CN206941656U - A kind of structure that injected hole is reserved using gas cell - Google Patents

A kind of structure that injected hole is reserved using gas cell Download PDF

Info

Publication number
CN206941656U
CN206941656U CN201720821659.2U CN201720821659U CN206941656U CN 206941656 U CN206941656 U CN 206941656U CN 201720821659 U CN201720821659 U CN 201720821659U CN 206941656 U CN206941656 U CN 206941656U
Authority
CN
China
Prior art keywords
air bag
agent structure
building enclosure
reserved
injected hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720821659.2U
Other languages
Chinese (zh)
Inventor
罗伟
武卫星
高朝阳
欧阳院平
郭晓刚
颜昌伟
周丹
苏晓文
朱敏
向功兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201720821659.2U priority Critical patent/CN206941656U/en
Application granted granted Critical
Publication of CN206941656U publication Critical patent/CN206941656U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a kind of structure that injected hole is reserved using gas cell, is related to municipal Construction Technique of Underground Works field.Its air bag is fixed at the construction joint of agent structure on the groove of building enclosure;Anti-stick oxidant layer is coated on the gasbag outer surface close to agent structure side, strong adhesive layer is coated on the gasbag outer surface away from agent structure side, and the air bag away from agent structure side is fixed on by strong adhesive layer on the waterproof layer of building enclosure or building enclosure;Agent structure concreting is around air bag;Cavity is between agent structure concrete and air bag;Air bag diameter is equal with slip casting pipe diameter;Air bag is air bag with high intensity.Overcome the injected hole that prior art is reserved in Grouting Pipe easily to be blocked by concrete slurry in agent structure concreting, the shortcomings that being unable to reach plugging effect;With slip casting effect is preferable, lower-cost advantage.

