CN106097149A - The method for designing of project of transmitting and converting electricity cost software based on BIM technology - Google Patents

The method for designing of project of transmitting and converting electricity cost software based on BIM technology Download PDF

Info

Publication number
CN106097149A
CN106097149A CN201610453778.7A CN201610453778A CN106097149A CN 106097149 A CN106097149 A CN 106097149A CN 201610453778 A CN201610453778 A CN 201610453778A CN 106097149 A CN106097149 A CN 106097149A
Authority
CN
China
Prior art keywords
project
transmitting
engineering
converting electricity
secondary development
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610453778.7A
Other languages
Chinese (zh)
Inventor
崔荣
朱辉
李红娟
邢晓蕊
廖家文
鲁黎
姚凡
贾春燕
冯婷婷
苏芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Chongqing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610453778.7A priority Critical patent/CN106097149A/en
Publication of CN106097149A publication Critical patent/CN106097149A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Stored Programmes (AREA)

Abstract

The method for designing of a kind of project of transmitting and converting electricity cost software based on BIM technology, it realizes the account valuation of defeated journey of exchanging work by software, has the advantage that 1, optimizes design, strengthen investment control;2, construction simulation, information sharing, improves collaborative efficiency;3, a power industry professional construction difficult problem is effectively solved;4, construction costs intelligence computation, raises labour efficiency, and promotes management level;5, project of transmitting and converting electricity data information sharing, formulates for Industry Policy and provides foundation.

