CN106952023A - Construction project Fast Quasi construction method and system - Google Patents
Construction project Fast Quasi construction method and system Download PDFInfo
- Publication number
- CN106952023A CN106952023A CN201710117209.XA CN201710117209A CN106952023A CN 106952023 A CN106952023 A CN 106952023A CN 201710117209 A CN201710117209 A CN 201710117209A CN 106952023 A CN106952023 A CN 106952023A
- Authority
- CN
- China
- Prior art keywords
- project
- construction
- module
- labor
- proposed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention relates to a kind of construction project Fast Quasi construction method and system, comprise the following steps:A1, according to the industry type of projects awaiting construction to determine that corresponding proposed model is carried out proposed;A2, the input proposed model project basic parameter;The labor and materials machine data of each module in A3, the filling proposed model;A4, the project basic parameter to input and filling labor and materials machine data are collected automatically, form the project data institutional framework of projects awaiting construction;A5, selection and the project data institutional framework of the industry type identical associated item of the projects awaiting construction, the project data institutional framework to projects awaiting construction are verified.The present invention reduces the workload of progress construction costs estimation by the way that model is proposed, improves efficiency, reduces cost, and will not rely on the ration standard and artificial experience of government's issue;Can intuitively be estimated by the project data institutional framework of the projects awaiting construction formed after collecting automatically and predictive engine project construction costs.
Description
Technical field
The invention belongs to construction industry construction costs estimating techniques field, and in particular to a kind of construction project Fast Quasi
Construction method and system, it can realize the quick estimation and prediction to newly built construction Project Cost.
Background technology
The engineering project of construction industry typically has investment estimate, estimation per design, bid contrul, construction budget, completion knot
In the stages such as calculation, each stage is required for estimating construction costs cost.Traditional construction costs estimation scheme is mainly:By
Quota of budgetary estimate is formulated in countries and regions, then by budgeter according to data such as engineering concrete conditions and design drawing, applies mechanically various
Quota index carries out taking expense, finally estimates construction costs.
Traditional construction costs estimation scheme performs less efficient, time and effort consuming, and cost of labor is high, and excessively relies on
The ration standard and artificial experience of government's issue.Under the driving that China changes this trend from planned economy to market economy,
Project quota also will progressively exit sector application, it is therefore desirable to which a kind of high efficiency, the scheme of the marketization replace traditional pass through
Quota estimates the scheme of construction costs.
The content of the invention
The present invention performs low efficiency, high cost for traditional construction costs estimation scheme, excessively relies on government's hair
The defects such as the ration standard and artificial experience of cloth, propose a kind of construction project Fast Quasi construction method, and accordingly propose one
Plant the design of the quick proposed system of construction project.
A kind of construction project Fast Quasi construction method proposed by the present invention, mainly includes the following steps that A1 to A5:
A1, according to the industry type of projects awaiting construction to determine that corresponding proposed model is carried out proposed;
A2, the input proposed model project basic parameter;
The labor and materials machine data of each module in A3, the filling proposed model;
A4, the project basic parameter to input and filling labor and materials machine data are collected automatically, form the proposed item
Purpose project data institutional framework;
A5, selection and the project data institutional framework of the industry type identical associated item of the projects awaiting construction, to institute
The project data institutional framework for stating projects awaiting construction is verified;Verification is verified not by then returning to A3 by then completing proposed.
In the alternative of the present invention, project basic parameter in step A2 includes project name, calculate bore and
Project stage.
In the alternative of the present invention, step A3 is specifically included:Automatic adaptation and the proposed mould are guided by inventory
The labor and materials machine data that each module matches in type are filled.
In the alternative of the present invention, step A3 is specifically included:Receive the labor and materials machine of each module in the proposed model
Being manually entered for data is filled.
In the alternative of the present invention, step A3 is specifically included:Pass through the project EXCEL formatted files or XML of importing
Corresponding labor and materials machine data in formatted file, the labor and materials machine data to each module in the proposed model are filled.
In the alternative of the present invention, step A1 is carried out proposed by way of creating new proposed model;Step A2
In project basic parameter also include:The number of plies, ground, underground.
In the alternative of the present invention, the project data institutional framework of projects awaiting construction described in step A4 includes always
Look at, overview, structure, branch's subitem, institutional framework and data including labor and materials machine, index.
The design for the quick proposed system of a kind of construction project that the present invention is accordingly proposed, mainly including proposed mould
Type determining module, project basic parameter input module, labor and materials machine database population module, collect module and correction verification module automatically;
Proposed model determining module, for determining that corresponding proposed model is intended according to the industry type of projects awaiting construction
Build;
Project basic parameter input module, the project basic parameter for inputting the proposed model;
Labor and materials machine database population module, the labor and materials machine data for filling each module in the proposed model;
Automatically module is collected, the labor and materials machine data for the project basic parameter to input and filling are collected automatically,
Form the project data institutional framework of the projects awaiting construction;
Correction verification module, for choosing the project data tissue with the industry type identical associated item of the projects awaiting construction
Structure, the project data institutional framework to the projects awaiting construction is verified.
Beneficial effect:The present invention reduces the workload of progress construction costs estimation by the way that model is proposed, improves efficiency,
Cost is reduced, and will not excessively rely on the ration standard and artificial experience of government's issue;Pass through what is formed after collecting automatically
The project data institutional framework (including overview, overview, structure, branch's subitem, labor and materials machine, index etc.) of projects awaiting construction can be directly perceived
Ground estimation and the construction costs of predictive engine project.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet for construction project Fast Quasi construction method that embodiment one is related to.
Fig. 2 is a kind of structured flowchart for the quick proposed system of construction project that embodiment two is related to.
Embodiment
For the ease of it will be appreciated by those skilled in the art that being carried out below in conjunction with accompanying drawing and embodiment to the present invention further
Description.
Embodiment one
Referring to Fig. 1, a kind of construction project Fast Quasi construction method that embodiment one is related to, is mainly included the following steps that
S100 to S500:
S100, according to the industry type of projects awaiting construction to determine that corresponding proposed model is carried out proposed.
Industry type is for example in step S100:Architectural engineering-residential architecture-house, proposed mould is determined according to industry type
Proceeded by after block proposed.Proposed model may include following any several modules as the case may be:Civil engineering, decoration, plumbing,
HVAC, electric, fire-fighting, intellectuality, municipal administration, plant equipment, elevator, basement and gardens.
Determine that corresponding proposed module can be realized using following either type in step S100:Newly built construction template is created to make
Proposed model, selection constructed item template are set for proposed model, according to project structure as proposed model, based on off-the-shelf item
Model is created.
S200, the input proposed model project basic parameter.
Project basic parameter is for example including project name, calculating bore and project stage in step S200.Work as step
In S100 according to project structure set proposed model when, the project basic parameter further preferably further comprise the number of plies, ground,
Under.By selection or entry item structure, calculate bore, the number of plies, ground, underground and be used as screening conditions, can be looked into from project library
Projects with qualified conditions data are looked for as the candidate item data of projects awaiting construction data.
The labor and materials machine data of each module in S300, the filling proposed model.
Step S300 can be realized by one of following several ways:
One is, guides automatic adaptation to be carried out with the labor and materials machine data that each module in the proposed model matches by inventory
Filling.Selection inventory feature or quota data can be guided according to the existing inventory of database, automatically to the labor and materials machine of proposed model
Data are filled.
Two are, being manually entered for labor and materials machine data for receiving each module in the proposed model is filled.For example:Receive
The quantities of proposed personnel's handwriting input, the conjunction valency that system guides automatic calculation note;Proposed personnel can also be clear to labor and materials machine
Forms data is modified modification, or fills in the labor and materials machine data such as title material, specifications and models, unit, quantity, unit price manually.
Three are, by corresponding labor and materials machine data in the project EXCEL formatted files or XML format file of importing, to institute
The labor and materials machine data for stating each module in proposed model are filled.For example:Pass through the project EXCEL formatted files or XML of importing
The inventory automatically selected with certain module matches in proposed model is guided work by corresponding labor and materials machine data in formatted file, system
Material machine data.If selecting the proposed model of architectural engineering-residential architecture-Housing Project type, and civil engineering module is selected to carry out
Data are filled, and by the project EXCEL formatted files or XML format file of importing, system is clear by Auto-matching Civil Specialities
Single characteristic labor and materials machine data corresponding with its.
S400, the project basic parameter to input and filling labor and materials machine data are collected automatically, are formed described proposed
The project data institutional framework of project.
As reference, the project data institutional framework of projects awaiting construction described in step S400 includes overview, overview, knot
Institutional framework and data including structure, branch's subitem, labor and materials machine, index, can intuitively show the construction costs of engineering project.
S500, selection and the project data institutional framework of the industry type identical associated item of the projects awaiting construction are right
The project data institutional framework of the projects awaiting construction is verified.
Verification is verified not by then returning to S300 by then completing proposed in step S500.
Embodiment two
Referring to Fig. 2, the introduction of embodiment two is that a kind of construction project corresponding with embodiment one is quickly proposed
The design of system, mainly including proposed model determining module, project basic parameter input module, labor and materials machine data fill mould
Block, collect module and correction verification module automatically.
Proposed model determining module, for determining that corresponding proposed model is intended according to the industry type of projects awaiting construction
Build.
Project basic parameter input module, the project basic parameter for inputting the proposed model.
Labor and materials machine database population module, the labor and materials machine data for filling each module in the proposed model.
Automatically module is collected, the labor and materials machine data for the project basic parameter to input and filling are collected automatically,
Form the project data institutional framework of the projects awaiting construction.
Correction verification module, for choosing the project data tissue with the industry type identical associated item of the projects awaiting construction
Structure, the project data institutional framework to the projects awaiting construction is verified.
The know-why and beneficial effect of above example two are corresponding with embodiment one, repeat no more here.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of construction project Fast Quasi construction method, it is characterised in that comprise the following steps:
A1, according to the industry type of projects awaiting construction to determine that corresponding proposed model is carried out proposed;
A2, the input proposed model project basic parameter;
The labor and materials machine data of each module in A3, the filling proposed model;
A4, the project basic parameter to input and filling labor and materials machine data are collected automatically, form the projects awaiting construction
Project data institutional framework;
A5, selection and the project data institutional framework of the industry type identical associated item of the projects awaiting construction, intend described
The project data institutional framework for building project is verified;Verification is verified not by then returning to A3 by then completing proposed.
2. construction project Fast Quasi construction method according to claim 1, it is characterised in that the project base in step A2
This parameter includes project name, calculates bore and project stage.
3. construction project Fast Quasi construction method according to claim 1, it is characterised in that step A3 is specifically included:
The labor and materials machine data for guiding automatic adaptation to match with each module in the proposed model by inventory are filled.
4. construction project Fast Quasi construction method according to claim 1, it is characterised in that step A3 is specifically included:
Being manually entered for labor and materials machine data for receiving each module in the proposed model is filled.
5. construction project Fast Quasi construction method according to claim 1, it is characterised in that step A3 is specifically included:
By corresponding labor and materials machine data in the project EXCEL formatted files or XML format file of importing, to each in the proposed model
The labor and materials machine data of module are filled.
6. construction project Fast Quasi construction method according to claim 1, it is characterised in that step A1 is new by creating
Proposed model mode carry out it is proposed;Project basic parameter in step A2 also includes:The number of plies, ground, underground.
7. the construction project Fast Quasi construction method according to any one of claim 1 to 6, it is characterised in that step A4
Described in projects awaiting construction project data institutional framework include overview, overview, structure, branch's subitem, labor and materials machine, index including
Institutional framework and data.
8. the quick proposed system of a kind of construction project, it is characterised in that join substantially including proposed model determining module, project
Count input module, labor and materials machine database population module, collect module and correction verification module automatically;
Proposed model determining module, it is proposed for determining that corresponding proposed model is carried out according to the industry type of projects awaiting construction;
Project basic parameter input module, the project basic parameter for inputting the proposed model;
Labor and materials machine database population module, the labor and materials machine data for filling each module in the proposed model;
Automatically module is collected, the labor and materials machine data for the project basic parameter to input and filling are collected automatically, is formed
The project data institutional framework of the projects awaiting construction;
Correction verification module, for choosing the project data knot of tissue with the industry type identical associated item of the projects awaiting construction
Structure, the project data institutional framework to the projects awaiting construction is verified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710117209.XA CN106952023A (en) | 2017-03-01 | 2017-03-01 | Construction project Fast Quasi construction method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710117209.XA CN106952023A (en) | 2017-03-01 | 2017-03-01 | Construction project Fast Quasi construction method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106952023A true CN106952023A (en) | 2017-07-14 |
Family
ID=59466638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710117209.XA Pending CN106952023A (en) | 2017-03-01 | 2017-03-01 | Construction project Fast Quasi construction method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106952023A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490975A (en) * | 2019-08-25 | 2019-11-22 | 中铁二局第一工程有限公司 | A kind of overall construction site plan production method based on orthography data |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050038636A1 (en) * | 2000-03-03 | 2005-02-17 | Beck Technology, Ltd. | Computer-implemented building design and modeling and project cost estimation and scheduling system |
CA2832806A1 (en) * | 2013-11-26 | 2015-05-26 | Kamran Hazini Bahram Abadi | Method for optimizing schedule compression in projects using accelerating and overlapping of activities |
CN104866952A (en) * | 2015-04-28 | 2015-08-26 | 国家电网公司 | Three-dimensional digital management implementation method for hydropower station engineering project |
CN105243608A (en) * | 2015-10-29 | 2016-01-13 | 国家电网公司 | Line project cost estimation method based on power transmission and transformation project cost design elements |
CN106097149A (en) * | 2016-06-21 | 2016-11-09 | 国家电网公司 | The method for designing of project of transmitting and converting electricity cost software based on BIM technology |
CN106156408A (en) * | 2016-06-24 | 2016-11-23 | 东南大学 | The building of the classification of a kind of Component-Based Development and combination works in coordination with constructing system and method |
-
2017
- 2017-03-01 CN CN201710117209.XA patent/CN106952023A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050038636A1 (en) * | 2000-03-03 | 2005-02-17 | Beck Technology, Ltd. | Computer-implemented building design and modeling and project cost estimation and scheduling system |
CA2832806A1 (en) * | 2013-11-26 | 2015-05-26 | Kamran Hazini Bahram Abadi | Method for optimizing schedule compression in projects using accelerating and overlapping of activities |
CN104866952A (en) * | 2015-04-28 | 2015-08-26 | 国家电网公司 | Three-dimensional digital management implementation method for hydropower station engineering project |
CN105243608A (en) * | 2015-10-29 | 2016-01-13 | 国家电网公司 | Line project cost estimation method based on power transmission and transformation project cost design elements |
CN106097149A (en) * | 2016-06-21 | 2016-11-09 | 国家电网公司 | The method for designing of project of transmitting and converting electricity cost software based on BIM technology |
CN106156408A (en) * | 2016-06-24 | 2016-11-23 | 东南大学 | The building of the classification of a kind of Component-Based Development and combination works in coordination with constructing system and method |
Non-Patent Citations (1)
Title |
---|
刘保成: ""建筑项目造价控制系统的设计与实现"", 《电子测试》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490975A (en) * | 2019-08-25 | 2019-11-22 | 中铁二局第一工程有限公司 | A kind of overall construction site plan production method based on orthography data |
CN110490975B (en) * | 2019-08-25 | 2022-11-01 | 中铁二局第一工程有限公司 | Construction general plane graph manufacturing method based on orthographic image data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Choi et al. | Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage | |
CN108550020A (en) | Building cost control method based on BIM technology | |
KR101909996B1 (en) | Construction Quantity take-off system based on the BIM and method therefor | |
CN104265349B (en) | A kind of mine ventilation system construction method based on DIMINE softwares | |
CN110069891B (en) | BIM-based electromechanical design and rechecking method | |
CN106373036A (en) | Construction project data automatic recognition and analysis method and system | |
CN107229791A (en) | Cost of construction metering method and device | |
CN110990914A (en) | BIM technology-based large boiler installation method | |
KR20090128634A (en) | Cbr-based cost prediction model for design phase of public multi housing construction projects | |
Laine et al. | Benefits of BIM in the thermal performance management | |
Khoshdelnezamiha et al. | Evaluation of BIM application for water efficiency assessment | |
CN111709697A (en) | Accounting method, system and storage medium for highway project energy consumption and carbon emission | |
CN107808042A (en) | The LOD500 model implementation methods of BIM technology | |
CN110147574A (en) | Auxiliary design method, system and the storage medium of roofing siphon storm-water system | |
CN106952023A (en) | Construction project Fast Quasi construction method and system | |
AU2021102904A4 (en) | A BIM-Based Optimization Method of Construction Cost and Construction Duration-Cost of Prefabricated Construction Project | |
KR101472461B1 (en) | Development system of BIM library for building assessment | |
CN113065783A (en) | BIM (building information modeling) engineering quantity application method of waste incineration power plant based on BIM technology | |
CN110119596B (en) | A kind of place editing system based on Revit | |
Marzouk et al. | Framework for sustainable low-income housing projects in Egypt | |
KR102066859B1 (en) | Method for ordering fitting | |
Köseci | Integrated Life Cycle Assessment (LCA) to Building Information Modelling (BIM) | |
CN115510536A (en) | BIM-based automatic processing system and method for reinforcing steel bars | |
KR101835551B1 (en) | Method and system for estimating 3D BIM-based repair and replacement cost | |
KR20190087784A (en) | Development of BIM based LID Facilities Supply Auto-checking system and Auto-checking method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170714 |