CN107301527A CN201710247252.8A CN201710247252A CN107301527A CN 107301527 A CN107301527 A CN 107301527A CN 201710247252 A CN201710247252 A CN 201710247252A CN 107301527 A CN107301527 A CN 107301527A
Authority
CN
China
Prior art keywords
subitem
valency
project
engineering project
solid material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710247252.8A
Other languages
Chinese (zh)
Other versions
CN107301527B (en
Inventor
罗杏春
吴培关
瞿国旭
罗余春
杜云梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201710247252.8A priority Critical patent/CN107301527B/en
Publication of CN107301527A publication Critical patent/CN107301527A/en
Application granted granted Critical
Publication of CN107301527B publication Critical patent/CN107301527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Probability & Statistics with Applications (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of engineering project subitem method that quickly can precisely evaluate again, belong to project management field.The present invention carries out classification subitem by constituting solid material to engineering project, and " amount " and " valency " of subitem contains whole key elements such as structure position, engineering material, arrangement and method for construction, construction management;Engineering project solid material subitem similar with engineering project location completed engineering project tradition subitem " amount " and " amount " correspondence and " amount " and " valency " corresponding coupling algorithm and database are set up, the automatic mathematical statistics and Intelligent data mining of location solid material subitem " valency " is realized;Engineering project budget estimate of preliminary design, working drawing budget actually occur value to marked price, clearing price, final accounts valency etc. in the measuring and calculating value of " valency " and bid and are all contrasted and verified with the statistical value of " valency ", the utilization and checking of " valency " in Whole Process in Basic Construction such as the estimated value of decision phase, the measuring and calculating value of design phase and the actual values of construction stage are realized, the automatic computational entity of BIM models is recycled(Material)" amount " of subitem, realizes the appraisal of engineering project fast accurate.

