CN205422720U CN201620171831.XU CN201620171831U CN205422720U CN 205422720 U CN205422720 U CN 205422720U CN 201620171831 U CN201620171831 U CN 201620171831U CN 205422720 U CN205422720 U CN 205422720U
Authority
CN
China
Prior art keywords
concrete
borehole wall
wall concrete
cast
batch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620171831.XU
Other languages
Chinese (zh)
Inventor
董亚宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Magang Group Holding Co Ltd
Original Assignee
Magang Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Magang Group Holding Co Ltd filed Critical Magang Group Holding Co Ltd
Priority to CN201620171831.XU priority Critical patent/CN205422720U/en
Application granted granted Critical
Publication of CN205422720U publication Critical patent/CN205422720U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof, under the possession mine concrete building structure field. Characteristics are that up and down segments wall of a well concrete junction surface is established and is connect stubble seam, and the connecting reinforcement net that both wings are " L " shape is established to upper segment wall of a well concrete lower extreme, is connected with hypomere wall of a well concrete, and the horizontal wing of reinforcing bar net is pulled and is directly stretched into hypomere wall of a well concrete upper portion, the up and down segments wall of a well concrete joint close outside is established and is connect a batch template, connects batch concrete extrusion pouring in the cavity that connects a batch template, country rock and up and down segments wall of a well concrete to enclose, with up and down segments wall of a well concrete and country rock closely, firmly link together, the formwork device connects a batch template by the arc of setting for quantity, and wooden template, chuck and roof pressure mechanism group become. The advantage is that the design is novel, simple manufacture, the sound construction, simple to operate, quick, the repeatedly usable of construction, connect batch concrete shaping whole closely knit smooth, intensity is high, does not occupy the pit shaft space, makes the pit shaft construction go on in succession, it is fast to become the well.