Description

A kind of structure that injected hole is reserved using gas cell
Technical field
Municipal Construction Technique of Underground Works field is the utility model is related to, more specifically it is a kind of pre- using gas cell Stay the structure of injected hole.
Background technology
In order to solve the urban land contradiction in short supply between the Land Demand that expands day by day, urban construction is progressively from ground Go underground.Construction of underground structure is constructed, inevitably in the presence of substantial amounts of construction joint, movement joint, the presence of these structural joints Often turn into the main thoroughfare of underground water seepage, underground water seepage has had a strong impact on the utilization benefit and effect of the underground space; By taking underground subway station as an example, on the one hand these percolating waters cause the wet stain in station ground or hinder station electrical equipment to use, shadow The normal use of subway station is rung, brings bad social influence;Another aspect seepage easily causes structure erosion, influences station knot Structure is safe to use.
Conventional way is when concreting at present, Grouting Pipe is reserved in construction joint or deformation joint, after When phase finds seepage, the passive grouting for water plugging of Grouting Pipe is utilized;But there is larger defect in current this mode, be primarily due to reserve Injected hole in Grouting Pipe is often just blocked in agent structure concreting by concrete slurry, and the later stage is noted by Grouting Pipe The leak stopping slurries entered, which may not broken through, to be blocked, and leak stopping slurries can not enter concrete wall gap by hole in Grouting Pipe In, often spend a large amount of funds to be but unable to reach expected plugging effect.
Existing Application No. 201210253475.2, patent name are《Deformation joint seepage mud jacking is stifled draw method for repairing and mending and its Slip casting special equipment》Disclose and open up injected hole, inserting Grouting Pipe, the stifled mode repair distortion seam for drawing bar of installation, be a kind of quilt Dynamic repairing method, applicable elements have more limitation;
Existing Application No. 201210312967.4, patent name are《The repairerment construction method of basement deformation joint seepage》 Disclose and set up water expandable waterstop, external labeling type waterstop and open up drainage groove, the method for diversion to plash carries out ground The seepage treatment of lower room movement joint, sealing, somewhat expensive are realized by setting up measures of preventing water, and be not suitable for construction joint etc. its His Leakage Position.
The content of the invention
The purpose of this utility model is to provide a kind of structure that injected hole is reserved using gas cell, and slip casting effect is preferable, uses Air bag replaces Grouting Pipe, and cost is relatively low, simple to operate.
To achieve these goals, the technical solution of the utility model is:A kind of knot that injected hole is reserved using gas cell Structure, it is characterised in that:Inflated airbag is fixed at the construction joint of agent structure on the groove of building enclosure;Anti-stick oxidant layer applies The gasbag outer surface close to agent structure side is overlying on, strong adhesive layer is coated on the air bag appearance away from agent structure side Face, the air bag away from agent structure side are fixed on the waterproof layer of building enclosure or building enclosure by strong adhesive layer On;Agent structure concreting is around air bag;When gas is extracted and between air bag and agent structure concrete in air bag Gap when having water injection, the air bag of coating anti-stick oxidant layer, which is separated with agent structure concrete and shunk, to be gathered in coating by force The air bag side of adhesive layer, cavity is between agent structure concrete and air bag and in agent structure concrete;Gas Capsule diameter is equal with slip casting pipe diameter;Air bag is air bag with high intensity, and intensity is more than or equal to 0.2MPa.
In the above-mentioned technical solutions, the groove of building enclosure determines according to that need to reserve slip casting cavity diameter or air bag diameter. It is easy to fixation balloon.
In concreting, air pressure can support chutable concrete pressure and not produce moderate finite deformation in air bag;Air bag For flexible air-bag, minimum volume can be contracted to a direction under external force.
Anti-stick oxidant layer is coated, using anti-stick measure, treats agent structure concrete setting, makes air bag easily and agent structure Concrete departs from, and air bag shrinks to side, just forms slip casting cavity passage;Strong adhesive layer is coated, measure is bonded using strong, It is easy to air bag to be shunk to the side, avoids air bag from blocking opposite side, enter agent structure coagulation soil cracking beneficial to follow-up leak stopping slurries Gap.
The utility model has the following advantages that:
(1) air bag has higher-strength, in concreting, in air bag air pressure can support chutable concrete pressure, And do not produce moderate finite deformation;
(2) air bag side coats strong adhesive layer and is coupled with outside building enclosure, and opposite side coating anti-stick oxidant layer is with mixing Coagulate native non-binding, air in extracting air bag and outside air bag side hydraulic pressure effect under, air bag can to side shrink extruding, be easy to shape It is preferable into the cavity that can inject leak stopping slurries, slip casting effect;The injected hole for effectively solving traditional built-in slip casting pipe is easily blocked, noted Starch the problem of effect difference;
(3) be not provided with Grouting Pipe, but original built-in slip casting pipe it is local it is pre-buried with Grouting Pipe with the inflation of diameter Air bag, when reserved injected hole is shorter, gas cell surrounding smears adhesive, and air bag is directly taken out;When reserved longer slip casting During hole, after agent structure concrete setting, balloon occlusion mouth is opened, is extracted out airbag gas using air pump, while by water Injected along gasbag ektexine, under water injection pressure and interior vacuum double action, air bag is provided with anti-stick oxidant layer side and concrete Come off, and air bag is provided with strong binding agent side and extruded, form slip casting cavity passage, effectively solve to reserve longer slip casting hole When, it is difficult to the technical barrier for taking out air bag;
(4) the utility model is also applied for movement joint or leak stopping at the structure of seepage easily occurs in other;
(5) Grouting Pipe is replaced with air bag, cost is relatively low, simple to operate, strong applicability, can bring preferable economic benefit And social benefit.
Brief description of the drawings
Fig. 1 is the utility model agent structure, construction joint structure, building enclosure schematic diagram.
Fig. 2 is the utility model air bag pre-buried structure schematic diagram.
Fig. 3 is structural representation after the pumping of the utility model air bag.
Fig. 4 notes the structural representation in cavity for the utility model leak stopping slurries.
1- agent structures in figure, 2- construction joints, 3- building enclosures, 4- air bags, 5- agent structure concrete, 6- antitack agents Layer, the strong adhesive layers of 7-, 8- cavitys, 9- leak stopping slurries, 10- cracks.
Embodiment
Describe performance of the present utility model in detail below in conjunction with the accompanying drawings, but they are not formed to of the present utility model Limit, it is only for example.The advantages of making the utility model by explanation simultaneously, is more clear and is readily appreciated that.
Understood refering to accompanying drawing:A kind of structure that injected hole is reserved using gas cell, it is characterised in that:Inflated airbag 4 is solid At the construction joint 2 of agent structure 1 on the groove of building enclosure 3 (as shown in Figure 1);Anti-stick oxidant layer 6 is coated on close to main The outer surface of air bag 4 of the side of body structure 1, strong adhesive layer 7 is coated on the outer surface of air bag 4 away from the side of agent structure 1, remote The air bag 4 of the side of agent structure 1 is fixed on the waterproof layer of building enclosure 3 or building enclosure 3 by strong adhesive layer 7; Agent structure concrete 5 is poured around air bag 4;Cavity 8 is between agent structure concrete 5 and air bag 4 and is located at main body In structural concrete 5 (as shown in Figure 2 and Figure 3);The diameter of air bag 4 is equal with slip casting pipe diameter;Air bag 4 is air bag with high intensity, intensity More than or equal to 0.2MPa.The groove of building enclosure determines according to that need to reserve cavity diameter or air bag diameter.
A kind of grouting method of structure for using gas cell to reserve injected hole described in the utility model is in agent structure 1 Before pouring, the building enclosure 3 at main structure construction seam 2 is handled, little groove is formed, is fixed on after air bag 4 is inflated In the little groove of building enclosure 3 (as shown in Figure 1 and Figure 2),
It is coated with the waterproof that the side of air bag 4 of strong adhesive layer is fixed in building enclosure 3 or be affixed in building enclosure 3 In material layer;Pour agent structure concrete 5;After the solidification of agent structure concrete 5, the gas in air bag 4 is extracted out, and to gas Gap between capsule 4 and agent structure concrete 5 uses pressure water flooding method water filling, and water injection pressure is more than or equal to 0.1MPa;Gas Including capsule 4, in the presence of external pressure, separated along air bag 4 coated with anti-stick oxidant layer side with agent structure concrete 5, and to Coated with strong adhesive layer and the side of air bag 4 being fixed in building enclosure or be affixed on the waterproof layer in building enclosure Shrink, form cavity 8 (as shown in Figure 3);Leak stopping slurries 9 are injected using slip casing by pressure normal direction cavity 8, leak stopping slurries 9 are being pressed The crack 10 (as shown in Figure 4) in agent structure 1 is effectively entered under power effect, so as to reach the effect of effective leak-proof leak-stopping Fruit.
Other unaccounted parts belong to prior art.

