CN208702154U - A kind of building template reinforcement tools - Google Patents

A kind of building template reinforcement tools Download PDF

Info

Publication number
CN208702154U
CN208702154U CN201821438353.XU CN201821438353U CN208702154U CN 208702154 U CN208702154 U CN 208702154U CN 201821438353 U CN201821438353 U CN 201821438353U CN 208702154 U CN208702154 U CN 208702154U
Authority
CN
China
Prior art keywords
flitch
connecting sewing
hole
template
batten
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821438353.XU
Other languages
Chinese (zh)
Inventor
孙瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Wisdom Home Technology Co Ltd
Original Assignee
Hubei Wisdom Home Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Wisdom Home Technology Co Ltd filed Critical Hubei Wisdom Home Technology Co Ltd
Priority to CN201821438353.XU priority Critical patent/CN208702154U/en
Application granted granted Critical
Publication of CN208702154U publication Critical patent/CN208702154U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to technical field of building construction.Being designed to provide one kind can be to the building template reinforcement tools that template connecting sewing is reinforced.The technical scheme adopted by the utility model is a kind of building template reinforcement tools, including more flitches being arranged side by side and the template being laid on flitch, length direction on the flitch along flitch is uniformly provided with several first through hole, and the first through hole runs through the two sides of flitch;It further include the reinforcing batten being arranged at template connecting sewing, the batten of reinforcing extends along the length direction of connecting sewing, and the section for reinforcing batten is u-shaped, and being resisted against on connecting sewing on one side of being open to U-shaped of reinforcing strip backboard.The phenomenon that the utility model can be reinforced to the connecting sewing between template, avoid the occurrence of spillage.

Description

A kind of building template reinforcement tools
Technical field
The utility model relates to technical field of building construction, and in particular to a kind of building template reinforcement tools.
Background technique
In modern architecture industry, reinforced concrete works proportion is increasing, and the requirement of construction quality is also increasingly It is high.In concreting engineering, building template used need to be often fixed, be supported.In traditional building template fixing means, Scaffold is usually first set up, flitch is then fixed on scaffold, then the fixed form on the inside of flitch, is finally poured It builds.
It is limited by template width and length, there are a connecting sewings between template, and lack in the prior art to even Effective reinforcing of seaming position, the problem of leading to usually to occur spillage, template explosion, strong influence construction quality.
Summary of the invention
The purpose of this utility model is to provide a kind of work can be reinforced to the building template that template connecting sewing is reinforced Tool.
For achieving the above object, the technical scheme adopted by the utility model is a kind of building template reinforcement tools, Including more flitches being arranged side by side and the template being laid on flitch, the length direction on the flitch along flitch is uniformly opened up There are several first through hole, the first through hole runs through the two sides of flitch;It further include the reinforcing batten being arranged at template connecting sewing, The batten of reinforcing extends along the length direction of connecting sewing, and the section for reinforcing batten is u-shaped, and reinforcing strip backboard is to U-shaped Opening is resisted against on connecting sewing on one side;The length direction of the two lateral edge reinforcing strip plates for reinforcing batten U-shaped uniformly opens up There are multiple second through-holes, the spacing of second through-hole is equal to the spacing of first through hole;Between the flitch of the connecting sewing two sides More are provided with to wire drawing bar, and nut is fitted with to the both ends of wire drawing bar;The size and first through hole to wire drawing bar It is adapted, the middle section of wire drawing bar is threaded through in the second through-hole for reinforcing batten, both ends are threaded through connecting sewing two with the second through-hole It is locked in the first through hole of the flitch of side and by nut and flitch.
Preferably, the nut is castle nut.
Preferably, it is additionally provided with joint filling strip at the connecting sewing, the section of the joint filling strip is in inverted T-shaped, and the one of joint filling strip Checkpost is located in connecting sewing, and another side, which is folded in, to be reinforced between batten and template;Joint filling paraffin is also filled in the connecting sewing.
The beneficial effects of the utility model embody a concentrated reflection of, and can reinforce, avoid out to the connecting sewing between template The phenomenon that existing spillage.Specifically, the utility model is in construction, and advanced hand cradle of traveling far and wide, flitch and template are set up, this with it is existing There is technology identical.After the completion of template is set up, is placed in the outside of template connecting sewing and reinforce batten, then utilized and wire drawing bar is worn It crosses first through hole and the second through-hole to be attached reinforcing batten with flitch, finally recycles nut that will be to wire drawing rod locking It can.The utility model reinforces connecting sewing by reinforcing batten, so as to effectively prevent from occurring spillage at connecting sewing The case where, also it can prevent the template edge of connecting sewing two sides from damaging, to improve the pouring quality of building.Meanwhile The utility model structure is simple, is quickly and expediently installed.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of flitch;
Fig. 3 is the structural schematic diagram for reinforcing batten;
Fig. 4 is the portion A enlarged drawing in Fig. 1.
Specific embodiment
A kind of building template reinforcement tools in conjunction with shown in Fig. 1-4 including more flitches 1 being arranged side by side and are laid on wood Template 2 in side 1 is generally also used to support the scaffold of flitch 1 certainly, this is the prior art, is not shown in the figure, this is practical It is also repeated no more in novel.
As shown in Fig. 2, the length direction on the flitch 1 along flitch 1 is uniformly provided with several first through hole 3, described One through-hole 3 runs through the two sides of flitch 1.It as shown in figs. 1 and 3, further include the reinforcing batten 4 being arranged at 2 connecting sewing 5 of template, institute The length direction extension for reinforcing batten 4 along connecting sewing 5 is stated, the section for reinforcing batten 4 is u-shaped, and reinforces batten 4 backwards to U-shaped Shape opening is resisted against on one side on connecting sewing 5.The length direction of the two lateral edge reinforcing strip plates 4 for reinforcing batten 4U font is uniform Multiple second through-holes 6 are offered, the spacing of second through-hole 6 is equal to the spacing of first through hole 3, that is, adjacent first leads to The distance between hole 3 is equal to adjacent the distance between the second through-hole 6, so that it is guaranteed that first through hole 3 and the second through-hole 6 can be mutual It is corresponding.
More are provided with to wire drawing bar 7 between the flitch 1 of 5 two sides of connecting sewing, and the both ends of wire drawing bar 7 are adapted to There is nut 8, the nut 8 is castle nut, easy to disassemble.The size to wire drawing bar 7 and first through hole 3 and the second through-hole 6 are adapted, and are threaded through in the second through-hole 6 for reinforcing batten 4 to the middle section of wire drawing bar 7, both ends are threaded through the wood of 5 two sides of connecting sewing It is locked in the first through hole 3 of side 1 and by nut 8 and flitch 1.
The utility model in construction, set up, this is same as the prior art by advanced hand cradle of traveling far and wide, flitch 1 and template 2. It after the completion of template 2 is set up, is placed in the outside of 2 connecting sewing 5 of template and reinforces batten 4, then utilized and first is passed through to wire drawing bar 7 Through-hole 3 and the second through-hole 6 will be reinforced batten 4 and be attached with flitch 1, finally recycles nut 8 that will lock to wire drawing bar 7 and is It can.The utility model reinforces connecting sewing 5 by reinforcing batten 4, so as to effectively prevent from leaking at connecting sewing 5 The case where slurry, can also prevent 1 edge of template of 5 two sides of connecting sewing from damaging, to improve the pouring quality of building.Together When, the utility model structure is simple, is quickly and expediently installed.
Connecting sewing occurs extra part, also setting up at the connecting sewing 5 after being in concrete drying in order to prevent There is joint filling strip 9, the section of the joint filling strip 9 is in inverted T-shaped, and joint filling strip 9 is fastened on one side in connecting sewing 5, and another side is folded in It reinforces between batten 4 and template 2.Joint filling paraffin 10 is also filled in the connecting sewing 5.So it ensures that and has poured The smoothness of concrete surface after is cut without manually carrying out chisel again.
In addition, avoiding damaging flitch 1 to wire drawing bar 7, more preferably to improve the intensity of 3 hole wall of first through hole on flitch 1 Way can also be and be embedded an iron casing in first through hole 3, the centre bore of iron casing is adapted with to wire drawing bar 7.

Claims (3)

1. a kind of building template reinforcement tools, including more flitches (1) being arranged side by side and the template being laid on flitch (1) (2), it is characterised in that: the length direction on the flitch (1) along flitch (1) is uniformly provided with several first through hole (3), described First through hole (3) runs through the two sides of flitch (1);It further include the reinforcing batten (4) being arranged at template (2) connecting sewing (5), it is described The length direction that batten (4) are reinforced along connecting sewing (5) extends, and the section for reinforcing batten (4) is u-shaped, and reinforces batten (4) back It is resisted against on connecting sewing (5) on one side to what U-shaped was open;The two lateral edge reinforcing strip plates (4) for reinforcing batten (4) U-shaped Length direction is uniformly provided with multiple second through-holes (6), and the spacing of second through-hole (6) is equal to the spacing of first through hole (3); More are provided with to wire drawing bar (7) between the flitch (1) of connecting sewing (5) two sides, and the both ends of wire drawing bar (7) are adapted to There are nut (8);The size to wire drawing bar (7) is adapted with first through hole (3) and the second through-hole (6), to wire drawing bar (7) Middle section is threaded through in the second through-hole (6) for reinforcing batten (4), and it is first logical to be threaded through the flitch (1) of connecting sewing (5) two sides for both ends It is locked in hole (3) and by nut (8) and flitch (1).
2. building template reinforcement tools according to claim 1, it is characterised in that: the nut (8) is castle nut.
3. building template reinforcement tools according to claim 2, it is characterised in that: be additionally provided at the connecting sewing (5) Joint filling strip (9), the section of the joint filling strip (9) are in inverted T-shaped, and joint filling strip (9) is fastened on one side in connecting sewing (5), another side It is folded in and reinforces between batten (4) and template (2);Joint filling paraffin (10) are also filled in the connecting sewing (5).
CN201821438353.XU 2018-08-31 2018-08-31 A kind of building template reinforcement tools Expired - Fee Related CN208702154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821438353.XU CN208702154U (en) 2018-08-31 2018-08-31 A kind of building template reinforcement tools

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821438353.XU CN208702154U (en) 2018-08-31 2018-08-31 A kind of building template reinforcement tools

Publications (1)

Publication Number Publication Date
CN208702154U true CN208702154U (en) 2019-04-05

Family

ID=65945957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821438353.XU Expired - Fee Related CN208702154U (en) 2018-08-31 2018-08-31 A kind of building template reinforcement tools

Country Status (1)

Country Link
CN (1) CN208702154U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318537A (en) * 2019-07-17 2019-10-11 浙江新东阳建设集团有限公司 A kind of building template bracing means
CN111173279A (en) * 2020-02-19 2020-05-19 竺玉贞 Connecting and locking device for building template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318537A (en) * 2019-07-17 2019-10-11 浙江新东阳建设集团有限公司 A kind of building template bracing means
CN111173279A (en) * 2020-02-19 2020-05-19 竺玉贞 Connecting and locking device for building template
CN111173279B (en) * 2020-02-19 2021-04-06 天长市天建建筑工程有限责任公司 Connecting and locking device for building template

Similar Documents

Publication Publication Date Title
CN208702154U (en) A kind of building template reinforcement tools
CN204492159U (en) A kind of for concrete wall seam areas formwork seal bracing means
CN106168054A (en) Connecting structure with dry shaped connecting piece precast shear wall plate and construction method thereof
CN204960950U (en) Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to
CN206233579U (en) A kind of shear wall formwork is to drawing connector and its formwork reinforcement structure
CN205875734U (en) Concrete placement splices template
CN207048312U (en) Tool-type post formwork for Large area reinforced concrete post
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN204960318U (en) Reinforcement type exterior angle hoop template device
CN206070731U (en) Connecting structure with dry shaped connecting piece precast shear wall plate
CN206873914U (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN206000160U (en) A kind of wall construction is with carrying the large-scale plank sheathing of reinforced
CN106481082B (en) A kind of improvement casting method of constructional column
CN208105890U (en) A kind of concrete works wallboard pours hopper
CN212671162U (en) Novel back of body of steel-wood combination is stupefied
CN207211727U (en) A kind of internal corner formwork component and its bracing means
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN206110646U (en) Strenghthened type building templates
CN207633765U (en) A kind of quickly fragmentary concrete placings tool
CN203559581U (en) Quickly dismounted/mounted plastic building angle-adjustable template
CN205654079U (en) Instrument formula wall form system that fissure of displacement was arranged
CN207905361U (en) A kind of novel reinforced device of building form
CN104712139B (en) Construction method for radian column formwork erection
CN217949754U (en) Can have enough to meet need peripheral template and consolidate pull rod external member
CN104727553A (en) Aluminum alloy shear wall and floor template adopted construction method and device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20190831

CF01 Termination of patent right due to non-payment of annual fee