Description

A kind of engineering project subitem method that quickly can precisely evaluate again
Technical field
It is specifically that one kind is based on structure the present invention relates to a kind of engineering project subitem method that quickly can precisely evaluate again A kind of method for the energy fast accurate appraisal itemized into the solid material of engineering project, belongs to project management field.
Background technology
Engineering project is delivered for use from decision-making, design, construction to final acceptance of construction, operation management and maintenance, entirely builds And if the division in each stage and its precedence are referred to as capital construction procedure during operation, its process is by capital construction What objective law (including the natural law and economic law) was determined, by the natural conditions such as geology, the hydrology and material technology condition Strict restriction, and require, according to set needs are met and scientific master-plan is built and managed, typically to divide For the decision phase(Including two links of pre feasibility study and engineering feasibility study), the design phase(Including preliminary, technology and Three links of construction drawing design), the construction stage(Including preparation of construction, construction management, hand over the links such as final acceptance of construction)With operation rank Section(Including links such as rear evaluation, audit, operation management and maintenances)Four-stage.
At present, the investment evaluation of engineering project and the specific method of the analysis of prices mainly have two:The utilization of decision phase The economic indicator speedy estimation of macroscopic view and design phase, the analysis of prices measuring and calculating of bidding stage bill of quantities.
Decision phase utilizes the construction scale determination that the method for macro-performance indicator speedy estimation is in project dicision Afterwards, the amount of express statistic macro-indicators such as construction area or highway kilometer etc., apply mechanically engineering location similar item macro-indicators Statistical value a kind of method of speedy estimation is carried out to the investment of engineering project, although applying mechanically similar item macro-indicators Necessary adjustment and amendment can be carried out to investment according to the engineering attribute of engineering project during statistical value, but in engineering location The same time can not possibly have identical engineering project, so, this method is mainly embodiment quickly, it is difficult to take into account essence It is accurate.
Design phase, the project table of bid and bill of quantities analysis of prices method are that engineering project has clear and definite design After chart, each calculate is calculated according to the regulation of preliminary budget project table quantities Measurement rules or bill of quantities computation rule and itemized Quantities, then apply mechanically a kind of measuring and calculating analysis cost of each branch of applicable quota analysis engineering project subitem cost and investment Method, according to plan, charging rules for bill of quantities or preliminary budget project table work load evaluation calculate quantities, It is one and requires work that is very strict and fine and wasting time and energy, it is necessary to possesses cost engineer's ability of very high professional quality It is competent at this work, so, although this analysis of prices method precisely, is difficult to accomplish quick.
Due between index and subitem and subitem " amount " and the content of " valency " comprising with intersecting, false relation it is extremely complex, Both approaches are difficult complete unity and are mutually authenticated, and cause final accounts excess budget, budget spending beyond the original estimation, budgetary estimate excess estimate etc. three super existing As often occurring and making investment out of control.
The content of the invention
The technical problems to be solved by the invention be provide one kind for the investment evaluation of engineering project and the analysis of prices can The subitem method that speedy estimation can be analyzed precisely again, the present invention seeks engineering from Highway Project solid material visual angle is constituted The major influence factors and its coupling mechanism of mesh Whole Process in Basic Construction " amount " and " valency ", are reasonable determine and effective control highway Project cost and investment provide it is a kind of can the subitem method that can precisely analyze again of speedy estimation.
The technical solution adopted by the present invention is:A kind of engineering project subitem method that quickly can precisely evaluate again, bag Include following steps:
The principle being adapted by physical make-up, homogeneity division, with each stage working depth of capital construction procedure is to engineering project structure Classification subitem is carried out into solid material, expression key element and subitem method are provided for BIM-BIM displayings engineering project, Make project dicision, design, construction and the Whole Process in Basic Construction and construction project of O&M, individual works, construction unit, point Portion's engineering and the whole components of subdivisional work can be applicable, and " amount " of subitem contains structure position, engineering material and constitute project reality The key element of body, " valency " of subitem contains arrangement and method for construction, the engineering material of measure project and auxiliary, construction management and all Element;
Set up engineering project solid material subitem it is similar with engineering project location completed engineering project tradition itemize " amount " and " amount " correspondence and " amount " and " valency " corresponding coupling algorithm and database, realize the automatic number of location solid material subitem " valency " Reason statistics and Intelligent data mining, obtain the statistical value of the average value, peak and minimum of similar solid material subitem " valency ";
The budget worked out according to the budgetary estimate of engineering project Preliminary design establishment, construction drawing design is to the measuring and calculating value of " valency " and bid Value is actually occurred in the work progress such as middle marked price, clearing price, final accounts valency to be contrasted and be verified to the statistical value of " valency ", Realize " valency " estimated value in the decision phase, the full mistake of the capital construction of measuring and calculating value and the actual value of construction stage of design phase The utilization of journey and checking, form spiralling circulation checking with utilizing, the statistical value of " valency " is progressively close to the real valency in market Lattice;
Calculate " amount " of each stage solid material subitem of engineering project automatically using BIM models, realize engineering project fast accurate Appraisal and the checking with measuring and calculating value.
Specifically, described solid material refers to:Combination or the composite of engineering project entity are constituted, can intuitively be existed The automatic counting statistics of engineering project BIM-BIM its volume, area, weight or number;Described physical make-up principle Refer to:Combination of entities or composite by engineering project is constituted carry out no longer being combined as new entity material between physics subitem, subitem Material subitem;Described homogeneity division principle refers to:Similar solid material subitem should refine homogeneity attribute, and determine the meter of self-consistentency Measure unit, just different analysis of prices depth and management level the need for can division freely;Described is each with capital construction procedure The adaptable principle of stage working depth refers to:Capital construction project from decision-making, design, construction, operation four stages to be estimated, Budgetary estimate, budget, clearing and the final accounts stage investment and cost measuring and calculating, its working depth be from macroscopic view to it is microcosmic, from coarse to fine by Step is deep, and required subitem method and each stage working depth of capital construction procedure are adapted, meet each stage analysis of prices and The need for Cost Management.
