CN107778029A - The concrete curing method of pipe laying in structure - Google Patents

The concrete curing method of pipe laying in structure Download PDF

Info

Publication number
CN107778029A
CN107778029A CN201711050191.2A CN201711050191A CN107778029A CN 107778029 A CN107778029 A CN 107778029A CN 201711050191 A CN201711050191 A CN 201711050191A CN 107778029 A CN107778029 A CN 107778029A
Authority
CN
China
Prior art keywords
concrete
grouting pipe
wallboard
pipe
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711050191.2A
Other languages
Chinese (zh)
Other versions
CN107778029B (en
Inventor
吴云飞
张驰
金钊
张俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201711050191.2A priority Critical patent/CN107778029B/en
Publication of CN107778029A publication Critical patent/CN107778029A/en
Application granted granted Critical
Publication of CN107778029B publication Critical patent/CN107778029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/02Selection of the hardening environment
    • C04B40/0277Hardening promoted by using additional water, e.g. by spraying water on the green concrete element

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of concrete curing method of pipe laying in structure, is that Grouting Pipe is buried in concrete structure, and water inlet is set on concrete structure, and curing water enters Grouting Pipe by water inlet, so as to be conserved to concrete structure.Invention increases the new application that Grouting Pipe is used to conserve, and solve the structure for being not easy to carry out conventional maintenance operation and be difficult to carry out the present situation of maintenance in maintenance limited space early stage.

Description

The concrete curing method of pipe laying in structure
Technical field
The present invention relates to a kind of method of concrete curing, and in particular to the concrete curing side of pipe laying in a kind of structure Method, belong to concrete curing technical field.
Background technology
In concrete structure construction, maintenance is to ensure the performances such as concrete strength, durability in construction, reduces crackle etc. Important process caused by mass defect, but be limited by working space and job scheduling, first 7 days most after concrete structure final set , may be narrow due to working space when needing maintenance, the reasons such as supporting construction can not remove, maintenance there is a situation where not in place.
For structures such as the underpass under town road, pipe galleries, such situation is particularly evident, especially wallboard Maintenance is difficult in place, cause wallboard crack to produce, and concrete does not reach the mass defect such as respective strengths, durability decline.
A kind of new maintaining process is developed herein, and good concrete structure maintenance effect can be reached under confined condition, Be advantageous to improve the performance of concrete structure.
The content of the invention
It is an object of the invention to provide the concrete structure that a kind of suitable operating space is limited, especially wallboard class formation The concrete curing method of pipe laying in the structure that the concrete structures such as piping lane more, space is small, box culvert, underpass use.
The technical proposal for solving the technical problem of the invention is:
The concrete curing method of pipe laying in a kind of structure, it is that Grouting Pipe is buried in concrete structure, and in concrete structure Upper setting water inlet, curing water enter Grouting Pipe by water inlet, so as to be conserved to concrete structure.
Further scheme is:
When concrete structure is wallboard concrete, Grouting Pipe is located at wallboard concrete upper end face region, and Concrete structure upper end sets water inlet, and curing water enters Grouting Pipe by water inlet, and is oozed by Grouting Pipe from wallboard upper end Go out, flowed down along surfaces of wall, realize the maintenance of wallboard.
Further scheme is:
When concrete structure is non-wallboard concrete, Grouting Pipe is located inside concrete structure, on concrete structure Water inlet is provided with, curing water directly penetrates into inside configuration by Grouting Pipe, and inside configuration is conserved, and reaches comprehensive maintenance Purpose.
Further scheme is:
The Grouting Pipe runs through whole wallboard concrete upper end.
Further scheme is:
The Grouting Pipe is embedded in wallboard concrete surface, is fixed on template surface by fixture, or consolidate by fixture It is scheduled on bar-mat reinforcement.
Further scheme is:
The Grouting Pipe is being provided with flow cavitation result baffle plate close to pull bar region to pull bar region.
Invention increases the new application that Grouting Pipe is used to conserve, and solves the structure for being not easy to carry out conventional maintenance operation The present situation of maintenance is difficult to carry out in maintenance limited space early stage.
Brief description of the drawings
Fig. 1 implements sectional schematic diagram for present invention maintenance;
Fig. 2, which is that Grouting Pipe is embedded, is longitudinally arranged schematic diagram;
Fig. 3 is baffle plate setting schematic diagram at Grouting Pipe;
Diagram is explained:1- water inlet pipes and valve, 2- Grouting Pipes, 3- templates are to pull bar, 4- flow cavitation result baffle plates.
Embodiment
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
The concrete curing method of pipe laying in a kind of structure, it is that Grouting Pipe 2, Grouting Pipe 2 are buried in concrete structure Water inlet is set in wallboard concrete upper end face region, and in concrete structure upper end, is provided with water inlet into water Pipe and valve 1, curing water enters Grouting Pipe by water inlet, and is oozed out by Grouting Pipe from wallboard upper end, along surfaces of wall stream Under, realize the maintenance of wallboard.
For mass concrete, Grouting Pipe 2 is located inside concrete structure, and water receiving is provided with concrete structure Mouthful, curing water directly penetrates into inside configuration by Grouting Pipe, inside configuration is conserved, and reaches the purpose conserved comprehensively.
The Grouting Pipe runs through whole wallboard concrete upper end.
The Grouting Pipe is embedded in wallboard concrete surface, is fixed on template surface by fixture, or pass through card Tool is fixed on bar-mat reinforcement.
The Grouting Pipe 2, to pull bar 3, flow cavitation result baffle plate is being provided with to pull bar region close to the template to pull bar region 4。
In the specific implementation, the Grouting Pipe of suitable caliber, and slip casting are selected according to structure type and access water pressure Length of tube is segmented, and Grouting Pipe making is carried out according to design.
When wall top plate steel bar template is constructed, installation maintenance Grouting Pipe, Grouting Pipe is embedded in panel structure surface, can passed through Fixture is fixed on template surface, can be also fixed on by fixture on bar-mat reinforcement, and fixture spacing ensures to impact in casting concrete Grouting Pipe will not be caused to deform.Close to pull bar region, it is excessive to be preferably easily installed baffle controls infiltration for Grouting Pipe.
Continue structure construction by normal concrete structure construction order, until structural concrete pours.
Concreting is completed 24 hours, and constant pressure water flooding is carried out into Grouting Pipe, while is unclamped wallboard template and reinforced bolt Etc. reinforcement measure, sled rapping plate is easy to curing water to ooze out.Then constructed according to normal construction program.
Water filling is inspected periodically during conserving, and is oozed out situation according to wallboard curing water, is adjusted flow, installs baffle plate, ensures to support While shield needs, maintenance water consumption is controlled.
Although reference be made herein to invention has been described for explanatory embodiment of the invention, and above-described embodiment is only this hair Bright preferable embodiment, embodiments of the present invention are simultaneously not restricted to the described embodiments, it should be appreciated that people in the art Member can be designed that a lot of other modifications and embodiment, and these modifications and embodiment will fall in principle disclosed in the present application Within scope and spirit.

