CN205936654U - A gasbag template for tunnel secondary lining - Google Patents

A gasbag template for tunnel secondary lining Download PDF

Info

Publication number
CN205936654U
CN205936654U CN201620973715.XU CN201620973715U CN205936654U CN 205936654 U CN205936654 U CN 205936654U CN 201620973715 U CN201620973715 U CN 201620973715U CN 205936654 U CN205936654 U CN 205936654U
Authority
CN
China
Prior art keywords
ring portion
lining
internal ring
groove
air bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620973715.XU
Other languages
Chinese (zh)
Inventor
姚志军
许金华
黄明欢
孙鑫涛
李东林
高凡凡
薛超
吕方帅
王朋鹏
韩煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No.4 Engineering Co., Ltd., Zhongtie Co., Ltd., Bureau Group
Original Assignee
姚志军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 姚志军 filed Critical 姚志军
Priority to CN201620973715.XU priority Critical patent/CN205936654U/en
Application granted granted Critical
Publication of CN205936654U publication Critical patent/CN205936654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a gasbag template for tunnel secondary lining, including the inner ring portion and the outer loop portion that link to each other, inner ring portion and outer loop portion shape are the arch with secondary lining terminal surface shape adaptation, and outer loop position in the arched radial periphery of inner ring portion, inner ring portion and outer loop partially do not have independent air chamber, are provided with double -layered groove between inner ring portion and the outer loop portion, and inner ring portion and/or outer loop position are provided with the slot in pressing from both sides groove open -ended side, the slot is followed arch length direction extends. Can set up the gasbag template at the tip of pouring the space, the clamp sets up the waterstop in the groove, and the realization shutoff is aerifyd to the gasbag template, after gasbag template outer end sets up support piece concreting can, need not relapse the dismouting plank sheathing, the work progress is simple, saves a large amount of timber and manual work. The slot of gasbag side can form protruding muscle, the cohesion and the waterproof ability of increase and next section lining cutting at the lining cutting terminal surface.