Preferably, using the solid material itemize the average value of " valency ", peak and minimum statistical value to engineering Project budget estimate of preliminary design, working drawing budget are contrasted and analysis on its rationality.
Preferably, using the solid material itemize the average value of " valency ", peak and minimum statistical value to engineering Marked price, clearing price and final accounts valency equivalence are contrasted and verified in the offer by tender of project bid, contract.
Preferably, itemized by the use of the solid material and be used as the bill of quantities of highway bids project.
Preferably, measured and counted as the bill of quantities of project management using solid material subitem Valency.
Preferably, by the use of the solid material itemize and its itemize method as engineering project 3D printing management essentials and Management method.
The beneficial effects of the invention are as follows:The solid material subitem of the present invention avoids the measure in subitem amount and work progress The complicated relations such as the intersection and chaos of quantities and ancillary works amount, specify that " amount " of subitem simply forms engineering The quantities of mesh solid material, other amounts are included in " valency ", pass through the history item completed to engineering location The subitem of the subitem method of tradition subitem and the present invention carries out the correspondence of " amount " and " valency " and database is set up in coupling algorithm definition Programming count and Intelligent data mining are carried out, the statistical value and empirical value of " valency " of all kinds of solid material subitems is drawn, it is possible to Fast accurate calculates the investment value in each stage of engineering project.
Embodiment
With reference to embodiment, the present invention is further detailed.
A kind of engineering project subitem method that quickly can precisely evaluate again, comprises the following steps:
By the principle of " physical make-up, homogeneity division and each stage working depth of capital construction procedure are adapted " to engineering project Constitute solid material and carry out classification subitem, such as civil engineering projects solid material is divided into the cubic metre of earth and stone, masonry marshalling, coagulating cement The major class of soil, bituminous concrete, compound, steel, decoration, greening, electromechanics and other materials etc. ten, is BIM-BIM Show that engineering project provides expression key element and subitem method, make project dicision, design, construction and the capital construction of O&M complete Process and the whole components of construction project, individual works, construction unit, partitioned project and subdivisional work can be applicable, subitem " amount " contains the key element that structure position, engineering material constitute project entity, and " valency " of subitem contains arrangement and method for construction, measure Mesh and the engineering material of auxiliary, whole key elements of construction management;
Set up engineering project solid material subitem it is similar with engineering project location completed engineering project tradition itemize " amount " and " amount " correspondence and " amount " and " valency " corresponding coupling algorithm and database, realize the automatic number of location solid material subitem " valency " Reason statistics and Intelligent data mining, obtain the statistical value of the average value, peak and minimum of similar solid material subitem " valency ";
The budget worked out according to the budgetary estimate of engineering project Preliminary design establishment, construction drawing design is to the measuring and calculating value of " valency " and bid Value is actually occurred in the work progress such as middle marked price, clearing price, final accounts valency to be contrasted and be verified to the statistical value of " valency ", Realize " valency " estimated value in the decision phase, the full mistake of the capital construction of measuring and calculating value and the actual value of construction stage of design phase The utilization of journey and checking, form spiralling circulation checking with utilizing, the statistical value of " valency " is progressively close to the real valency in market Lattice;
Calculate " amount " of each stage solid material subitem of engineering project automatically using BIM models, realize engineering project fast accurate Appraisal and the checking with measuring and calculating value.
Specifically, described physical make-up principle refers to:Combination of entities or composite by engineering project is constituted carry out thing New solid material subitem is no longer combined as between reason subitem, subitem;Described homogeneity division principle refers to:Similar solid material subitem Homogeneity attribute should be refined, and determines the measurement unit of self-consistentency, the need for different analysis of prices depth and management level Energy division is freely;The described principle being adapted with each stage working depth of capital construction procedure refers to:Capital construction project is from certainly Plan, design, construction, operation four stages to be estimated, budgetary estimate, budget, clearing and the final accounts stage investment and cost measuring and calculating, its Working depth is from macroscopic view to microcosmic, from coarse to fine progressively deep, required subitem method and each stage work of capital construction procedure Make depth to be adapted, the need for meeting each stage analysis of prices and Cost Management.
Preferably, using the solid material itemize the average value of " valency ", peak and minimum statistical value to engineering Project budget estimate of preliminary design, working drawing budget are contrasted and analysis on its rationality.
Preferably, using the solid material itemize the average value of " valency ", peak and minimum statistical value to engineering Marked price, clearing price and final accounts valency equivalence are contrasted and verified in the offer by tender of project bid, contract.
Preferably, itemized by the use of the solid material and be used as the bill of quantities of highway bids project.
Preferably, measured and counted as the bill of quantities of project management using solid material subitem Valency.
Preferably, by the use of the solid material itemize and its itemize method as engineering project 3D printing management essentials and Management method.