Claims (6)

  1. A kind of 1. concrete curing method of pipe laying in structure, it is characterised in that:It is that Grouting Pipe is buried in concrete structure, and Water inlet is set on concrete structure, and curing water enters Grouting Pipe by water inlet, so as to be conserved to concrete structure.
  2. 2. according to claim 1 in structure pipe laying concrete curing method, it is characterised in that:
    When concrete structure is wallboard concrete, Grouting Pipe is located at wallboard concrete upper end face region, and Concrete structure upper end sets water inlet, and curing water enters Grouting Pipe by water inlet, and is oozed by Grouting Pipe from wallboard upper end Go out, flowed down along surfaces of wall, realize the maintenance of wallboard.
  3. 3. according to claim 1 in structure pipe laying concrete curing method, it is characterised in that:
    When concrete structure is non-wallboard concrete, Grouting Pipe is located inside concrete structure, on concrete structure Water inlet is provided with, curing water directly penetrates into inside configuration by Grouting Pipe, and inside configuration is conserved, and reaches comprehensive maintenance Purpose.
  4. 4. according to claim 2 in structure pipe laying concrete curing method, it is characterised in that:
    The Grouting Pipe runs through whole wallboard concrete upper end.
  5. 5. according to claim 2 in structure pipe laying concrete curing method, it is characterised in that:
    The Grouting Pipe is embedded in wallboard concrete surface, is fixed on template surface by fixture, or consolidate by fixture It is scheduled on bar-mat reinforcement.
  6. 6. according to claim 2 in structure pipe laying concrete curing method, it is characterised in that:
    The Grouting Pipe is being provided with flow cavitation result baffle plate close to pull bar region to pull bar region.
CN201711050191.2A 2017-10-31 2017-10-31 Concrete curing method for buried pipe in structure Active CN107778029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711050191.2A CN107778029B (en) 2017-10-31 2017-10-31 Concrete curing method for buried pipe in structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711050191.2A CN107778029B (en) 2017-10-31 2017-10-31 Concrete curing method for buried pipe in structure

Publications (2)

Publication Number Publication Date
CN107778029A true CN107778029A (en) 2018-03-09
CN107778029B CN107778029B (en) 2021-04-02

Family

ID=61431922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711050191.2A Active CN107778029B (en) 2017-10-31 2017-10-31 Concrete curing method for buried pipe in structure

Country Status (1)

Country Link
CN (1) CN107778029B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565509A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 High-pier built-in type health-preserving water pipe system and concrete health-preserving method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10264133A (en) * 1997-03-28 1998-10-06 Ohbayashi Corp Curing equipment of precast concrete member
CN201232359Y (en) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 Internal dispersion and external accumulation concrete moisture retention and temperature control maintaining system
CN202021683U (en) * 2011-04-25 2011-11-02 江苏兴邦建工集团有限公司 Automatic spray curing system for concrete
CN204781973U (en) * 2015-07-01 2015-11-18 中国十七冶集团有限公司 Antiseep plugging device in split bolt hole
CN205348794U (en) * 2015-12-08 2016-06-29 中国建筑第八工程局有限公司 Concrete structure's heat preservation maintenance system
CN205591555U (en) * 2015-12-15 2016-09-21 中铁城建集团北京工程有限公司 Processing apparatus of basement outer wall
CN106142316A (en) * 2015-04-14 2016-11-23 任丘市永基建筑安装工程有限公司 A kind of assembling die curing system
CN107246148A (en) * 2017-06-13 2017-10-13 河南省水利第工程局 Thin wall concrete is to drawing screw water sealing structure and sealing technique

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10264133A (en) * 1997-03-28 1998-10-06 Ohbayashi Corp Curing equipment of precast concrete member
CN201232359Y (en) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 Internal dispersion and external accumulation concrete moisture retention and temperature control maintaining system
CN202021683U (en) * 2011-04-25 2011-11-02 江苏兴邦建工集团有限公司 Automatic spray curing system for concrete
CN106142316A (en) * 2015-04-14 2016-11-23 任丘市永基建筑安装工程有限公司 A kind of assembling die curing system
CN204781973U (en) * 2015-07-01 2015-11-18 中国十七冶集团有限公司 Antiseep plugging device in split bolt hole
CN205348794U (en) * 2015-12-08 2016-06-29 中国建筑第八工程局有限公司 Concrete structure's heat preservation maintenance system
CN205591555U (en) * 2015-12-15 2016-09-21 中铁城建集团北京工程有限公司 Processing apparatus of basement outer wall
CN107246148A (en) * 2017-06-13 2017-10-13 河南省水利第工程局 Thin wall concrete is to drawing screw water sealing structure and sealing technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565509A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 High-pier built-in type health-preserving water pipe system and concrete health-preserving method thereof

Also Published As

Publication number Publication date
CN107778029B (en) 2021-04-02

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN101634149B (en) Prestressed anchor foundation pit support and construction method
CN101949135B (en) Transverse anchorage system outside hollow slab bridge body and construction process thereof
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN204492159U (en) A kind of for concrete wall seam areas formwork seal bracing means
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN204783046U (en) Tunnel lining restores structure fast based on carbon fiber mesh grid
CN105714678B (en) A kind of combined type gravity anchorage
CN104790381B (en) Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN107778029A (en) The concrete curing method of pipe laying in structure
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN104153451A (en) Construction method for installing concrete pipeline through prefabricated supporting block
CN202450780U (en) Combined threaded rod
CN204081064U (en) A kind of basement sandwich
CN103806653B (en) A kind of construction method of set of adjustable sealing up screw external member
CN201024584Y (en) Water heating ground heat pipeline pavement template
CN203769317U (en) Complete adjustable water stopping screw kit
CN206110683U (en) Be used for archaize building slope shape roof boarding construction and installation structure
CN108019038A (en) It is a kind of while mould fixing device and while touch fixed construction method
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN204080820U (en) A kind of concrete structure foundation ditch support replacement device
CN103572669B (en) Ballast bed and tunnel bottom defect regulating and constructing method as well as anchoring device
CN207620379U (en) A kind of side mould fixing device
CN205153525U (en) Concrete wall warp stitch fixation formula template system of consolidating

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant