CN107288339A - The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template - Google Patents

The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template Download PDF

Info

Publication number
CN107288339A
CN107288339A CN201710550992.9A CN201710550992A CN107288339A CN 107288339 A CN107288339 A CN 107288339A CN 201710550992 A CN201710550992 A CN 201710550992A CN 107288339 A CN107288339 A CN 107288339A
Authority
CN
China
Prior art keywords
template
clip
standing tree
circular arc
wood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710550992.9A
Other languages
Chinese (zh)
Inventor
程健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710550992.9A priority Critical patent/CN107288339A/en
Publication of CN107288339A publication Critical patent/CN107288339A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Abstract

The present invention is that a kind of circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template, belongs to the reinforcement means of template in construction project, its operating procedure is:One), preparation of construction:1) template and clip, two, material prepares, 2), are made), reinforce the circular arc reversed beam that cornices and hang mould template, three), the clip for hanging mould template, four are installed), hang mould template, the dismounting of clip;Wherein, the clip includes left standing tree, right standing tree, transverse slat, iron nail, Screw arbor with nut at both-ends, chevron card and hex nut, the rectangular ∩ shapes of the clip, transverse slat is fixedly mounted with iron nail between the top of left standing tree and right standing tree, install Screw arbor with nut at both-ends and chevron card and hex nut are installed, according to the length direction of left and right side template, by preceding to the clip of interval installation backward, make the lateral surface of the left standing tree of this clip longitudinal lumps of wood for blocking the left and right sides corresponding with the inner side of right standing tree;It is not only simple in structure, convenient disassembly and scene are gathered materials on the spot, cycling and reutilization has saved timber, reduces cost.