The technical problems to be solved by the invention be provide one kind for the investment evaluation of engineering project and the analysis of prices can The subitem method that speedy estimation can be analyzed precisely again, be using constitute the solid material of civil engineering projects as subitem basis, according to According to and basic principle, that is, " amount " itemized simply forms the quantities of engineering project solid material, and traditional subitem method point The existing close contact of " structure position, construction method and composition material " three elements of item has the difference of detail, this subitem again " amount " of the subitem of method is the real component of engineering project or semi-finished product, contains " structure position and the composition of tradition subitem The full content of material " three elements, and the measures engineering amount and auxiliary included in the work progress such as construction method and arrangement and method for construction Quantities is then included in " valency ", and " valency " refers to that completing the whole consumption in kind of solid material quantities includes artificial, material, machinery The synthesis valency of the measures engineering amount and ancillary works amount that are included with related resource and its influence factor such as equipment machine-team etc., entity material Material subitem is to provide expression key element and subitem expression, solid material subitem for BIM-BIM displayings engineering project To be individually present be nonsensical.
Engineering project tradition subitem method is the key element in terms of structure position, material composition, construction method etc. three to recognize Know and express project content, in terms of the visual angle of structure, engineering project is divided into construction project, individual works, partitioned project, subitem The components such as engineering;Composition solid material composition such as the civil engineering projects of engineering project generally include the cubic metre of earth and stone, masonry marshalling, water The major class of cement concrete, bituminous concrete, steel, compound, ornament materials, greening, electromechanical equipment and other materials etc. ten, it is each Class can be subdivided into different material key element again and The concrete specification forms thousands of specific material entities;Engineering project is applied Work method mainly has artificial construction and the major class of mechanical execution two, and specific project is according to specific execution conditions and constructs key element not With having specific construction organization and construction method, such as concrete has prefabricated and cast-in-place specific construction method.Measure, valuate, Subitem in terms of quality inspection be all with two or more combinations of the aspect of structure position, material composition, construction method etc. three, with Project management and become more meticulous and require more and more higher, subitem divides also just more and more thinner.The core work of the present invention is to find engineering The general character and individual character characteristic of project entity material.The solid material subitem subitem method of the present invention is by physical make-up principle, together Matter division principle and each stage working depth of capital construction procedure are adapted what principle was divided.
(1)Physics subitem principle
Combination of entities or composite by engineering project is constituted carry out no longer being combined as new entity material between physics subitem, subitem Material subitem, such as civil engineering projects are segmented into the cubic metre of earth and stone, masonry marshalling, cement concrete, bituminous concrete, compound, steel The major class of material, decoration, greening, electromechanics and other materials etc. ten, cement concrete and steel are no longer combined as armored concrete and pre- Prestressed concrete.
(2)Homogeneity division principle
Similar entity(Material)Subitem should refine homogeneity attribute, and determine the measurement unit of self-consistentency, just different cost point Deepness and management level the need for can division freely.
(3)The principle being adapted with each stage working depth of capital construction procedure
Capital construction project will be estimated from decision-making, design, construction, four stages of operation, budgetary estimate, budget, clearing and final accounts etc. Investment and the measuring and calculating of cost, its working depth be from macroscopic view to microcosmic, from coarse to fine progressively deep, subitem method of the present invention with Each stage working depth of capital construction procedure is adapted, the need for meeting each stage analysis of prices and Cost Management.
Subitem method of the present invention carries out physics subitem by engineering project solid material, and such as civil engineering projects are divided into native stone Side, masonry marshalling, cement concrete, bituminous concrete, compound, steel, decoration, greening, electromechanics and other materials etc. ten is big Class, the content based on each stage engineering project general character of capital construction procedure and individual character can obtain solid material subitem and tradition The correspondence and containment relationship of project;The engineering project data for relying on engineering project location to complete, checking solid material subitem With the reasonability and feasibility of the containment relationship of conventional items table.
Solid material subitem avoid the intersection of measures engineering amount in subitem amount and work progress and ancillary works amount with The complicated relation such as chaos, specify that " amount " of subitem simply forms the quantities of engineering project solid material, other amounts It is included in " valency ", passes through the tradition subitem and the subitem method of the present invention of the history item completed to engineering location Subitem carry out correspondence and the coupling algorithm of " amount " and " valency " and define and set up database progress programming count and Intelligent data mining, Draw the statistical value and empirical value of " valency " of all kinds of solid material subitems.
Solid material subitem is the component or semi-finished product subitem table of engineering project, contains " the knot of conventional items table subitem The full content of structure position, construction method and composition material " three elements, the specifically corresponding containing of progress in terms of " amount " with " valency " two Relation and coupling algorithm are analyzed, calculated and statistics:
(1)The subitem of solid material subitem table and the corresponding containment relationship of the specific item " amount " of conventional items table, by conventional items table Specific item quantities Measurement rules clear and definite solid material subitem table subitem and the containing pass of " amount " of the specific item of conventional items table System, the specific item of some conventional items tables is the auxiliary content for the subitem for completing solid material subitem table, thus without setting up " amount "- The relation of quantity, but the relation of " valency "-amount of money is set up, mainly there are three kinds of situations:Solid material subitem table computational item " amount " of " amount "=conventional items table computational item;" amount " of " amount "=conventional items table computational item of solid material subitem table computational item × conversion coefficient such as unit is inconsistent;The decomposition computation of " amount "=conventional items table computational item of solid material subitem table computational item " amount ", will supplement the quantities of its composition under bill of quantities subitem table computational item, then be referred to corresponding solid material meter Calculate item." amount " × conversion coefficient of " amount "=conventional items table computational item of solid material subitem table computational item, conversion coefficient is 1 When be exactly the situation of the first above.
