CN202467181U - Pouring-molding template of constructional column of infill wall - Google Patents
Pouring-molding template of constructional column of infill wall Download PDFInfo
- Publication number
- CN202467181U CN202467181U CN2012200979475U CN201220097947U CN202467181U CN 202467181 U CN202467181 U CN 202467181U CN 2012200979475 U CN2012200979475 U CN 2012200979475U CN 201220097947 U CN201220097947 U CN 201220097947U CN 202467181 U CN202467181 U CN 202467181U
- Authority
- CN
- China
- Prior art keywords
- template
- liner
- constructional column
- main body
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a pouring-molding template of a constructional column of an infill wall. The pouring-molding template comprises a liner template and a main body template; the upper end part of the main body template is provided with a liner template mounting opening for mounting the liner template; a constructional column template is formed by splicing the liner template and the main body template; a horn type feeding device is mounted on the liner template mounting opening, and is located at the outer side of the constructional column template; the height of a feeding opening at the upper part of the horn type feeding device is higher than or equal to the beam bottom height of a framework beam; the liner template is a movable template capable of vertically or transversely moving along the inner wall of the main body template; a template moving piece which vertically or transversely moves to drive the liner template to synchronously vertically or transversely move is arranged on the outer side wall of the liner template; and a sliding groove on which the template moving piece can vertically or transversely move is correspondingly mounted on the main body template. The pouring-molding template provided by the utility model has the advantages of reasonable structural design, simplicity in operation, high economical benefit and high practical applicability, time and labor conservation, and good using effect. Various actual problems existing in the conventional construction of the constructional column of the infill wall can be solved.
Description
Technical field
The utility model belongs to infilled wall constructional column technical field of construction, especially relates to a kind of infilled wall constructional column and builds forming panel.
Background technology
The infilled wall constructional column has following effect: the shear strength that 1, improves body of wall; 2, improve the deformability in body of wall and house by a relatively large margin; 3, form the constraint system with collar tie beam, effectively limit the generation and the development of wall body slit, guarantee that body of wall does not collapse.Thereby constructional column directly influences the general safety performance in house, and especially for the frame construction infilled wall, constructional column is indispensable especially.Nowadays at present; When the infilled wall constructional column is carried out pouring construction; The conventional construction column template that is adopted generally comprises the forming panel that is assemblied to form by four side templates, it is perpendicular stupefied and to be installed in the multiple tracks horizontal stroke in the forming panel outside from top to bottom stupefied to be installed in the multiple tracks in the forming panel outside; The upper end of a side template is provided with the horn charging aperture in the forming panel simultaneously, and the horn charging aperture is than needing the high approximately 100mm of constructing structure post.
The above-mentioned conventional construction column template of actual employing carries out in the work progress; Treat to lay above-mentioned horn charging aperture again after formwork is accomplished; And when building the post concrete horn charging aperture is also completely watered; Be concreting to horn charging aperture top, treat concrete setting and form removal after, the unnecessary concrete that again horn charging aperture place is left is carved and is removed (promptly cutter falls the unnecessary concrete that horn charging aperture place leaves).Like this; Above-mentioned traditional constructional column template that the horn charging aperture is set must be waited until that concrete reaches and could remove after solidifying; And also will carve unnecessary concrete after the form removal, and engraving tool also needs the out-of-flatness face of horn charging aperture place on the constructional column (promptly carve and remove the position) is repaired after removing, thereby cause wastes such as manpower, material, duration except that horn charging aperture place; And owing to the concrete of carving after removing must be handled, thereby also can polluting to environment.
The utility model content
The utility model technical problem to be solved is to above-mentioned deficiency of the prior art; Provide a kind of infilled wall constructional column to build forming panel; Its reasonable in design, simple to operate, install to lay convenient and economical and practical, result of use is good, solved the material that exists in the existing infilled wall constructional column construction, artificial, environment pollution serious with time waste seriously, the construction period is difficult to assurance, the more high multiple practical problem of construction cost.