Description

Shaft wall cast-in-situ concrete joint and erecting device thereof
Technical field
The invention belongs to underground mine concrete building structures technical field, particularly relate to shaft wall cast-in-situ concrete joint, connect stubble construction erecting device.
Background technology
Vertical is the most important engineering in underground mining mine, be responsible for lifting, transport, ventilate, draining and personal security are passed through.Shaft of vertical well uses circular cross section mostly, and according to different technology arrangement requirements, mineshaft diameter differs in size, and shaft wall thickness is not less than armored concrete and the concrete supporting structure of 300mm.In recent years, application along with metal large form, shaft of vertical well step pouring molding, every section of height is not less than 3000mm, while shaft construction Completed advance rate is increasingly faster, also the stubble that connects bringing shaft wall upper-lower section cast-in-place concrete connects insecure, the uncompacted disadvantage of internal structure, and the quality connecing batch junction surface directly affects the globality of the borehole wall, mechanical property and water proofing property.In order to improve mechanical strength and the water proofing property at upper-lower section concrete junction surface.Existing frequently-used connecting plate is constructed, or uses window construction to connect stubble.When using connecting plate construction, along the all-round reserved cutter feet angle of pit shaft bottom the epimere borehole wall, a height of 200mm of angle, when the pouring of hypomere borehole wall final section template is to during away from angle lower end 100mm, plug jointing form, limit insert edge fills concrete, it is achieved connect stubble.When using window to connect batch, bottom the epimere borehole wall along girth at a certain distance, no more than 2000mm, reserved 300mm × 300mm connects a batch window, and concrete pours into from this window, finally connects a batch window with the closure of piece wood piece template, it is achieved connect stubble.Existing defects is that apparatus structure is complicated, difficulty of construction is big;Time-consuming, engineering time length, seriously restrict Completed advance rate;The concrete of same label is still used owing to upper-lower section concrete connects joint portion, again without connecting elements, template in construction process base opening easily deforms and supports without external force extruding, concrete connects stubble and still suffers from connecting insecure, the uncompacted disadvantage of internal structure, total quality cannot ensure, particularly in the deep formation that hydraulic pressure is bigger, cast-in-situ concrete joint connects joint portion mechanical strength and sealing waterproof problem fails to solve very well.
Summary of the invention
For overcoming the defect of prior art, it is an object of the invention to provide a kind of shaft wall cast-in-situ concrete joint and erecting device thereof, connect a batch simple in construction, reliable and stable, erecting device make, easy for installation, reusable, the closely knit batch concrete that connects of crushing failure at high speed, improves shaft construction Completed advance rate.
Shaft wall cast-in-situ concrete joint, including borehole wall concrete, segmentation is watered and is built up pit shaft, is characterized in that upper-lower section borehole wall concrete junction surface sets and connects stubble seam, and epimere borehole wall concrete lower end sets connection bar-mat reinforcement, is connected with hypomere borehole wall concrete;Described connection bar-mat reinforcement both wings are L-shaped, pour into a mould epimere borehole wall concrete, and the perpendicular wing is located in epimere borehole wall concrete, and wing is placed in epimere borehole wall concrete lower end;Cast hypomere borehole wall concrete, wing moves toward straightening the top stretching into the cavity that the default borehole wall concrete blinding of hypomere borehole wall concrete is constituted with country rock;Jointing form is set outside upper-lower section borehole wall concrete joint close, be cast in the cavity that jointing form, country rock and upper-lower section borehole wall concrete surround higher than batch concrete extrusion that connects of borehole wall concrete grade one-level, with upper-lower section borehole wall concrete and country rock closely, be securely attached together.
Improving further, described connection bar-mat reinforcement, perpendicular muscle and the horizontal bar vertical welding of φ 8~10mm are connected into latticed, mesh spacing 100~200mm;Perpendicular muscle length 900~1200mm, can be folded in half into " L " shape, and both wings angle is not less than 90 °, also can move toward straightening the shape that is in line;Described horizontal bar length 1000~2000mm, in circular arc, matches with the arc of the borehole wall;Arranged around borehole wall concrete by the connection bar-mat reinforcement setting quantity during use.
Improving further, the described batch concrete that connects is voussoir shape, and connecing a batch concrete longitudinal section is that approximate right angle is trapezoidal, and outer bottom edge is not less than 100mm, and inner bottom hem width is in outer bottom edge, and lower waist is straight, and upper waist is by downward-sloping outside the inside.
Shaft wall cast-in-situ concrete joint construction formwork device, including borehole wall concrete blinding, connect batch concrete and operation platform, it is characterized in that this erecting device is by the circular arc jointing form setting quantity, wooden template and timber wedge composition, annulus cast is connected into by bolt, be located at borehole wall concrete connect stubble seam outside, top-pressure mechanism top is pressed in the middle part of jointing form facing each other, connect a batch concrete extrusion be cast in connect stubble seam in.
Improving further, described jointing form is made by channel-section steel, in circular arc, matches with borehole wall concrete arc;Channel-section steel two ends set connecting plate, and connecting plate at least sets 2 elliptical holes, and connecting bolt passes through hole;Middle part sets stop block, in order to fixing top-pressure mechanism;Jointing form is arranged in pairs, and at least 2 is right, and top-pressure mechanism top is pressed on jointing form stop block.
Improving further, described wooden template and jointing form, with wide, are loaded between two jointing forms by bolt and timber wedge;Described connecting bolt length is not less than 300mm, and diameter is not less than 20mm.
Improving further, described top-pressure mechanism is connected with push rod by jack and forms, and two ends are pushed up and are pressed on the stop block set in the middle part of jointing form facing each other, and jack force, jointing form is pressed on the stubble that connects of borehole wall concrete and sews on, and dense extrusion connects a batch concrete.
Shaft wall cast-in-situ concrete joint construction method, is carried out in the steps below:
1, make jointing form, transport job site to;
2, after the concreting of the pit shaft epimere borehole wall, lower pick country rock, after enough mould height, bottom is provided with face, oblique angle;Then pit shaft surrounding in shaft bottom places sandstone, levelling;
3, unclamp borehole wall concrete blinding, move down;
4, chisel pre-buried connection bar-mat reinforcement on epimere borehole wall concrete bottom end angle face, move toward straightening downwards, be used for connecting hypomere borehole wall concrete;
5, fixing overall borehole wall concrete blinding, at the pre-buried connection in borehole wall concrete blinding bottom bar-mat reinforcement, makes that borehole wall concrete blinding is suitable for reading is not more than 100mm away from epimere borehole wall concrete bottom height;
6, at borehole wall concrete blinding installment work suitable for reading platform, hypomere borehole wall concrete is poured to borehole wall concrete mould plate top surface;
7, jointing form is installed, pours and connect a batch concrete;
8, top-pressure mechanism is installed, starts jack, apply pressure, dense extrusion joint part concrete to jointing form facing each other by push rod;
9, relatively tighten the nut of the connecting plate both sides at jointing form two ends, be in clamping connection plate, with this fixing jointing form;
10, processing wooden template according to the gap size scene between adjacent two jointing forms, the gap between the adjacent jointing form of polishing, by timber wedge wedging between wooden template and bolt;
11, unclamp top-pressure mechanism, withdraw shaft face;
12, dig country rock under continuing after borehole wall concreting, pour next section of borehole wall concrete.
Compared with prior art, advantage is novel, makes simple, Stability Analysis of Structures is firm, easy for installation, speed of application is fast, reusable, connect batch concrete formation overall closely knit smooth, intensity is high, being not take up wellbore space, enable shaft construction to be carried out continuously, pit shaft Completed advance rate is improved.
Accompanying drawing explanation
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is pit shaft schematic perspective view.
Fig. 2 is pit shaft generalized section.
Fig. 3 is pit shaft section 1. node schematic diagram.
Fig. 4 is pit shaft section 2. node schematic diagram.
Fig. 5 is concrete jointing form scheme of installation.
Fig. 6 is the node schematic diagram of Fig. 5.
In figure: 1-pit shaft, 2-borehole wall concrete, 3-operation platform, 4-country rock, 5-borehole wall concrete blinding, 6-jointing form, 7-epimere borehole wall concrete, 8-hypomere borehole wall concrete, 9-connect bar-mat reinforcement, 10-connects a batch concrete, 11-connecting plate, 12-bolt, 13-packing ring, nut, the wooden template of 14-, 15-jack, 16-push rod, 17-sandstone.
Detailed description of the invention
Be can be seen that by Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, shaft wall cast-in-situ concrete joint, including borehole wall concrete 2, segmentation is watered and is built up pit shaft 1, it is characterized in that upper-lower section borehole wall concrete junction surface sets and connects stubble seam, epimere borehole wall concrete seven lower end sets connection bar-mat reinforcement 9, is connected with hypomere borehole wall concrete eight;Described connection bar-mat reinforcement 9 both wings are L-shaped, and during cast epimere borehole wall concrete seven, the perpendicular wing is located in epimere borehole wall concrete, and wing is placed in the lower end at epimere borehole wall concrete mould strip oblique angle;Before cast hypomere borehole wall concrete eight, wing is moved toward straightening the top stretching into the cavity that the default borehole wall concrete blinding 5 of hypomere borehole wall concrete is constituted with country rock 4;Jointing form 6 is set outside upper-lower section borehole wall concrete joint close, be cast in the cavity that jointing form 6, country rock 4 and upper-lower section borehole wall concrete surround higher than batch concrete 10 extruding that connects of borehole wall concrete 2 label one-level, with upper-lower section borehole wall concrete and country rock 4 closely, be securely attached together.
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 it can be seen that described connection bar-mat reinforcement 9, perpendicular muscle and the horizontal bar vertical welding of φ 8~10mm are connected into latticed, mesh spacing 100~200mm;Perpendicular muscle length 900~1200mm, can be folded in half into " L " shape, and both wings angle is not less than 90 °, also can move toward straightening the shape that is in line;Described horizontal bar length 1000~2000mm, in circular arc, matches with the arc of the borehole wall;Arranged around borehole wall concrete 2 by the connection bar-mat reinforcement 9 setting quantity during use.
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 it can be seen that the described batch concrete 10 that connects is in voussoir shape, longitudinal section is that approximate right angle is trapezoidal, and outer bottom edge is not less than 100mm, and inner bottom hem width is in outer bottom edge, and lower waist is straight, and upper waist is by downward-sloping outside the inside.
Be can be seen that by Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, shaft wall cast-in-situ concrete joint construction formwork device, including borehole wall concrete blinding 5 with connect batch concrete 10, operation platform 3, it is characterized in that this erecting device is by the circular arc jointing form 6 setting quantity, wooden template 14 and timber wedge composition, annulus cast is connected into by bolt 12, it is located at borehole wall concrete 2 and connects outside stubble seam, top-pressure mechanism top is pressed in the middle part of jointing form facing each other, higher than borehole wall concrete grade one-level connect batch concrete 6 extruding be cast in connect stubble seam in.
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 it can be seen that described jointing form 6 is made by channel-section steel, in circular arc, match with borehole wall concrete 2 circular arc;Channel-section steel two ends set connecting plate 11, and connecting plate at least sets 2 elliptical holes, and bolt 12 is through through hole;Middle part sets stop block, in order to fixing top-pressure mechanism;Jointing form 6 is arranged in pairs, and at least 2 is right, and top-pressure mechanism top is pressed on jointing form stop block.
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 it can be seen that described wooden template 14 and jointing form 6 are with wide, if through hole is corresponding with the through hole on connecting plate 11, wooden template, bolt 12 and timber wedge it is loaded between two jointing forms 6.
Be can be seen that by Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, described top-pressure mechanism is connected with push rod 16 by jack 15 and forms, top, two ends is pressed on the stop block set in the middle part of jointing form 6 facing each other, jack exerts a force, jointing form 6 is pressed on the stubble that connects of borehole wall concrete 2 and sews on, and dense extrusion connects batch concrete 10.
Shaft wall cast-in-situ concrete joint construction method, is carried out in the steps below:
1, make jointing form 6, transport job site to;
2, after pit shaft 1 epimere borehole wall concrete seven pours, lower pick country rock 4, after enough mould height, bottom is provided with face, oblique angle;Then pit shaft 1 surrounding in shaft bottom places sandstone 17, levelling;
3, unclamp borehole wall concrete blinding 5, move down;
4, chisel pre-buried connection bar-mat reinforcement 9 on epimere borehole wall concrete seven bottom end angle face, move toward straightening downwards, be used for connecting hypomere borehole wall concrete eight;
5, fixing overall borehole wall concrete blinding 5, at the pre-buried connection in borehole wall concrete blinding bottom bar-mat reinforcement 9, makes that borehole wall concrete blinding is suitable for reading is not more than 100mm away from epimere borehole wall concrete bottom height;
6, at borehole wall concrete blinding 5 installation suitable for reading platform 3, hypomere borehole wall concrete eight is poured to borehole wall concrete mould plate top surface;
7, jointing form 6 is installed, pours and connect batch concrete 10;
8, top-pressure mechanism is installed, starts jack 15, apply pressure, dense extrusion joint part concrete to jointing form 6 facing each other by push rod 16;
9, relatively tighten the nut 13 of connecting plate 11 both sides at jointing form 6 two ends, be in clamping connection plate, with this fixing jointing form;
10, processing wooden template 14 according to the gap size scene between adjacent two jointing forms 6, the gap between the adjacent jointing form of polishing, by timber wedge wedging between wooden template 14 and bolt 12;
11, unclamp top-pressure mechanism, withdraw shaft construction platform 3;
12, continue lower pick country rock 4 after borehole wall concrete 2 pours, pour next section of borehole wall concrete 2.

Claims (7)

1. shaft wall cast-in-situ concrete joint, including borehole wall concrete (2), segmentation is watered and is built up pit shaft (1), it is characterized in that upper-lower section borehole wall concrete junction surface sets and connect stubble seam, epimere borehole wall concrete (7) lower end sets connection bar-mat reinforcement (9), is connected with hypomere borehole wall concrete (8);Described connection bar-mat reinforcement (9) both wings are L-shaped, and when pouring epimere borehole wall concrete (7), the perpendicular wing is located in epimere borehole wall concrete, and wing is placed in epimere borehole wall concrete lower end;Pour hypomere borehole wall concrete (8) front, wing is moved toward straightening the top stretching into the cavity that the default borehole wall concrete blinding (5) of hypomere borehole wall concrete is constituted with country rock (4);Jointing form (6) is set outside upper-lower section borehole wall concrete joint close, it is cast in the cavity that jointing form (6), country rock (4) and upper-lower section borehole wall concrete surround higher than a batch concrete (10) extruding that connects of borehole wall concrete (2) label one-level, tight with upper-lower section borehole wall concrete and country rock (4), be securely attached together.
Shaft wall cast-in-situ concrete joint the most according to claim 1, it is characterised in that described connection bar-mat reinforcement (9), perpendicular muscle and the horizontal bar vertical welding of φ 8~10mm are connected into latticed, mesh spacing 100~200mm;Perpendicular muscle length 900~1200mm, can be folded in half into " L " shape, and both wings angle is not less than 90 °, also can move toward straightening the shape that is in line;Described horizontal bar length 1000~2000mm, in circular arc, matches with the arc of the borehole wall;Arranged around borehole wall concrete (2) by the connection bar-mat reinforcement (9) setting quantity during use.
Shaft wall cast-in-situ concrete joint the most according to claim 1, it is characterised in that the described batch concrete (10) that connects is in voussoir shape, and longitudinal section is that approximate right angle is trapezoidal, outer bottom edge is not less than 100mm, inner bottom hem width is in outer bottom edge, and lower waist is straight, and upper waist is by downward-sloping outside the inside.
The construction formwork device of shaft wall cast-in-situ concrete joint the most according to claim 1, including borehole wall concrete blinding (5) with connect a batch concrete (10), operation platform (3), it is characterized in that this erecting device is by the circular arc jointing form (6) setting quantity, wooden template (14) and timber wedge composition, annulus cast is connected into by bolt (12), it is located at borehole wall concrete (2) and connects outside stubble seam, top-pressure mechanism top is pressed in the middle part of jointing form facing each other, higher than borehole wall concrete grade one-level connect a batch concrete (10) extruding be cast in connect stubble seam in.
Shaft wall cast-in-situ concrete joint construction formwork device the most according to claim 4, it is characterised in that described jointing form (6) is made by channel-section steel, in circular arc, matches with borehole wall concrete (2) circular arc;Channel-section steel two ends set connecting plate (11), and connecting plate at least sets 2 elliptical holes, and bolt (12) passes through hole;Middle part sets stop block, in order to fixing top-pressure mechanism;Jointing form (6) is arranged in pairs, and at least 2 is right, and top-pressure mechanism top is pressed on jointing form stop block.
Shaft wall cast-in-situ concrete joint construction formwork device the most according to claim 4, it is characterized in that described wooden template (14) and jointing form (6), with wide, are loaded between two jointing forms (6) by bolt (12) and timber wedge.
Shaft wall cast-in-situ concrete joint construction formwork device the most according to claim 4, it is characterized in that described top-pressure mechanism is connected with push rod (16) by jack (15) to form, top, two ends is pressed on the stop block that jointing form facing each other (6) middle part sets, jack exerts a force, jointing form (6) is pressed on the stubble that connects of borehole wall concrete (2) and sews on, and dense extrusion connects a batch concrete (10).
CN201620171831.XU 2016-03-07 2016-03-07 Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof Withdrawn - After Issue CN205422720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620171831.XU CN205422720U (en) 2016-03-07 2016-03-07 Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620171831.XU CN205422720U (en) 2016-03-07 2016-03-07 Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof

Publications (1)

Publication Number Publication Date
CN205422720U true CN205422720U (en) 2016-08-03

Family

ID=56534158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620171831.XU Withdrawn - After Issue CN205422720U (en) 2016-03-07 2016-03-07 Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof

Country Status (1)

Country Link
CN (1) CN205422720U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697019A (en) * 2016-03-07 2016-06-22 马钢(集团)控股有限公司 Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN106522959A (en) * 2016-12-12 2017-03-22 中国矿业大学 Steel-structure waterproof jointing plate of well wall and construction process of steel-structure waterproof jointing plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697019A (en) * 2016-03-07 2016-06-22 马钢(集团)控股有限公司 Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN106522959A (en) * 2016-12-12 2017-03-22 中国矿业大学 Steel-structure waterproof jointing plate of well wall and construction process of steel-structure waterproof jointing plate

Similar Documents

Publication Publication Date Title
CN203905966U (en) Lining mold used for at-one-time concrete pouring of tunnel inverted arch structure
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN105697019A (en) Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN108547644B (en) Tunnel crossing crushing belt shed protection structure and supporting method
CN205422720U (en) Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof
CN110359586B (en) Post-cast strip structure and construction method
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN114215090A (en) Construction method of raft and compression pile in closed space
CN108222656B (en) The construction method of Prefabricated enclosure wall
CN103590599A (en) Self-compaction mode locking device and using method
CN213510645U (en) PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed
CN203961099U (en) A kind of high strength hollow constructional column template brick and the constructional column of building thereof
CN108729466B (en) Large formwork supporting method for constructing anchor-free concrete retaining wall
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN218439399U (en) Auxiliary supporting device for tunnel inverted arch construction
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN110863856A (en) Road-entering type cemented filling plugging wall and construction method thereof
CN105298147A (en) Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
CN211038666U (en) Sleeve lining pouring construction structure based on assembled scaffold
CN101886470A (en) Construction method of exposed concrete ribbed beams
CN210068171U (en) Tunnel mould spouts concrete support construction equipment
CN212129909U (en) Post-cast strip side-fixing inner-supporting steel wire mesh combined formwork system
CN102162224B (en) Top reaching one-time casting process of concrete check gate seam pier
CN213039283U (en) Hoisting hole sealing structure for shield vertical overlapping launching or receiving

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160803

Effective date of abandoning: 20180424