(2)The corresponding containment relationship that solid material is itemized with the specific item " valency " of conventional items table, itemizes according to solid material " project content " each clear and definite bill of quantities of the computational item of table or the computational item of preliminary budget project table and solid material point The containment relationship of " valency "-amount of money of the computational item of item table, mainly there is two kinds of situations:" valency " of the subitem of solid material subitem table= " valency " of conventional items table computational item, sets up man-to-man corresponding relation, and the first two situation of the corresponding relation of " amount "-quantity is certainly The dynamic corresponding relation concluded into " valency "-amount of money;" valency "=conventional items table computational item of the subitem of solid material subitem table " valency " × decomposition coefficient, such as one general(In advance)" valency " of calculation project computational item will decompose multiple solid material subitem computational items, One-to-many corresponding relation is set up, calculating determination is carried out to the solid material subitem table computational item to be spread out of conventional items table computational item Decomposition coefficient.
BIM-BIM the programming counts built again by engineering project capital construction each stage and the entity calculated Material " amount ", the statistical value and empirical value of " valency " of all kinds of solid material subitems of utilizing works project location just can be quickly smart Standard calculates the investment value of engineering project.
The precision ratio of speedy estimation is carried out to the investment in project dicision stage using the subitem method of the present invention Conventional method improves a lot, and reason is:Subitem expression of the subitem method of the present invention to decision phase engineering project is to use Constitute the solid material such as cubic metre of earth and stone, masonry marshalling, cement concrete, bituminous concrete, compound, steel, the dress of engineering project The quantities true such as decorations, greening, electromechanical and other materials, embody the personal characteristics of engineering project, estimate than tradition Valency method is fine and much accurate with the expression such as one or two of macro-indicators such as construction area or highway kilometer, it is not necessary to according to tool The engineering attribute of body is adjusted to measuring and calculating value.
Designing Stage of Engineering Projects and the solid material of construction stage subitem cost are entered using the subitem method of the present invention The result of the row quantity of goods produced method analysis of prices directly can be analyzed with solid material statistical value, more can guarantee that the analysis of prices As a result reliability.
Further, the bill of quantities and engineering project pipe of highway bids project are used as by the use of subitem method of the invention The bill of quantities of reason metering and valuation, the common objective for preferably having unified each participant of engineering project is exactly to be pressed according to quantity by matter When complete " amount " of engineering project solid material subitem, the risk for realizing each participant of engineering project is more reasonably divided, led It is embodied in the calculating of " amount " of engineering project solid material subitem and defines definitely and clearly, and engineering project is respectively participated in The risk of side is included in " valency " that engineering project solid material is itemized, and is determined by way of market competition.
Further, the solid material subitem and its method of itemizing by the use of the present invention are used as the management of engineering project 3D printing Key element and management method.
The core content of Highway Project decision phase and design phase are estimation of the determination to " amount " to " valency ", such as Feasibility study is to the route origin and destination of different construction schemes and major control point, construction scale, the demonstration of standard with recommending just It is that macroscopically " amount " is being confined, Preliminary design, Technology design and construction drawing design are then that recommendation and determination are built If scheme carries out the determination and the measuring and calculating to " valency " of " amount ";The core content of construction stage and operation stage are the realities to " amount " Now, use and the determination to " valency ", such as construction tendering is the determination to intending " amount " progress " valency " to be implemented, construction management In clearing be execution to actually accomplishing " valency " of " amount ", design alteration is largely the change to " amount ", be to carry out it is tight Lattice management.Current typical highway engineering subitem project table is mainly made up of Highway Project cost expense(Preliminary budget is total The amount of money)It is project table, construction norm project table, norm for detailed estimates project table, quota of budgetary estimate project table, index of estimate project table, general pre- Project table, estimation project table, bill of quantities and performance rating project table etc. are calculated, the subitem method of these conventional items tables is most Big feature be it is prominent embody to work progress and the attention of construction management, " amount " and the content of " valency " includes between subitem and subitem With intersecting, false relation it is extremely complex.
The solid material subitem subitem method of the present invention is by physical make-up principle, homogeneity division principle and capital construction journey Each stage working depth of sequence be adapted the principle such as principle Highway Project entity " material " be divided into the cubic metre of earth and stone, masonry marshalling, The major class of cement concrete, bituminous concrete, compound, steel, decoration, greening, electromechanics and other materials etc. ten, all kinds of each subitems Project content and work load evaluation agree as follows:
(1)The cubic metre of earth and stone constitutes the solid volume calculating quantities of highway engineering, including roadbed by filling and excavating on the upper thread of original place Excavation, embankment, tunnel excavation and works foundation ditch excavation etc.;
(2)Masonry marshalling by it is various regardless of grade of mortar laid dry, grout tile stone constitute engineering project solid volume calculate work Cheng Liang;
(3)Cement concrete is constituted the entity of engineering project by the various cement concretes regardless of concrete grade and construction method Volume calculates quantities;
(4)Bituminous concrete constitutes engineering project by the various bituminous concretes regardless of bitumen aggregate ratio and construction method bituminous rubble The solid volume on road surface calculates quantities;
(5)Compound is by the various solid volume calculating works constituted regardless of material with the compound composition engineering project of construction method Cheng Liang, including the compound such as treatment of soft foundation and bed course, basic unit;
(6)The steel weight that steel constitute engineering project by the various steel regardless of model and species calculates quantities;
(7)Decoration is to carry out graticule and beautification, mainly pavement strip, tunnel coating and ceramic tile etc. in engineering project solid object surface Ornament materials, by the actual design areal calculation quantities of decoration;
(8)Afforest the greening body natural volume physically designed by highway engineering and calculate quantities, including grass planting, turf, arbor, Shrub etc.;
(9)Electromechanics calculates quantities by the all-in one desk set of the electromechanical equipment of design;
(10)Other materials such as earth working material and other new materials etc. are by the material weight statistical engineering amount for constituting entity.
Therefore it can be tied by capital construction stage feasibility study, Preliminary design, Technology design, construction drawing design, construction BIM-the BIM of the different phases such as calculation, budget needed for the completion of projects calculates and counted automatically each individual works, construction unit and divides The quantities of the solid material subitem of subitem component, can also be complete with engineering project location in terms of " amount " and " valency " two The history item of work carries out the analysis of correspondence containment relationship, calculated and statistics:
(1)The subitem of solid material subitem table and the corresponding containment relationship of the specific item " amount " of conventional items table:
By the subitem and conventional items of the specific item quantities Measurement rules of conventional items table solid material subitem table clearly of the present invention The containment relationship of " amount " of the specific item of table, the specific item of some conventional items tables is the auxiliary for the subitem for completing solid material subitem table Content, thus without setting up the relation of " amount "-quantity, but the relation of " valency "-amount of money is set up, mainly there are three kinds of situations:
1. solid material subitem table computational item " amount "=conventional items table computational item " amount "
Such as Highway Project solid material itemizes " roadbed excavation " in " certain bill of quantities subitem table ", and " roadbed excavation "= " earth excavation(203-1-1)"+", digs the cubic meter of stone(203-1-2)"+", digs non-suitable material(Without mud)(203-1-3)"+", digs mud (203-1-4)"+", removes slip mass(205-12-1)"+" off-load earth excavation(205-12-2)"+" off-load digs the cubic meter of stone(205-12- 3)”(Numbering in bracket is bill of quantities code name, similarly hereinafter).
2. solid material subitem table computational item " amount "=conventional items table computational item " amount " × conversion coefficient(Such as unit It is inconsistent etc.)
Such as Highway Project solid material subitem " bituminous concrete " is in " certain bill of quantities subitem table ", " pitch coagulation Soil "=" thick 6cm(309-1-1-3)× thickness conversion coefficient 0.06 "+" thick 5cm(309-1-3-2)× thickness conversion coefficient 0.05 " + " thick 3cm(309-1-4-2)× thickness conversion coefficient 0.03 ".
3. solid material subitem table computational item " amount "=conventional items table computational item decomposition computation " amount "
Will be by design drawing if computational item of the Highway Project by meter Ji Liang internal diameter 1.0m single hole pressure on circular reinforced concrete culvert Cover plate reinforcing bar, the concrete of its composition of the information polishings such as table, engineering machine account or quota group valency contain body and cover plate, blotter, base The quantities such as hole excavation, then sort out the phases such as reinforcing bar, cement concrete, compound, the cubic metre of earth and stone for corresponding to entity " material " subitem The computational item for the solid material answered.
1., 2. the, which plant situation, to unify 2. handle, i.e. solid material is itemized " amount "=conventional items of table computational item " amount " × conversion coefficient of table computational item, conversion coefficient is exactly situation 1. when being 1;3. the plant situation will be in bill of quantities point The quantities of its composition is supplemented under item table computational item, then is referred to corresponding solid material computational item of the present invention.
(2)The subitem of solid material subitem table and the corresponding containment relationship of the specific item " valency " of conventional items table:
According to " project content " of the computational item of solid material of the present invention subitem table clear and definite each bill of quantities subitem table The containing of " valency "-amount of money of the computational item of computational item and solid material of the present invention subitem table, coupled relation, mainly there is two kinds of feelings Condition:
1. solid material subitem table subitem " valency "=conventional items table computational item " valency "
Such as Highway Project solid material itemizes " roadbed excavation " in " certain bill of quantities subitem table ", and " roadbed excavation "= " earth excavation(203-1-1)"+", digs the cubic meter of stone(203-1-2)"+", digs non-suitable material(Without mud)(203-1-3)"+", digs mud (203-1-4)"+", removes slip mass(205-12-1)"+" off-load earth excavation(205-12-2)"+" off-load digs the cubic meter of stone(205-12- 3)"+" debit(204-3-1)"+" digging soil is overhauled(203-3-1)", by the work load evaluation of agreement, " cubic metre of earth and stone presses original ground The solid volume calculating quantities for constituting highway engineering, including roadbed excavation, embankment, tunnel excavation and knot are filled and excavated on line Structure thing foundation ditch excavation etc. ", " digging soil is overhauled(203-3-1)" it is ancillary works amount in work progress, entity " material is not constituted " amount " of material " subitem, correspondence is in " valency ".
2. " valency " × decomposition coefficient of " valency "=conventional items table computational item of the subitem of solid material subitem table, one general (In advance)" valency " of calculation project computational item will decompose multiple solid material subitem computational items;
Computational item such as Highway Project tradition subitem by meter Ji Liang internal diameter 1.0m single hole pressure on circular reinforced concrete culvert " valency " will be decomposed in the subitems such as solid material subitem computational item reinforcing bar, cement concrete, compound, the cubic metre of earth and stone, then to be inquired about The group valency situation of conventional items table computational item, is decomposed in the corresponding amount of money of solid material subitem computational item or ratio.
The 1. to plant situation be to set up man-to-man corresponding relation, the of the corresponding relation of " amount "-quantity 1., 2. plant situation oneself The dynamic corresponding relation concluded into " valency "-amount of money;The 2. to plant situation be to set up one-to-many corresponding relation, and conventional items meter is calculated The solid material subitem table computational item to be spread out of item, which calculate, determines decomposition coefficient.
Solid material subitem avoid the intersection of measures engineering amount in subitem amount and work progress and ancillary works amount with The complicated relation such as chaos, specify that " amount " of subitem simply forms the quantities of engineering project solid material, other amounts It is included in " valency ", passes through the tradition subitem and the subitem method of the present invention of the history item completed to engineering location Subitem carry out correspondence and the coupling algorithm of " amount " and " valency " and define and set up database progress programming count and Intelligent data mining, Draw the statistical value and empirical value of " valency " of all kinds of solid material subitems, it is possible to which fast accurate calculates each stage of engineering project Investment value.
The specific embodiment of the present invention is explained in detail above in conjunction with accompanying drawing, but the present invention is not limited to above-mentioned reality Example is applied, can also be on the premise of present inventive concept not be departed from the knowledge that those of ordinary skill in the art possess Various changes can be made.