Description

The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template
Technical field
The invention belongs to the reinforcement means of template in construction project, more particularly, to a kind of circular arc cornice reversed beam template plus Solid method.
Background technology
The working procedure of conventional reversed beam is cumbersome, in work progress, and the reinforcing for reversed beam template of cornicing is generally using wooden U-shaped Card or bearing diagonal method, but this construction method reinforces not in place, and easy swollen mould, race tire, after form removable, are mixed during casting concrete The forming quality for coagulating soil cannot get any guarantee, and reinforce trouble, and wooden U-shaped card or bearing diagonal can not be recycled, and consumption is big Timber, the flitch of amount, material serious waste make, installation needs to spend a large amount of manpowers, material resources, the duration is difficult to ensure.
The content of the invention
The purpose of the present invention is in view of the above-mentioned problems, proposing that a kind of circular arc reversed beam that cornices hangs the clamping hoop type reinforcing side of mould template Method, be not only simple in structure, install easily, convenient disassembly, scene gather materials on the spot, waste and old template, the lumps of wood can be used, and save wood Material, and during the reversed beam of the same size of construction, engineering cost can be reduced with Reusability, improve construction quality.
The object of the present invention is achieved like this:A kind of circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template, Its operating procedure is:One), preparation of construction, two), reinforce the circular arc reversed beam that cornices and hang mould template, three), the card for hanging mould template is installed Hoop, four), hang mould template, the dismounting of clip, wherein:
One), preparation of construction:
1), material prepares:Construction material mainly has:1., iron nail (length of this iron nail can be 40mm), 2., the waste and old lumps of wood (width × height of this waste and old lumps of wood can be 5cm × 10cm), 3., Screw arbor with nut at both-ends, 4., chevron card, 5., hex nut, 6., waste and old mould Plate.
2) template and clip, are made:
According to design, template is made, carpenter is made by figure numbering block-by-block according to matching die figure and hangs mould template;
According to design, make clip (see Fig. 3):Described clip includes left standing tree 1-1, right standing tree 1-2, transverse slat 9, iron nail 7th, Screw arbor with nut at both-ends 3, chevron card 4 and hex nut 6, the rectangular ∩ shapes of described clip, described left standing tree 1-1, right standing tree 1-2 It is symmetrically vertically arranged, strip is fixedly mounted with iron nail 7 between described left standing tree 1-1 and right standing tree 1-2 top Transverse slat 9, symmetrically perforate and installs Screw arbor with nut at both-ends 3, to drawing spiral shell on described left standing tree 1-1 and right standing tree 1-2 epimere Bar 3 overhangs left standing tree 1-1, is respectively mounted chevron card 4 and hex nut 6 on overhanging section of right standing tree 1-2, and carpenter is according to mould Figure, the clip for hanging mould, every piece of transverse slat 9 (this transverse slat 9 can be made of waste and old template) and left standing tree 1-1 and right standing tree 1- are made by figure 2 lumps of wood (this left standing tree 1-1 and right standing tree 1-2 can be made of the waste and old lumps of wood) is by the size field blanking of manuscript, transverse slat 9 During blanking, first with the good size of coil of strip dipstick metering, after the good line of ink marker of bullet, handsaw blanking, left standing tree 1-1 and right standing tree 1-2 and transverse slat 9 are used Contact surface first planished with thicknesser, dig straight, is then planished with hand plane, using electric drill on the lumps of wood jewel hole, then used according to clip figure Iron nail 7 fixes transverse slat 9, then Screw arbor with nut at both-ends 3 is interted into, and set installs chevron card 4, and hex nut 6 is tightened with spanner, meanwhile, Left standing tree 1-1 and right standing tree 1-2 perpendicularity is checked with 2m guiding rulers, is checked with 5 meters of tape measures in left standing tree 1-1 and right standing tree 1-2 Side is opened away from meeting design requirement, the Form panel clamping hoop of finished product, which makes, to be finished up and down.
Two), reinforce the circular arc reversed beam that cornices and hang mould template:
The circular arc reversed beam that cornices is hung mould template and reinforced using clip, and its construction technology process is:Set up platform internal frame → peace The longitudinal lumps of wood of another side template of one side template of assembling platform template → installation reversed beam → installation reversed beam → installation, the horizontal lumps of wood → Clip → installation Screw arbor with nut at both-ends → installation support → adjustment fixation → preliminary examination → is installed to inspect for acceptance → casting concrete → form removal (while once the clip of mould is hung in dismounting).
After platform template installation, circular arc is installed and corniced the left side template 2-1 and right side template 2-2 of reversed beam, is then existed According to the bullet well installation of longitudinal lumps of wood 5, reinforcing line is designed on left side template 2-1 and right side template 2-2 lateral surface, in left side mould On plate 2-1 and right side template 2-2 top surface according to design bullet well the installation of the horizontal lumps of wood 10, reinforce line;
Longitudinal lumps of wood is installed:(see Fig. 1)
Using iron nail, by circular arc cornice the left side template 2-1 and right side template 2-2 of reversed beam lateral surface with being in from top to bottom Uniform spaced longitudinal correspondence of the lumps of wood 5 is clenched, wherein, by upper on left side template 2-1 and right side template 2-2 lateral surface Three longitudinal lumps of wood 5 can be uniformly positioned apart under, are corniced the suitable for reading, middle of reversed beam, lower portion corresponding to circular arc, by this Cornice two side templates (template 2-1 and right side template 2-2 on the left of i.e.) of reversed beam of three longitudinal lumps of wood 5 and circular arc are clenched;
The horizontal lumps of wood is installed:(see Fig. 2)
On left side template 2-1 and right side template 2-2 top surface, the horizontal lumps of wood 10 is installed at interval from front to back, and can be every The 2.5 meter amperes dress horizontal lumps of wood 10 together is spaced, left side template 2-1 and right side are fixed on iron nail by left section of this horizontal lumps of wood 10 On template 2-2, the right-hand member section of this horizontal lumps of wood 10 is fixed on the arc section of the mounted swash plate 8 that cornices, it is anti-to prevent Beam hangs mould template (i.e. left side template 2-1 and right side template 2-2) floating;
Three), the clip for hanging mould template is installed:
According to on-site actual situations, the circular arc reversed beam that cornices is installed and hangs the clip of mould template, according to left side template 2-1 and right side Template 2-2 length direction, by preceding to the clip of interval installation backward, and can fill one of clip at interval of 1.5 meter amperes, make this clip The left standing tree 1-1 longitudinal lumps of wood 5 for blocking the left and right sides corresponding with right standing tree 1-2 inner side lateral surface;
Four) mould template, the dismounting of clip, are hung:
The circular arc reversed beam that cornices is hung after mould template (i.e. left side template 2-1 and right side template 2-2) installs and fixed with clip, Using general casting craft casting concrete, after concrete reaches strength of mould stripping, the clip for hanging mould template is removed, is had successively Remove to sequence, first tapped and shaken with batten, unnecessary rubble, concrete are removed, will not torn open with hook or flat chisel, crowbar Under two side templates (i.e. left side template 2-1 and right side template 2-2) sled under, wait after two side templates and clip remove entirely, then concentrate Transport and stack appointed place, divider trellis code is put well, recycled next time with entering.
