CN107217840A - A kind of regularization template external corner reinforcement system - Google Patents

A kind of regularization template external corner reinforcement system Download PDF

Info

Publication number
CN107217840A
CN107217840A CN201710399385.7A CN201710399385A CN107217840A CN 107217840 A CN107217840 A CN 107217840A CN 201710399385 A CN201710399385 A CN 201710399385A CN 107217840 A CN107217840 A CN 107217840A
Authority
CN
China
Prior art keywords
main
flute
formwork
retainer
back flute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710399385.7A
Other languages
Chinese (zh)
Inventor
刘成亮
崔秋
曹维存
王俊峰
杨富荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201710399385.7A priority Critical patent/CN107217840A/en
Publication of CN107217840A publication Critical patent/CN107217840A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种定型化模板阳角加固体系,涉及模板工程技术领域。本发明包括模板、主背楞和次背楞,还包括挡撑背楞和挡片。本发明通过特制的定型化构件能够方便稳固地对混凝土模板阳角进行加固,由于主背楞、挡撑背楞和挡片之间的相互配合以及撑背楞连接件、挡片连接件的双重连接作用,能使主背楞、挡撑背楞和挡片之间相互咬合,连接紧密,能更好地对混凝土模板的角度进行固定,同时也能防止外力导致的混凝土模板变形,提高成型质量。

The invention discloses a stereotyped formwork external angle reinforcement system, which relates to the technical field of formwork engineering. The invention includes a template, a main back flute and a secondary back flute, and also includes a retainer back flute and a blocking sheet. The invention can conveniently and stably reinforce the external corners of the concrete formwork through the specially-made stereotyped components. The connection function can make the main back flute, the back support back flute and the retainer bite each other, and the connection is tight, which can better fix the angle of the concrete formwork, and can also prevent the deformation of the concrete formwork caused by external forces and improve the forming quality. .

Description

一种定型化模板阳角加固体系A stereotyped external angle reinforcement system of formwork

技术领域technical field

本发明涉及模板工程技术领域。The invention relates to the technical field of formwork engineering.

背景技术Background technique

传统的模板加固体系采用木胶合模板+方木+钢管组成,由于方木刚度小、制作精度差,钢管与木方为线接触等原因,易造成混凝土成型质量差,阴阳角不方正、漏浆,实测实量不达标等诸多质量问题。The traditional formwork reinforcement system is composed of wood-glued formwork + square wood + steel pipe. Due to the small rigidity of the square wood, poor manufacturing accuracy, and the line contact between the steel pipe and the wood square, it is easy to cause poor concrete molding quality, irregular yin and yang angles, and grout leakage. , The actual measured quantity is not up to the standard and many other quality problems.

发明内容Contents of the invention

本发明提供一种定型化模板阳角加固体系,旨在解决现有技术混凝土浇筑时成型效果差的问题。The invention provides a stereotyped formwork external angle reinforcement system, aiming to solve the problem of poor shaping effect during concrete pouring in the prior art.

本发明提供的一种定型化模板阳角加固体系,包括模板、主背楞和次背楞,所述次背楞顶撑在所述模板外侧,所述主背楞顶撑在所述次背楞外侧,还包括阳角锁具,所述阳角锁具包括挡撑背楞和挡片,所述挡撑背楞沿自身主轴线方向设有挡撑背楞连接件;所述挡片包括摩擦板和支撑板,所述支撑板固定在所述摩擦板的反面的边缘,且所述支撑板与所述摩擦板垂直;所述挡撑背楞垂直顶撑在所述次背楞外侧,所述挡撑背楞垂直顶撑在所述主背楞上通过所述挡撑背楞连接件固定在所述主背楞上,所述挡片通过挡片连接件固定在所述主背楞上,所述支撑板与所述挡撑背楞抵接。The invention provides a stereotyped formwork positive angle reinforcement system, comprising a formwork, a main back corrugated and a secondary back corrugated, the secondary back corrugated top brace is on the outside of the template, the main back corrugated top brace is placed on the secondary back corrugated The outer side of the flute also includes a male corner lock. The male corner lock includes a back flute and a blocking piece. The back flute is provided with a back flute connector along the main axis of itself; the blocking piece includes a friction plate. and a support plate, the support plate is fixed on the edge of the opposite side of the friction plate, and the support plate is perpendicular to the friction plate; The vertical support of the retainer back flute is fixed on the main back flute through the retainer back flute connecting piece on the main back flute, and the blocking piece is fixed on the main back flute through the blocking piece connecting piece. The support plate abuts against the back rib of the retainer.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡片连接件包括主背楞卡片,所述主背楞卡片固定在所述摩擦板的正面,所述主背楞卡片与所述主背楞卡接。Further, in the above-mentioned external corner reinforcement system of a stereotyped formwork, the connecting member of the blocking piece includes a main back flute card, and the main back flute card is fixed on the front of the friction plate, and the main back flute card is connected with the front of the friction plate. The main back flute card connection.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡片的摩擦板中部设有第一螺栓孔,所述挡片连接件包括第一螺栓,所述主背楞上设有与所述第一螺栓孔对应的第一通孔。Further, in the above-mentioned external angle reinforcement system of a stereotyped formwork, a first bolt hole is provided in the middle part of the friction plate of the baffle, the connecting part of the baffle includes a first bolt, and the main back flute is provided with a bolt hole. A first through hole corresponding to the first bolt hole.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡撑背楞包括挡撑杆,所述挡撑杆端部设有卡爪。Further, in the above-mentioned external corner reinforcement system of a stereotyped formwork, the retainer back flute includes a retainer strut, and claws are provided at the end of the retainer strut.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡撑背楞包括两根挡撑杆和挡撑杆连接件,两根所述挡撑杆通过所述挡撑杆连接件,两根所述挡撑杆平行设置且两根所述挡撑杆之间具有间隙,所述挡撑背楞连接件为钩头螺栓。Further, in the above-mentioned external angle reinforcement system of a shaped formwork, the back flute of the retaining brace includes two retaining struts and a retaining strut connecting piece, and the two retaining struts pass through the retaining strut connecting piece , the two retaining struts are arranged in parallel and there is a gap between the two retaining struts, and the connecting parts of the retaining struts are hook bolts.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡撑杆连接件包括挡撑杆连接螺栓、挡撑杆限位套管和挡撑杆连接螺母,所述挡撑杆连接螺栓穿过两根所述挡撑杆和所述挡撑杆限位套管并通过所述挡撑杆连接螺母将两根所述挡撑杆紧固,所述挡撑杆限位套管位于两根所述挡撑杆之间,且所述挡撑杆限位套管均顶在两根所述挡撑杆上。Further, in the above-mentioned external corner reinforcement system of a stereotyped formwork, the connecting member of the retaining strut includes a retaining strut connecting bolt, a retaining strut limit sleeve and a retaining strut connecting nut, and the retaining strut connecting Bolts pass through the two stop braces and the stop brace limit sleeves and fasten the two stop braces through the stop brace connecting nuts, and the stop brace limit sleeves are located at Between the two barrier struts, and the limit sleeves of the barrier struts are supported on the two barrier struts.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡撑杆两端部均设有单向设置的卡爪,且两根所述挡撑杆上的卡爪方向相反。Further, in the above-mentioned external angle reinforcement system of a stereotyped formwork, both ends of the barrier struts are provided with claws arranged in one direction, and the claws on the two barrier struts are in opposite directions.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡片还包括顶板,所述顶板固定在所述摩擦板的反面,且位于所述支撑板的对边。Further, in the above-mentioned external corner reinforcement system of a shaped formwork, the blocking piece further includes a top plate, and the top plate is fixed on the opposite side of the friction plate and is located on the opposite side of the support plate.

进一步地,前述的一种定型化模板阳角加固体系中,所述挡片还包括挡撑背楞卡片,所述挡撑背楞卡片固定在所述支撑板与所述挡撑背楞接触的侧面。Further, in the above-mentioned external corner reinforcement system of a shaped formwork, the blocking sheet also includes a back flute card for the back support, and the back flute card for the back support is fixed on the side where the support plate is in contact with the back flute of the back support. side.

进一步地,前述的一种定型化模板阳角加固体系中,所述主背楞为双背楞结构,所述主背楞包括两根主杆和主杆连接件,两根所述主杆通过所述主杆连接件连接,两根所述主杆平行设置且两根所述主杆之间具有间隙。Further, in the above-mentioned external angle reinforcement system of a stereotyped formwork, the main back flute is a double back flute structure, and the main back flute includes two main rods and main rod connectors, and the two main rods pass through The connecting parts of the main rods are connected, and the two main rods are arranged in parallel with a gap between the two main rods.

进一步地,前述的一种定型化模板阳角加固体系中,所述主背楞设有用于调节所述主背楞长度的伸缩结构。Further, in the above-mentioned external angle reinforcement system of a shaped formwork, the main back flute is provided with a telescopic structure for adjusting the length of the main back flute.