Claims (7)

1. a kind of engineering project subitem method that quickly can precisely evaluate again, it is characterised in that comprise the following steps:
The principle being adapted by physical make-up, homogeneity division, with each stage working depth of capital construction procedure is to engineering project structure Classification subitem is carried out into solid material, expression key element and subitem method are provided for BIM-BIM displayings engineering project, Make project dicision, design, construction and the Whole Process in Basic Construction and construction project of O&M, individual works, construction unit, point Portion's engineering and the whole components of subdivisional work can be applicable, and " amount " of subitem contains structure position, engineering material and constitute project reality The key element of body, " valency " of subitem contains arrangement and method for construction, the engineering material of measure project and auxiliary, construction management and all Element;
Set up engineering project solid material subitem it is similar with engineering project location completed engineering project tradition itemize " amount " and " amount " correspondence and " amount " and " valency " corresponding coupling algorithm and database, realize the automatic number of location solid material subitem " valency " Reason statistics and Intelligent data mining, obtain the statistical value of the average value, peak and minimum of similar solid material subitem " valency ";
The budget worked out according to the budgetary estimate of engineering project Preliminary design establishment, construction drawing design is to the measuring and calculating value of " valency " and bid Value is actually occurred in the work progress such as middle marked price, clearing price, final accounts valency to be contrasted and be verified to the statistical value of " valency ", Realize " valency " estimated value in the decision phase, the full mistake of the capital construction of measuring and calculating value and the actual value of construction stage of design phase The utilization of journey and checking, form spiralling circulation checking with utilizing, the statistical value of " valency " is progressively close to the real valency in market Lattice;
Calculate " amount " of each stage solid material subitem of engineering project automatically using BIM models, realize engineering project fast accurate Appraisal and the checking with measuring and calculating value.
2. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In described physical make-up principle refers to:Combination of entities or composite by engineering project is constituted are carried out between physics subitem, subitem No longer it is combined as new solid material subitem;Described homogeneity division principle refers to:Similar solid material subitem should refine homogeneity category Property, and determine the measurement unit of self-consistentency, just the need for different analysis of prices depth and management level can division freely;Institute The principle being adapted with each stage working depth of capital construction procedure stated refers to:Capital construction project from decision-making, design, construction, Operate four stages to be estimated, budgetary estimate, budget, clearing and the final accounts stage investment and cost measuring and calculating, its working depth be from Macroscopic view arrives microcosmic, from coarse to fine progressively deep, and required subitem method is adapted with each stage working depth of capital construction procedure, The need for meeting each stage analysis of prices and Cost Management.
3. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In, using the solid material itemize the average value of " valency ", peak and minimum statistical value to engineering project Preliminary design Budgetary estimate, working drawing budget are contrasted and analysis on its rationality.
4. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In the throwing called for bid using the statistical value of the average value, peak and minimum of solid material subitem " valency " to engineering project Marked price, clearing price and final accounts valency are contrasted and verified in mark quotation, contract.
5. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In, by the use of the solid material itemize be used as highway bids project bill of quantities.
6. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In, using the solid material subitem measured and valuated as the bill of quantities of project management.
7. a kind of engineering project subitem method that quickly can precisely evaluate again according to claim 1, its feature exists In method of being itemized and its itemized by the use of the solid material is used as the management essentials and management method of engineering project 3D printing.
CN201710247252.8A 2017-04-17 2017-04-17 Project evaluation method based on items Active CN107301527B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710247252.8A CN107301527B (en) 2017-04-17 2017-04-17 Project evaluation method based on items

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710247252.8A CN107301527B (en) 2017-04-17 2017-04-17 Project evaluation method based on items

Publications (2)

Publication Number Publication Date
CN107301527A true CN107301527A (en) 2017-10-27
CN107301527B CN107301527B (en) 2021-01-05

Family

ID=60138020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710247252.8A Active CN107301527B (en) 2017-04-17 2017-04-17 Project evaluation method based on items

Country Status (1)

Country Link
CN (1) CN107301527B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977465A (en) * 2017-12-21 2018-05-01 福建省晨曦信息科技股份有限公司 A kind of project cost display methods and terminal
CN108364134A (en) * 2018-02-11 2018-08-03 武汉理工大学 Cost of construction based on BIM technology manages system
CN108416131A (en) * 2018-02-28 2018-08-17 江苏国泰新点软件有限公司 A kind of drawing file methods of exhibiting, device, server and storage medium
CN108984876A (en) * 2018-07-02 2018-12-11 广州盛冠建筑科技有限公司 A kind of service sleeve automation modeling method and system based on BIM
CN109272294A (en) * 2018-09-11 2019-01-25 上海宝冶集团有限公司 A kind of limitation design method of assembled architecture, device, equipment and storage medium
CN109325886A (en) * 2018-09-25 2019-02-12 温州云计划科技有限公司 A method of automatically generating decoration budget and goods matching
CN109472446A (en) * 2018-09-30 2019-03-15 中铁第勘察设计院集团有限公司 Project Budget preparation method based on BIM model
CN109872043A (en) * 2019-01-17 2019-06-11 上海申元工程投资咨询有限公司 A kind of cost process risk management-control method and its system
CN111078750A (en) * 2019-11-29 2020-04-28 深圳市华阳国际工程设计股份有限公司 Data statistical method and device of project model and computer storage medium
CN111210162A (en) * 2020-01-14 2020-05-29 中资锐诚工程项目管理有限公司 BIM-based whole process engineering pricing management method and BIM-based whole process engineering management system
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer
CN112785173A (en) * 2021-01-29 2021-05-11 华联世纪工程咨询股份有限公司 Cost whole process management system and method
CN112989459A (en) * 2021-02-22 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104537447A (en) * 2015-01-20 2015-04-22 广州赛诺博恩低碳工程研究有限公司 Computing system for construction carbon emission load in construction project
CN105335905A (en) * 2015-11-24 2016-02-17 广州拓欧信息技术有限公司 Building engineering computation and evaluation system and method
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106095989A (en) * 2016-06-21 2016-11-09 上海市建筑科学研究院(集团)有限公司 A kind of architectural engineering information switching method based on BIM
CN106156343A (en) * 2016-07-21 2016-11-23 中国地质大学(武汉) A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104537447A (en) * 2015-01-20 2015-04-22 广州赛诺博恩低碳工程研究有限公司 Computing system for construction carbon emission load in construction project
CN105335905A (en) * 2015-11-24 2016-02-17 广州拓欧信息技术有限公司 Building engineering computation and evaluation system and method
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106095989A (en) * 2016-06-21 2016-11-09 上海市建筑科学研究院(集团)有限公司 A kind of architectural engineering information switching method based on BIM
CN106156343A (en) * 2016-07-21 2016-11-23 中国地质大学(武汉) A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘晓峰: "《基于BIM的施工过程管理的应用研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
王树军: "《建设工程造价量与价的思考》", 《中国科技信息》 *
薛守贵: "《基于BIM的全面造价管理实施构想》", 《安徽建筑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977465A (en) * 2017-12-21 2018-05-01 福建省晨曦信息科技股份有限公司 A kind of project cost display methods and terminal
CN108364134B (en) * 2018-02-11 2021-07-23 武汉理工大学 Building engineering cost management system based on BIM technology
CN108364134A (en) * 2018-02-11 2018-08-03 武汉理工大学 Cost of construction based on BIM technology manages system
CN108416131A (en) * 2018-02-28 2018-08-17 江苏国泰新点软件有限公司 A kind of drawing file methods of exhibiting, device, server and storage medium
CN108416131B (en) * 2018-02-28 2022-06-17 国泰新点软件股份有限公司 Drawing file display method and device, server and storage medium
CN108984876A (en) * 2018-07-02 2018-12-11 广州盛冠建筑科技有限公司 A kind of service sleeve automation modeling method and system based on BIM
CN108984876B (en) * 2018-07-02 2023-09-05 广州盛冠建筑科技有限公司 BIM-based embedded sleeve automatic modeling method and system
CN109272294A (en) * 2018-09-11 2019-01-25 上海宝冶集团有限公司 A kind of limitation design method of assembled architecture, device, equipment and storage medium
CN109325886A (en) * 2018-09-25 2019-02-12 温州云计划科技有限公司 A method of automatically generating decoration budget and goods matching
CN109472446A (en) * 2018-09-30 2019-03-15 中铁第勘察设计院集团有限公司 Project Budget preparation method based on BIM model
CN109872043A (en) * 2019-01-17 2019-06-11 上海申元工程投资咨询有限公司 A kind of cost process risk management-control method and its system
CN111078750A (en) * 2019-11-29 2020-04-28 深圳市华阳国际工程设计股份有限公司 Data statistical method and device of project model and computer storage medium
CN111078750B (en) * 2019-11-29 2023-03-10 深圳市华阳国际工程设计股份有限公司 Data statistical method and device of project model and computer storage medium
CN111210162A (en) * 2020-01-14 2020-05-29 中资锐诚工程项目管理有限公司 BIM-based whole process engineering pricing management method and BIM-based whole process engineering management system
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer
CN111367939B (en) * 2020-03-04 2023-08-22 昆明海巍科技有限公司 Highway engineering project account compiling and managing system, method and computer
CN112785173A (en) * 2021-01-29 2021-05-11 华联世纪工程咨询股份有限公司 Cost whole process management system and method
CN112989459A (en) * 2021-02-22 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item
CN112989459B (en) * 2021-02-22 2023-04-07 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item

Also Published As

Publication number Publication date
CN107301527B (en) 2021-01-05

Similar Documents

Publication Publication Date Title
CN107301527A (en) A kind of engineering project subitem method that quickly can precisely evaluate again
Atibu An investigation into factors causing delays in road construction projects in Kenya
de Lima et al. Distribution of materials in road earthmoving and paving: mathematical programming approach
CN105930931A (en) Electric power engineering cost management method
Cooper et al. Risk analysis of a construction cost estimate
CN103971289B (en) The processing method and processing device of mine ore drawing data
CN104881762A (en) Engineering quantity list decomposition method and system
CN106097149A (en) The method for designing of project of transmitting and converting electricity cost software based on BIM technology
CN107527185B (en) Parallel implementation method for compiling and examining construction project cost file
CN109409634A (en) A method of the metering of Grid Construction Project project amount is carried out based on project management APP
CN105956928A (en) Metal open-pit mine 5D temporal-spatial dynamic production scheduling plan model building method
CN111210162A (en) BIM-based whole process engineering pricing management method and BIM-based whole process engineering management system
Zhadanovsky et al. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation
CN104599061A (en) Method for calculating project amount of road bridge engineering project
Chong et al. Estimating highway construction production rates during design: Elements of a useful estimation tool
Vidić et al. The profitability of dimension stone deposit exploitation in relation to the coefficient of utilization
Chen et al. A whole process cost control strategy of construction engineering based on BIM
Read et al. Constructive dual DP for reservoir optimization
Wang et al. Evaluation of highway maintenance performance using Data Envelopment Analysis (DEA) in Taiwan
Guo Research on Dynamic Cost Management During Construction of Real Estate Project Construction Stage
KR101112634B1 (en) Recording medium recording program for performing an cost calculating method for ecoriver facility construction
Zou et al. The whole process cost management based on BIM
Jing et al. Jestr r
Le Minh Thoa Building Labor Level In Management And Operation Of Water Works System In Hung Yen Province, Vietnam
Ďubek et al. Process of verification of earthworks execution using terrestrial laser scanning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant