CN107268348B - 地铁柱式检查坑施工方法 - Google Patents
地铁柱式检查坑施工方法 Download PDFInfo
- Publication number
- CN107268348B CN107268348B CN201710608911.6A CN201710608911A CN107268348B CN 107268348 B CN107268348 B CN 107268348B CN 201710608911 A CN201710608911 A CN 201710608911A CN 107268348 B CN107268348 B CN 107268348B
- Authority
- CN
- China
- Prior art keywords
- column
- concrete
- bed course
- side wall
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608911.6A CN107268348B (zh) | 2017-07-25 | 2017-07-25 | 地铁柱式检查坑施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608911.6A CN107268348B (zh) | 2017-07-25 | 2017-07-25 | 地铁柱式检查坑施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107268348A CN107268348A (zh) | 2017-10-20 |
CN107268348B true CN107268348B (zh) | 2019-04-05 |
Family
ID=60078098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710608911.6A Active CN107268348B (zh) | 2017-07-25 | 2017-07-25 | 地铁柱式检查坑施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107268348B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108162162A (zh) * | 2017-12-22 | 2018-06-15 | 中铁第四勘察设计院集团有限公司 | 一种预制混凝土柱及其制备方法和使用方法 |
CN108331385B (zh) * | 2018-04-24 | 2024-05-03 | 建华建材(中国)有限公司 | 一种检查坑预制柱结构及其施工方法 |
CN110761124B (zh) * | 2018-07-26 | 2021-05-28 | 中铁华铁工程设计集团有限公司 | 装配式混凝土支柱轨道桥 |
CN110159016B (zh) * | 2019-06-26 | 2023-12-05 | 中国铁路设计集团有限公司 | 一种预制装配式可调节轨顶标高的柱式检查坑 |
CN111535089A (zh) * | 2020-06-12 | 2020-08-14 | 中铁二局集团有限公司 | 一种地铁工程检查坑立柱混凝土施工辅助装置及使用方法 |
CN111778782A (zh) * | 2020-06-18 | 2020-10-16 | 上海市城市建设设计研究总院(集团)有限公司 | 用于轨道交通的装配式浮置柱式检查坑隔振系统 |
CN117888753A (zh) * | 2024-01-05 | 2024-04-16 | 中铁建华南建设(广州)高科技产业有限公司 | 柱式检查坑及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3562419A (en) * | 1967-12-21 | 1971-02-09 | Canada Iron Foundries Ltd | Inspection method and apparatus for track alignment |
JP2006348695A (ja) * | 2005-06-20 | 2006-12-28 | Chubu Kido Kensetsu Kk | 可動クロッシング吊上金具及び可動クロッシング吊上方法 |
CN104631232A (zh) * | 2015-01-06 | 2015-05-20 | 邵冠慧 | 一种针对轨道柱式检查坑扣件系统安装的一体化浇筑装置 |
CN105735063A (zh) * | 2016-03-29 | 2016-07-06 | 中铁城建集团第一工程有限公司 | 采用胶粘法及架轨工装吊轨法铺设检查坑轨道的施工方法 |
CN107313314A (zh) * | 2017-07-19 | 2017-11-03 | 中铁上海工程局集团有限公司 | 一种地铁车辆段预留立柱检查坑轨道施工方法 |
-
2017
- 2017-07-25 CN CN201710608911.6A patent/CN107268348B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3562419A (en) * | 1967-12-21 | 1971-02-09 | Canada Iron Foundries Ltd | Inspection method and apparatus for track alignment |
JP2006348695A (ja) * | 2005-06-20 | 2006-12-28 | Chubu Kido Kensetsu Kk | 可動クロッシング吊上金具及び可動クロッシング吊上方法 |
CN104631232A (zh) * | 2015-01-06 | 2015-05-20 | 邵冠慧 | 一种针对轨道柱式检查坑扣件系统安装的一体化浇筑装置 |
CN105735063A (zh) * | 2016-03-29 | 2016-07-06 | 中铁城建集团第一工程有限公司 | 采用胶粘法及架轨工装吊轨法铺设检查坑轨道的施工方法 |
CN107313314A (zh) * | 2017-07-19 | 2017-11-03 | 中铁上海工程局集团有限公司 | 一种地铁车辆段预留立柱检查坑轨道施工方法 |
Non-Patent Citations (1)
Title |
---|
"地铁车辆段大库立柱检查坑施工方法改进",张伟,建筑工人,2016年6月15日;张伟;《建筑工人》;20160615;第6页-第8页 |
Also Published As
Publication number | Publication date |
---|---|
CN107268348A (zh) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268348B (zh) | 地铁柱式检查坑施工方法 | |
CN104480803B (zh) | 中低速磁浮铁路低置线路连续拱形承轨梁结构及施工方法 | |
CN104790302B (zh) | 一种高墩连续刚构桥边跨直线段挂篮配合盖梁支架整体施工法 | |
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN104294767B (zh) | 一种悬臂梁现浇施工用接长挂篮及其施工方法 | |
CN109853908A (zh) | 一种新型预制轨顶风道结构及其施工方法 | |
CN108330980A (zh) | 大面积坡面混凝土隐轨滑模结构及施工方法 | |
CN109235499A (zh) | 一种明挖地下建筑结构装配式施工方法 | |
CN106088147A (zh) | 空腹墙板混合预制装配式综合管廊及其施工方法 | |
CN108729353A (zh) | 一种通用钢筋笼绑扎胎架 | |
CN107905114A (zh) | 一种特大跨径连续刚构拱桥的施工方法 | |
CN106917328A (zh) | 一种地铁轨道工程浮置板整体道床轨道的施工方法 | |
CN103321111A (zh) | 有轨电车轨道连铺的施工方法 | |
CN104060629A (zh) | 盖挖逆作地铁车站叠合墙施工方法及移动式侧墙模板台车 | |
CN108755421A (zh) | 盖梁施工装置及施工方法 | |
CN105804395A (zh) | 基于整体式定型模板的楼梯一次连续浇筑成型施工方法 | |
CN108842624A (zh) | 高墩现浇盖梁复合式悬挑支模体系及施工方法 | |
CN107988921B (zh) | 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法 | |
CN106087671A (zh) | 一种混凝土浇筑用模板 | |
CN203755164U (zh) | 声屏障t梁后浇翼缘板施工专用吊架 | |
CN108708290A (zh) | 小半径铁路曲线单元的箱桥架空结构及现浇施工方法 | |
CN108166395A (zh) | 一种跨越营业线修建梁桥的施工方法 | |
CN204139075U (zh) | 一种悬臂梁现浇施工用接长挂篮 | |
CN208328660U (zh) | 公铁两用桥的双拼u型梁结构 | |
CN103758040A (zh) | 声屏障t梁后浇翼缘板施工专用吊架及使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Jianping Inventor after: Xiao Chong Inventor after: Mi Wanfu Inventor after: Yao Lianghai Inventor after: Yang Zhisheng Inventor after: Tian Qing Inventor after: Yan Lei Inventor before: Li Jianping Inventor before: Mi Wanfu Inventor before: Yao Lianghai Inventor before: Yang Zhisheng Inventor before: Tian Qing Inventor before: Yan Lei |
|
GR01 | Patent grant | ||
GR01 | Patent grant |