For solving the problems of the technologies described above; The technical scheme that the utility model adopts is: a kind of infilled wall constructional column is built forming panel; It is characterized in that: comprise that liner template and upper end have the main body template of the liner lamina membranacea installing port that supplies the installation of liner template; Said liner template and said main body template are assemblied to form the constructional column template; The inside forming cavity structure of said constructional column template and size all with the structure that needs construction infilled wall constructional column and measure-alike, and said constructional column formwork support arrangement is between floor and the Vierendeel girder that is laid in above the floor; On the said liner lamina membranacea installing port horn feed arrangement is installed; Said horn feed arrangement is positioned at the said constructional column template outside; The top charging aperture height of said horn feed arrangement is not less than height at the bottom of the beam of Vierendeel girder, and the bottom discharging opening structure of horn charging aperture and size all with the structure of said liner lamina membranacea installing port and measure-alike; Said liner template is for carrying out up and down or the removable template of move left and right along the inwall of said main body template; Be equipped with up and down on the lateral wall of liner template or drive move left and right the time that the liner template synchronous is carried out up and down or the template moving member of move left and right, and corresponding having supplies said template moving member to carry out up and down or the chute of move left and right on the said main body template.
Above-mentioned a kind of infilled wall constructional column is built forming panel; It is characterized in that: the gang form of said main body template for surrounding by a plurality of side templates; A plurality of said side templates all prop up and stand between floor and the Vierendeel girder, and said liner lamina membranacea installing port is laid in a side template upper end in a plurality of said side templates.
Above-mentioned a kind of infilled wall constructional column is built forming panel; It is characterized in that: said template moving member comprises on the lateral wall that is installed in the liner template and can carry out up and down or the screw rod of move left and right, be sleeved on the clamp nut on the screw rod outer end and be installed in the lateral wall of said main body template and the clamp between the clamp nut along said chute; Said screw rod is vertical laying with the liner template, and clamp is sleeved on the screw rod and it is positioned at the said chute outside.
Above-mentioned a kind of infilled wall constructional column is built forming panel; It is characterized in that: said chute moves up and down for the said template moving member of confession and is vertically to the vertical chute of laying; And said template moving member drives the liner template synchronous and moves up and down when vertical chute moves up and down, the vertical height of said liner template is not less than the vertical height of said liner lamina membranacea installing port; The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same vertical curve, and a plurality of said template moving member all is positioned at the middle part of vertical chute.
Above-mentioned a kind of infilled wall constructional column is built forming panel; It is characterized in that: said chute carries out move left and right and is vertical to the horizontal concrete chute of laying for supplying said template moving member; And said template moving member drives the liner template synchronous when carrying out move left and right along said horizontal concrete chute and carries out move left and right, and the transverse width of said liner template is not less than the transverse width of said liner lamina membranacea installing port; The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same horizon, and a plurality of said template moving member all is positioned at the middle part of said horizontal concrete chute.
Above-mentioned a kind of infilled wall constructional column is built forming panel, it is characterized in that: also comprise being installed on the formwork reinforcement device that carries out integral reinforcing outside the said main body template and to said main body template; Said main body template is vertically to laying, and said formwork reinforcement device comprises a plurality of transversely strengthening spares that are installed in the said main body template outside from top to bottom.
Above-mentioned a kind of infilled wall constructional column is built forming panel, it is characterized in that: the distance of said horn feed arrangement bottom at the bottom of the Vierendeel girder beam is 15cm ± 2cm, and the high at least 5cm of height at the bottom of the beam of the top charging aperture aspect ratio Vierendeel girder of horn feed arrangement; Said liner template is the steel plate of thickness 1mm~3mm.
Above-mentioned a kind of infilled wall constructional column is built forming panel; It is characterized in that: also comprise two poles of respectively left and right sides of horn feed arrangement being carried out support fixation; The bottom of said pole is fixed in a plurality of said transversely strengthening spares and is positioned on the transversely strengthening spare of the top, and the pole top is fixed on the lateral wall of horn feed arrangement.
Above-mentioned a kind of infilled wall constructional column is built forming panel, it is characterized in that: said formwork reinforcement device also comprises a plurality of vertical girth members that are laid in the said main body template outside respectively; Said transversely strengthening spare is to be level to the anchor ear of laying, and a plurality of said vertical girth member is all fixed through a plurality of said anchor ears.
Above-mentioned a kind of infilled wall constructional column is built forming panel, it is characterized in that: said to need construction infilled wall constructional column be that transverse shape is polygonal polygon prism, and said main body template be shaped as the polygon prism shape; Said liner lamina membranacea installing port is a rectangular opening, and said vertical chute is laid under the said rectangular opening, and the liner template is a rectangular slab, and the transverse width of said rectangular slab is not less than the transverse width of said rectangular opening.
The utility model compared with prior art has the following advantages:
That 1, is adopted builds simple, the reasonable in design and easy accessibility of forming template structure, mainly comprises the constructional column template be made up of liner template and main body template, drives assemblies such as template moving member that the liner template moves and horn feed arrangement.
2, the processing and fabricating cost is low, only needs existing infilled wall constructional column template is carried out local improvement.
3, use easy and simple to handle and result of use good.
4, simple, the saving of work and time of processing step, efficiency of construction is high and it is convenient to realize, construction effect is good; Mainly comprise measure that unwrapping wire, reinforcing cage installation, formwork, horn feed arrangement are installed, the liner template is moved outward, pouring construction, the travelling backwards of liner template and the horn feed arrangement is removed and steps such as form removal; Reduced and treated that institute's concreting solidifies the back and the unnecessary concrete at horn charging aperture place is carved removed and the out-of-flatness face of horn charging aperture place on the constructional column (promptly carve and remove the position) is repaired two procedures in the existing infilled wall constructional column pouring construction process; Its concrete of just can be after concreting finishes being built in immediately with the constructional column template through the travelling backwards of liner template separates with concrete in the horn feed arrangement fully; Easy, accomplish unnecessary concrete recycling in the horn feed arrangement fast; Time saving and energy saving; Shortened the construction period significantly; Simultaneously also accelerated all transfer efficients of constructional column forming panel, and reduced and carved the pollution that removes in the horn mouth concrete process environment.
When 5, carrying out concrete pouring construction; Having practiced thrift the concrete at horn mouth place in the existing technology wastes for no reason; Practiced thrift about 0.04 side's concrete; Simultaneously practice thrift concrete shipment and delivery cost indirectly, and also reduced and transported emission amount of carbon dioxide in the concrete process, met the theory of low-carbon environment-friendly.
6, the infilled wall constructional column quality of institute's construction molding is easy to guarantee; Its underpart cylinder adopts concrete pouring construction; And the top cylinder adopts microdilatancy pea gravel concreten pouring construction, owing to be prone to the concrete shrinkage problem during lower post body concrete pouring construction, and after top adopts the microdilatancy pea gravel concreten to build; The expansion energy that the microdilatancy pea gravel concreten produces effectively solves the concrete shrinkage problem of bottom cylinder, has strengthened the compactness of institute's construction molding infilled wall constructional column.
In sum; The utility model reasonable in design, simple to operate, install to lay convenient and economical and practical, result of use is good, solved the material that exists in the existing infilled wall constructional column construction, artificial, environment pollution serious with time waste seriously, the construction period is difficult to assurance, the more high multiple practical problem of construction cost.
Through accompanying drawing and embodiment, the technical scheme of the utility model is done further detailed description below.
Description of drawings
Fig. 1 is the user mode reference diagram of the utility model.
Construction technology process frame when Fig. 2 carries out pouring construction for adopting the utility model to the infilled wall constructional column.
Fig. 3 is for adopting the structural representation of the utility model institute construction molding infilled wall constructional column.
Description of reference numerals:
The 1-Vierendeel girder; The 2-floor; The 3-side template;
4-liner template; 5-horn feed arrangement; The vertical chute of 6-;
The 7-anchor ear; 8-pole; The 9-1-screw rod;
The 9-2-clamp nut; The 9-3-clamp;
The infilled wall constructional column of 10-construction molding.
The specific embodiment
As shown in Figure 1; The utility model comprises that liner template 4 and upper end have the main body template of the liner lamina membranacea installing port that supplies 4 installations of liner template; Said liner template 4 is assemblied to form the constructional column template with said main body template; The inside forming cavity structure of said constructional column template and size all with the structure that needs construction infilled wall constructional column and measure-alike, and said constructional column formwork support arrangement is in floor 2 and be laid between the Vierendeel girder 1 of floor 2 tops.On the said liner lamina membranacea installing port horn feed arrangement 5 is installed; Said horn feed arrangement 5 is positioned at the said constructional column template outside; The top charging aperture height of said horn feed arrangement 5 is not less than height at the bottom of the beam of Vierendeel girder 1, and the bottom discharging opening structure of horn charging aperture 5 and size all with the structure of said liner lamina membranacea installing port and measure-alike.Said liner template 4 is for carrying out up and down along the inwall of said main body template or the removable template of move left and right; Be equipped with up and down on the lateral wall of liner template 4 or drive move left and right the time that liner template 4 is carried out up and down synchronously or the template moving member of move left and right, and corresponding having supplies said template moving member to carry out up and down or the chute of move left and right on the said main body template.
In the present embodiment, the gang form of said main body template for surrounding by a plurality of side templates 3, a plurality of said side templates 3 all prop up and stand between floor 2 and the Vierendeel girder 1, and said liner lamina membranacea installing port is laid in side template 3 upper ends in a plurality of said side templates 3.
During practice of construction, it is unitary whole formula template that said main body template can adopt a processing and fabricating.
In the present embodiment; Said template moving member comprises on the lateral wall that is installed in liner template 4 and can carry out up and down or the screw rod 9-1 of move left and right, be sleeved on the clamp nut 9-2 on the screw rod 9-1 outer end and be installed in the lateral wall of said main body template and the clamp 9-3 between the clamp nut 9-2 along said chute; Said screw rod 9-1 is vertical laying with liner template 4, and clamp 9-3 is sleeved on that screw rod 9-1 goes up and it is positioned at the said chute outside.
In the present embodiment; Said chute moves up and down for the said template moving member of confession and is vertically to the vertical chute of laying 6; And said template moving member drives liner template 4 and moves up and down synchronously when vertical chute 6 moves up and down, the vertical height of said liner template 4 is not less than the vertical height of said liner lamina membranacea installing port.The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same vertical curve, and a plurality of said template moving member all is positioned at the middle part of vertical chute 6.
Said clamp 9-3 is vertical laying with screw rod 9-1, and the transverse width of said clamp 9-3 is greater than the transverse width of vertical chute 6.In the present embodiment, said vertical chute 6 be laid in said liner lamina membranacea installing port under, and the quantity of said template moving member is two, said clamp 9-3 middle part has the through hole that supplies screw rod 9-1 to pass.
During actual processing and fabricating, said chute also can be horizontal concrete chute.And when said chute for supplying said template moving member and carry out move left and right and when being vertically to the horizontal concrete chute laid; Said template moving member drives liner template 4 when carrying out move left and right along said horizontal concrete chute and carries out move left and right synchronously, and the transverse width of said liner template 4 is not less than the transverse width of said liner lamina membranacea installing port.The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same horizon, and a plurality of said template moving member all is positioned at the middle part of said horizontal concrete chute.
When said chute was horizontal concrete chute, said horizontal concrete chute can also can be the right side horizontal concrete chute that is laid in said liner lamina membranacea installing port right side for being laid in the left side horizontal concrete chute in said liner lamina membranacea installing port left side.
Simultaneously, the utility model also comprises the formwork reinforcement device that is installed on the said main body template outside and said main body template is carried out integral reinforcing; Said main body template is vertically to laying, and said formwork reinforcement device comprises a plurality of transversely strengthening spares that are installed in the said main body template outside from top to bottom.
In the present embodiment, said transversely strengthening spare is to be level to the anchor ear of laying 7.
Simultaneously, said formwork reinforcement device also comprises a plurality of vertical girth members that are laid in the said main body template outside respectively, and a plurality of said vertical girth member is all fixed through a plurality of said anchor ears 7.During actual the use, said vertical girth member is that vertical side is stupefied.
In the present embodiment; The utility model also comprises two poles 8 of respectively left and right sides of horn feed arrangement 5 being carried out support fixation; The bottom of said pole 8 is fixed in a plurality of said transversely strengthening spares and is positioned on the transversely strengthening spare of the top, and pole 8 tops are fixed on the lateral wall of horn feed arrangement 5.
During practice of construction, the said transverse shape that need construct the infilled wall constructional column is polygon, circle or oval.When the said construction infilled wall constructional column that needs is a transverse shape when being polygonal polygon prism, a plurality of said side templates 3 are flat board, and said main body template be shaped as the polygon prism shape.
In the present embodiment, needing the transverse shape of construction infilled wall constructional column is rectangle, and said main body template is the quadrangular shape template of being made up of four side templates 3.
Said liner lamina membranacea installing port is a rectangular opening, and said vertical chute 6 is laid under the said rectangular opening, and said liner template 4 is a rectangular slab, and the transverse width of said rectangular slab is not less than the transverse width of said rectangular opening.In the present embodiment, the transverse width of said rectangular slab is identical with the transverse width of said rectangular opening.
During actual processing and fabricating, the distance of said horn feed arrangement 5 bottoms at the bottom of Vierendeel girder 1 beam is 15cm ± 2cm, and the high at least 5cm of height at the bottom of the beam of the top charging aperture aspect ratio Vierendeel girder 1 of horn feed arrangement 5; Said liner template 4 is the steel plate of thickness 1mm~3mm.
Specifically add man-hour, the vertical height of said liner template 4 is 15cm~30cm.High 5cm~the 10cm of height at the bottom of the beam of the top charging aperture aspect ratio Vierendeel girder 1 of said horn feed arrangement 5.
In the present embodiment, the distance of said horn feed arrangement 5 bottoms at the bottom of Vierendeel girder 1 beam is 15cm, and the high 5cm of height at the bottom of the beam of the top charging aperture aspect ratio Vierendeel girder 1 of horn feed arrangement 5; Said liner template 4 is the steel plate of thickness 3mm, and the vertical height of liner template 4 is 30cm.In the concrete process; Can be according to actual needs, the height that exceeds at the bottom of the beam of top charging aperture than Vierendeel girder 1 to the distance of horn feed arrangement 5 bottoms at the bottom of Vierendeel girder 1 beam, horn feed arrangement 5, the thickness of slab and the vertical height of liner template 4 adjust accordingly.
As shown in Figure 2, when adopting the utility model that the infilled wall constructional column is built moulding, its work progress may further comprise the steps:
Step 1, measurement unwrapping wire:, need construction infilled wall constructional column is measured unwrapping wire according to the construction survey line-putting method of routine.
The said transverse shape that need construct the infilled wall constructional column is polygon, circle or oval.
In the present embodiment; The said main body template outside also is equipped with the formwork reinforcement device that said main body template is carried out integral reinforcing; Thereby after formwork is accomplished in the step 3; Also need said formwork reinforcement device to be installed so that said main body template is carried out integral reinforcing, take place in case run hidden danger of quality such as mould, bloated mould in the said main body template outside.
In the present embodiment, the horn feed arrangement that adopted 5 used horn charging aperture during for conventional infilled wall constructional column pouring construction.
In the present embodiment; Earlier the clamp nut 9-2 in two said template moving members is all loosened; Afterwards the screw rod 9-1 in two said template moving members is moved down along vertical slideway 6; Screw rod 9-1 until the said template moving member that is arranged in the below moves to vertical slideway 6 bottoms, and this moment, said liner lamina membranacea installing port was opened fully, for concreting is got ready.
When said chute is the left side horizontal concrete chute, need in this step liner template 4 to be moved to the left through said left side horizontal concrete chute; And when said chute is the right side horizontal concrete chute, need in this step through said right side horizontal concrete chute liner template 4 to be moved right.
In the present embodiment, when carrying out concrete pouring construction from the bottom to top, its pouring construction process is following:
Step 601, bottom cylinder pouring construction: according to the concreting method of conventional infilled wall constructional column; Utilize said constructional column template and pass through horn feed arrangement 5; Carry out concrete pouring construction from the bottom to top, and need to obtain the bottom cylinder of construction infilled wall constructional column; Distance between at the bottom of cylinder top, said bottom and Vierendeel girder 1 beam is 50mm~80mm; And when said bottom cylinder was carried out concreting, the concrete that is adopted was the used concrete of conventional infilled wall constructional column pouring construction.
Step 602, top cylinder pouring construction: according to the concreting method of conventional infilled wall constructional column; Utilize said constructional column template and pass through horn feed arrangement 5; Carry out from the bottom to top concrete pouring construction until institute's concreting till the top of horn feed arrangement 5 charging aperture overflows, and to need the top cylinder of construction infilled wall constructional column; And when said top cylinder was carried out concreting, the concrete that is adopted was the microdilatancy pea gravel concreten.
During actual pouring construction, the high grade of concrete intensity described in the strength ratio step 601 of the pea gravel concreten of microdilatancy described in the step 602.
In the present embodiment, the concrete described in the step 601 is the C25 concrete, and the microdilatancy pea gravel concreten described in the step 602 is a C30 microdilatancy pea gravel concreten.During actual pouring construction, also can adjust accordingly adopting concrete intensity in step 601 and the step 602 according to concrete needs.
In the present embodiment; When liner template 4 is carried out travelling backwards; Screw rod 9-1 in two said template moving members is moved up along vertical slideway 6,, be about to be pushed at the bottom of the beam of Vierendeel girder 1 on the liner template 4 until said liner lamina membranacea installing port complete closed this moment; Afterwards the clamp nut 9-2 in two said template moving members is all tightened, so that liner template 4 positions are fixed.Subsequently, just dismountable horn feed arrangement 5.After at the bottom of the beam that is pushed into Vierendeel girder 1 on the liner template 4; The concrete of being built in the said constructional column template is separated with horn feed arrangement 5 interior concrete fully, thereby just can recycle the unnecessary concrete in the horn feed arrangement 5 this moment.
When said chute is the left side horizontal concrete chute, need in this step liner template 4 to be moved right through said left side horizontal concrete chute; And when said chute is the right side horizontal concrete chute, need in this step through said right side horizontal concrete chute liner template 4 to be moved right.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any restriction; Everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of the utility model technical scheme according to the utility model technical spirit.
Claims (10)
1. an infilled wall constructional column is built forming panel; It is characterized in that: comprise that liner template (4) and upper end have the main body template of the liner lamina membranacea installing port that supplies liner template (4) installation; Said liner template (4) and said main body template are assemblied to form the constructional column template; The inside forming cavity structure of said constructional column template and size all with the structure that needs construction infilled wall constructional column and measure-alike, and said constructional column formwork support arrangement is between floor (2) and the Vierendeel girder (1) that is laid in above the floor (2); On the said liner lamina membranacea installing port horn feed arrangement (5) is installed; Said horn feed arrangement (5) is positioned at the said constructional column template outside; The top charging aperture height of said horn feed arrangement (5) is not less than height at the bottom of the beam of Vierendeel girder (1), and the bottom discharging opening structure of horn charging aperture (5) and size all with the structure of said liner lamina membranacea installing port and measure-alike; Said liner template (4) is for carrying out up and down or the removable template of move left and right along the inwall of said main body template; Be equipped with up and down on the lateral wall of liner template (4) or drive move left and right the time that liner template (4) is carried out up and down synchronously or the template moving member of move left and right, and corresponding having supplies said template moving member to carry out up and down or the chute of move left and right on the said main body template.
2. build forming panel according to the described a kind of infilled wall constructional column of claim 1; It is characterized in that: the gang form of said main body template for surrounding by a plurality of side templates (3); A plurality of said side templates (3) all prop up and stand between floor (2) and the Vierendeel girder (1), and said liner lamina membranacea installing port is laid in a side template (3) upper end in a plurality of said side templates (3).
3. build forming panel according to claim 1 or 2 described a kind of infilled wall constructional columns; It is characterized in that: said template moving member comprises on the lateral wall that is installed in liner template (4) and can carry out up and down or the screw rod (9-1) of move left and right, be sleeved on the clamp nut (9-2) on screw rod (9-1) outer end and be installed in the lateral wall of said main body template and the clamp (9-3) between the clamp nut (9-2) along said chute; Said screw rod (9-1) is vertical laying with liner template (4), and clamp (9-3) is sleeved on that screw rod (9-1) is gone up and it is positioned at the said chute outside.
4. build forming panel according to the described a kind of infilled wall constructional column of claim 3; It is characterized in that: said chute moves up and down for the said template moving member of confession and is vertically to the vertical chute of laying (6); And said template moving member drives liner template (4) along vertical chute (6) and moves up and down synchronously when moving up and down, the vertical height of said liner template (4) is not less than the vertical height of said liner lamina membranacea installing port; The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same vertical curve, and a plurality of said template moving member all is positioned at the middle part of vertical chute (6).
5. build forming panel according to the described a kind of infilled wall constructional column of claim 3; It is characterized in that: said chute carries out move left and right and is vertical to the horizontal concrete chute of laying for supplying said template moving member; And said template moving member drives liner template (4) when carrying out move left and right along said horizontal concrete chute and carries out move left and right synchronously, and the transverse width of said liner template (4) is not less than the transverse width of said liner lamina membranacea installing port; The quantity of said template moving member is a plurality of, and a plurality of said template moving members are laid on the same horizon, and a plurality of said template moving member all is positioned at the middle part of said horizontal concrete chute.
6. build forming panel according to claim 1 or 2 described a kind of infilled wall constructional columns, it is characterized in that: also comprise being installed on the formwork reinforcement device that carries out integral reinforcing outside the said main body template and to said main body template; Said main body template is vertically to laying, and said formwork reinforcement device comprises a plurality of transversely strengthening spares that are installed in the said main body template outside from top to bottom.
7. build forming panel according to claim 1 or 2 described a kind of infilled wall constructional columns; It is characterized in that: said horn feed arrangement (5) the bottom distance at the bottom of Vierendeel girder (1) beam is 15cm ± 2cm, and the high at least 5cm of height at the bottom of the beam of the top charging aperture aspect ratio Vierendeel girder (1) of horn feed arrangement (5); Said liner template (4) is the steel plate of thickness 1mm~3mm.
8. build forming panel according to claim 1 or 2 described a kind of infilled wall constructional columns; It is characterized in that: also comprise two poles (8) of respectively left and right sides of horn feed arrangement (5) being carried out support fixation; The bottom of said pole (8) is fixed in a plurality of said transversely strengthening spares and is positioned on the transversely strengthening spare of the top, and pole (8) top is fixed on the lateral wall of horn feed arrangement (5).
9. build forming panel according to the described a kind of infilled wall constructional column of claim 6, it is characterized in that: said formwork reinforcement device also comprises a plurality of vertical girth members that are laid in the said main body template outside respectively; Said transversely strengthening spare is to be level to the anchor ear of laying (7), and a plurality of said vertical girth member is all fixed through a plurality of said anchor ears (7).
10. build forming panel according to the described a kind of infilled wall constructional column of claim 2, it is characterized in that: said to need construction infilled wall constructional column be that transverse shape is polygonal polygon prism, and said main body template be shaped as the polygon prism shape; Said liner lamina membranacea installing port is a rectangular opening, and said vertical chute (6) is laid under the said rectangular opening, and liner template (4) is a rectangular slab, and the transverse width of said rectangular slab is not less than the transverse width of said rectangular opening.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200979475U CN202467181U (en) | 2012-03-15 | 2012-03-15 | Pouring-molding template of constructional column of infill wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200979475U CN202467181U (en) | 2012-03-15 | 2012-03-15 | Pouring-molding template of constructional column of infill wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202467181U true CN202467181U (en) | 2012-10-03 |
Family
ID=46915348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200979475U Expired - Fee Related CN202467181U (en) | 2012-03-15 | 2012-03-15 | Pouring-molding template of constructional column of infill wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202467181U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561681A (en) * | 2012-03-15 | 2012-07-11 | 陕西建工集团总公司 | Casting molding template and casting molding process for constructional columns of infilled walls |
CN104831923A (en) * | 2015-05-26 | 2015-08-12 | 温州东瓯建设集团有限公司 | Constructional column steel molding plate |
CN110984569A (en) * | 2019-11-20 | 2020-04-10 | 中冶天工集团有限公司 | Structural column upper sealing template supporting device and supporting method thereof |
-
2012
- 2012-03-15 CN CN2012200979475U patent/CN202467181U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561681A (en) * | 2012-03-15 | 2012-07-11 | 陕西建工集团总公司 | Casting molding template and casting molding process for constructional columns of infilled walls |
CN102561681B (en) * | 2012-03-15 | 2013-12-11 | 陕西建工集团总公司 | Casting molding template and casting molding process for constructional columns of infilled walls |
CN104831923A (en) * | 2015-05-26 | 2015-08-12 | 温州东瓯建设集团有限公司 | Constructional column steel molding plate |
CN110984569A (en) * | 2019-11-20 | 2020-04-10 | 中冶天工集团有限公司 | Structural column upper sealing template supporting device and supporting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561681B (en) | Casting molding template and casting molding process for constructional columns of infilled walls | |
CN206646813U (en) | Template system for pouring concrete column | |
CN104196055B (en) | Outer wall of basement lower die board construction method | |
CN102022123B (en) | Integral lining method for tunnel with altered diameter by model board trolley | |
CN204590634U (en) | For pouring into a mould the feed arrangement of constructional column | |
CN201666157U (en) | Inverted arch integral type moving die carrier | |
CN203905467U (en) | Building formwork chapiter dismounted early | |
CN111113628B (en) | Construction method for spraying prefabricated T-shaped beam | |
CN202467181U (en) | Pouring-molding template of constructional column of infill wall | |
CN202644976U (en) | Slope roof double-side formwork support structure | |
CN107191006B (en) | Dismantling and repairing method for refractory concrete layer of diversion trench | |
CN103628672A (en) | Steel wire mesh and template combined type inclined reinforced concrete floor device and construction method thereof | |
CN102677624B (en) | U-shaped aqueduct simulation testing device and method | |
CN210976630U (en) | Repeatedly-usable construction column bell mouth concrete pouring device free of chiseling | |
CN205521918U (en) | Prefabricated formwork system of T roof beam batch production | |
CN201972715U (en) | Integrated ditch cable trough mould frame | |
CN109676749B (en) | Prefabricated block mold for tunnel rail lower structure and method for prefabricating tunnel rail lower structure by using prefabricated block mold | |
CN111350348A (en) | Positioning and reinforcing device for outer wall anti-seepage inverted beam template and construction method | |
CN217327341U (en) | Self-propelled long-span variable cross-section hydraulic formwork trolley | |
CN203613790U (en) | Steel wire mesh and form combined inclined reinforced concrete floor slab construction device | |
CN106050271A (en) | Ditch formwork device for tunnel and construction method of ditch formwork device | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN113339055B (en) | Filling body pouring and curing device and using method thereof | |
CN204626965U (en) | For the steel stair template of poured up at a time between architectural stair | |
CN209831997U (en) | Tunnel rail lower structure prefabricated section mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20170315 |