进一步地,前述的一种定型化模板阳角加固体系中,所述主背楞的两根所述主杆上设有错位设置的伸缩节结构。Further, in the above-mentioned external corner reinforcement system of a shaped formwork, the two main rods of the main back flute are provided with telescopic joint structures arranged in dislocation.

进一步地,前述的一种定型化模板阳角加固体系中,所述伸缩节结构包括套杆和伸缩杆,两根所述套杆分别套接在所述伸缩杆的两端部。Further, in the above-mentioned external corner reinforcement system of a stereotyped formwork, the telescopic joint structure includes a sleeve rod and a telescopic rod, and the two sleeve rods are respectively sleeved on both ends of the telescopic rod.

进一步地,前述的一种定型化模板阳角加固体系中,所述主杆连接件包括主杆连接螺栓、主杆限位套管和主杆连接螺母,所述主杆连接螺栓穿过两根所述主杆和所述主杆限位套管并通过所述主杆连接螺母将两根所述主杆紧固,所述主杆限位套管位于两根所述主杆之间,且所述主杆限位套管均顶在两根所述主杆上。Further, in the above-mentioned external angle reinforcement system of a stereotyped formwork, the main rod connecting piece includes a main rod connecting bolt, a main rod limit sleeve and a main rod connecting nut, and the main rod connecting bolt passes through two The main rod and the main rod limiting sleeve fasten the two main rods through the main rod connecting nut, the main rod limiting sleeve is located between the two main rods, and The limiting sleeves of the main rods are both supported on the two main rods.

本发明所述技术方案所产生的有益效果为:The beneficial effects produced by the technical solution of the present invention are:

本发明提供的一种定型化模板阳角加固体系通过特制的定型化构件能够方便稳固地对混凝土模板阳角进行加固,由于主背楞、挡撑背楞和挡片之间的相互配合以及撑背楞连接件、挡片连接件的双重连接作用,能使主背楞、挡撑背楞和挡片之间相互咬合,连接紧密,能更好地对混凝土模板的角度进行固定,同时也能防止外力导致的混凝土模板变形,提高成型质量。The external angle reinforcement system of a stereotyped formwork provided by the present invention can conveniently and stably reinforce the external angles of the concrete formwork through special shaped components. The double connection function of the back flute connector and the retainer connector can make the main back flute, the retainer back flute and the retainer interlock with each other, and the connection is tight, which can better fix the angle of the concrete formwork, and at the same time can Prevent deformation of concrete formwork caused by external force and improve molding quality.

附图说明Description of drawings

图1是本发明一种实施例的结构示意图;Fig. 1 is a structural representation of an embodiment of the present invention;

图2是图1实施例部分拆分后的结构示意图;Fig. 2 is a schematic structural diagram of the partially disassembled embodiment of Fig. 1;

图3是本发明一种实施例的结构示意图;Fig. 3 is a structural representation of an embodiment of the present invention;

图4是图3实施例部分拆分后的结构示意图;Fig. 4 is a schematic diagram of the structure of the partially disassembled embodiment of Fig. 3;

图5是图3实施例挡片的结构示意图;Fig. 5 is a schematic structural view of the baffle of Fig. 3 embodiment;

图6是图1实施例挡片的结构示意图;Fig. 6 is a schematic structural view of the baffle of Fig. 1 embodiment;

图7是图3实施例挡撑背楞的剖面结构示意图;Fig. 7 is a schematic cross-sectional structure diagram of the back flute of the embodiment of Fig. 3;

图8是图1实施例挡撑背楞的剖面结构示意图;Fig. 8 is a schematic cross-sectional structure diagram of the back flute of the embodiment of Fig. 1;

图9是图1实施例主背楞的剖面结构示意图;Fig. 9 is a schematic cross-sectional structure diagram of the main back flute of Fig. 1 embodiment;

图10是本发明一种实施例的阳角锁具和对应的阴角锁具使用状态的俯视示意图;Fig. 10 is a schematic top view of the use state of the male corner lockset and the corresponding female corner lockset according to an embodiment of the present invention;

图11是本发明一种实施例对应的阴角的俯视结构示意图;Fig. 11 is a schematic top view structural diagram of a female corner corresponding to an embodiment of the present invention;

图12是本发明一种实施例对应的支撑结构的俯视示意图。Fig. 12 is a schematic top view of a supporting structure corresponding to an embodiment of the present invention.

上述附图中标记对应关系为:The corresponding relationship of the marks in the above drawings is:

100主背楞;110主杆;111套杆;112伸缩杆;100 main back flute; 110 main rod; 111 sets of rods; 112 telescopic rods;

120主杆连接件;121主杆连接螺栓;122主杆限位套管;123主杆连接螺母;120 main rod connector; 121 main rod connecting bolt; 122 main rod limit sleeve; 123 main rod connecting nut;

200挡撑背楞;210挡撑杆;211螺杆孔;220卡爪;200 back brace; 210 brace; 211 screw hole; 220 claw;

230挡撑杆连接件;231挡撑杆连接螺栓;232挡撑杆限位套管;233挡撑杆连接螺母;230 block strut connecting piece; 231 block strut connecting bolt; 232 block strut limit sleeve; 233 block strut connecting nut;

310钩头螺栓;320螺杆;310 hook bolt; 320 screw;

400挡片;410摩擦板;411第一螺栓孔;420主背楞卡片;430顶板;440支撑板;441挡撑背楞卡片;400 block; 410 friction plate; 411 first bolt hole; 420 main back flute card; 430 top plate; 440 support plate; 441 back support back flute card;

510次背楞;520模板;510 back corrugated; 520 templates;

610垫片;610 gasket;

710拉条;720斜撑;710 braces; 720 diagonal braces;

800阴角锁具。800 internal angle lockset.

具体实施方式detailed description

下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

参考附图1至附图8,本发明提供的一种定型化模板阳角加固体系,包括模板520、主背楞100和次背楞510,所述次背楞510顶撑在所述模板520外侧,所述主背楞100顶撑在所述次背楞510外侧,还包括阳角锁具,所述阳角锁具包括挡撑背楞200和挡片400,所述挡撑背楞200沿自身主轴线方向设有挡撑背楞连接件;所述挡片400包括摩擦板410和支撑板440,所述支撑板440固定在所述摩擦板410的反面的边缘,且所述支撑板440与所述摩擦板410垂直;所述挡撑背楞200垂直顶撑在所述次背楞510外侧,所述挡撑背楞200垂直顶撑在所述主背楞100上并通过所述挡撑背楞连接件固定在所述主背楞100上,所述挡片400通过挡片连接件固定在所述主背楞100上,所述支撑板440与所述挡撑背楞200抵接。摩擦板410的反面是指摩擦板410远离主背楞100的一面。Referring to accompanying drawings 1 to 8, a stereotyped formwork external angle reinforcement system provided by the present invention includes a formwork 520, a main back flute 100 and a secondary back flute 510, and the secondary back flute 510 is supported on the formwork 520 On the outside, the main back flute 100 is supported on the outside of the secondary back flute 510, and also includes a male corner lock. The male corner lock includes a retaining back flute 200 and a blocking piece 400, and the retaining back flute 200 is along its own The direction of the main axis is provided with a retaining back corrugated connector; the blocking plate 400 includes a friction plate 410 and a support plate 440, the support plate 440 is fixed on the edge of the opposite side of the friction plate 410, and the support plate 440 is connected to the The friction plate 410 is vertical; the retainer back flute 200 vertically supports the outside of the secondary back flute 510, and the retainer back flute 200 vertically props up on the main back flute 100 and passes through the retainer The back flute connector is fixed on the main back flute 100 , the retainer 400 is fixed on the main back flute 100 through the retainer connector, and the support plate 440 abuts against the retainer back flute 200 . The opposite side of the friction plate 410 refers to the side of the friction plate 410 away from the main flute 100 .

使用时,将模板520、主背楞100和次背楞510初步搭设,在阳角位置设置挡撑背楞200,接着用挡撑背楞连接件将挡撑背楞200初步连接在主背楞100上,然后将挡片400安装在挡撑背楞200和主背楞100形成的直角处,挡片400的摩擦板410紧贴在主背楞100上,同时使挡片400的支撑板440顶住挡撑背楞200,将所述挡片400通过挡片连接件固定在所述主背楞100上,最后将模板520、主背楞100和次背楞510以及挡片400初步固定后将挡撑背楞连接件、挡片连接件以及其他应当紧固的结构紧固牢靠即可。When in use, the formwork 520, the main back flute 100 and the secondary back flute 510 are preliminarily set up, and the retaining back flute 200 is set at the positive corner position, and then the retaining back flute 200 is initially connected to the main back flute with the retaining back flute connector 100, and then install the baffle 400 at the right angle formed by the back support back 200 and the main back 100, the friction plate 410 of the baffle 400 is closely attached to the main back 100, and at the same time the support plate 440 of the baffle 400 Withstand the support back flute 200, fix the blocking piece 400 on the main back flute 100 through the blocking piece connector, and finally fix the template 520, the main back flute 100, the secondary back flute 510 and the blocking piece 400 It is enough to fasten the retainer back corrugated connectors, baffle connectors and other structures that should be fastened securely.

本发明提供的一种定型化模板阳角加固体系通过特制的定型化构件能够方便稳固地对混凝土模板阳角进行加固,由于主背楞100、挡撑背楞200和挡片400之间的相互配合以及撑背楞连接件、挡片连接件的双重连接作用,能使主背楞100、挡撑背楞200和挡片400之间相互咬合,连接紧密,能更好地对混凝土模板的角度进行固定,同时也能防止外力导致的混凝土模板变形,提高成型质量。The outside corner reinforcement system of a shaped formwork provided by the present invention can conveniently and stably reinforce the outside corners of the concrete formwork through special shaped components. Cooperating with the double connection function of the support back corrugated connector and the retainer connector, can make the main back corrugated 100, the retainer back corrugated 200 and the retainer 400 interlock with each other, and the connection is tight, which can better adjust the angle of the concrete formwork Fixing can also prevent the deformation of the concrete formwork caused by external force and improve the molding quality.

进一步地,参考附图5和附图6,前述的一种定型化模板阳角加固体系中,所述挡片连接件包括主背楞卡片420,所述主背楞卡片420固定在所述摩擦板410的正面所述主背楞卡片420与所述主背楞100卡接。摩擦板410的正面是指摩擦板410紧贴主背楞100的一面。Further, with reference to accompanying drawings 5 and 6, in the aforesaid stereotyped formwork male corner reinforcement system, the retainer connector includes a main back corrugated card 420, and the main back corrugated card 420 is fixed on the friction The main back flute card 420 on the front side of the board 410 is clamped with the main back flute 100 . The front side of the friction plate 410 refers to the side of the friction plate 410 that is close to the main flute 100 .

进一步地,参考附图10和附图11,前述的一种定型化模板阳角加固体系中,还包括阴角锁具800,所述阴角锁具800包括两根相互垂直连接的阴角背楞,所述阴角背楞中的一根或两根为主背楞100,所述阴角背楞为双背楞结构。阴角锁具800相当于L型杠,与角尺形状类似,将阴角锁具800固定在阴角位置的主背楞100上,或通过丝杠固定在混凝土内即可保证阴角的角度准确。Further, with reference to accompanying drawings 10 and 11, the aforesaid stereotyped formwork male corner reinforcement system also includes a female corner lock 800, the female corner lock 800 includes two vertically connected female corner back corrugations, One or two of the inner corner back flutes are the main back flutes 100, and the inner corner back flutes have a double back flute structure. The internal corner lock 800 is equivalent to an L-shaped bar, which is similar in shape to a square square. Fixing the internal corner lock 800 on the main back corrugated 100 at the internal corner position, or fixing it in the concrete through a screw can ensure that the angle of the internal corner is accurate.

进一步地,参考附图4和附图5,前述的一种定型化模板阳角加固体系中,所述挡片400的摩擦板410中部设有第一螺栓孔411,所述挡片连接件包括第一螺栓,所述主背楞100上设有与所述第一螺栓孔411对应的第一通孔。所述第一螺栓穿过第一螺栓孔411和所述第一通孔将所述挡片400和所述主背楞100连接。采用螺栓连接简单有效,主背楞100和挡片400通过穿过第一螺栓孔411和主背楞100两根主杆110之间间隙的第一螺栓固定,第一螺栓位于主背楞100远离挡片400的一侧可设置垫片610防止滑脱。Further, with reference to accompanying drawings 4 and 5, in the above-mentioned external corner reinforcement system of a shaped formwork, a first bolt hole 411 is provided in the middle of the friction plate 410 of the blocking plate 400, and the connecting piece of the blocking plate includes For the first bolt, the main back flute 100 is provided with a first through hole corresponding to the first bolt hole 411 . The first bolt passes through the first bolt hole 411 and the first through hole to connect the blocking piece 400 and the main flute 100 . The bolt connection is simple and effective. The main back flute 100 and the retainer 400 are fixed by the first bolt passing through the gap between the first bolt hole 411 and the two main rods 110 of the main back flute 100. The first bolt is located far away from the main back flute 100. A gasket 610 may be provided on one side of the blocking plate 400 to prevent slipping.

进一步地,参考附图7,前述的一种定型化模板阳角加固体系中,所述挡撑背楞200端部设有卡爪220。所述挡撑背楞200通过所述卡爪220卡住所述主背楞100。使用时,将挡撑背楞200通过卡爪220撑在主背楞100上即可。Further, referring to FIG. 7 , in the above-mentioned external angle reinforcement system of a shaped formwork, the end of the retainer back flute 200 is provided with claws 220 . The retainer back flute 200 clamps the main back flute 100 through the claws 220 . When in use, it is sufficient to support the retaining back flute 200 on the main back flute 100 through the claws 220 .

进一步地,参考附图7,前述的一种定型化模板阳角加固体系中,所述挡撑背楞200包括挡撑杆210,所述挡撑杆210两端部均设有卡爪220,所述挡撑杆210中空且端部设有螺杆孔211,所述挡撑背楞连接件为螺杆320。这种挡撑背楞200适于加固具有两个连续阳角的结构,采用螺杆320将挡撑背楞200紧固在主背楞100上,螺杆320一端紧固即可使挡撑背楞200紧固,挡撑背楞200两端受力均匀,整个定型化模板阳角加固体系不易变形。Further, referring to Fig. 7 , in the above-mentioned external corner reinforcement system of a shaped formwork, the back brace 200 includes a brace 210, and both ends of the brace 210 are provided with claws 220, The retainer strut 210 is hollow and has a screw hole 211 at the end, and the retainer back corrugated connector is a screw 320 . This kind of retaining corrugation 200 is suitable for strengthening the structure with two continuous external corners. The retaining corrugation 200 is fastened on the main corrugation 100 by using the screw 320, and the retaining corrugation 200 can be made by tightening one end of the screw 320. Tightening, the two ends of the back corrugated 200 are evenly stressed, and the entire external angle reinforcement system of the shaped formwork is not easy to deform.

进一步地,参考附图8,前述的一种定型化模板阳角加固体系中,所述挡撑背楞200包括两根挡撑杆210和挡撑杆连接件230,两根所述挡撑杆210通过所述挡撑杆连接件230,两根所述挡撑杆210平行设置且两根所述挡撑杆210之间具有间隙,所述挡撑背楞连接件为钩头螺栓310。这种挡撑背楞200适于加固单个阳角的结构,也可以用于加固具有多个阳角的结构,采用钩头螺栓310将挡撑背楞200紧固在主背楞100上,便于调节挡撑背楞200的位置,使阳角角度更为精确。在本发明的一种具体实施方式中,这种挡撑背楞200为带有卡爪220的主背楞100。Further, referring to the accompanying drawing 8, in the above-mentioned external corner reinforcement system of a shaped formwork, the said retaining brace back flute 200 includes two retaining struts 210 and retaining strut connectors 230, and the two retaining struts 210 passes through the retaining strut connector 230 , two retaining struts 210 are arranged in parallel and there is a gap between the two retaining struts 210 , and the retaining back corrugated connecting member is a hook bolt 310 . This retaining back flute 200 is suitable for reinforcing a single external corner structure, and can also be used to reinforce a structure with multiple external corners. The retaining back flute 200 is fastened on the main back flute 100 by hook bolts 310, which is convenient Adjust the position of the retaining back corrugated 200 to make the angle of the sun angle more accurate. In a specific embodiment of the present invention, the retainer back flute 200 is the main back flute 100 with claws 220 .

进一步地,参考附图8,前述的一种定型化模板阳角加固体系中,所述挡撑杆连接件230包括挡撑杆连接螺栓231、挡撑杆限位套管232和挡撑杆连接螺母233,所述挡撑杆连接螺栓231穿过两根所述挡撑杆210和所述挡撑杆限位套管232并通过所述挡撑杆连接螺母233将两根所述挡撑杆210紧固,所述挡撑杆限位套管232位于两根所述挡撑杆210之间,且所述挡撑杆限位套管232均顶在两根所述挡撑杆210上。采用挡撑杆限位套管232能够有效保证挡撑杆210之间的距离,同时挡撑杆限位套管232也便于使用钩头螺栓310勾住紧固。Further, referring to FIG. 8 , in the above-mentioned external angle reinforcement system of a stereotyped formwork, the connecting member 230 of the retaining strut includes a retaining strut connecting bolt 231 , a retaining strut limiting sleeve 232 and a retaining strut connection. Nut 233, the connecting bolt 231 of the blocking strut rod passes through the two blocking strut rods 210 and the limiting sleeve 232 of the blocking strut rod and connects the two blocking strut rods through the connecting nut 233 of the blocking strut rod 210 is fastened, and the stop strut limit sleeve 232 is located between the two stop struts 210 , and the stop strut limit sleeve 232 is supported on the two stop struts 210 . The distance between the stop braces 210 can be effectively ensured by using the stop brace limit sleeve 232 , and the stop brace limit sleeve 232 is also convenient to be hooked and fastened by the hook bolt 310 .

