery |
CN111885126A (en) * | 2020-07-08 | 2020-11-03 | 泰康保险集团股份有限公司 | Task pushing method and device |
CN111898899A (en) * | 2020-07-25 | 2020-11-06 | 江苏锐创软件技术有限公司 | Flow management and control method, device and system for automatically triggering workflow and storage medium |
CN111915275A (en) * | 2020-07-31 | 2020-11-10 | 上海燕汐软件信息科技有限公司 | Application operation process management method, device and system |
CN112132300A (en) * | 2020-09-30 | 2020-12-25 | 国网智能科技股份有限公司 | Transformer substation maintenance method, device and system |
CN112507168A (en) * | 2020-12-17 | 2021-03-16 | 武汉卓尔信息科技有限公司 | Application workflow processing method and framework |
CN115378792A (en) * | 2021-05-18 | 2022-11-22 | 腾讯云计算(北京)有限责任公司 | Alarm processing method, device and storage medium |
CN113220497A (en) * | 2021-05-31 | 2021-08-06 | 挂号网(杭州)科技有限公司 | System abnormity alarm method, device, equipment and storage medium |
CN113919757A (en) * | 2021-11-22 | 2022-01-11 | 重庆允成互联网科技有限公司 | Workflow-based backlog handler matching method and system |
CN113919757B (en) * | 2021-11-22 | 2022-11-15 | 重庆允成互联网科技有限公司 | Workflow-based backlog handler matching method and system |
CN115086146A (en) * | 2022-06-10 | 2022-09-20 | 深圳市商汤科技有限公司 | Alarm processing method, device, equipment and storage medium |
CN115022154A (en) * | 2022-06-21 | 2022-09-06 | 深圳市商汤科技有限公司 | Alarm flow processing method, device, equipment, storage medium and program product |
CN116664102A (en) * | 2023-05-12 | 2023-08-29 | 上海天玑科技股份有限公司 | Monitoring and warning method for operation and maintenance flow |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108520316A (en) | A kind of data-optimized processing method of overload alarm | |
CN107886238B (en) | Business process management system and method based on mass data analysis | |
CN108459939A (en) | A kind of log collecting method, device, terminal device and storage medium | |
CN102739802B (en) | Service application-oriented IT centralized operation and maintenance analyzing system | |
CN107566498A (en) | A kind of method for monitoring numerical control machine and system based on Internet of Things | |
CN107294764A (en) | Intelligent supervision method and intelligent monitoring system | |
CN110581773A (en) | automatic service monitoring and alarm management system | |
CN105843182A (en) | Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS | |
CN106202346A (en) | A kind of data load and clean engine, dispatch and storage system | |
CN107508722A (en) | A kind of business monitoring method and device | |
CN106230985B (en) | One kind is based on Internet of Things big data processing method, system and service processing end | |
CN107577748A (en) | Building trade information acquisition system and its method based on big data | |
CN107993004A (en) | A kind of power information processing system and method | |
JP5003084B2 (en) | Business monitoring device, business monitoring system, business monitoring method and program | |
CN112749060A (en) | Power system service bus monitoring method | |
KR20150058709A (en) | Integrated system for research productivity and operation managment based on big date technology, and method thereof | |
CN113821538B (en) | Stream data processing system based on metadata | |
CN111680892A (en) | Research and development management system of integrated systematized tool chain | |
CN109302459B (en) | Service compiling device and method of service-oriented intelligent power grid dispatching control system | |
CN114372105A (en) | ETL tool based method for realizing system automatic inspection | |
Wen-Yue et al. | Semantic web service discovery algorithm and its application on the intelligent automotive manufacturing system | |
CN112948353A (en) | Data analysis method, system and storage medium applied to DAstudio | |
CN110390466A (en) | A kind of multidimensional visualized O&M managing device based on cloud SOA framework | |
CN115081679A (en) | CDC-based industrial data dynamic change automatic perception processing system | |
JP2002288403A (en) | Method, system, and program for project management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Room 505, No.11, software Avenue, Yuhuatai District, Nanjing City, Jiangsu Province, 210000 Applicant after: Jiangsu Zhige Hi Tech Co.,Ltd. Address before: 210000 room 402, Huashen building, No. 11, software Avenue, Yuhuatai District, Nanjing City, Jiangsu Province Applicant before: NANJING CHIGE POWER TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |
|
RJ01 | Rejection of invention patent application after publication |