Description

Air bag form for Tunnel Second Lining
Technical field
This utility model is related to constructing tunnel, relates particularly to a kind of air bag form of Tunnel Second Lining Construction.
Background technology
Constructing tunnel, needs first to form preliminary bracing in the Tunnel wall jet concrete excavated, then does paragraph by paragraph Go out guarded drainage layer and secondary lining, guarded drainage layer is fitted with preliminary bracing, including setting draining blind pipe, geotextiles, splash guard etc., Secondary lining needs first to arrange within guarded drainage layer bar-mat reinforcement, formwork jumbo is walked to construction area, allows trolley formwork to stretch Go out, form the casting space of secondary lining between trolley formwork and guarded drainage layer.In casting space casting concrete, after solidification Obtain this section of secondary lining, before casting concrete, need first with template, the space of above-mentioned casting space end to be blocked, prevent Only concrete leaks.
At present, conventional casting space end face method for blocking, is to arrange twice arch template according to the shape of lining cutting, bowed out The outside of template is contacted with preliminary bracing, arranges waterstop, for the sealing of two sections of lining cutting joining places between inside and outside arch template. Due to the concrete pole out-of-flatness of Tunnel preliminary bracing injection, if bowed out template uses the formwork parts of standard, cannot be with Preliminary bracing is in close contact, and necessarily leaks.Therefore not only can only consume a large amount of using the matching board splicing of lamellar plank sheathing scene Timber, and operation easier is big, and along with inside and outside arch needs between template to install, reinforces waterstop, operation easier increases further Plus, often consume artificial in a large number, spillage also still occurs, runs mould, the problems such as waterstop misplaces.And entirely tunnel includes A lot of section Second Lining Construction, every section of lining cutting is required for installing, dismounting plank sheathing makes work progress very loaded down with trivial details.
Utility model content
Technical problem to be solved in the utility model is:A kind of air bag form is provided, so that the end face of casting space is blocked Operation is simpler, and construction quality improves.
This utility model solves its technical problem and be employed technical scheme comprise that:
For the air bag form of Tunnel Second Lining, including the internal ring portion being connected and outer portion, internal ring portion and outer portion shape Shape is the arch being adapted to secondary lining end surface shape, and outer portion is located at the radial outer periphery of internal ring portion arch;Internal ring portion is with outward Ring portion is respectively provided with independent air chamber, is provided with groove between internal ring portion and outer portion, and internal ring portion and/or outer portion are located at groove The side of opening is provided with groove, and described groove extends along described arch shaped length direction.
Further, described internal ring portion and outer portion are respectively arranged with least one along its length and are used for maintaining section shape The sizing cut-off of shape, described sizing cut-off is provided with the breather at connection two ends.
Further, described internal ring portion design internal diameter is identical with the design internal diameter size of secondary lining to be poured, outer shroud Portion designs external diameter 10cm bigger than the design external diameter of secondary lining to be poured.
Further, described internal ring portion and outer portion material are rubber.
The beneficial effects of the utility model are:Tunnel Second Lining Construction is carried out using above-mentioned air bag form, by air bag mould Plate replaces splice plate template-setup in casting space end face, and waterstop can easily insert in the crack of air bag form, inflation Make airbag inflation can achieve end face closure, and clamp waterstop, after casting concrete solidification, the half of waterstop is just solid It is scheduled in lining cutting, subsequent air bag deflation, can easily remove air bag for next time using it is not necessary to repeated disassembled and assembled plank sheathing, construct Process is simple, can improve construction quality, and saves a large amount of timber and artificial.The groove of air bag side can be in lining cutting end face shape Become convex tendon, increase the adhesion with next section of lining cutting and waterproof ability.
Brief description
Fig. 1 is schematic diagram during Tunnel Second Lining Construction;
Fig. 2 is air bag form schematic diagram of the present utility model;
Fig. 3 is the partial schematic diagram of air bag form of the present utility model;
In figure reference is:Formwork jumbo 1, trolley formwork 11, preliminary bracing 21, guarded drainage layer 22, casting space 3, Air bag form 4, internal ring portion 41, outer portion 42, groove 421, groove 43, waterstop 431, sizing cut-off 44.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further illustrated:
For the air bag form of Tunnel Second Lining, including the internal ring portion 41 being connected and outer portion 42, internal ring portion 41 is with outward Ring portion 42 is shaped as the arch being adapted to secondary lining end surface shape, and outer portion 42 is outside positioned at the footpath of internal ring portion 41 arch Enclose;Internal ring portion 41 and outer portion 42 are respectively provided with independent air chamber, are provided with groove 43 between internal ring portion 41 and outer portion 42, interior Ring portion 41 and/or outer portion 42 are provided with groove 421 positioned at the side of groove 43 opening, and described groove 421 is long along described arch Degree direction extends.
Air bag form of the present utility model is used for replacing traditional splicing plank sheathing, and it includes connected internal ring portion 41 with outward Ring portion 42, that is, as shown in Figure 2,3, outer portion 42 is connected to the dome of internal ring portion 41, and both have independent air chamber, are Respectively internal ring portion 41 and outer portion 42 can be inflated, allow internal ring portion 41 and outer portion 42 to enrich respectively.Internal ring portion 41 and outer shroud Portion 42 adopts soft deformable material, and such as plastics, air-locked braided material etc., can be preferably rubber, after inflation Air bag form forms arch, can shrink folding after venting.
As shown in Figure 2,3, it is provided with groove 43 between internal ring portion 41 and outer shroud 42, groove 43 is along whole air bag form 4 Arch extend, the half of waterstop 431 may be inserted in groove 43, and second half exposes from air bag form 4 side.Internal ring portion 41 With outer portion 42 inflation, waterstop 431, and the opening closure by casting space 3 end face can be clamped, realize the closure of template Function.
As shown in figure 3, groove 421 is located at the side that groove 43 opening is located, that is, will contact with casting concrete Side, the lining cutting end face after groove 421 can make to pour forms convex tendon, then after pouring next section of lining cutting, can increase by two sections of linings Build the linking power of faying face, also increase waterproof effect.
Specifically, Tunnel Second Lining Construction method is carried out using above-mentioned air bag form, can carry out including order Following steps:
A, complete the preliminary bracing 21 of Tunnel and guarded drainage layer 22 is constructed, arrange in the medial surface of guarded drainage layer 22 secondary The bar-mat reinforcement of lining cutting;Formwork jumbo 1 is walked to construction position, stretches out trolley formwork 11, in trolley formwork 11 and guarded drainage layer 22 Between formed secondary lining casting space 3, described bar-mat reinforcement be located at casting space 3 in;
B, the air bag form 4 for Tunnel Second Lining described in the setting of the end of described casting space 3, make described ditch Groove 421 place side, towards casting space 3, is inflated to described air bag form 4 and is arranged waterstop 431 in groove 43, only allow Water band 431 half is located in groove 43, and second half exposes from air bag form 4 side, and stretches in casting space 3, the gas of inflation Capsule template 4 is by the plug at end part of casting space 3;
C, air bag form 4 outer end arrange support member, to casting space 3 casting concrete, treat that concrete setting reaches by force After scale standard, remove support member, air bag form 4 is exitted and taken out, and this section of Second Lining Construction completes.
As shown in Figure 1:First conventionally, complete the preliminary bracing 21 of Tunnel and guarded drainage layer 22 is constructed, then Construction secondary lining:The position being first located in guarded drainage layer 22 in tunnel arranges the bar-mat reinforcement of secondary lining, then by template Chassis 1 is walked the construction position of this section of lining cutting, stretches out trolley formwork 11, forms two between trolley formwork 11 and guarded drainage layer 22 The casting space 3 of secondary lining cutting, bar-mat reinforcement is located in casting space 3, after follow-up fill concrete, you can obtain this section of secondary lining Build.
Before concreting, it is arranged at the end face opening of casting space with air bag form 4, and arrange in groove 43 Waterstop 431, airbag aeration expands realizes plugging effect.During air bag form 4 setting, the side direction that groove 421 to be allowed is located Casting space 3, allows waterstop 431 half to be clipped in groove 43, second half stretches into casting space 3, follow-up casting concrete, dismounting After air bag form 4, then the end face of the vertical insertion lining cutting of half waterstop 431, is set in concrete, second half waterstop 431 expose lining cutting end face, and for being connected with rear one section of lining cutting pouring, and groove 421 is just contacted with the concrete pouring, Lining cutting end face formation convex tendon after making to pour, then the linking power of two sections of lining cutting faying faces when pouring next section of lining cutting, can be increased, Also increase waterproof effect.
Preferably, air bag form 4 is inflated and method that waterstop 431 is set in groove 43, can be first internally Ring portion 41 is inflated, and then injects the half of waterstop 431 in groove 43, then outer portion 42 is inflated, so that waterstop 431 is pressed from both sides Tightly.
Internal ring portion 41 inflation, arch shapes substantially, now by waterstop 431 insertion groove 43, more convenient operation, Subsequently outer portion 42 inflation, waterstop 431 is clamped by internal ring portion 41, outer portion 42, and blocks the end face of casting space 3. Because air bag form 4 has certain flexibility, can be deformed according to the surface configuration of preliminary bracing, therefore plugging effect is good, no Easily there is spillage.
Then, support member need to be set to air bag form 4 outer end, air bag form 4 is propped up by support member, pour for antagonism mixed During solidifying soil flowing, impact and the pressure to air bag form 4, for example, can be that support member includes gripper shoe and support bar, gripper shoe shelves Outside air bag form 4, support bar one end is resisted against gripper shoe, and the other end is resisted against on formwork jumbo 1.Can also be other shapes Air bag form 4 is blocked by the part of formula, prevents from being extruded by the pressure of concrete.
Then to casting space 3 casting concrete, treat that concrete setting reaches strength criterion, for example, reach design strength 60~75%, you can remove support member, air bag form 4 is exitted, taken out, this section of Second Lining Construction completes.Air bag form 4 does After necessary cleaning, the pouring construction of next section of lining cutting can be re-used for, with respect to the splicing plank sheathing of conventional construction method, All a large amount of man-hours can be saved when model sheetinstallat and dismounting operation, and air bag form 4 can be reused several times, and can save expense With.
Preferably, to before casting space 3 casting concrete, can first the contact surface of air bag form 4 and concrete be applied Cloth concrete parting agent.After follow-up concrete setting, it is easy to the demoulding and air bag cleaning.
This air bag form 4 according to the size of Tunnel Second Lining come design size can be able to be preferably, described internal ring portion 41 design internal diameters are identical with the design internal diameter size of secondary lining to be poured, and it is more secondary than to be poured that outer portion 42 designs external diameter The big 10cm of design external diameter of lining cutting.
So-called internal ring portion 41 designs internal diameter, refers to that internal ring portion 41 is full of internal diameter when gas expands, outer portion 42 designs outer Footpath refers to that outer portion 42 is full of external diameter when gas expands.
Outer portion 42 designs external diameter and is more than the secondary lining external diameter pouring, and can make the outer portion 42 of expansion and the first of tunnel Phase supporting 21 is fully contacted, and can adequately fill up preliminary bracing 21 depression in the surface after outer portion 42 crimp, and closure is tighter Close, mortar leakage prevention.
Preferably, can be described internal ring portion 41 and outer portion 42 is respectively arranged with least one along its length and is used for tieing up Hold the sizing cut-off 44 of cross sectional shape, described sizing cut-off 44 is provided with the breather at connection two ends.
Embodiment as shown in Figure 2, its internal ring portion 41 and outer portion 42 are respectively provided with four sizing cut-offs 44, cut-off 44 of shaping The cross sectional shape of air bag can be maintained, for example, can be the horizontal stroke that rectangular plastics or diaphragm of rubber are arranged on outer portion 42 inwall On section, outer portion 42 is made after inflating, still to keep the profile of square column type;In the same manner, internal ring portion 41 inwall is also provided with sizing cut-off 44.
Sizing cut-off 44 be provided with breather for connection separate two ends space, make gas can be full of whole outer portion 42 or internal ring portion 41, not affected by sizing cut-off 44.

Claims (4)

1. it is used for the air bag form of Tunnel Second Lining it is characterised in that including internal ring portion (41) and the outer portion (42) being connected, Internal ring portion (41) and outer portion (42) are shaped as the arch being adapted to secondary lining end surface shape, and outer portion (42) is located at internal ring The radial outer periphery of portion (41) arch;Internal ring portion (41) and outer portion (42) are respectively provided with independent air chamber, and internal ring portion (41) is with outward It is provided with groove (43), internal ring portion (41) and/or outer portion (42) set positioned at the side of groove (43) opening between ring portion (42) It is equipped with groove (421), described groove (421) extends along described arch shaped length direction.
2. be used for as claimed in claim 1 the air bag form of Tunnel Second Lining it is characterised in that described internal ring portion (41) and Outer portion (42) is respectively arranged with least one along its length for maintaining the sizing of cross sectional shape to separate (44), described sizing Cut-off (44) is provided with the breather at connection two ends.
3. it is used for the air bag form of Tunnel Second Lining as claimed in claim 1 it is characterised in that described internal ring portion (41) sets Meter internal diameter is identical with the design internal diameter size of secondary lining to be poured, and outer portion (42) design external diameter is than secondary lining to be poured The big 10cm of design external diameter building.
4. be used for as claimed in claim 1 the air bag form of Tunnel Second Lining it is characterised in that described internal ring portion (41) and Outer portion (42) material is rubber.
CN201620973715.XU 2016-08-29 2016-08-29 A gasbag template for tunnel secondary lining Active CN205936654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620973715.XU CN205936654U (en) 2016-08-29 2016-08-29 A gasbag template for tunnel secondary lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620973715.XU CN205936654U (en) 2016-08-29 2016-08-29 A gasbag template for tunnel secondary lining

Publications (1)

Publication Number Publication Date
CN205936654U true CN205936654U (en) 2017-02-08

Family

ID=57954485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620973715.XU Active CN205936654U (en) 2016-08-29 2016-08-29 A gasbag template for tunnel secondary lining

Country Status (1)

Country Link
CN (1) CN205936654U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100652A (en) * 2017-05-19 2017-08-29 中国矿业大学(北京) A kind of compliant impact resistant method for protecting support and device
CN107269301A (en) * 2017-08-17 2017-10-20 中铁局集团有限公司 A kind of Tunnel Second Lining Construction air bag termination device and end-blocking construction method
CN108506024A (en) * 2018-04-17 2018-09-07 蓝传雯 A kind of construction method and supporting mold of Tunnel
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN109723470A (en) * 2019-01-24 2019-05-07 西南交通大学 Adapt to the Radial resistant force controllable type supporting construction and method for protecting support in large deformation tunnel
CN111119944A (en) * 2020-02-17 2020-05-08 国家电网有限公司 Tunnel concrete lining inflation die
CN112065447A (en) * 2020-09-08 2020-12-11 中建钢构天津有限公司 Tunnel formwork and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100652A (en) * 2017-05-19 2017-08-29 中国矿业大学(北京) A kind of compliant impact resistant method for protecting support and device
CN107100652B (en) * 2017-05-19 2023-11-17 中国矿业大学(北京) Flexible impact-resistant supporting method and device
CN107269301A (en) * 2017-08-17 2017-10-20 中铁局集团有限公司 A kind of Tunnel Second Lining Construction air bag termination device and end-blocking construction method
CN108506024A (en) * 2018-04-17 2018-09-07 蓝传雯 A kind of construction method and supporting mold of Tunnel
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN109723470A (en) * 2019-01-24 2019-05-07 西南交通大学 Adapt to the Radial resistant force controllable type supporting construction and method for protecting support in large deformation tunnel
CN111119944A (en) * 2020-02-17 2020-05-08 国家电网有限公司 Tunnel concrete lining inflation die
CN112065447A (en) * 2020-09-08 2020-12-11 中建钢构天津有限公司 Tunnel formwork and construction method

Similar Documents

Publication Publication Date Title
CN205936654U (en) A gasbag template for tunnel secondary lining
CA2004749C (en) Apparatus and method for improved pipe to manhole sealing
CN106285725B (en) A kind of stopper structure and its installation method being mounted between formwork jumbo and country rock
CN207297041U (en) A kind of changeable type inflatable waterstop for Tunneling by mining method
CN105926539B (en) A kind of construction method of the vertical sealing swaging die of concrete works deformation joint
CN106760512B (en) A kind of pipe drawing device, template connecting structure and its construction method of small-sized preformed hole
CN105220700A (en) Foundation pit waterproof curtain reinforcement
KR101566229B1 (en) Manufacturing equipment for Manhole using various connecting pipe, manufacturing method for the same and connecting method for the manhole with a connecting pipe
CN104314048A (en) Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die
CN206352508U (en) A kind of stopper structure being arranged between formwork jumbo and country rock
CN105568927A (en) Construction method of water bag type concrete engineering deformation joint water stop cavity die
KR200418566Y1 (en) Packer for repair of water pipe
CN206815839U (en) Split bolt hole water sealing structure
KR20050082143A (en) A concrete manhole
CN206694694U (en) Sealing ring applied to concrete pipe culvert bell socket
CN105780815A (en) Anti-seepage construction device and method for continuous wall
CN106014478A (en) Cooling circulation system used for single-arm three-dimensional measurement scribing instrument
CN206941656U (en) A kind of structure that injected hole is reserved using gas cell
CN110778028A (en) Grouting sleeve assembly and construction method thereof
CN111795225B (en) Waterproof connection method for cement pipeline
CN107246148A (en) Thin wall concrete is to drawing screw water sealing structure and sealing technique
CN215168323U (en) Plugging device for wall drainage hole
CN218813038U (en) Quick pointing device for standing stone installation
CN109732770B (en) Auxiliary positioning device and method for arc-shaped embedded sleeve
KR200349441Y1 (en) The concrete form which uses the air tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180408

Address after: 721006 Baoji province Shaanxi city Weibin District Zhongtan Road No. 4, No. 9 Building 4 unit 4 Building No. 11

Co-patentee after: No.4 Engineering Co., Ltd., Zhongtie Co., Ltd., Bureau Group

Patentee after: Yao Zhijun

Address before: 721006 Baoji province Shaanxi city Weibin District Zhongtan Road No. 4, No. 9 Building 4 unit 4 Building No. 11

Patentee before: Yao Zhijun