The circular arc proposed by the invention reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template, is not only simple in structure, installs Easily, convenient disassembly, scene are gathered materials on the spot, and waste and old template, the lumps of wood can be used, and have saved timber, and same size of constructing Reversed beam when, engineering cost can be reduced with Reusability, improve construction quality.
The clamping hoop type reinforcing side of mould template is hung in conjunction with the drawings and examples reversed beam that corniced to circular arc proposed by the invention Method is described further.
Brief description of the drawings
Fig. 1 is that the circular arc proposed by the invention main view that reversed beam hung when the clamping hoop type reinforcement means of mould template is used of cornicing is shown One of be intended to.
Fig. 2 is that the circular arc proposed by the invention main view that reversed beam hung when the clamping hoop type reinforcement means of mould template is used of cornicing is shown One of be intended to.
Fig. 3 is that the circular arc proposed by the invention reversed beam that cornices hangs the main view of the clip in the clamping hoop type reinforcement means of mould template Schematic diagram.
In Fig. 1, Fig. 2, Fig. 3:
1-1, left standing tree 1-2, right standing tree 2-1, left side template 2-2, right side template 3, Screw arbor with nut at both-ends 4, chevron card 5, Longitudinal lumps of wood 6, hex nut 7, iron nail 8, the swash plate 9 that cornices, transverse slat 10, the horizontal lumps of wood
Embodiment
The circular arc proposed by the invention reversed beam that cornices has been used to hang in Maanshan City (Tai Bai main roads) certain Technology Park engineering The clamping hoop type reinforcement means of mould template, concrete operation step is:
One), preparation of construction:
1), material prepares:Construction material mainly has:1., iron nail (length of this iron nail be 40mm), 2., the waste and old lumps of wood (this The width of the waste and old lumps of wood × a height of 5cm × 10cm), 3., Screw arbor with nut at both-ends, 4., chevron card, 5., hex nut, 6., waste and old template.
2) template and clip, are made:
According to design, template is made, carpenter is made by figure numbering block-by-block according to matching die figure and hangs mould template;
According to design, clip is made:Described clip include left standing tree 1-1, right standing tree 1-2, transverse slat 9, iron nail 7, to draw Screw rod 3, chevron card 4 and hex nut 6, the rectangular ∩ shapes of described clip, described left standing tree 1-1, right standing tree 1-2 are symmetrically It is vertically arranged, the transverse slat 9 of strip is fixedly mounted with iron nail 7 between described left standing tree 1-1 and right standing tree 1-2 top, Symmetrically perforate and Screw arbor with nut at both-ends 3 is installed on described left standing tree 1-1 and right standing tree 1-2 epimere, in the outer of Screw arbor with nut at both-ends 3 Stretch out left standing tree 1-1, be respectively mounted chevron card 4 and hex nut 6 on overhanging section of right standing tree 1-2, carpenter is according to matching die figure, by figure Make and hang the clip of mould, the lumps of wood (this of every piece of transverse slat 9 (this transverse slat 9 is made of waste and old template), left standing tree 1-1 and right standing tree 1-2 Left standing tree 1-1 and right standing tree 1-2 are made of the waste and old lumps of wood) by manuscript size field blanking, during 9 blanking of transverse slat, first use steel After the good size of tape measure amount, the good line of ink marker of bullet, handsaw blanking is used, left standing tree 1-1 and right standing tree 1-2 and transverse slat 9 contact surface are first used Thicknesser planing, plane are straight, are then planished with hand plane, using electric drill on the lumps of wood jewel hole, then fix horizontal stroke according to clip figure iron nail 7 Plate 9, then Screw arbor with nut at both-ends 3 is interted into, set installs chevron card 4, and hex nut 6 is tightened with spanner, meanwhile, checked with 2m guiding rulers Left standing tree 1-1 and right standing tree 1-2 perpendicularity, with 5 meters of tape measures check on the inside of left standing tree 1-1 and right standing tree 1-2 open up and down away from, Meet design requirement, the Form panel clamping hoop of finished product, which makes, to be finished.
Two), reinforce the circular arc reversed beam that cornices and hang mould template:
The circular arc reversed beam that cornices is hung mould template and reinforced using clip, and its construction technology process is:Set up platform internal frame → peace The longitudinal lumps of wood of another side template of one side template of assembling platform template → installation reversed beam → installation reversed beam → installation, the horizontal lumps of wood → Clip → installation Screw arbor with nut at both-ends → installation support → adjustment fixation → preliminary examination → is installed to inspect for acceptance → casting concrete → form removal (while once the clip of mould is hung in dismounting).
After platform template installation, circular arc is installed and corniced the left side template 2-1 and right side template 2-2 of reversed beam, in left side On template 2-1 and right side template 2-2 according to design bullet well longitudinal lumps of wood 5, the installation of the horizontal lumps of wood 10, reinforce line;
Longitudinal lumps of wood is installed:(see Fig. 1)
Using iron nail, by circular arc cornice the left side template 2-1 and right side template 2-2 of reversed beam lateral surface with being in from top to bottom Uniform spaced longitudinal correspondence of the lumps of wood 5 is clenched, and by up on left side template 2-1 and right side template 2-2 lateral surface Three longitudinal lumps of wood 5 are uniformly positioned apart from down, are corniced the suitable for reading, middle of reversed beam, lower portion corresponding to circular arc, by this three Cornice two side templates (i.e. left side template 2-1 and right side template 2-2) of reversed beam of longitudinal lumps of wood 5 and circular arc are clenched;
The horizontal lumps of wood is installed:(see Fig. 2)
On left side template 2-1 and right side template 2-2 top surface, the horizontal lumps of wood 10, and every are installed in interval from front to back Every the 2.5 meter amperes dress together horizontal lumps of wood 10, left side template 2-1 and right side mould are fixed on iron nail by left section of this horizontal lumps of wood 10 On plate 2-2, the right-hand member section of this horizontal lumps of wood 10 is fixed on the arc section of the mounted swash plate 8 that cornices, to prevent reversed beam Hang mould template (i.e. left side template 2-1 and right side template 2-2) floating;
Three), the clip for hanging mould template is installed:
According to on-site actual situations, the circular arc reversed beam that cornices is installed and hangs the clip of mould template, according to left side template 2-1 and right side Template 2-2 length direction, by preceding to the clip of interval installation backward, and fills one of clip at interval of 1.5 meter amperes, makes this clip The lateral surface of the left standing tree 1-1 longitudinal lumps of wood 5 for blocking the left and right sides corresponding with right standing tree 1-2 inner side;
Four) mould template, the dismounting of clip, are hung:
The circular arc reversed beam that cornices is hung after mould template (i.e. left side template 2-1 and right side template 2-2) installs and fixed with clip, Using general casting craft casting concrete, after concrete reaches strength of mould stripping, the clip for hanging mould template is removed, is had successively Remove to sequence, first tapped and shaken with batten, unnecessary rubble, concrete are removed, will not torn open with hook or flat chisel, crowbar Under two side templates (i.e. left side template 2-1 and right side template 2-2) sled under, wait after two side templates and clip remove entirely, then concentrate Transport and stack appointed place, divider trellis code is put well, recycled next time with entering.
The circular arc proposed by the invention reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template in this Technology Park engineering Application has been arrived, the duration is not only shortened, and construction quality is significantly improved, the concrete impression quality of the reversed beam of shaping Good, surface has obtained the consistent favorable comment of Maanshan City's Quality Supervision Station, owner and supervision companies without common quality defects such as honeycomb, pitted skins.

Claims (8)

1. the present invention is a kind of circular arc, the reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template, and its operating procedure is:One), construct Prepare, two), reinforce the circular arc reversed beam that cornices and hang mould template, three), the clip for hanging mould template, four are installed), hang mould template, clip Remove, wherein:
One), preparation of construction:
1), material prepares:Construction material mainly has:1., iron nail, 2., the waste and old lumps of wood, 3., Screw arbor with nut at both-ends, 4., chevron card, 5., Hex nut, 6., waste and old template;
2) template and clip, are made:
According to design, template is made, carpenter is made by figure numbering block-by-block according to matching die figure and hangs mould template;
According to design, clip is made:Described clip include left standing tree (1-1), right standing tree (1-2), transverse slat (9), iron nail (7), Screw arbor with nut at both-ends (3), chevron card (4) and hex nut (6), the rectangular ∩ shapes of described clip, by described left standing tree (1-1), Right standing tree (1-2) is symmetrically vertically arranged, and iron nail (7) is used between the top of described left standing tree (1-1) and right standing tree (1-2) The transverse slat (9) of strip is fixedly mounted, symmetrically perforate is simultaneously on the epimere of described left standing tree (1-1) and right standing tree (1-2) Screw arbor with nut at both-ends (3) is installed, overhanging left standing tree (1-1), be respectively mounted on overhanging section of right standing tree (1-2) in Screw arbor with nut at both-ends (3) Chevron card (4) and hex bolts (6), carpenter are made the clip for hanging mould, every piece of transverse slat (9), left standing tree by figure according to matching die figure (1-1) and right standing tree (1-2) press manuscript size field blanking, during transverse slat (9) blanking, first with the good size of coil of strip dipstick metering, bullet After the good line of ink marker, handsaw blanking is used, the contact surface of left standing tree (1-1) and right standing tree (1-2) and transverse slat (9) is first planished with thicknesser, Plane is straight, is then planished with hand plane, using electric drill on the lumps of wood jewel hole, then fix transverse slat (9) with iron nail (7) according to clip figure, Screw arbor with nut at both-ends (3) is interted into again, set installs chevron card (4), and hex nut (6) is tightened with spanner, meanwhile, with 2m guiding ruler The perpendicularity of left standing tree (1-1) and right standing tree (1-2) is checked, left standing tree (1-1) and right standing tree (1-2) are checked with 5 meters of tape measures Inner side is opened away from meeting design requirement, the Form panel clamping hoop of finished product, which makes, to be finished up and down;
Two), reinforce the circular arc reversed beam that cornices and hang mould template:
The circular arc reversed beam that cornices is hung mould template and reinforced using clip, and its construction technology process is:Platform internal frame → installation is set up to put down The longitudinal lumps of wood of another side template of one side template of platform template → installation reversed beam → installation reversed beam → installation, the horizontal lumps of wood → installation Clip → installation Screw arbor with nut at both-ends → installation support → adjustment fixation → preliminary examination → is inspected for acceptance → casting concrete → form removal, simultaneously Once the clip of mould is hung in dismounting;
After platform template installation, circular arc is installed and corniced the left side template (2-1) and right side template (2-2) of reversed beam, is then existed On the lateral surface of left side template (2-1) and right side template (2-2) according to design bullet well the installation of longitudinal lumps of wood (5), reinforce line, On the top surface of left side template (2-1) and right side template (2-2) according to design bullet well the installation of the horizontal lumps of wood (10), reinforce line;
Longitudinal lumps of wood is installed:
Using iron nail, by circular arc cornice reversed beam left side template (2-1) and right side template (2-2) lateral surface with being in from top to bottom The uniform spaced longitudinal lumps of wood (5) correspondence is clenched;
The horizontal lumps of wood is installed:
On the top surface of left side template (2-1) and right side template (2-2), the horizontal lumps of wood (10) is installed at interval from front to back, by this Left section of the horizontal lumps of wood (10) is fixed on iron nail on the top surface of left side template (2-1) and right side template (2-2), by this transverse direction side The right-hand member section of wooden (10) is fixed on the arc section of the mounted swash plate that cornices (8), to prevent reversed beam from hanging mould template i.e. left side The floating of template (2-1) and right side template (2-2);
Three), the clip for hanging mould template is installed:
According to on-site actual situations, the circular arc reversed beam that cornices is installed and hangs the clip of mould template, according to left side template (2-1) and right side mould The length direction of plate (2-2), by preceding to the clip of interval installation backward, makes the left standing tree (1-1) and right standing tree (1-2) of this clip Inner side correspondence blocks the lateral surface of longitudinal lumps of wood (5) of the left and right sides;
Four) mould template, the dismounting of clip, are hung:
1st, the circular arc reversed beam that cornices hangs mould template i.e. left side template (2-1) and after right side template (2-2) installs and fixed with clip, Using general casting craft casting concrete, after concrete reaches strength of mould stripping, the clip for hanging mould template is removed, is had successively Remove to sequence, then tapped and shaken with batten, unnecessary rubble, concrete are removed, will not with hook or flat chisel, crowbar Under two side templates pulled down i.e. left side template (2-1) and right side template (2-2) sled, wait after two side templates and the full dismounting of clip, then Concentration is transported and is deposited in appointed place, and divider trellis code is put well, is recycled next time with entering.
2. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that this iron The length for following closely (7) is 40mm.
3. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that this gives up The width of the old lumps of wood × highly it is 5cm × 10cm.
4. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that this is left Standing tree (1-1) and right standing tree (1-2) are made of the useless lumps of wood.
5. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that this is horizontal Plate (9) is made of waste and old template.
6. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that on a left side Three longitudinal lumps of wood (5) are from top to bottom uniformly positioned apart from side template (2-1) and the lateral surface of right side template (2-2), it is right Should be corniced the suitable for reading, middle of reversed beam, lower portion in circular arc, the both sides for reversed beam that this three longitudinal lumps of wood (5) and circular arc are corniced Template is that left side template (2-1) and right side template (2-2) are clenched.
7. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that every Every the 2.5 meter amperes dress together horizontal lumps of wood (10).
8. circular arc according to claim 1 cornices, reversed beam hangs the clamping hoop type reinforcement means of mould template, it is characterised in that every One of clip is filled every 1.5 meter amperes.
CN201710550992.9A 2017-07-07 2017-07-07 The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template Pending CN107288339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710550992.9A CN107288339A (en) 2017-07-07 2017-07-07 The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710550992.9A CN107288339A (en) 2017-07-07 2017-07-07 The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template