Description

The method for designing of project of transmitting and converting electricity cost software based on BIM technology
Technical field
The present invention relates to power transformation engineering technical field, a kind of method for designing for power transformation engineering cost software.
Background technology
At present, electricity power engineering power transmission and transformation construction project detail design uses two dimensional surface detail design, design mistake, leakage The scene frequencies such as item, specialty are overlapping are existing, and making engineering design change quantity increases, and job site is done over again, rebuild phenomenon seriously, throws Money controls difficulty and increases.
China's building field Engineering Cost Management is chronically at following two situation:
Two dimension drawing+artificial manual calculation amount+manually organize valency.That is: construction costs determines, engineering labor and materials machine manages, engineering knot Calculate the full manual operations of management.
Two dimension drawing+software calculation amount+software group valency.That is: construction costs determines and depends on two dimension drawing and cost software, engineering The management of labor and materials machine, Engineering Settlement management manual operations.
Huge construction project, due to practitioner's difference of technology level, often manually operates the construction costs determined Deviation is relatively big and the longest, and usual construction costs finally determines that the time is 1-2 after completion of works, makes engineering process manage Middle no data foundation, by rule of thumb, the management of thick mad property, labor and materials machine tissue, supply without scientific basis, velocity of funds relatively slowly, people, Material, machine are idle, waste situation is serious, and cost increases, and lacks strong competitiveness.Whole industry Cost Management level relatively foreign level There is larger difference, need employing international advanced technology badly and promote management level.
Summary of the invention
It is an object of the invention to provide the method for designing of a kind of project of transmitting and converting electricity cost software based on BIM technology, it The accurate budget of project of transmitting and converting electricity can be realized, improve the accuracy rate and work efficiency calculated.
It is an object of the invention to be realized by such technical scheme, specifically comprise the following steps that
1) utilize software Revit to set up project of transmitting and converting electricity BIM technology three-dimension modeling interface, be used for carrying engineering construction Information;
2) data base and query and search interface are set up;
3) work load evaluation is set up;
4) Revit software secondary development interface API is utilized, it is achieved model is interactive with data double-way;
5) Revit software secondary development interface API is utilized, it is achieved model and quantities calculation one-way interaction;
6) utilize Revit software secondary development interface API, set up data base and select interface;
7) utilizing Revit software secondary development interface API, foundation is data base and selects interface;
8) utilize Revit software secondary development interface API, set up option storehouse and select interface;
9) utilize Revit software secondary development interface API, set up work load evaluation storehouse;
10) utilize Revit software secondary development interface API, resolve BIM model architecture quantities, generate corresponding engineering number According to file, form computer capacity corresponding with engineering model interactive, and generate result of calculation according to computation rule, calculating error ± 2%;
11) utilize Revit software secondary development interface API, be created as retribution sheet format storehouse;
12) utilize Revit software secondary development interface API, set up achievement calculating formula format library;
13) Revit software secondary development interface API is utilized, it is achieved form selectively produces, query interface;
14) utilize Revit software secondary development interface API, realize quantities calculation formula, form derivation behaviour in the design phase Make interface.
Further, step 2) described in set up data base and query and search interface include:
Set up power construction engineering norm for detailed estimates data base and query and search interface thereof;Set up power construction engineering budgetary estimate fixed Volume data base and query and search interface.
Further, step 3) described in set up work load evaluation and include:
Set up power construction engineering norm for detailed estimates work load evaluation;Set up power construction engineering quota of budgetary estimate quantities Computation rule;Set up project of transmitting and converting electricity valuating engineering work load with bill work load evaluation.
Further, step 9) described in set up work load evaluation storehouse and include:
Set up power construction engineering norm for detailed estimates work load evaluation storehouse;Set up power construction engineering quota of budgetary estimate engineering Amount calculates rule base.
Further, step 10) described in formed computer capacity include power construction engineering norm for detailed estimates computer capacity, Power construction engineering quota of budgetary estimate computer capacity and project of transmitting and converting electricity valuating engineering work load with bill computer capacity.
Further, step 11) described in be created as retribution sheet format storehouse and include: power construction engineering norm for detailed estimates form Format library, power construction engineering quota of budgetary estimate statement form storehouse and project of transmitting and converting electricity valuating engineering work load with bill statement form Storehouse.
Owing to have employed technique scheme, present invention have the advantage that:
1. optimize design, strengthen investment control
The present invention utilizes BIM technology to set up project of transmitting and converting electricity three-dimensional building information model, and it is real that solid presents project of transmitting and converting electricity Body, the situations such as project engineering stage discovery design perforated scrofula of neck, mistake, specialty are overlapping, evade engineering design and cause investment to slip up
2. construction simulation, information sharing, improves collaborative efficiency
Project of transmitting and converting electricity working procedure is various, and specialty is intersected, and it is big that difficulty is coordinated in construction management, sets up in the technical program Project of transmitting and converting electricity BIM model can be with model engineering site layout project and work progress, Optimizing Construction Scheme, improves collaborative efficiency.
3. construction costs intelligence computation, raises labour efficiency, and promotes management level
Establishment project of transmitting and converting electricity BIM model Criterion handbook, power engineering industry quota of budgetary estimate, norm for detailed estimates data Storehouse, power engineering industry quota of budgetary estimate, norm for detailed estimates, valuating engineering work load with bill work load evaluation handbook, in conjunction with BIM Technical research realizes project of transmitting and converting electricity quantities intelligence computation, determines construction costs, and forms visualization construction costs.Data provide Source is shared, and reduces settlement dispute, raises labour efficiency.Strengthen power grid construction management level, effectively control construction investment.
4. project of transmitting and converting electricity data information sharing, formulates for Industry Policy and provides foundation
By all kinds of project of transmitting and converting electricity architecture informations are added up, utilize " big data " technology, formation construction costs index, Amount, valency, take index, recruitment index, labor and materials machine distribu-tion index, engineering construction high-quality experience and the number such as construction organization preferred version According to, set up the strong foundation of offer for industry system, policy.
Other advantages, target and the feature of the present invention will be illustrated to a certain extent in the following description, and And to a certain extent, will be apparent to those skilled in the art based on to investigating hereafter, or can To be instructed from the practice of the present invention.The target of the present invention and other advantages can be wanted by description below and right Ask book to realize and obtain.
Accompanying drawing explanation
The accompanying drawing of the present invention is described as follows.
Fig. 1 is the schematic flow sheet of the present invention.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
The method for designing of a kind of project of transmitting and converting electricity cost software based on BIM technology, specifically comprises the following steps that
1, establishment project of transmitting and converting electricity BIM model Criterion handbook.
2, by utilizing BIM technology to set up project of transmitting and converting electricity threedimensional model, data source uses the BIM of autodesk, inc. to set Meter software Revit, in designer's design process, automatization produces.
3, " power construction engineering norm for detailed estimates " data base is set up.
4, " power construction engineering quota of budgetary estimate " data base is set up.
5, establishment " power construction engineering norm for detailed estimates " work load evaluation handbook.
6, establishment " power construction engineering quota of budgetary estimate " work load evaluation handbook.
7, establishment " project of transmitting and converting electricity valuating engineering work load with bill " work load evaluation handbook.
8, design software Revit its second development interface API is used, it is ensured that the accurate corresponding premise of data and figure Under, data structure conventional during extracting calculation amount, such as following table:
Data name Unit Describe Acquisition mode
Volume m<sup>3</sup> Volume Secondary development api interface
Area Area Secondary development api interface
Height mm Highly Secondary development api interface
Width mm Width Secondary development api interface
Length mm Length Secondary development api interface
Face Face structure Secondary development api interface
Material Material Secondary development api interface
Type Type Secondary development api interface
Count Number Statistics
9, Revit software secondary development interface API research and development, set up " power construction engineering norm for detailed estimates " quantities calculation rule Then storehouse.
10, Revit software secondary development interface API research and development, set up " power construction engineering quota of budgetary estimate " quantities calculation Rule base.
11, Revit software secondary development interface API research and development, set up " project of transmitting and converting electricity valuating engineering work load with bill " work Journey amount calculates rule base.
12, Revit software secondary development interface API research and development, it is achieved model is interactive with data double-way.
13, Revit software secondary development interface API research and development, it is achieved model and computational engineering amount one-way interaction.
14, Revit software secondary development interface API research and development, set up parameter library and select interface.
15, Revit software secondary development interface API research and development, set up library of factors and select interface.
16, Revit software secondary development interface API research and development, set up option storehouse and select interface.
17, Revit software secondary development interface API research and development, analytical design method stage BIM model data, generate corresponding engineering Amount data, form " power construction engineering quota of budgetary estimate " calculating formula, and can be with result of calculation and engineering model two-way interaction, in real time Corrected Calculation rule and result, it is achieved error calculated rate ± 2%.
18, Revit software secondary development interface API research and development, resolve construction drawing stage BIM model data, generate corresponding work Journey amount data, form " power construction engineering norm for detailed estimates " calculating formula, and can be real with result of calculation and engineering model two-way interaction Time corrected Calculation rule and result, it is achieved error calculated rate ± 2%.
19, Revit software secondary development interface API research and development, resolve construction drawing stage BIM model data, generate corresponding work Journey amount data, form " project of transmitting and converting electricity valuating engineering work load with bill " calculating formula, and can be double with engineering model with result of calculation To interaction, real-time corrected Calculation rule and result, it is achieved error calculated rate ± 2%.
20, adjust project of transmitting and converting electricity BIM model Criterion handbook, jointly fit with quantities calculation reaching Engineering Modeling With.
21, Revit software secondary development interface API research and development, set up " power construction engineering norm for detailed estimates " achievement form lattice Formula storehouse.
22, Revit software secondary development interface API research and development, set up " power construction engineering quota of budgetary estimate " achievement form lattice Formula storehouse.
23, Revit software secondary development interface API research and development, set up " project of transmitting and converting electricity valuating engineering work load with bill " and become Retribution sheet format storehouse.
24, Revit software secondary development interface API research and development, set up achievement calculating formula format library.
25, " power construction engineering norm for detailed estimates " inquiry, search function and interface are set up.
26, " power construction engineering quota of budgetary estimate " inquiry, search function and interface are set up.
27, Revit software secondary development interface API research and development, it is achieved " power construction engineering norm for detailed estimates " quantities calculation Formula, form derive operation interface.
28, Revit software secondary development interface API research and development, it is achieved " power construction engineering quota of budgetary estimate " quantities calculation Formula, form derive operation interface.
29, Revit software secondary development interface API research and development, it is achieved " project of transmitting and converting electricity valuating engineering work load with bill " work Journey amount calculating formula, form derive operation interface.
30, Revit software secondary development interface API research and development, it is achieved Report Server Management function and interface.
The using method of project of transmitting and converting electricity cost software is as follows:
1) the CAD plane drawing that modeling engineering teacher is designed by designing institute, utilizes Revit to draw building threedimensional model, and The relevant information of typing graphics component in drawing process.This is the element task of whole BIM computing, the not model of software development Farmland;
2) utilizing Revit to open BIM, amount calculation software can use when initializing application by norm Model data.Therefore this software can be used as the plug-in unit of Revit and carries out initial work;List after can also having initialized Solely run amendment or statistics, the report output work carrying out formula;
3) selecting the graphic element that i.e. will calculate in Revit graphics component, this is a single choice job, it is impossible to many Choosing, i.e. will carry out the manual proof-reading of quota formula to each graphics component.Its flow process is as follows:
3-1) pattern selector prompting user selects to carry out the component object of quota calculation, such as wall, post, plate etc.;
3-2) user is after graphical interfaces selects corresponding graphics component, figure state highlighted;
3-3) now user has been selected figure to be analyzed by pattern selector, and extracts corresponding UniqueID, and it is right to generate The Geometry information answered;
Geometry object needed for 3-4) graphical configuration device generates quota computed in software and data, such as the area of Face, The length etc. of Edge;
3-5) Geometry object enters Geometry matching module, carries out Auto-matching.User is the most alternative Amendment coupling object;
After 3-6) having revised, user preserves, and Geometry object can enter Geometry manager;Above section be with The data manipulation that Revit figure is relevant, these parts are trusted by force and Revit figure, it is necessary to carry out in Revit;
4) arithmetic section can isolated operation, it is also possible to run in Revit plug-in unit.Its workflow is as follows:
4-1) formulat calculator is dependent on Geometry manager, but Geometry manager can from data base individually Take out;
4-2) in formulat calculator, user can not meet user from Row sum-equal matrix and calculates the computation rule of wish, and public Formula computer after Row sum-equal matrix completes, is reconstructed analysis to the company of user user automatically, errors excepted, and friendly prompting;
4-3) the formula provided by formulat calculator, is exported quantities, and enters according to the unit of user's self-defining Row conversion automatically, as rice is converted into millimeter;
4-4) apply mechanically quota according to valuation rule, and carry out valuation conversion;
4-5) during mechanically used quota, user also can revise the quota data that system provides voluntarily;
4-6) report output.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, although with reference to relatively The present invention has been described in detail by good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, and without deviating from objective and the scope of the technical program, it all should be contained in the present invention Right in the middle of.

Claims (6)

1. the method for designing of a project of transmitting and converting electricity cost software based on BIM technology, it is characterised in that specifically comprise the following steps that
1) utilize software Revit to set up project of transmitting and converting electricity BIM technology three-dimension modeling interface, be used for carrying engineering construction letter Breath;
2) data base and query and search interface are set up;
3) work load evaluation is set up;
4) Revit software secondary development interface API is utilized, it is achieved model is interactive with data double-way;
5) Revit software secondary development interface API is utilized, it is achieved model and quantities calculation one-way interaction;
6) utilize Revit software secondary development interface API, set up data base and select interface;
7) utilizing Revit software secondary development interface API, foundation is data base and selects interface;
8) utilize Revit software secondary development interface API, set up option storehouse and select interface;
9) utilize Revit software secondary development interface API, set up work load evaluation storehouse;
10) utilize Revit software secondary development interface API, resolve BIM model architecture quantities, generate corresponding project data literary composition Part, forms computer capacity corresponding with engineering model interactive, and generates result of calculation according to computation rule, calculate error ± 2%;
11) utilize Revit software secondary development interface API, be created as retribution sheet format storehouse;
12) utilize Revit software secondary development interface API, set up achievement calculating formula format library;
13) Revit software secondary development interface API is utilized, it is achieved form selectively produces, query interface;
14) utilize Revit software secondary development interface API, realize quantities calculation formula, form derivation operation circle in the design phase Face.
2. the method for designing of project of transmitting and converting electricity cost software based on BIM technology as claimed in claim 1, it is characterised in that Step 2) described in set up data base and query and search interface include:
Set up power construction engineering norm for detailed estimates data base and query and search interface thereof;Set up power construction engineering quota of budgetary estimate number According to storehouse and query and search interface.
3. the method for designing of project of transmitting and converting electricity cost software based on BIM technology as claimed in claim 1, it is characterised in that Step 3) described in set up work load evaluation and include:
Set up power construction engineering norm for detailed estimates work load evaluation;Set up power construction engineering quota of budgetary estimate quantities calculation Rule;Set up project of transmitting and converting electricity valuating engineering work load with bill work load evaluation.
4. the method for designing of project of transmitting and converting electricity cost software based on BIM technology as claimed in claim 1, it is characterised in that Step 9) described in set up work load evaluation storehouse and include:
Set up power construction engineering norm for detailed estimates work load evaluation storehouse;Set up power construction engineering quota of budgetary estimate engineering gauge Calculate rule base.
5. the method for designing of project of transmitting and converting electricity cost software based on BIM technology as claimed in claim 1, it is characterised in that Step 10) described in the computer capacity that formed to include power construction engineering norm for detailed estimates computer capacity, power construction engineering general Calculate quota calculation scope and project of transmitting and converting electricity valuating engineering work load with bill computer capacity.
6. the method for designing of project of transmitting and converting electricity cost software based on BIM technology as claimed in claim 1, it is characterised in that Step 11) described in be created as retribution sheet format storehouse and include: power construction engineering norm for detailed estimates statement form storehouse, power construction Budgetary Estimates quota statement form storehouse and project of transmitting and converting electricity valuating engineering work load with bill statement form storehouse.
CN201610453778.7A 2016-06-21 2016-06-21 The method for designing of project of transmitting and converting electricity cost software based on BIM technology Pending CN106097149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610453778.7A CN106097149A (en) 2016-06-21 2016-06-21 The method for designing of project of transmitting and converting electricity cost software based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610453778.7A CN106097149A (en) 2016-06-21 2016-06-21 The method for designing of project of transmitting and converting electricity cost software based on BIM technology

Publications (1)

Publication Number Publication Date
CN106097149A true CN106097149A (en) 2016-11-09

Family

ID=57237746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610453778.7A Pending CN106097149A (en) 2016-06-21 2016-06-21 The method for designing of project of transmitting and converting electricity cost software based on BIM technology

Country Status (1)

Country Link
CN (1) CN106097149A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106530143A (en) * 2016-11-08 2017-03-22 河南财政税务高等专科学校 Engineering cost list service system
CN106952023A (en) * 2017-03-01 2017-07-14 广东中建普联科技股份有限公司 Construction project Fast Quasi construction method and system
CN107436928A (en) * 2017-07-12 2017-12-05 国网山东省电力公司经济技术研究院 The through-flow method of amount valency of substation project
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN109165462A (en) * 2018-09-11 2019-01-08 云南材材通信息技术有限公司 Material utilization amount automatic monitoring method, device, system and can storage medium
CN109472446A (en) * 2018-09-30 2019-03-15 中铁第勘察设计院集团有限公司 Project Budget preparation method based on BIM model
CN109753717A (en) * 2018-12-28 2019-05-14 国网浙江省电力有限公司经济技术研究院 A kind of construction method of power distribution network component mathematical model and application
CN109766605A (en) * 2018-12-28 2019-05-17 国网浙江省电力有限公司经济技术研究院 Method for building up in kind with the power distribution network full information mathematical model of value linkage
CN109800497A (en) * 2019-01-16 2019-05-24 深圳大学 A kind of data sharing method and device based on Revit
CN110909450A (en) * 2019-10-22 2020-03-24 国网冀北电力有限公司经济技术研究院 Intelligent design cost integrated acquisition method for power transmission line
CN111507001A (en) * 2020-04-17 2020-08-07 国网湖南省电力有限公司 Method and system for calculating construction cost of power transformation project, readable storage medium and computer
CN111507002A (en) * 2020-04-17 2020-08-07 国网湖南省电力有限公司 Method and system for mounting power transformation project, readable storage medium and computer
CN117235876A (en) * 2023-11-14 2023-12-15 中国建筑西南设计研究院有限公司 Method and system for counting engineering quantity based on Rhinoceros

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121145A (en) * 2013-04-05 2014-10-15 서울대학교산학협력단 BIM based Integrated Management System for Constrcution Data

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121145A (en) * 2013-04-05 2014-10-15 서울대학교산학협력단 BIM based Integrated Management System for Constrcution Data

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘睿等: ""BIM在变电站项目工程造价中的应用"", 《工程造价管理》 *
李波: ""基于 BIM 的施工项目成本管理研究"", 《万方数据库》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106530143A (en) * 2016-11-08 2017-03-22 河南财政税务高等专科学校 Engineering cost list service system
CN106952023A (en) * 2017-03-01 2017-07-14 广东中建普联科技股份有限公司 Construction project Fast Quasi construction method and system
CN107436928A (en) * 2017-07-12 2017-12-05 国网山东省电力公司经济技术研究院 The through-flow method of amount valency of substation project
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN109165462A (en) * 2018-09-11 2019-01-08 云南材材通信息技术有限公司 Material utilization amount automatic monitoring method, device, system and can storage medium
CN109472446B (en) * 2018-09-30 2022-03-04 中铁第一勘察设计院集团有限公司 BIM model-based engineering budget estimate planning method
CN109472446A (en) * 2018-09-30 2019-03-15 中铁第勘察设计院集团有限公司 Project Budget preparation method based on BIM model
CN109753717A (en) * 2018-12-28 2019-05-14 国网浙江省电力有限公司经济技术研究院 A kind of construction method of power distribution network component mathematical model and application
CN109766605A (en) * 2018-12-28 2019-05-17 国网浙江省电力有限公司经济技术研究院 Method for building up in kind with the power distribution network full information mathematical model of value linkage
CN109800497A (en) * 2019-01-16 2019-05-24 深圳大学 A kind of data sharing method and device based on Revit
CN110909450A (en) * 2019-10-22 2020-03-24 国网冀北电力有限公司经济技术研究院 Intelligent design cost integrated acquisition method for power transmission line
CN111507001A (en) * 2020-04-17 2020-08-07 国网湖南省电力有限公司 Method and system for calculating construction cost of power transformation project, readable storage medium and computer
CN111507002A (en) * 2020-04-17 2020-08-07 国网湖南省电力有限公司 Method and system for mounting power transformation project, readable storage medium and computer
CN111507001B (en) * 2020-04-17 2023-04-14 国网湖南省电力有限公司 Method and system for calculating construction cost of power transformation project, readable storage medium and computer
CN111507002B (en) * 2020-04-17 2023-09-26 国网湖南省电力有限公司 Power transformation project mounting method, system, readable storage medium and computer
CN117235876A (en) * 2023-11-14 2023-12-15 中国建筑西南设计研究院有限公司 Method and system for counting engineering quantity based on Rhinoceros
CN117235876B (en) * 2023-11-14 2024-01-30 中国建筑西南设计研究院有限公司 Method and system for counting engineering quantity based on Rhinoceros

Similar Documents

Publication Publication Date Title
CN106097149A (en) The method for designing of project of transmitting and converting electricity cost software based on BIM technology
CN110046364A (en) A kind of method for computing work amount based on BIM technology
CN104778753B (en) The three-dimensional modeling implementation method of bridge reinforcement
Wijayakumar et al. Automation of BIM quantity take-off to suit QS’s requirements
CN105574652A (en) Planning big data management and control system of smart power distribution network and method
CN109359322A (en) Novel water conservancy project BIM unique encodings method based on Omniclass sorting technique
CN105046432A (en) Building dimensional guide construction method
CN110990914A (en) BIM technology-based large boiler installation method
KR20160080388A (en) Bim-based construction value engineering (ve) processing system
CN107229791A (en) Cost of construction metering method and device
CN109948933A (en) A kind of intelligent plant method of allocation plan and system
Wei et al. Application of BIM technology in building water supply and drainage design
CN105631135B (en) Based on ABAQUS excavation of foundation pit rapid modeling analysis system and its application method
CN109377092A (en) A kind of modeling method of the project of transmitting and converting electricity valuation model based on BIM
CN110083926A (en) A method of for subway line plane and vertical section integrated design
Faltejsek BIM as an effective tool of project and facility management
CN104599061A (en) Method for calculating project amount of road bridge engineering project
Wang Analysis and application of BIM technology in the project goal control
Yan et al. Dynamic control of integrated project management system based on engineering projects
CN117035700A (en) BIM-based hydraulic and hydroelectric engineering forward collaborative design method
CN105469180A (en) TPS based industrial cluster enterprise production coordinated management evaluating system
CN112184134B (en) Network plan rationality evaluation dimension design method, evaluation method, system and device
Qin The advantages of BIM application in EPC mode
CN106339810A (en) Mathematic model corresponding to standard information providing and preliminary budget making
Qiu et al. Application of BIM technology in construction engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109