进一步地,参考附图7和附图8,前述的一种定型化模板阳角加固体系中,所述挡撑杆210两端部均设有单向设置的卡爪220,且两根所述挡撑杆210上的卡爪220方向相反。这种挡撑背楞200适于加固具有两个连续阳角的结构,两个阳角的主背楞100由挡撑背楞200支撑,挡撑背楞200既限定了阳角角度又限定了两个主背楞100之间的距离,结构简单,使用方便。Further, with reference to accompanying drawings 7 and 8, in the aforesaid external angle reinforcement system of a stereotyped formwork, both ends of the retaining strut 210 are provided with one-way claws 220, and the two The claws 220 on the blocking strut 210 are in opposite directions. This kind of brace back flute 200 is suitable for strengthening the structure with two continuous external corners, the main back flute 100 of the two external corners is supported by the brace back flute 200, and the brace back flute 200 not only defines the angle of the outside corner but also limits the The distance between the two main back flutes is 100, the structure is simple, and the use is convenient.

进一步地,参考附图5,前述的一种定型化模板阳角加固体系中,所述挡片400还包括顶板430,所述顶板430固定在所述摩擦板410的反面,且位于所述支撑板440的对边。顶板430的设置有利于对挡片400位置进行微调,调节时敲击顶板430即可调节挡片400位置,防止调节挡片400位置时,敲击作用使挡片400其他位置变形或损坏。Further, referring to FIG. 5 , in the above-mentioned external angle reinforcement system of a stereotyped formwork, the baffle 400 also includes a top plate 430, which is fixed on the opposite side of the friction plate 410 and is located on the support Opposite side of plate 440 . The setting of the top plate 430 is conducive to fine-tuning the position of the blocking plate 400. When adjusting, the top plate 430 can be knocked to adjust the position of the blocking plate 400, so as to prevent the other positions of the blocking plate 400 from being deformed or damaged by knocking when the position of the blocking plate 400 is adjusted.

进一步地,参考附图6,前述的一种定型化模板阳角加固体系中,所述挡片400还包括挡撑背楞卡片441,所述挡撑背楞卡片441固定在所述支撑板440与所述挡撑背楞200接触的侧面。挡撑背楞卡片441用于卡住挡撑背楞200,这样能够防止挡撑背楞200沿主背楞100的轴向旋转,导致角度产生偏差。Further, referring to the accompanying drawing 6, in the above-mentioned external corner reinforcement system of a shaped formwork, the retainer 400 also includes a retainer back corrugated card 441, and the retainer back corrugated card 441 is fixed on the support plate 440 The side surface in contact with the back flute 200 of the retainer. The retainer back flute card 441 is used to block the retainer back flute 200, which can prevent the retainer back flute 200 from rotating along the axial direction of the main back flute 100, resulting in angle deviation.

进一步地,参考附图9,前述的一种定型化模板阳角加固体系中,所述主背楞100为双背楞结构,所述主背楞100包括两根主杆110和主杆连接件120,两根所述主杆110通过所述主杆连接件120连接,两根所述主杆110平行设置且两根所述主杆110之间具有间隙。Further, referring to accompanying drawing 9, in the above-mentioned external angle reinforcement system of a shaped formwork, the main back flute 100 is a double back flute structure, and the main back flute 100 includes two main rods 110 and main rod connectors 120 , the two main rods 110 are connected by the main rod connector 120 , the two main rods 110 are arranged in parallel with a gap between the two main rods 110 .

进一步地,参考附图9,前述的一种定型化模板阳角加固体系中,所述主背楞100设有用于调节所述主背楞100长度的伸缩结构。转角位置会对主背楞100的长度产生要求,伸缩结构能调节主背楞100的长度,防止采用直接截断主背楞100的方式造成浪费。Further, referring to FIG. 9 , in the above-mentioned external angle reinforcement system of a shaped formwork, the main back flute 100 is provided with a telescopic structure for adjusting the length of the main back flute 100 . The position of the corner will generate requirements for the length of the main back flute 100, and the telescopic structure can adjust the length of the main back flute 100 to prevent waste caused by directly cutting off the main back flute 100.

进一步地,参考附图9,前述的一种定型化模板阳角加固体系中,所述主背楞100的两根所述主杆110上设有错位设置的伸缩节结构。错位设置的伸缩节结构能够有效保证主背楞100的受力状态,防止局部局部滑移或胀模造成的危害。Further, referring to FIG. 9 , in the above-mentioned external angle reinforcement system of a stereotyped formwork, the two main rods 110 of the main back flute 100 are provided with dislocated expansion joint structures. The dislocation-set expansion joint structure can effectively ensure the stressed state of the main back corrugated 100 and prevent damage caused by local slippage or mold expansion.

进一步地,参考附图9,前述的一种定型化模板阳角加固体系中,所述伸缩节结构包括套杆111和伸缩杆112,两根所述套杆111分别套接在所述伸缩杆112的两端部。采用套杆结构最为简单有效,套杆111与伸缩杆112既可以滑动连接,又可以采用紧固结构固定连接,使用简单方便。Further, referring to accompanying drawing 9, in the above-mentioned external angle reinforcement system of a stereotyped formwork, the telescopic joint structure includes a sleeve rod 111 and a telescopic rod 112, and the two sleeve rods 111 are respectively socketed on the telescopic rod 112 at both ends. The sleeve rod structure is the most simple and effective. The sleeve rod 111 and the telescopic rod 112 can be slidably connected, and can also be fixedly connected by a fastening structure, which is simple and convenient to use.

进一步地,参考附图9,前述的一种定型化模板阳角加固体系中,所述主杆连接件120包括主杆连接螺栓121、主杆限位套管122和主杆连接螺母123,所述主杆连接螺栓121穿过两根所述主杆110和所述主杆限位套管122并通过所述主杆连接螺母123将两根所述主杆110紧固,所述主杆限位套管122位于两根所述主杆110之间,且所述主杆限位套管122均顶在两根所述主杆110上。Further, referring to FIG. 9 , in the above-mentioned external angle reinforcement system of a stereotyped formwork, the main rod connecting piece 120 includes a main rod connecting bolt 121 , a main rod limiting sleeve 122 and a main rod connecting nut 123 . The main rod connecting bolts 121 pass through the two main rods 110 and the main rod limit sleeve 122 and fasten the two main rods 110 through the main rod connecting nuts 123, the main rod limit The positioning sleeve 122 is located between the two main rods 110 , and the main rod limiting sleeves 122 are both supported on the two main rods 110 .

进一步地,参考附图12,前述的一种定型化模板阳角加固体系中,还包括外拉外撑结构,所述外拉外撑结构包括拉条710和斜撑720,所述拉条710中部设有花篮螺栓,所述斜撑720为伸缩杆结构,所述伸缩杆结构为丝杠型伸缩杆结构。斜撑720设置在拉条710附近,一撑一拉,能够有效保证模板位置的准确。其中花篮螺栓用于调节拉条710松紧,丝杠型伸缩杆结构用于调节斜撑720的顶撑位置。Further, with reference to the accompanying drawing 12, the above-mentioned external angle reinforcement system of a stereotyped formwork also includes an externally pulled outrigger structure, which includes a brace 710 and a diagonal brace 720, and the brace 710 The middle part is provided with a turnbuckle bolt, and the diagonal brace 720 is a telescopic rod structure, and the telescopic rod structure is a lead screw type telescopic rod structure. The diagonal braces 720 are arranged near the braces 710, one brace and one pull, which can effectively ensure the accuracy of the position of the formwork. Wherein the turnbuckle bolt is used to adjust the tightness of the brace 710, and the lead screw type telescopic rod structure is used to adjust the top support position of the diagonal brace 720.

下面结合采用本发明提供的定型化模板阳角加固体系的具体工程实例对本发明进行进一步地说明。The present invention will be further described below in combination with specific engineering examples using the external corner reinforcement system of the stereotyped formwork provided by the present invention.

1. 前言1 Introduction

建设规模日益扩大,建筑耗材消耗日益增加,森林资源日趋匮乏,国内木材供需矛盾日渐突出,建筑施工领域木材节约代用工作势在必行。The scale of construction is expanding, the consumption of construction materials is increasing, forest resources are becoming increasingly scarce, and the contradiction between domestic timber supply and demand is becoming increasingly prominent. It is imperative to save and substitute timber in the field of construction.

为了达到节约资源、提高效益的目的,我项目部通过调研,对传统模板体系进行了改进,采用定型镀锌方钢代替传统木方作为模板主、次龙骨,与双面覆膜多层板混搭的一种新型模板体系。该项技术操作简单,在我项目实体工程中得到应用,综合效益明显,推广应用前景良好。方钢龙骨模板体系的推广应用可给节约更多的木材资源,创造更大的社会和经济效益。In order to achieve the purpose of saving resources and improving efficiency, our project department has improved the traditional formwork system through investigations, using shaped galvanized square steel instead of traditional wooden squares as the main and secondary keels of the formwork, and mixed with double-sided film-coated multilayer panels A new type of template system. This technology is easy to operate and has been applied in the physical engineering of our project. The comprehensive benefits are obvious and the prospect of popularization and application is good. The promotion and application of the square steel keel formwork system can save more timber resources and create greater social and economic benefits.

2. 工法特点2. Construction method characteristics

传统的模板加固体系采用木胶合模板+方木+钢管组成,由于方木刚度小、制作精度差,钢管与木方为线接触等原因,易造成混凝土成型质量差,阴阳角不方正、漏浆,实测实量不达标等诸多质量问题。The traditional formwork reinforcement system is composed of wood-glued formwork + square wood + steel pipe. Due to the small rigidity of the square wood, poor manufacturing accuracy, and the line contact between the steel pipe and the wood square, it is easy to cause poor concrete molding quality, irregular yin and yang angles, and grout leakage. , The actual measured quantity is not up to the standard and many other quality problems.

定型化模板加固施工技术对传统做法中的加固材料进行改进,采用双层覆膜多层板+方钢管次背楞+双方钢管主背楞组合而成,成功解决了上述质量通病,提高了实测实量成绩等质量问题。The stereotyped formwork reinforcement construction technology improves the reinforcement materials in the traditional method. It is composed of double-layer film-coated multi-layer board + square steel pipe secondary back corrugation + double steel pipe main back corrugation, which successfully solves the above common quality problems and improves the actual measurement. Quality issues such as actual results.

定型化模板加固施工技术具有以下技术特点:The stereotyped formwork reinforcement construction technology has the following technical characteristics:

(1)方钢管刚度大,尺寸精度准确,安全可靠,简捷高效。不易变形,与模板、主次背楞接触面积大,有效地避免了背楞变形对支模体系的影响。(1) The square steel pipe has high rigidity, accurate dimensional accuracy, safety, reliability, simplicity and efficiency. It is not easy to deform, and has a large contact area with the formwork and the primary and secondary back corrugations, effectively avoiding the influence of back corrugation deformation on the formwork support system.

(2)采用统一定型化加工制作,规格统一、安拆方便、提高了施工效率,周转使用率高,减少了材料用量。施工更简单方便、效率更高。(2) It adopts unified stereotyped processing and production, with uniform specifications, convenient installation and disassembly, improved construction efficiency, high turnover rate and reduced material consumption. The construction is simpler, more convenient and more efficient.

(3)混凝土成型后的结构尺寸及观感质量较好,提高了实测实量成绩,减少了后期装修成本。(3) The structural size and visual quality of the concrete after molding are better, which improves the results of actual measurement and measurement and reduces the cost of later decoration.

(4)构件造型及尺寸灵活多变,满足建筑结构各种尺寸的要求,产品能够随意组合,可在多个工程中重复周转使用,周转次数多,且回收成本高,摊销费用少,综合经济效益显著。(4) The shape and size of the components are flexible and changeable, meeting the requirements of various sizes of the building structure. The products can be combined at will, and can be used repeatedly in multiple projects. The number of turnovers is large, and the recovery cost is high, and the amortization cost is low. Comprehensive Significant economic benefits.

(5)重量轻、体积小,便于运输。方钢龙骨体积小、重量轻,最长的构件4.2米重量不超过13kg,大部分为2.7m,不超过8kg。施工中仅需设置起重能力5t以下的塔机便可完成模板的垂直运输,与大模板工艺相比可节省机械台班费用25%,短途、长途运输都方便,可进行异地工程周转使用,综合经济效益显著。镀锌方钢代替木方,将工程中的低值易消耗品改革为周转材料,方钢龙骨可在多个工程施工中反复利用,可周转使用300次以上,摊销费用低。(5) Light weight, small size, easy to transport. The square steel keel is small in size and light in weight. The longest member is 4.2 meters and weighs no more than 13kg, and most of it is 2.7m, no more than 8kg. During construction, it is only necessary to set up a tower crane with a lifting capacity of less than 5t to complete the vertical transportation of the formwork. Compared with the large formwork process, it can save 25% of the cost of the mechanical shift. The comprehensive economic benefit is remarkable. Galvanized square steel replaces wooden squares, and transforms low-value consumables in the project into turnover materials. The square steel keel can be reused in multiple construction projects, and can be used more than 300 times, with low amortization costs.

(6)占用施工场地小,对于施工场地狭小的项目具有明显优势。(6) It occupies a small construction site, which has obvious advantages for projects with small construction sites.

(7)构件标准化、模数化,附件简易,适用性强。方钢规格统一,采用定型辅件连接,简单可靠,安装速度快。不仅仅适用于剪力墙施工,还适用于框架柱、梁、板施工。标准化、模数化规范了工人施工,在提高施工质量的同时,保证了施工现场的整洁,为文明施工打下基础。(7) Standardization and modularization of components, simple accessories and strong applicability. The square steel has uniform specifications and is connected by shaped accessories, which is simple and reliable, and the installation speed is fast. It is not only suitable for shear wall construction, but also for frame column, beam and slab construction. Standardization and modularization regulate the construction of workers. While improving the construction quality, it ensures the cleanliness of the construction site and lays the foundation for civilized construction.

(8)节能环保。节约木材,保护有限的森林资源;节约钢材,保护不可再生资源;节约塑料,保障工程质量,保证大众健康;不需切割方木,没有木屑,减轻大气污染;节约劳动力,提高工作效率;方钢可循环使用,用废可以再生。(8) Energy saving and environmental protection. Save wood, protect limited forest resources; save steel, protect non-renewable resources; save plastic, ensure project quality, and ensure public health; no need to cut square wood, no wood chips, reduce air pollution; save labor, improve work efficiency; square steel Recyclable, waste can be regenerated.

3. 适用范围3. Scope of application

适用于各种房屋建筑工程现浇框架、框剪结构梁板、剪力墙、柱模板工程。It is suitable for cast-in-place frames, frame-shear structural beams, shear walls, and column formwork projects in various housing construction projects.

4. 工艺原理4. Process principle

1、方钢龙骨承载力较高、刚度大、形变小,与木模板组合拼装操作简单,对于楼板模板,通过合理设置主、次楞方钢的间距,方钢龙骨与木模板组合的方钢龙骨模板体系能较好地承受楼板模板上部的结构自重及施工荷载;对于墙柱侧模,通过合理设置竖向方钢龙骨的间距,方钢龙骨模板体系能较好的承受墙柱混凝土浇筑过程中及浇筑后的侧压力。1. The square steel keel has high bearing capacity, high rigidity, and small deformation. It is easy to assemble and assemble with the wooden formwork. For the floor formwork, by setting the distance between the main and secondary flute square steel reasonably, the square steel keel combined with the wooden formwork The keel formwork system can better bear the structural weight and construction load of the upper part of the floor formwork; for the wall column side formwork, by setting the vertical square steel keel spacing reasonably, the square steel keel formwork system can better withstand the concrete pouring process of the wall column Lateral pressure during and after pouring.

2、方钢龙骨模板体系是用1根40*40*2.5mm镀锌方钢作次龙骨、2根40*40*2.5mm镀锌方钢作主龙骨,和下部可调顶托、支撑架等组成顶板模板组合支撑体系。在竖向支撑杆件搭设好后,用可调顶托支撑镀锌方钢主龙骨,在主龙骨上安装次龙骨,用可调顶托调整标高,按要求进行起拱,在主次龙骨组合结构上方铺排模板。2. The square steel keel formwork system uses one 40*40*2.5mm galvanized square steel as the secondary keel, two 40*40*2.5mm galvanized square steel as the main keel, and the lower adjustable jacking and support frame and so on form the combined support system of the roof formwork. After the vertical support rods are erected, use the adjustable jack to support the galvanized square steel main keel, install the secondary keel on the main keel, adjust the elevation with the adjustable jack, perform arching as required, and combine the primary and secondary keels Formwork is laid over the structure.

5. 施工工艺及操作要点5. Construction technology and key points of operation

5.1 施工条件5.1 Construction conditions

(1)材料和工具(1) Materials and tools

使用40*100mm木方、40*40*2.5mm方钢、对拉螺杆等。Use 40*100mm wooden square, 40*40*2.5mm square steel, pull screw, etc.

材料堆放到位,并应尽量散放,避免局部集中荷载过大;The materials should be stacked in place, and should be scattered as much as possible to avoid excessive local concentrated load;

(2)楼面强度满足施工设计强度要求;(2) The floor strength meets the construction design strength requirements;

(3)楼面放线工作已经完成;(3) The laying-out work on the floor has been completed;

(4)外架防护到位,保证楼层周边的安全防护高度满足施工要求;(4) The protection of the outer frame is in place to ensure that the safety protection height around the floor meets the construction requirements;

(5)根据施工方案对工人进行安全技术交底,使工人都熟悉施工工艺及在施工中应注意的问题。(5) According to the construction plan, the safety technology of the workers should be disclosed, so that the workers are familiar with the construction technology and the problems that should be paid attention to during the construction.

5.2 洞口的制作5.2 Fabrication of the hole

模板合模后,装好主背楞、次背楞,然后组装洞口,将洞口锁具用对拉螺栓固定到主背楞上,每侧带上一个阳角锁具加固。After the formwork is closed, install the main back flute and the secondary back flute, then assemble the hole, fix the hole lock to the main back flute with pull bolts, and reinforce it with a male corner lock on each side.

5.3 梁、楼板模板工程工艺流程及操作要点5.3 Technological process and operation points of beam and floor formwork engineering

1工艺流程 1 process flow

钢管脚手架搭设→安装板底可调顶托→安装梁底模、板底模、梁侧模。Erection of steel pipe scaffolding → installation of adjustable jacking at the bottom of the slab → installation of beam bottom formwork, slab bottom formwork, and beam side formwork.

2操作要点 2 Operation points

较小截面梁(梁高H<600)及楼板模板及支撑体系。Smaller cross-section beams (beam height H<600) and floor formwork and support systems.

钢管脚手架搭设steel pipe scaffolding erection

首先根据梁板支撑体系设计方案定出立杆的位置,然后竖向钢管立杆,板底立杆间距为1000~1200mm,梁底排架立杆排距为900mm,排架立杆纵距为1000~1200mm,然后安装纵横扫地杆、水平联系杆的步距为1200~1500mm。First determine the position of the poles according to the design plan of the beam-slab support system, then vertical steel pipe poles, the distance between the poles at the bottom of the slab is 1000-1200mm, the distance between the vertical poles at the bottom of the beam is 900mm, and the vertical distance of the vertical poles is 1000~1200mm, and then install the vertical and horizontal sweeping rods and horizontal connecting rods with a step distance of 1200~1500mm.

安装板底可调顶托Adjustable top bracket on the bottom of the installation plate

可调顶托插入立杆的深度不小于可调顶托长度的2/3。可调顶托上部开口托板的宽度必须满足放置两排45*45方钢以上,以便于方钢主楞搭接时的安放,可调顶托剩余的宽度可通过稍微扭转来卡紧方钢。The depth of the adjustable jacking bracket inserted into the pole is not less than 2/3 of the length of the adjustable jacking bracket. The width of the upper opening support plate of the adjustable jacking must be sufficient to place more than two rows of 45*45 square steel, so as to facilitate the placement of the square steel when the main flute is lapped, and the remaining width of the adjustable jacking can be tightened by slightly twisting the square steel .

安装梁底模、板底模、梁侧模Install beam bottom formwork, slab bottom formwork and beam side formwork

板底次龙骨、主龙骨安装:先调整可调顶托的标高,并按规范要求设置起拱度,再安装方钢主龙骨,方钢的规格为40*40*2.5mm,方钢长度为2700mm,然后安装方钢次龙骨,方钢的规格同主龙骨方钢,次龙骨间距为250~400mm。Installation of the secondary keel and main keel at the bottom of the slab: first adjust the elevation of the adjustable jacking, and set the camber according to the specification requirements, and then install the main keel of the square steel. The specification of the square steel is 40*40*2.5mm, and the length of the square steel is 2700mm, and then install the square steel sub keel, the specifications of the square steel are the same as the main keel square steel, and the distance between the sub keels is 250-400mm.

当主龙骨搭接时,两根方钢的搭接范围设置在相邻两个主龙骨支座(即相邻两个可调顶托处);当次龙骨搭接时,两根方钢的搭接范围设置在相邻两个次龙骨支座(及相邻两个主龙骨);When the main keels are overlapped, the overlapping range of the two square steels is set at the two adjacent main keel supports (that is, at the two adjacent adjustable jackings); when the secondary keels are overlapped, the overlapping range of the two square steels The connection range is set on two adjacent secondary keel supports (and two adjacent main keels);

板底模安装:在次龙骨上铺设板底模,采用15mm厚木双面覆膜多层板,板底模间隔1500mm设置与次龙骨方钢同大小的方木,钉铁钉将板底模与拼缝方木连接牢固。Bottom mold installation: lay the bottom mold on the sub-keel, use 15mm thick wood double-sided laminated multilayer board, set the bottom mold with square wood of the same size as the square steel of the sub-keel at an interval of 1500mm, and nail the bottom mold with the square steel of the sub-keel The patchwork square wood is firmly connected.

根据下层结构所放轴线定出梁底模位置、校正标高后安装梁底模。梁高H<600时,梁底模采用15mm厚双面覆膜多层板,梁底模直接搁置在小横杆上,要求小横杆安装水平,并按照规范设置起拱高度。梁高600≤H≤800时,先将梁底纵向方木与梁底模拼装好,再安装梁底模。Determine the position of the bottom formwork of the beam according to the axis of the lower structure, and install the bottom formwork of the beam after correcting the elevation. When the beam height H<600, the bottom formwork of the beam adopts 15mm thick double-sided film-coated multi-layer board, and the bottom formwork of the beam is placed directly on the small horizontal bar. When the beam height is 600≤H≤800, the beam bottom longitudinal square timber and the beam bottom formwork shall be assembled first, and then the beam bottom formwork shall be installed.

封梁侧模:先用纵向方木将梁底侧模拼装连接起来,再安装梁侧模,最后安装步步紧,再用步步紧将梁两侧模外下边端部的方木卡紧,以固定梁两侧侧模。梁高600≤H≤800时还需要在梁中设置对拉螺杆进行加固处理。Beam sealing side formwork: first assemble and connect the beam bottom side formwork with longitudinal square timber, then install the beam side formwork, and finally install step-by-step tightening, and then use step-by-step tightening to clamp the square timber at the outer lower end of the formwork on both sides of the beam , to fix the side molds on both sides of the beam. When the beam height is 600 ≤ H ≤ 800, it is also necessary to set the tension screw in the beam for reinforcement.

5.3墙柱模板工程工艺流程及操作要点5.3 Technological process and operation points of wall stud formwork engineering

1工艺流程 1 process flow

墙柱定位放线→钉压脚板→墙柱模板安装。Positioning and setting out of the wall column → nailing the presser plate → installation of the wall column formwork.

2操作要点 2 Operation points

下层梁板混凝土浇筑12小时后在楼板上弹线放出墙柱定位线,再安装墙柱压脚板,然后安装墙柱预先拼装好的木模板(剪力墙沿墙长方向间隔1500mm设置拼接方木,柱子则在每侧边的两端各设置一根拼板方木,拼板方木为45*45mm),方钢采用40*40*2.5方钢@250mm,模板采用15mm厚木双面覆膜多层板。After 12 hours of concrete pouring on the lower beam slab, the positioning line of the wall column is released by springing the wire on the floor, and then the wall column presser plate is installed, and then the pre-assembled wooden formwork of the wall column is installed (the shear wall is set at an interval of 1500mm along the length of the wall to set spliced square timber) , the pillars are provided with a piece of square wood at both ends of each side, the square wood of the piece is 45*45mm), the square steel is 40*40*2.5 square steel@250mm, and the template is 15mm thick wood with double-sided coating multilayer board.

6. 质量控制6. Quality control

6.1 执行标准6.1 Implementation Standards

《建筑施工模板安全技术规范》JGJ 162-2008"Building Construction Formwork Safety Technical Code" JGJ 162-2008

《混凝土结构工程施工质量验收规范》GB50204-2015"Code for Construction Quality Acceptance of Concrete Structure Engineering" GB50204-2015

工程技术、质保资料做到与实体同步、及时、准确、完整,符合规范及评定标准的要求。Engineering technology and quality assurance data are synchronized with the entity, timely, accurate, and complete, and meet the requirements of specifications and evaluation standards.

6.2 质量控制6.2 Quality Control

对模板及其支撑系统要求:Requirements for formwork and its support system:

保证结构、构件各部分形状尺寸的准确;Ensure the accuracy of the shape and size of each part of the structure and components;

必须具有足够的强度、刚度和稳定性;Must have sufficient strength, stiffness and stability;

模板接缝要严密,不得漏浆;The joints of the formwork should be tight and no slurry leakage should be allowed;

便于模板的安拆;Easy to install and disassemble the formwork;

对跨度不小于4米的现浇钢筋混凝土梁、板,其模板应按设计要求起拱;当设计无具体要求时,起拱高度宜为跨度的1‰~3‰;For cast-in-place reinforced concrete beams and slabs with a span of not less than 4 meters, the formwork should be arched according to the design requirements; when there is no specific requirement in the design, the arching height should be 1‰~3‰ of the span;

模板与混凝土的接触面满涂隔离剂,浇筑混凝土前用水润湿木模板,但不得有积水;The contact surface between the formwork and the concrete is covered with release agent, and the wooden formwork is moistened with water before pouring the concrete, but there must be no water accumulation;

为了提高工效,保证质量,模板重复使用时应编号定位,清理干净模板上砂浆,刷隔离剂,使混凝土达到不掉角,不脱皮,表面光洁。In order to improve work efficiency and ensure quality, the formwork should be numbered and positioned when it is reused, the mortar on the formwork should be cleaned, and the release agent should be applied so that the concrete will not drop corners, peel off, and have a smooth surface.

精心处理柱、梁、板交接处的模板拼装,做到稳定、牢固、不漏浆。Carefully handle the formwork assembly at the junction of columns, beams, and slabs to ensure stability, firmness, and no slurry leakage.

固定在模板上的预埋件和预留孔洞均不得遗漏,安装必须牢固,位置准确,其允许偏差均应控制在允许值内。The embedded parts and reserved holes fixed on the template must not be missed, the installation must be firm, the position must be accurate, and the allowable deviation should be controlled within the allowable value.

施工中在施工现场做好试块,与结构混凝土同条件养护,经试验确定具体的拆模时间;During the construction, the test block shall be prepared at the construction site, and it shall be cured under the same conditions as the structural concrete, and the specific form removal time shall be determined through the test;

上层梁板施工时应保证下面一层的模板及支撑未拆除。 During the construction of the upper beam slab, it should be ensured that the formwork and support of the lower layer are not removed.

7. 安全措施7. Security measures

7.1模板上架设的电线和使用的电动工具,应采用36v的低压电源或采用专用电箱配漏电保护器。7.1 The wires erected on the formwork and the electric tools used should use a 36v low-voltage power supply or use a special electric box with a leakage protector.

7.2高空作业时,各种配件应放在工具箱或工具袋内,不得掉落。严禁放在模板或脚手架上。7.2 When working at heights, various accessories should be placed in the tool box or tool bag and must not be dropped. Do not place on formwork or scaffolding.

7.3高空作业人员严禁攀登模板或脚手架等上下,也不得在高空的墙顶、独立梁及其模板等上面行走。7.3 Personnel working at heights are strictly prohibited from climbing up and down formwork or scaffolding, and are not allowed to walk on high-altitude wall tops, independent beams and their formwork.

7.4模板的预留孔洞等处,应加盖设置安全平网。7.4 The reserved holes and other places of the formwork should be covered with safety flat nets.

7.5装拆模板时,上下应有人接应,随拆随运走,并应把活动部件固定牢固,严禁堆放在脚手架上和抛落。7.5 When assembling and dismantling the formwork, there should be someone from the top and bottom to take care of it, and it should be transported away as it is dismantled, and the moving parts should be fixed firmly.

7.6装拆模板时,必须采用稳固的登高工具,高度超过3.5m时,必须搭设脚手架。装拆施工时,除操做人员外,下面不得站人。高空作业时,操作人员应挂上安全带。7.6 When assembling and disassembling the formwork, stable climbing tools must be used, and scaffolding must be erected when the height exceeds 3.5m. During assembly and disassembly construction, no one is allowed to stand below except the operator. When working at heights, operators should wear safety belts.

7.7安装墙、柱模板时,应随时支撑固定,防止倾覆。7.7 When installing wall and column formwork, it should be supported and fixed at any time to prevent overturning.

7.8预拼装模板的安装,应边就位,边校正,边安设连接件,并加设临时支撑稳固。7.8 The installation of the pre-assembled formwork should be in place, corrected, installed with connectors, and added temporary support for stability.

7.9预拼装模板垂直吊运时,应采取两个以上的吊点,水平吊运时应设四个吊点。7.9 When the pre-assembled formwork is lifted vertically, more than two lifting points should be adopted, and four lifting points should be set for horizontal lifting.

7.10拆除承重模板时,应先设立临时支撑,防止突然整体坍落。7.10 When removing the load-bearing formwork, temporary supports should be set up first to prevent sudden overall collapse.

8. 环保措施8. Environmental protection measures

8.1进场前做好员工环保教育,提高员工环保意识。8.1 Do a good job of environmental protection education for employees before entering the site, so as to improve their awareness of environmental protection.

8.2加强机械管理,改进施工工艺,减少施工过程中的噪音。噪声控制符合国家标准《建筑施工场界噪声限值》。8.2 Strengthen mechanical management, improve construction technology, and reduce noise during construction. Noise control complies with the national standard "Noise Limits at Construction Site Boundary".

8.3废旧、淘汰模板的处置:现场按模板损坏程度及大小分别设置回收场地,实现分类管理,并做出标识。施工现场无垃圾任意堆放现象。废弃模板定时由废1日木材回收单位清理,损毁较轻或烂边的大块模板将每边切除150mm,以便再次周转使用或用于二次结构零星小型构件使用。8.3 Disposal of waste and obsolete templates: set up recycling sites on site according to the degree of damage and size of templates, realize classified management, and make signs. There is no random pile of garbage on the construction site. Abandoned formwork is regularly cleaned up by waste 1-day wood recycling units. Large formwork with light damage or rotten edges will be cut off by 150mm on each side for reuse or sporadic small components of secondary structures.

方钢龙骨模板体系全部为优质钢材制作,厚度最小为2.5mm,因此可反复周转使用300次,而建筑施工中传统方木龙骨方式每年消耗木材上亿立方米,因此与传统方木支撑相比节省70%成本。大钢模购买成本高,二次改制费用极高,施工进度慢,与大钢模板比较可节省50%成本。节约木材,保护森林资源,为予孙留下一片绿色。The square steel keel formwork system is all made of high-quality steel, with a minimum thickness of 2.5mm, so it can be used repeatedly for 300 times, while the traditional square wood keel method in building construction consumes hundreds of millions of cubic meters of wood every year, so compared with the traditional square wood support Save 70% of the cost. The purchase cost of large steel formwork is high, the cost of secondary restructuring is extremely high, and the construction progress is slow. Compared with large steel formwork, it can save 50% of the cost. Save wood, protect forest resources, and leave a piece of green for Yu Sun.

9. 经济效益分析9. Economic benefit analysis

我项目通过跟踪调研方钢龙骨模板体系,对反馈回的信息进行统计汇总得出,以My project tracked and investigated the square steel keel formwork system, and made statistical summary of the feedback information.

10000㎡为单位进行测算,直接费和间接费的节省如下表所示:The unit of 10,000㎡ is calculated, and the savings of direct and indirect costs are shown in the table below:

本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。In this paper, specific examples are used to illustrate the principle and implementation of the present invention, and the descriptions of the above embodiments are only used to help understand the method and core idea of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

Claims (10)

1.一种定型化模板阳角加固体系,包括模板(520)、主背楞(100)和次背楞(510),所述次背楞(510)顶撑在所述模板(520)外侧,所述主背楞(100)顶撑在所述次背楞(510)外侧,其特征在于:还包括阳角锁具,所述阳角锁具包括挡撑背楞(200)和挡片(400);1. A stereotyped formwork positive angle reinforcement system, comprising a formwork (520), a main back flute (100) and a secondary back flute (510), and the secondary back flute (510) is supported on the outside of the formwork (520) , the main back flute (100) is braced on the outside of the secondary back flute (510), and it is characterized in that it also includes a male corner lock, and the male corner lock includes a retaining back flute (200) and a blocking piece (400 ); 所述挡撑背楞(200)沿自身主轴线方向设有挡撑背楞连接件;The retainer back flute (200) is provided with a retainer back flute connector along the direction of its main axis; 所述挡片(400)包括摩擦板(410)和支撑板(440),所述支撑板(440)固定在所述摩擦板(410)的反面的边缘,且所述支撑板(440)与所述摩擦板(410)垂直;The baffle (400) includes a friction plate (410) and a support plate (440), the support plate (440) is fixed on the edge of the opposite side of the friction plate (410), and the support plate (440) and The friction plate (410) is vertical; 所述挡撑背楞(200)垂直顶撑在所述次背楞(510)外侧,所述挡撑背楞(200)垂直顶撑在所述主背楞(100)上并通过所述挡撑背楞连接件固定在所述主背楞(100)上,所述挡片(400)通过所述挡片连接件固定在所述主背楞(100)上,所述支撑板(440)与所述挡撑背楞(200)抵接。The retainer back flute (200) is vertically supported on the outside of the secondary back flute (510), and the retainer back flute (200) is vertically supported on the main back flute (100) and passes through the retainer back flute (510). The support back flute connector is fixed on the main back flute (100), the baffle (400) is fixed on the main back flute (100) through the baffle connector, and the support plate (440) It abuts against the back flute (200) of the retainer. 2.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡片连接件包括主背楞卡片(420),所述主背楞卡片(420)固定在所述摩擦板(410)的正面,所述主背楞卡片(420)与所述主背楞(100)卡接。2. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the retainer connector includes a main back corrugated card (420), and the main back corrugated card (420) is fixed on the The front side of the friction plate (410), the main back flute card (420) is engaged with the main back flute (100). 3.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡片(400)的摩擦板(410)中部设有第一螺栓孔(411),所述挡片连接件包括第一螺栓,所述主背楞(100)上设有与所述第一螺栓孔(411)对应的第一通孔。3. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the middle part of the friction plate (410) of the retainer (400) is provided with a first bolt hole (411), and the retainer The sheet connector includes first bolts, and first through holes corresponding to the first bolt holes (411) are provided on the main back flute (100). 4.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡撑背楞(200)端部设有卡爪(220)。4. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the end of the retainer back corrugated (200) is provided with claws (220). 5.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡撑背楞(200)包括两根挡撑杆(210)和挡撑杆连接件(230),两根所述挡撑杆(210)通过所述挡撑杆连接件(230),两根所述挡撑杆(210)平行设置且两根所述挡撑杆(210)之间具有间隙,所述挡撑背楞连接件为钩头螺栓(310)。5. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the back brace (200) includes two brace braces (210) and brace brace connectors (230) , the two barrier struts (210) pass through the barrier strut connector (230), the two barrier struts (210) are arranged in parallel with a gap between the two barrier struts (210) , the retainer back corrugated connectors are hook bolts (310). 6.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡片(400)还包括顶板(430),所述顶板(430)固定在所述摩擦板(410)的反面,且位于所述支撑板(440)的对边。6. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the baffle (400) also includes a top plate (430), and the top plate (430) is fixed on the friction plate ( 410), and located on the opposite side of the support plate (440). 7.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述挡片(400)还包括挡撑背楞卡片(441),所述挡撑背楞卡片(441)固定在所述支撑板(440)与所述挡撑背楞(200)接触的侧面。7. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: said retainer (400) also includes a retainer back corrugated card (441), said retainer back corrugated card (441 ) is fixed on the side of the support plate (440) in contact with the back flute (200). 8.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述主背楞(100)为双背楞结构,所述主背楞(100)包括两根主杆(110)和主杆连接件(120),两根所述主杆(110)通过所述主杆连接件(120)连接,两根所述主杆(110)平行设置且两根所述主杆(110)之间具有间隙。8. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the main back flute (100) is a double back flute structure, and the main back flute (100) includes two main rods (110) and the main rod connector (120), the two main rods (110) are connected through the main rod connector (120), the two main rods (110) are arranged in parallel and the two main rods There are gaps between the rods (110). 9.如权利要求1所述的一种定型化模板阳角加固体系,其特征在于:所述主背楞(100)的两根所述主杆(110)上设有错位设置的伸缩节结构。9. A stereotyped formwork external corner reinforcement system according to claim 1, characterized in that: the two main rods (110) of the main back corrugated (100) are provided with dislocated expansion joint structures . 10.如权利要求8所述的一种定型化模板阳角加固体系,其特征在于:所述伸缩节结构包括套杆(111)和伸缩杆(112),两根所述套杆(111)分别套接在所述伸缩杆(112)的两端部。10. A stereotyped formwork external angle reinforcement system according to claim 8, characterized in that: the telescopic joint structure includes a sleeve rod (111) and a telescopic rod (112), and two of the sleeve rods (111) respectively sleeved on the two ends of the telescopic rod (112).
CN201710399385.7A 2017-05-31 2017-05-31 A kind of regularization template external corner reinforcement system Pending CN107217840A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710399385.7A CN107217840A (en) 2017-05-31 2017-05-31 A kind of regularization template external corner reinforcement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710399385.7A CN107217840A (en) 2017-05-31 2017-05-31 A kind of regularization template external corner reinforcement system

Publications (1)

Publication Number Publication Date
CN107217840A true CN107217840A (en) 2017-09-29

Family

ID=59947258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710399385.7A Pending CN107217840A (en) 2017-05-31 2017-05-31 A kind of regularization template external corner reinforcement system

Country Status (1)

Country Link
CN (1) CN107217840A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035538A (en) * 2017-11-30 2018-05-15 中国二十冶集团有限公司 Inner corner trim angle mould reinforcement means
CN108060775A (en) * 2017-11-30 2018-05-22 中国二十冶集团有限公司 External corner angle mould reinforcement means
CN110607904A (en) * 2019-09-02 2019-12-24 中铁一局集团建筑安装工程有限公司 Aluminium template of no cellular type dismouting
CN112376905A (en) * 2020-11-27 2021-02-19 腾达建设集团股份有限公司 Connecting mechanism of stand column steel formwork
CN113668858A (en) * 2021-09-24 2021-11-19 广州一建建设集团有限公司 Template supporting component and template system for building construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040927Y (en) * 2007-08-16 2008-03-26 刘福新 Wall template adjustable main back rib
CN201714075U (en) * 2010-04-29 2011-01-19 刘满意 Novel external angle lock for building
CN203514808U (en) * 2013-09-23 2014-04-02 魏志光 Wall formwork supporting composite structure
CN104563490A (en) * 2014-12-19 2015-04-29 天津市鑫福盛新型建筑模板有限公司 Novel adjustable wall body back ridge
CN105155842A (en) * 2015-08-12 2015-12-16 江苏省苏中建设集团股份有限公司 Fixture for buildings
CN205314561U (en) * 2015-11-30 2016-06-15 天津市鑫福盛新型建筑模板有限公司 External corner locking device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040927Y (en) * 2007-08-16 2008-03-26 刘福新 Wall template adjustable main back rib
CN201714075U (en) * 2010-04-29 2011-01-19 刘满意 Novel external angle lock for building
CN203514808U (en) * 2013-09-23 2014-04-02 魏志光 Wall formwork supporting composite structure
CN104563490A (en) * 2014-12-19 2015-04-29 天津市鑫福盛新型建筑模板有限公司 Novel adjustable wall body back ridge
CN105155842A (en) * 2015-08-12 2015-12-16 江苏省苏中建设集团股份有限公司 Fixture for buildings
CN205314561U (en) * 2015-11-30 2016-06-15 天津市鑫福盛新型建筑模板有限公司 External corner locking device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035538A (en) * 2017-11-30 2018-05-15 中国二十冶集团有限公司 Inner corner trim angle mould reinforcement means
CN108060775A (en) * 2017-11-30 2018-05-22 中国二十冶集团有限公司 External corner angle mould reinforcement means
CN110607904A (en) * 2019-09-02 2019-12-24 中铁一局集团建筑安装工程有限公司 Aluminium template of no cellular type dismouting
CN110607904B (en) * 2019-09-02 2021-06-11 中铁一局集团建筑安装工程有限公司 Aluminium template of no cellular type dismouting
CN112376905A (en) * 2020-11-27 2021-02-19 腾达建设集团股份有限公司 Connecting mechanism of stand column steel formwork
CN113668858A (en) * 2021-09-24 2021-11-19 广州一建建设集团有限公司 Template supporting component and template system for building construction

Similar Documents

Publication Publication Date Title
CN107217840A (en) A kind of regularization template external corner reinforcement system
CN104032948B (en) Steel and wood composite template and construction method
CN103912008A (en) Unilateral formwork structure and construction method thereof
WO2013185277A1 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN108677962B (en) Subway entrance and exit segment foundation pit formwork installing and dismantling method
CN108589767B (en) Turnbuckle single-sided vertical die inclined throwing and supporting device and construction method thereof
CN105926942A (en) Construction method of combined aluminum/steel frame wood-plastic formwork system
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN111535347A (en) A kind of prefabricated plate tire membrane nested connection structure and construction method
CN102518148A (en) Architecture related to triangular bracing structure of underground open cut station and construction method thereof
CN206829624U (en) A kind of regularization formwork reinforcement system
CN113152893A (en) Template for building construction and using method
CN210976588U (en) Template reinforcing system for double shear walls at deformation joint
CN110258864A (en) A kind of basement shear wall exempts from punching template construction method
CN102418417A (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN112609966B (en) Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system
CN113266035A (en) Construction method for upper structure of steam turbine base
CN104453235B (en) Current conversion station fire wall construction technology
CN111622494A (en) Hole-leaving-free construction method for shear wall light steel keel template
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN118049049A (en) General column hoop and construction method for cast-in-situ special-shaped frame column by using general column hoop
CN210025768U (en) A operation platform system for caisson template installation
CN208056107U (en) A kind of combined steel formwork support system
CN220150990U (en) A wall pillar reinforcement device
CN207727978U (en) Girderless floor bolumn cap template reinforcing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929