Publications (1)

Publication Number Publication Date
CN107288339A true CN107288339A (en) 2017-10-24

Family

ID=60101305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710550992.9A Pending CN107288339A (en) 2017-07-07 2017-07-07 The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template

Country Status (1)

Country Link
CN (1) CN107288339A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502266A (en) * 2020-05-27 2020-08-07 中建四局第六建筑工程有限公司 Structural reversed beam positioning and reinforcing device and reinforcing method
CN115596200A (en) * 2022-11-24 2023-01-13 中国二十二冶集团有限公司(Cn) Construction method for pouring multilayer concrete zigzag roof truss template

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100917696B1 (en) * 2009-06-23 2009-09-18 (주)청전건축 종합건축사 사무소 Lintel assembly for masonry work
CN202012196U (en) * 2011-03-07 2011-10-19 中建三局建设工程股份有限公司 U-shaped reinforcing device for side beam mold
CN202324613U (en) * 2011-11-07 2012-07-11 四川省第三建筑工程公司 Beam formwork reinforcing fixture
CN203050105U (en) * 2012-12-27 2013-07-10 江苏南通二建集团有限公司 Novel beam clamp capable of being used in turnover mode
CN203701586U (en) * 2013-11-12 2014-07-09 中建三局建设工程股份有限公司 Ring beam shaping device
CN204531403U (en) * 2015-01-26 2015-08-05 中天建设集团有限公司 A kind of beam side reinforcing shape-setting clamp
CN204781948U (en) * 2015-06-08 2015-11-18 五冶集团上海有限公司 A side form board wood clamp for < 600mmm deck -molding
CN205955193U (en) * 2016-07-11 2017-02-15 中国建筑第八工程局有限公司 Can have enough to meet need integral concrete beam reinforcing apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100917696B1 (en) * 2009-06-23 2009-09-18 (주)청전건축 종합건축사 사무소 Lintel assembly for masonry work
CN202012196U (en) * 2011-03-07 2011-10-19 中建三局建设工程股份有限公司 U-shaped reinforcing device for side beam mold
CN202324613U (en) * 2011-11-07 2012-07-11 四川省第三建筑工程公司 Beam formwork reinforcing fixture
CN203050105U (en) * 2012-12-27 2013-07-10 江苏南通二建集团有限公司 Novel beam clamp capable of being used in turnover mode
CN203701586U (en) * 2013-11-12 2014-07-09 中建三局建设工程股份有限公司 Ring beam shaping device
CN204531403U (en) * 2015-01-26 2015-08-05 中天建设集团有限公司 A kind of beam side reinforcing shape-setting clamp
CN204781948U (en) * 2015-06-08 2015-11-18 五冶集团上海有限公司 A side form board wood clamp for < 600mmm deck -molding
CN205955193U (en) * 2016-07-11 2017-02-15 中国建筑第八工程局有限公司 Can have enough to meet need integral concrete beam reinforcing apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502266A (en) * 2020-05-27 2020-08-07 中建四局第六建筑工程有限公司 Structural reversed beam positioning and reinforcing device and reinforcing method
CN115596200A (en) * 2022-11-24 2023-01-13 中国二十二冶集团有限公司(Cn) Construction method for pouring multilayer concrete zigzag roof truss template

Similar Documents

Publication Publication Date Title
CN104695703B (en) Exempt from boring shear wall construction template system and shear wall construction method
CN101509319B (en) Replacement construction method for post-adding reinforced concrete beam unit for wall
CN102704684B (en) Construction method for high-strength shaping combined template of plank frame of shear wall
CN107288339A (en) The circular arc reversed beam that cornices hangs the clamping hoop type reinforcement means of mould template
CN105804395A (en) Staircase one-step continuous casting forming construction method based on integral shaped formwork
CN201526158U (en) Special fixture for beam form
CN107217840A (en) A kind of regularization template external corner reinforcement system
CN110258864A (en) A kind of basement shear wall exempts from punching template construction method
CN209686866U (en) A kind of building frame structure square column circumference button formwork
CN205777483U (en) A kind of drawing template of shear wall
CN208702154U (en) A kind of building template reinforcement tools
CN109252879A (en) A kind of vcehicular tunnel gutter liner tool-typed formwork and construction method
CN206829624U (en) A kind of regularization formwork reinforcement system
CN205935656U (en) Stair template regularization reinforced structure of marking time
CN102127965B (en) Composite precast stressed template
CN205255247U (en) Gypsum moulding production facility
CN209163831U (en) A kind of vcehicular tunnel gutter liner tool-typed formwork
CN204040485U (en) Bars In Poured Concrete Slab thickness and reinforcement cover control support
CN211173055U (en) Plastic formwork and steel/aluminum combined formwork system
CN208039880U (en) One kind is repeatable to utilize Combined type sizing precast stair tread finished product protection device
CN206942134U (en) A kind of embedded stair template device
CN102635232A (en) Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam
CN101418596A (en) Cast-in-place structural beam and plate construction gap formwork construction method
CN111779276A (en) Large-span beam construction method based on hot-rolled high-strength steel bars
CN207988494U (en) A kind of novel big section square column formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024