CN102635232A - Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam - Google Patents

Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam Download PDF

Info

Publication number
CN102635232A
CN102635232A CN2012101235109A CN201210123510A CN102635232A CN 102635232 A CN102635232 A CN 102635232A CN 2012101235109 A CN2012101235109 A CN 2012101235109A CN 201210123510 A CN201210123510 A CN 201210123510A CN 102635232 A CN102635232 A CN 102635232A
Authority
CN
China
Prior art keywords
arc
arc beam
reinforcement
stupefied
shaped beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101235109A
Other languages
Chinese (zh)
Inventor
刘明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012101235109A priority Critical patent/CN102635232A/en
Publication of CN102635232A publication Critical patent/CN102635232A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a reinforcement method for a transverse reinforcement interior edge at the side of an arc-shaped beam. The reinforcement method comprises the following reinforcement construction steps: firstly, installing a side template after the reinforcement of the arc-shaped beam is machined and installed; secondly, after the side template of the arc-shaped beam is formed, reinforcing the side of the arc-shaped beam by adopting three-thread reinforcement as the interior edge and a steel pipe as an exterior edge; and finally, reinforcing the width of the arc-shaped beam through square timber. The method is convenient and fast to construct, and saves time, so that not only the appearance quality control of the arc-shaped beam is improved, but also the reinforcement can be continuously revolved and used, the template materials are saved, and the construction cost is lowered.

Description

Stupefied reinforcing method in the arc beam side transverse reinforcement
Technical field
The invention belongs to a kind of building engineering construction method, be specifically related to the job practices that a kind of arc beam side is reinforced.
Background technology
At present; It is through bottom steel pipe brace template that building operations arc beam is reinforced, the side wooden form, and laterally the lumps of wood is stupefied in doing; The method that vertical steel pipe is done outer stupefied reinforcing is reinforced the arc beam; Size to the arc beam positions reinforcing after-pouring concrete, treats to carry out form removal after concrete reaches intensity form removal requirement final arc beam moulding.There are two big defectives in this method: first; The crooked difficulty of the lumps of wood that is used for the reinforcing of arc beam side is big, consumes more manual work during making, and the lumps of wood can not have enough to meet the need after the form removable, and the waste of material rate is high.Second; The arc beam side lumps of wood is reinforced can not guarantee the deflection of beam radian, and the reinforcing difficulty is big, and when concreting was vibrated, the arc beam very easily deformed, and after the form removable, arc beam impression is relatively poor.
Summary of the invention
Stupefied reinforcing method in the arc beam side transverse reinforcement that the objective of the invention is to propose to adopt transverse reinforcement to replace the horizontal lumps of wood of side, this method not only easy construction, quick, reliable in quality, the number of turnover is high and greatly reduce spillage of material.
Stupefied reinforcing method technical scheme is such in the arc beam side transverse reinforcement of the present invention: at first, behind processing of arc beam steel and the installation forming, carry out the side template and install; Secondly, adopt after the moulding of arc beam side template that three road indented barss are stupefied in doing, steel pipe does outer stupefied arc beam side is reinforced; At last, with the lumps of wood arc beam width is reinforced.After the concreting moulding form removal, arc beam impression is checked.
Stupefied reinforcing method has the following advantages in the arc beam side transverse reinforcement proposed by the invention:
A, easy construction, quick, save time.
B, reinforcement system are not yielding, and the control of arc beam impression quality is improved.
C, reinforcing bar can have enough to meet the need use continuously, draw materials conveniently, have practiced thrift mould material, reduce construction cost.
Description of drawings
Fig. 1 is a stupefied reinforcing sketch map in the arc beam side transverse reinforcement proposed by the invention.
Among the figure: 1, arc beam side template, 2, arc beam bottom board plate, 3, stupefied in the transverse reinforcement, 4, steel pipe is outer stupefied, 5, the arc beam width location lumps of wood.
The specific embodiment
As can beappreciated from fig. 1, stupefied reinforcing method step is following in the arc beam side transverse reinforcement of the present invention:
At first, set up platform according to designing requirement and support, lay beam bottom board plate 2, the arc beam steel is installed in colligation, carries out and measure the unwrapping wire location, installs arc beam side template 1.
Secondly, stupefied 3 in making of transverse reinforcement, steel pipe is done outer stupefied 4 opposite side templates and is reinforced.
At last, control arc beam size positions reinforcing 5 with the lumps of wood to deck-siding, reaches consolidation effect.
After carrying out the concrete pouring of arc beam, during form removal successively with outer stupefied steel pipe, in stupefied reinforcing bar and side template remove, after recycling, reinforcing bar can continue to use by former material.
In certain construction works; The arc beam is carried out in the side transverse reinforcement stupefied reinforcing method to be reinforced; Find after the form removal that arc beam impression quality is good, disposable qualification rate 100% has been practiced thrift template, manual work, time; Simple to operate, reinforcing for the on-the-spot colligation of arc beam provides a kind of comparatively effectively job practices.

Claims (2)

1. stupefied reinforcing method in the arc beam side transverse reinforcement, its strengthening construction step is: at first, behind processing of arc beam steel and the installation forming, carry out the side template and install; Secondly, adopt after the moulding of arc beam side template that three road indented barss are stupefied in doing, steel pipe does outer stupefied arc beam side is reinforced; At last, with the lumps of wood arc beam width is reinforced.
2. stupefied reinforcing method in the arc beam side transverse reinforcement according to claim 1; It is characterized in that after carrying out the concrete pouring of arc beam; During form removal successively with outer stupefied steel pipe, in stupefied reinforcing bar and side template remove, after recycling, reinforcing bar can continue to use by former material.
CN2012101235109A 2012-04-25 2012-04-25 Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam Pending CN102635232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101235109A CN102635232A (en) 2012-04-25 2012-04-25 Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101235109A CN102635232A (en) 2012-04-25 2012-04-25 Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam

Publications (1)

Publication Number Publication Date
CN102635232A true CN102635232A (en) 2012-08-15

Family

ID=46619796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101235109A Pending CN102635232A (en) 2012-04-25 2012-04-25 Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam

Country Status (1)

Country Link
CN (1) CN102635232A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184234A (en) * 2018-09-25 2019-01-11 中国五冶集团有限公司 Actinobacillus device and line-putting method for the positioning of orthodrome beam
CN112727080A (en) * 2020-12-29 2021-04-30 浙江恒鸿建设有限公司 Cast-in-place concrete arc beam and construction method
CN115162718A (en) * 2022-06-01 2022-10-11 中铁建工集团有限公司 Large-section ring beam template reinforcing system and reinforcing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084203A (en) * 1994-06-20 1996-01-09 Maeda Corp Steel framed reinforcement beam and execution method thereof
CN2349297Y (en) * 1998-11-28 1999-11-17 李岭群 Length-adjustable prefabricated shearing force beam form
JP3200813B2 (en) * 1999-05-27 2001-08-20 日本鋼管ライトスチール株式会社 Beam formwork structure and its forming method
CN201206330Y (en) * 2008-04-30 2009-03-11 中建三局建设工程股份有限公司 Support system for arc lintel template
CN201474297U (en) * 2009-06-02 2010-05-19 中国第二冶金建设有限责任公司 Simple steel pipe setting-out template
CN102182303A (en) * 2011-03-31 2011-09-14 西安建筑科技大学 Oblique annular closed structural template supporting method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084203A (en) * 1994-06-20 1996-01-09 Maeda Corp Steel framed reinforcement beam and execution method thereof
CN2349297Y (en) * 1998-11-28 1999-11-17 李岭群 Length-adjustable prefabricated shearing force beam form
JP3200813B2 (en) * 1999-05-27 2001-08-20 日本鋼管ライトスチール株式会社 Beam formwork structure and its forming method
CN201206330Y (en) * 2008-04-30 2009-03-11 中建三局建设工程股份有限公司 Support system for arc lintel template
CN201474297U (en) * 2009-06-02 2010-05-19 中国第二冶金建设有限责任公司 Simple steel pipe setting-out template
CN102182303A (en) * 2011-03-31 2011-09-14 西安建筑科技大学 Oblique annular closed structural template supporting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李纲等: "利用CAD 三维技术辅助解决异形屋顶施工", 《施工技术》 *
陈卫华等: "洛阳铁路分局体育馆工程大型弧形剪力墙、弧形梁施工技术", 《建筑施工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184234A (en) * 2018-09-25 2019-01-11 中国五冶集团有限公司 Actinobacillus device and line-putting method for the positioning of orthodrome beam
CN109184234B (en) * 2018-09-25 2023-08-18 中国五冶集团有限公司 Paying-off device and paying-off method for positioning large arc beam
CN112727080A (en) * 2020-12-29 2021-04-30 浙江恒鸿建设有限公司 Cast-in-place concrete arc beam and construction method
CN115162718A (en) * 2022-06-01 2022-10-11 中铁建工集团有限公司 Large-section ring beam template reinforcing system and reinforcing method

Similar Documents

Publication Publication Date Title
CN102561681B (en) Casting molding template and casting molding process for constructional columns of infilled walls
CN102121310B (en) Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN203475456U (en) GRC forming die plate system
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN103195247A (en) Saddle-shaped hyperboloidal concrete slab construction method
CN102635232A (en) Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam
CN103628672A (en) Steel wire mesh and template combined type inclined reinforced concrete floor device and construction method thereof
CN204001678U (en) A kind of building multi-purpose type Combined formwork
CN103938635A (en) Method for conducting foundation pit bevel bed course construction by adopting inverted trapezoidal template
CN104153296A (en) Method for increasing bridge deck pavement flatness and comb-shaped form board used by same
CN204000608U (en) A kind of for building the comb shape template of deck paving both sides absolute altitude band
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN203613790U (en) Steel wire mesh and form combined inclined reinforced concrete floor slab construction device
CN202467181U (en) Pouring-molding template of constructional column of infill wall
CN205875714U (en) A consolidate fixture for retainer plate beam mold board
CN205035732U (en) Interim support of combined type bridge
CN207813014U (en) It can turnover type multi-ribbed plate plastics putamina joint treatment device
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN204418666U (en) A kind of building site is with there being side wall stair template
CN202787992U (en) Constructional column top concrete pouring structure
CN202450539U (en) Cement prefabricated tyre template
CN105317056A (en) Reinforced inspection well cover plate
CN108487510A (en) Anti- waterproof tongue and groove construction method on a kind of cast-in-place concrete exterior wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120815