Claims (2)

  1. A kind of 1. structure that injected hole is reserved using gas cell, it is characterised in that:Inflated airbag (4) is fixed on agent structure (1) on the groove of construction joint (2) place's building enclosure (3);Anti-stick oxidant layer (6) is coated on close to agent structure (1) side Air bag (4) outer surface, strong adhesive layer (7) are coated on air bag (4) outer surface away from agent structure (1) side, away from main body The air bag (4) of structure (1) side is fixed on the waterproof material of building enclosure (3) or building enclosure (3) by strong adhesive layer (7) On layer;Agent structure concrete (5) is poured around air bag (4);Cavity (8) is located at agent structure concrete (5) and air bag (4) Between and in the agent structure concrete (5);Air bag (4) diameter is equal with slip casting pipe diameter;Air bag (4) is high intensity gas Capsule, intensity are more than or equal to 0.2MPa.
  2. A kind of 2. structure that injected hole is reserved using gas cell according to claim 1, it is characterised in that:Building enclosure (3) groove determines according to that need to reserve cavity (8) diameter or air bag (4) diameter.
CN201720821659.2U 2017-07-08 2017-07-08 A kind of structure that injected hole is reserved using gas cell Active CN206941656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720821659.2U CN206941656U (en) 2017-07-08 2017-07-08 A kind of structure that injected hole is reserved using gas cell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720821659.2U CN206941656U (en) 2017-07-08 2017-07-08 A kind of structure that injected hole is reserved using gas cell

Publications (1)

Publication Number Publication Date
CN206941656U true CN206941656U (en) 2018-01-30

Family

ID=61369277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720821659.2U Active CN206941656U (en) 2017-07-08 2017-07-08 A kind of structure that injected hole is reserved using gas cell

Country Status (1)

Country Link
CN (1) CN206941656U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165199A (en) * 2017-07-08 2017-09-15 长江勘测规划设计研究有限责任公司 A kind of use gas cell reserves the structure and its grouting method of injected hole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165199A (en) * 2017-07-08 2017-09-15 长江勘测规划设计研究有限责任公司 A kind of use gas cell reserves the structure and its grouting method of injected hole

Similar Documents

Publication Publication Date Title
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN207739264U (en) A kind of Grouting Pipe
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN206016824U (en) A kind of stopping means for preventing shield sky from pushing away Segment displacement
CN207727600U (en) Plugging dewatering well device
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN101864778A (en) Method for leaking stoppage of external wall of underground structure
CN207193996U (en) A kind of precipitation pipe well well-sealing device
CN109915068B (en) Automatic water-absorbing plugging and hole-sealing device and method for near-horizontal coal seam gas extraction drill hole
CN109139059A (en) A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method
CN102561314A (en) Prefabricated waterproof pile (WSP pile) and inserting and pulling construction method thereof
CN106894820B (en) A kind of waterproof well wall retractable device and its construction technology
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN103469792B (en) Method for conducting grouting construction at back of pile bottom of cast-in-place pile
CN111926841A (en) Dewatering well water-carrying plugging structure and construction method thereof
CN208235554U (en) A kind of installation of pressure-bearing dewatering well and plugging device
CN203362181U (en) Mud jacking film bag for water resistance and leaking stoppage in tunnel construction
CN207537993U (en) A kind of diversion tunnel concrete plug
CN206941656U (en) A kind of structure that injected hole is reserved using gas cell
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN201424658Y (en) Water leakage detection of underground continuous wall groove seams and block repair device
CN105220700A (en) Foundation pit waterproof curtain reinforcement
CN206971581U (en) A kind of water-proofing treatment system of joint of plate perforating pipe position
CN107165199A (en) A kind of use gas cell reserves the structure and its grouting method of injected hole
CN209040133U (en) Well-covering device for dewatering well suitable for rich groundwater region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant