CN107246148A - Thin wall concrete is to drawing screw water sealing structure and sealing technique - Google Patents

Thin wall concrete is to drawing screw water sealing structure and sealing technique Download PDF

Info

Publication number
CN107246148A
CN107246148A CN201710443659.8A CN201710443659A CN107246148A CN 107246148 A CN107246148 A CN 107246148A CN 201710443659 A CN201710443659 A CN 201710443659A CN 107246148 A CN107246148 A CN 107246148A
Authority
CN
China
Prior art keywords
water
section
millimeters
plastic film
reaming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710443659.8A
Other languages
Chinese (zh)
Other versions
CN107246148B (en
Inventor
郭全中
马志华
畅军
孔晨旭
畅会军
潘景茹
刘雪利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Bureau Of Henan Water Conservancy
Original Assignee
First Engineering Bureau Of Henan Water Conservancy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Bureau Of Henan Water Conservancy filed Critical First Engineering Bureau Of Henan Water Conservancy
Priority to CN201710443659.8A priority Critical patent/CN107246148B/en
Publication of CN107246148A publication Critical patent/CN107246148A/en
Application granted granted Critical
Publication of CN107246148B publication Critical patent/CN107246148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/007Plugs to close openings in forms' surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of thin wall concrete to drawing screw water sealing structure, including thin wall concrete is arranged on to drawing the plastic film capicitor in screw hole;In front of plastic film capicitor to draw screw hole be set to before reaming section, plastic film capicitor rear to drawing screw hole to be set to rear reaming section, the end of preceding reaming section is provided with water-swellable filler block, preceding reaming section, rear reaming section and plastic film capicitor plugging grouting material.The invention also discloses construction method of the above-mentioned thin wall concrete to drawing screw water sealing structure, first step installs plastic ripple pipe sleeve and to drawing screw;Second step is to pour and form removal;Third step is reaming;Four steps is to install water-swellable filler block;5th step is filling grouting material;6th step is, if any underground water, to increase by a water-swellable filler block in land side.Thin wall concrete is to drawing screw water sealing structure both to have higher performance resistant to pressure, it may have higher vertebration property and durability, and is easy to construction.

Description

Thin wall concrete is to drawing screw water sealing structure and sealing technique
Technical field
The present invention relates to the realm of building construction, more particularly to thin wall concrete is to drawing screw water sealing structure and sealing technique.
Background technology
In concrete engineering construction, split bolt is used between two side templates(Also known as Screw arbor with nut at both-ends or to draw screw)It is right It is conventional technological means that wall medial and lateral template, which carries out drawknot, to drawing screw to bear coagulation earth lateral pressure and other loads, Ensure that the rigidity and stability of interior outboard template meet design requirement.
In thin wall concrete engineering, to drawing screw to socket form technology, there are the following problems in current construction market:It is right The a whole set of processing technology thereof quality requirement height of screw sealing is drawn, installation difficulty is difficult form removal;For thin wall concrete, mix Solidifying soil wall is thin, to drawing screw short, seepage paths(Seepage paths refers to the permeation pathway of water)It is short, easily cause seepage after the long-term corrosion of screw mandrel; Because concrete wall is thin, reinforcing bar is close, pour vibrate when easily caused by cross to shake to draw screw sealing steel loop and expansion loop destruction or Because to drawing leakage at screw sealing steel loop, causing seepage.
The method of the patching to drawing screw used for thin wall concrete formwork reinforcement in current construction market Carry out looking into new and analysis, it is found that water-stopping method mainly includes two major classes:
The first kind:To drawing thread part to be embedded in concrete, by metallic water stop sheet and expansion loop sealing.Such water-stopping method Advantage is that water resistant Compressive Strength is big(The rise of hydraulic pressure not easily leads to further seepage by contrast, but can not solve original ooze Leakage).Shortcoming has:Difficulty of construction is big, progress is slow, construction cost is high, poor durability, easily because reasons in structure produces seepage etc..
Equations of The Second Kind:Pre-buried plastic bushing, to drawing screw to extract turnover out, wire drawing hole leans on water-swellable sealing putty and swollen Buckle starches sealing.Advantage is that construction cost is low to drawing screw to be used in turn;Water-swellable putty is anticorrosive, ageing-resistant, durable Property is good;It is easy for installation;The form removal cycle is short, can improve form cycling rate and accelerating construction progress.Have the disadvantage that water resistant Compressive Strength is small, easily The seepage caused by hydraulic pressure.
The content of the invention
It is an object of the invention to provide a kind of thin wall concrete to drawing screw water sealing structure, both with higher resistant to pressure Seepage property, it may have higher vertebration property and durability, and it is easy to construction.
To achieve the above object, thin wall concretes of the invention are to drawing screw water sealing structure to include being arranged on thin-walled coagulation Soil is to drawing the plastic film capicitor in screw hole;Using upstream face before to, in front of plastic film capicitor to drawing before screw hole is set to Reaming section, the diameter of preceding reaming section is more than the diameter of plastic film capicitor and the rearward end of preceding reaming section is provided with pre-large post-small preceding receipts Shrinkage cavity section, the preceding diameter for shrinking hole section rear end it is identical with plastic film capicitor external diameter and with plastic film capicitor is corresponding connects;
Plastic film capicitor rear to drawing screw hole to be set to rear reaming section, the diameter of rear reaming section is more than the straight of plastic film capicitor Footpath and rear reaming section leading section be provided with pre-small post-large after-contraction hole section;
The end of preceding reaming section is provided with water-swellable filler block, water-swellable filler block and preceding reaming section end and its preceding shrinkage hole Section is adapted;Closure has grouting material, the plastics at water-swellable filler block rear in preceding reaming section in front of water-swellable filler block Being blocked in rear reaming section in bellows and has grouting material.
The point diameter of water-swellable filler block is identical with the internal diameter of preceding reaming section, the rear end diameter of water-swellable filler block Less than plastic film capicitor internal diameter and stretch into plastic film capicitor.
20 millimeters of the water-swellable filler block length, a diameter of 16 millimeters of water-swellable filler block rear end, water-swellable stops The internal diameter of a diameter of 22 millimeters of the middle front part of water plug, preceding reaming section and rear reaming section is 22 millimeters, the preceding milli of reaming segment length 100 Rice, rear 20 millimeters of reaming segment length.
The invention also discloses above-mentioned thin wall concrete to draw screw water sealing structure construction technology, successively according to the following steps Carry out:
First step is plastic film capicitor to be penetrated between the template of front and rear sides and to drawing screw;
First will be to drawing screw to penetrate rigid plastics bellows, then by plastic film capicitor and to drawing screw to penetrate front and rear sides together In the pattern hole of template;Plastic ripple length of tube is more than 20 millimeters of concrete broken face thickness;The internal diameter of plastic film capicitor is more than spiral shell 2-4 millimeters of shank diameter;
Second step is to pour thin wall concrete and form removal,
After template acceptance(check), using conventional method casting concrete, after maintenance to predetermined strength of mould stripping from plastic film capicitor Extract out to drawing screw, then remove front side template and rear side template;
Third step is reaming, and electric hand drill is used to drawing spiral shell in the upstream face i.e. front end face of the thin wall concrete structure poured Silk hole carries out reaming, makes to drawing 4 millimeters of the aperture increases of screw hole, and processes preceding reaming section and its preceding contraction hole section;
Electric hand drill is used to drawing screw hole to carry out reaming, making to drawing screw hole in the back side of the thin wall concrete poured 4 millimeters of aperture increases, and process rear reaming section and its after-contraction hole section;
Four steps is to install water-swellable filler block;
Before operating personnel are checked the quality of water-swellable filler block being made using water expandable waterstop and checked reaming section and Quality of hole section is shunk before it, from upstream face by water-swellable filler block reached the last with hand hammer and tack plain bar reaming section and Hole section is shunk before it and is stoppered, the rearward end and preceding contraction hole section for making water-swellable filler block fit and water-swellable filler block Rear end enter plastic film capicitor front end;The diameter of tack plain bar is less than 2 millimeters of the diameter of preceding reaming section;
5th step is filling grouting material;
Added water mix grouting material, and the control ratio of mud is less than 0.2, and grouting material is injected into preceding reaming section, rear reaming section and its after-contraction Hole section and plastic film capicitor, before clogging, be compacted from front to back using diameter tack plain bar of 2 millimeters less than preceding reaming section Grouting material in reaming section, expands after being clogged, be compacted from back to front using diameter tack plain bar of 2 millimeters less than rear reaming section Grouting material in hole section and its after-contraction hole section and plastic film capicitor, from preceding reaming section front end and rear reaming section rear end to grouting Material progress is floating, finally pastes adhesive tape respectively in preceding reaming section front end and rear reaming section rear end and is conserved.
A diameter of 12-14 millimeters to drawing screw in first step, before plastic film capicitor is stretched into forward in first step 10 millimeters of side template and extend rearward into rear side 10 millimeters of template;The internal diameter of plastic film capicitor is 16 millimeters and outer in first step Footpath is 18 millimeters;
20 millimeters of water-swellable filler block length in second step, a diameter of 16 millimeters of the rear end of water-swellable filler block and it is preceding in Anterior a diameter of 22 millimeters.
The present invention has the advantage that:
The thin wall concrete of the present invention is to drawing screw water sealing structure, and performance resistant to pressure can reach more than 0.1MPa, with higher Vertebration property and durability, and be easy to construction.Because water sealing structure is on the basis of original material for pouring thin wall concrete On, water-swellable filler block and grouting material are increase only, cost is very low.
Reaming section before the present invention is provided with, the plastic film capicitor of reaming section before rejecting, enables grouting material preferably and mixed Solidifying soil is combined, and improves the stability of water sealing structure;Because the diameter of water-swellable filler block is more than the diameter of plastic film capicitor, so that Step-like structure is formed between preceding reaming section and plastic film capicitor(Preceding contraction hole section), it is preceding contraction hole section not only change infiltration Direction, improves anti-permeability strength, additionally it is possible to transmit water pressure using in upstream face, makes to permeate after water-swellable filler block rearward displacement Passage is pressed closer and closer, improves anti-permeability strength.If without preceding reaming section, water-swellable filler block, which does not just resist, pushes away measure, fills Slurry and water-swellable filler block slide backward to destroy leakage preventing structure in the presence of upstream face transmits water pressure.
Present invention employs plastic film capicitor, in the outer wall formation corrugated of plastic film capicitor after concreting, equally, Outer wall after grouting material closure in plastic film capicitor also forms corrugated.Compared to no plastic film capicitor or using smooth surface pvc pipe, Grouting material in the present invention is more interlocked securely by plastic film capicitor with thin wall concrete, forms self-locking structure, The ability of resistance upstream face hydraulic pressure is improved, water surface movable of being supported or opposed to the structure in drawing screw hole in the presence of hydraulic pressure is prevented;By In the bellows-shaped of plastic film capicitor, seepage paths is extended, thin wall concrete is further increased to drawing screw water sealing structure to resist Ooze ability.
Present invention employs grouting material, grouting material is used as finished product plugging material, it is to avoid match ratio manual operation error, from And ensure that to drawing screw hole closure quality;Due to the characteristic of grouting material microdilatancy, plugging material and concrete is set preferably to tie It is combined, improves the anti-permeability strength to drawing screw hole;The characteristics of due to grouting material high intensity(Generally higher than 50MPa), improve Intensity to drawing screw hole closure, it is ensured that thin wall concrete is to drawing the durability and stability of screw water sealing structure.
Present invention employs tack plain bar, 20 millimeters of the diameter of tack plain bar, it is ensured that tack light round steel Muscle and water-swellable filler block have larger contact area, ensure integrally to reach the last water-swellable filler block reaming section.
The construction technology of the present invention is easy to operate, without high capital equipment or material, can efficiently produce thin-walled and mix Solidifying soil is to drawing screw water sealing structure, it is ensured that thin wall concrete is to drawing the construction quality of screw water sealing structure, structural strength and impervious Performance.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the enlarged drawing at A in Fig. 1;
Fig. 3 is to drawing the structural representation after screw hole reaming;
Fig. 4 is to drawing the structural representation after screw hole reaming when having underground water;
Fig. 5 is the structural representation of present invention when there is water thin wall concrete both sides.
Embodiment
In Fig. 1 and Fig. 2 label 2 indicate for the water at thin wall concrete structure 3.
As shown in Figures 1 to 5, thin wall concrete of the invention is to drawing screw water sealing structure to include being arranged on thin wall concrete To drawing the plastic film capicitor 1 in screw hole;Plastic film capicitor is that its specific bellows-shaped is no longer shown in detail in prior art, figure.
Using upstream face before to the front of, plastic film capicitor 1 to draw screw hole be set to before reaming section 4, preceding reaming section 4 Diameter is more than the diameter of plastic film capicitor 1 and the rearward end of preceding reaming section 4 is provided with pre-large post-small preceding contraction hole section 5, preceding to shrink The diameter of the rear end of hole section 5 is identical with the external diameter of plastic film capicitor 1 and is connected with the correspondence of plastic film capicitor 1;Certainly, plastic film capicitor 1 external diameter is identical with the internal diameter to drawing screw hole.
The rear of plastic film capicitor 1 to drawing screw hole to be set to rear reaming section 6, the diameter of rear reaming section 6 is more than plastics ripple The leading section of the diameter of line pipe 1 and rear reaming section 6 is provided with pre-small post-large after-contraction hole section 7;
The end of preceding reaming section 4 is provided with water-swellable filler block 8, water-swellable filler block 8 and preceding reaming 4 ends of section and its preceding receipts Shrinkage cavity section 5 is adapted;Closure has the grouting material 9 that the ratio of mud is less than 0.2 in the preceding reaming section 4 in the front of water-swellable filler block 8, meets The grouting material for having the ratio of mud to be less than 0.2 is blocked in the plastic film capicitor 1 at the rear of water expansion water-stop plug 8 and in rear reaming section 6 9。
Wherein, water-swellable filler block 8 is made up of water-swellable material, such as water expandable waterstop(It is circular).
The point diameter of water-swellable filler block 8 is identical with the internal diameter of preceding reaming section 4, the rear end of water-swellable filler block 8 Diameter is less than the internal diameter of plastic film capicitor 1 and stretches into plastic film capicitor 1.
The water-swellable filler block 8 grows 20 millimeters, a diameter of 16 millimeters of the rear end of water-swellable filler block 8, water-swellable The internal diameter of a diameter of 22 millimeters of the middle front part of filler block 8, preceding reaming section 4 and rear reaming section 6 is 22 millimeters, preceding reaming section 4 It is long 100 millimeters, rear 20 millimeters of the length of reaming section 6.
Fig. 5 show the structural representation of present invention when there is water thin wall concrete both sides.
The invention also discloses above-mentioned thin wall concrete to draw screw water sealing structure construction technology, successively according to the following steps Carry out:
First step is plastic film capicitor 1 to be penetrated between the template of front and rear sides and to drawing screw;
First will be to drawing screw to penetrate rigid plastics bellows 1, then by plastic film capicitor 1 and to drawing screw to penetrate front and rear two together In the pattern hole of side template;It is respectively provided with using to drawing in the template of screw drawknot for wearing the pattern hole to drawing screw, is existing Technology, not shown template and pattern hole.Plastic ripple length of tube is more than 20 millimeters of concrete broken face thickness;Before plastic film capicitor 1 End penetrates front template and its rear end penetrates rear pattern plate, so as to occur spillage when preventing casting concrete at pattern hole;Plastics ripple The internal diameter of line pipe 1 is more than 2-4 millimeters of screw diameter;
Second step is to pour thin wall concrete and form removal,
After template acceptance(check), conventional method casting concrete is used between the template of front and rear sides, is conserved strong to predetermined form removal Extracted out after degree from plastic film capicitor 1 to drawing screw, then remove front side template and rear side template;
Third step is reaming, and electric hand drill is used to drawing spiral shell in the upstream face i.e. front end face of the thin wall concrete structure poured Silk hole carries out reaming, makes to drawing 4 millimeters of the aperture increases of screw hole to 22 millimeters of aperture, 100 millimeters of counterbore depth, drill bit at this Reaming section 4 and its preceding contraction hole section 5 before being processed naturally by its own shape during drilling;
Electric hand drill is used to drawing screw hole to carry out reaming, making to drawing screw in the back side of the thin wall concrete structure poured 4 millimeters to 22 millimeters of the aperture increases in hole, 20 millimeters of counterbore depth at this, drill bit is processed naturally when creeping into by its own shape Go out rear reaming section 6 and its after-contraction hole section 7;
Four steps is to install water-swellable filler block 8;
Operating personnel check the quality for the water-swellable filler block 8 being made using the rounded water expandable waterstop in section and inspection Reaming section 4 and its preceding quality for shrinking hole section 5 before looking into, from upstream face(I.e. from front to back)Water-swellable filler block 8 is used into hand hammer Reach the last reaming section 4 with tack plain bar and its preceding contraction and stoppered hole section 5, make the rearward end of water-swellable filler block 8 with Preceding contraction hole section 5 fits and the rear end of water-swellable filler block 8 enters the front end of plastic film capicitor 1;Tack plain bar it is straight Footpath is less than 2 millimeters of the diameter of preceding reaming section 4, is 20 millimeters.So, tack plain bar and water-swellable sealing can both be ensured Plug 8 has larger contact area, ensures, by the overall reaming section 4 of reaching the last of water-swellable filler block 8, tack light can be prevented again The situation that round bar is in contact with preceding reaming section 4, causes the hole wall of preceding reaming section 4 to be broken, 4 breakages of reaming section cause before preventing Leak;
5th step is filling grouting material 9;
Added water mix grouting material 9, and the control ratio of mud is less than 0.2, and grouting material 9 is injected into preceding reaming section 4, rear reaming section 6 and thereafter Hole section 7 and plastic film capicitor 1 are shunk, the tack plain bar of 4 two millimeters of preceding reaming section is less than using diameter(Tack light round steel 20 millimeters of muscle diameter)From front to back(I.e. from outside to inside)Grouting material 9 before filling, compacting in reaming section 4, after being less than using diameter Reaming 6 two millimeters of tack plain bar of section clogs from back to front, be compacted after reaming section 6 and its after-contraction hole section 7 and plastics Grouting material 9 in bellows 1, with trowel from preceding reaming section 4 front ends and rear reaming section 6 rear ends grouting material 9 is carried out it is floating, finally Adhesive tape is pasted respectively and is conserved in preceding reaming 4 front ends of section and 6 rear ends of rear reaming section.
One-way waterproof structure when above scheme background is without underground water, land side need to carry out two-way anti-when meeting underground water Water.Specific method is that rear reaming section depth is changed into 40 millimeters, then squeezes into a milli of water-swellable filler block 20 again from land side Rice, is finally blocked with grouting material again.
A diameter of 12-14 millimeters to drawing screw in first step, preferably 14 millimeters, plastic ripple in first step Pipe 1 stretches into forward 10 millimeters of the template in front side and extends rearward into 10 millimeters of template of rear side;Plastic film capicitor 1 is interior in first step Footpath is 16 millimeters and external diameter is 18 millimeters;
20 millimeters of water expandable waterstop plug in second step, a diameter of 16 millimeters of the rear end of water-swellable filler block 8 and preceding A diameter of 22 millimeters of middle front part;
Observed in the past using pre-buried plastic bushing and sealing putty and expansive mortar as water sealing structure through 72 hours, it is most Big water resistant Compressive Strength is 0.05 MPa, it is impossible to meet the requirement of engineering.
After the water sealing structure and water-stopping method of the present embodiment, inventor has carried out experiment resistant to pressure(Water column method). To drawing the impervious simulated experiment of screw hole:One group of concrete impervious testing mold 6 is taken, in bottom hole.Above as upstream face, bottom surface As back side, simulation thin wall concrete is to drawing screw sealing technique to test.By vertically installing plastics at die trial center Bellows and to drawing screw, dress C30W6 concrete, form removal, reaming, installs water-swellable filler block, grouting material closure, laboratory Learnt after the flows such as impermeability test, land side starts infiltration after 15 hours, continue to observe and pressurize, after 40 hours, due to The expansion extruding of water-swellable filler block 8, infiltration stops, continuing to be forced into 0.8MPa, do not seep water, seepage-resistant grade is more than W6。
Field test:Sampling 6 is to drawing screw hole, and adjustment water-column is to 8.5 meters(0.085MPa), observe 20 hours The land side of thin wall concrete structure starts infiltration afterwards.After 41 hours, extrude, ooze because water-swellable filler block 8 expands Water stops.There is not wet stain after 56 hours.Water-column is adjusted to 10 meters(0.1 MPa), observe 72 hours, do not occur Wet stain, illustrates that the water sealing structure of the present invention and the performance resistant to pressure of sealing technique reach 0.1 MPa.
Reaming section before the present invention is provided with, therefore the diameter of water-swellable filler block is greater than the diameter of plastic film capicitor, So as to form step-like structure between preceding reaming section and plastic film capicitor(Preceding contraction hole section), the thin-walled poured can be utilized Concrete structure directly supports water-swellable filler block from the front to the back, prevents grouting material and water-swellable filler block from being passed in upstream face Slide backward to destroy infiltration energy in the presence of the pressure come.If without preceding reaming section, water-swellable filler block is just Water-swellable filler block can not be directly supported in the longitudinal direction.
Present invention employs plastic film capicitor, the pouring material of thin wall concrete enter plastic film capicitor outer wall ripple it In, plastic film capicitor is firmly combined together with thin wall concrete material.Similarly, the inwall and grouting material of plastic film capicitor Also it is firmly combined together.Compared to no plastic film capicitor or light pipe is used, the grouting material in the present invention passes through plastic ripple Pipe is more firmly combined together with thin wall concrete, and structural strength more preferably, more resistant against the hydraulic pressure of upstream face, is prevented to drawing Structure in screw hole supports or opposes water surface movable in the presence of hydraulic pressure.
The construction technology of the present invention is easy to operate, without high capital equipment or material, can efficiently produce thin-walled and mix Solidifying soil is to drawing screw water sealing structure, it is ensured that thin wall concrete is to drawing the construction quality of screw water sealing structure, structural strength and impervious Aqueous energy.
The diameter of tack plain bar is less than 2 millimeters of the diameter of preceding reaming section, can both ensure tack plain bar and chance Water expansion water-stop plug have larger contact area, ensure by water-swellable filler block integrally reach the last reaming section, can prevent again The situation that only tack plain bar is in contact with preceding reaming section, causes the hole wall of preceding reaming section to be broken, reaming section is broken before preventing Damage causes infiltration.
Above example is only used to illustrative and not limiting technical scheme, although with reference to above-described embodiment to this hair It is bright to be described in detail, it will be understood by those within the art that:Still the present invention can be modified or be waited With replacement, any modification or partial replacement without departing from the spirit and scope of the present invention, it all should cover the power in the present invention Among sharp claimed range.

Claims (5)

1. thin wall concrete is to drawing screw water sealing structure, it is characterised in that:
Including being arranged on thin wall concrete to drawing the plastic film capicitor in screw hole;Using upstream face to be preceding to before plastic film capicitor Side is set to preceding reaming section to drawing screw hole, and the diameter of preceding reaming section is more than after the diameter of plastic film capicitor and preceding reaming section End is provided with pre-large post-small preceding contraction hole section, and the diameter of preceding contraction hole section rear end is identical with plastic film capicitor external diameter and and plastics Bellows correspondence is connected;
Plastic film capicitor rear to drawing screw hole to be set to rear reaming section, the diameter of rear reaming section is more than the straight of plastic film capicitor Footpath and rear reaming section leading section be provided with pre-small post-large after-contraction hole section;
The end of preceding reaming section is provided with water-swellable filler block, water-swellable filler block and preceding reaming section end and its preceding shrinkage hole Section is adapted;Closure has grouting material, the plastics at water-swellable filler block rear in preceding reaming section in front of water-swellable filler block Being blocked in rear reaming section in bellows and has grouting material.
2. thin wall concrete according to claim 1 is to drawing screw water sealing structure, it is characterised in that:Water-swellable filler block Point diameter and preceding reaming section internal diameter it is identical, the rear end diameter of water-swellable filler block is less than the internal diameter of plastic film capicitor simultaneously Stretch into plastic film capicitor.
3. thin wall concrete according to claim 1 is to drawing screw water sealing structure, it is characterised in that:The water-swellable stops 20 millimeters of water plug length, a diameter of 16 millimeters of water-swellable filler block rear end, a diameter of the 22 of the middle front part of water-swellable filler block The internal diameter of millimeter, preceding reaming section and rear reaming section is 22 millimeters, preceding 100 millimeters of reaming segment length, rear 20 millimeters of reaming segment length.
4. thin wall concrete described in claim 1 is to the construction technology of drawing screw water sealing structure, it is characterised in that successively by following Step is carried out:
First step is plastic film capicitor to be penetrated between the template of front and rear sides and to drawing screw;
First will be to drawing screw to penetrate rigid plastics bellows, then by plastic film capicitor and to drawing screw to penetrate front and rear sides together In the pattern hole of template;Plastic ripple length of tube is more than 20 millimeters of concrete broken face thickness;The internal diameter of plastic film capicitor is more than spiral shell 2-4 millimeters of shank diameter;
Second step is to pour thin wall concrete and form removal,
After template acceptance(check), using conventional method casting concrete, after maintenance to predetermined strength of mould stripping from plastic film capicitor Extract out to drawing screw, then remove front side template and rear side template;
Third step is reaming, and electric hand drill is used to drawing spiral shell in the upstream face i.e. front end face of the thin wall concrete structure poured Silk hole carries out reaming, makes to drawing 4 millimeters of the aperture increases of screw hole, and processes preceding reaming section and its preceding contraction hole section;
Electric hand drill is used to drawing screw hole to carry out reaming, making to drawing screw hole in the back side of the thin wall concrete poured 4 millimeters of aperture increases, and process rear reaming section and its after-contraction hole section;
Four steps is to install water-swellable filler block;
Before operating personnel are checked the quality of water-swellable filler block being made using water expandable waterstop and checked reaming section and Quality of hole section is shunk before it, from upstream face by water-swellable filler block reached the last with hand hammer and tack plain bar reaming section and Hole section is shunk before it and is stoppered, the rearward end and preceding contraction hole section for making water-swellable filler block fit and water-swellable filler block Rear end enter plastic film capicitor front end;The diameter of tack plain bar is less than 2 millimeters of the diameter of preceding reaming section;
5th step is filling grouting material;
Added water mix grouting material, and the control ratio of mud is less than 0.2, and grouting material is injected into preceding reaming section, rear reaming section and its after-contraction Hole section and plastic film capicitor, before clogging, be compacted from front to back using diameter tack plain bar of 2 millimeters less than preceding reaming section Grouting material in reaming section, expands after being clogged, be compacted from back to front using diameter tack plain bar of 2 millimeters less than rear reaming section Grouting material in hole section and its after-contraction hole section and plastic film capicitor, from preceding reaming section front end and rear reaming section rear end to grouting Material progress is floating, finally pastes adhesive tape respectively in preceding reaming section front end and rear reaming section rear end and is conserved.
5. construction technology according to claim 4, it is characterised in that:A diameter of 12- to drawing screw in first step 14 millimeters, plastic film capicitor stretches into forward 10 millimeters of the template in front side and extends rearward into 10 millimeters of template of rear side in first step; The internal diameter of plastic film capicitor is 16 millimeters in first step and external diameter is 18 millimeters;
20 millimeters of water-swellable filler block length in second step, a diameter of 16 millimeters of the rear end of water-swellable filler block and it is preceding in Anterior a diameter of 22 millimeters.
CN201710443659.8A 2017-06-13 2017-06-13 Water stopping structure and water stopping process for thin-wall concrete split screw Active CN107246148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710443659.8A CN107246148B (en) 2017-06-13 2017-06-13 Water stopping structure and water stopping process for thin-wall concrete split screw

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710443659.8A CN107246148B (en) 2017-06-13 2017-06-13 Water stopping structure and water stopping process for thin-wall concrete split screw

Publications (2)

Publication Number Publication Date
CN107246148A true CN107246148A (en) 2017-10-13
CN107246148B CN107246148B (en) 2022-06-21

Family

ID=60018073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710443659.8A Active CN107246148B (en) 2017-06-13 2017-06-13 Water stopping structure and water stopping process for thin-wall concrete split screw

Country Status (1)

Country Link
CN (1) CN107246148B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107778029A (en) * 2017-10-31 2018-03-09 中国冶集团有限公司 The concrete curing method of pipe laying in structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29506421U1 (en) * 1995-04-13 1996-08-08 THERA Patent GmbH & Co. KG Gesellschaft für industrielle Schutzrechte, 82229 Seefeld Seal for closing a hole
CN203296383U (en) * 2013-05-24 2013-11-20 中国华冶科工集团有限公司 Plugging rod for split bolt holes
CN103711205A (en) * 2014-01-13 2014-04-09 任斌向 Waterproof wall split bolt hole plugging structure and construction method thereof
CN105568928A (en) * 2015-12-30 2016-05-11 中国电建集团北京勘测设计研究院有限公司 Construction method of sealed joint of composite geomembrane face dam
CN106639313A (en) * 2017-02-21 2017-05-10 潍坊市宏源防水材料有限公司 Rubber water stopping plug and construction method for plugging and stopping water of opposite-pull bolt hole of underground outer wall template

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29506421U1 (en) * 1995-04-13 1996-08-08 THERA Patent GmbH & Co. KG Gesellschaft für industrielle Schutzrechte, 82229 Seefeld Seal for closing a hole
CN203296383U (en) * 2013-05-24 2013-11-20 中国华冶科工集团有限公司 Plugging rod for split bolt holes
CN103711205A (en) * 2014-01-13 2014-04-09 任斌向 Waterproof wall split bolt hole plugging structure and construction method thereof
CN105568928A (en) * 2015-12-30 2016-05-11 中国电建集团北京勘测设计研究院有限公司 Construction method of sealed joint of composite geomembrane face dam
CN106639313A (en) * 2017-02-21 2017-05-10 潍坊市宏源防水材料有限公司 Rubber water stopping plug and construction method for plugging and stopping water of opposite-pull bolt hole of underground outer wall template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107778029A (en) * 2017-10-31 2018-03-09 中国冶集团有限公司 The concrete curing method of pipe laying in structure
CN107778029B (en) * 2017-10-31 2021-04-02 中国一冶集团有限公司 Concrete curing method for buried pipe in structure

Also Published As

Publication number Publication date
CN107246148B (en) 2022-06-21

Similar Documents

Publication Publication Date Title
EP2929146B1 (en) Rock anchor bolt
CN205936654U (en) A gasbag template for tunnel secondary lining
CN202391019U (en) End part thickened grouting connector of steel bar
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN105155517B (en) Drilling extruding pressure-bearing type bellows branch pile construction method
CN103866762A (en) Pile body longitudinal multipoint grouting device
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN107587884A (en) Tunnel double-lining concrete vault backfills grouting device
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN111676954A (en) Locking type high polymer anti-seepage wall forming groove plate and construction method
CN206815839U (en) Split bolt hole water sealing structure
CN107246148A (en) Thin wall concrete is to drawing screw water sealing structure and sealing technique
CN206599776U (en) Junction block for buried waterproof steel plate in diaphram wall
CN106812132A (en) For the junction block and its construction method of buried waterproof steel plate in diaphram wall
CN215094511U (en) Cage weaving device for production of reinforced concrete drain pipe
CN106703291A (en) Joint pouring structure between prefabricated columns and construction method thereof
CN106013197A (en) Pre-grouting water stopping method for connecting part between diaphragm wall and bottom board
CN113279785B (en) Method and device for treating hollow and partial loose part of tunnel secondary lining vault
CN205422720U (en) Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof
CN214944357U (en) Grouting anchor rod structure supported by broken belt
CN212027809U (en) Height-adjustable plug board
CN203878568U (en) Longitudinal multi-point pile body grouting device
CN106401191A (en) Grouting device for steel shear structure assembling type building and construction method of grouting device
CN112360512A (en) Weak water-rich stratum tunnel structure repairing pretreatment device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant