- CN109139059A CN109139059A CN201811353463.0A CN201811353463A CN109139059A CN 109139059 A CN109139059 A CN 109139059A CN 201811353463 A CN201811353463 A CN 201811353463A CN 109139059 A CN109139059 A CN 109139059A
- Authority
- CN
- China
- Prior art keywords
- stick
- slip casting
- grouting
- infiltration
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000003204 osmotic effect Effects 0.000 title claims abstract description 36
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000007569 slipcasting Methods 0.000 claims abstract description 99
- 230000008595 infiltration Effects 0.000 claims abstract description 47
- 238000001764 infiltration Methods 0.000 claims abstract description 47
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 239000002002 slurry Substances 0.000 claims abstract description 21
- 239000002689 soil Substances 0.000 claims abstract description 18
- 238000005192 partition Methods 0.000 claims abstract description 13
- 230000002093 peripheral effect Effects 0.000 claims abstract description 12
- 239000012466 permeate Substances 0.000 claims abstract description 12
- 238000007789 sealing Methods 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 8
- 238000001914 filtration Methods 0.000 claims description 7
- 238000007373 indentation Methods 0.000 claims description 6
- 238000009738 saturating Methods 0.000 claims description 4
- 206010028347 Muscle twitching Diseases 0.000 claims description 3
- 230000001680 brushing effect Effects 0.000 claims description 3
- 239000011083 cement mortar Substances 0.000 claims description 3
- 230000032798 delamination Effects 0.000 claims description 3
- 238000009792 diffusion process Methods 0.000 claims description 3
- 238000011900 installation process Methods 0.000 claims description 3
- 239000011257 shell material Substances 0.000 claims description 3
- 238000013517 stratification Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 239000011148 porous material Substances 0.000 abstract description 3
- 230000003014 reinforcing effect Effects 0.000 abstract description 2
- 238000007596 consolidation process Methods 0.000 abstract 1
- 239000004576 sand Substances 0.000 description 3
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 229920002472 Starch Polymers 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Abstract
The present invention relates to a kind of osmotic groutings suitable for shield tunnel to integrate stick and construction method, the osmotic grouting integrates the slip casting stick that stick includes tubulose, the infiltration stick and Grouting Pipe of tubulose, the head end of slip casting stick is fixed with plug, the head end sealing of the tail end and infiltration stick of slip casting stick is connected, the head end of infiltration stick is fixed with partition, the tail end of infiltration stick is fixed with end plate, slurry outlet is evenly equipped on the peripheral wall of slip casting stick, it permeates on the peripheral wall of stick and is evenly equipped with water seepage hole, Grouting Pipe protrudes into slip casting stick after sequentially passing through end plate and partition, outlet pipe is fixed on end plate, outlet pipe passes through end plate and is connected to infiltration stick.The present invention has both the effect of slip casting and draining, can quickly and effectively dissipate excess pore water pressure caused by shield-tunneling construction in this way, fast lifting layer soil body effective stress, grouting consolidation effect during improving secondary grouting simultaneously and runing, and slip casting stick and infiltration stick together as one, it is easily installed, easy to use, the present invention is suitable for the fields such as Tunnel Engineering and leakage of underground engineering reinforcing.
Description
Technical field
The present invention relates to the technical fields such as subway engineering, highway and railway traffic Tunnel Engineering, specifically a kind of
Osmotic grouting suitable for shield tunnel integrates stick and construction method.
Background technique
Present subway, get down the highway and build with railway traffic channel nationwide like a raging fire, underground traffic has fortune
Defeated high-efficient, the advantages that carrying capacity is big, becomes and alleviates the effective way that traffic transports pressure and Accelerating Regional Economic construction.Shield
Method is the construction that subterranean tunnel most generallys use, during shield-tunneling construction, drawn into tunneling process due to shield around
The disturbance of ground layer soil body is to generate excess pore water pressure, if Super-void Water Pressure dissipates not in time around tunnel duct piece, it will
Cause duct piece float upward, ground the environmental effects such as significantly to settle, certain hidden danger is caused to tunnel safety.
Because the shield tunnel dangerous situation that section of jurisdiction leakage causes happens occasionally.When on 2 7th, 2018 evenings 7, Foshan subway 2
Handing over two boat office bid section Lutao lake to lakes to gush in line first stage of the project, the burst of the shield section building site You Xian is permeable, and operating worker attempts leak stopping
Have no resolution, until at night 8 when 40 divide or so, live water permeable area expands, and causes tunnel duct piece to deform and damaged, causes ground season West China
The more meters of sections Lu Sanshi collapse.Through investigating, accident segment occurred is there are deep water-rich silty sand layers and closes on highly permeable medium-sand seam,
Underground water has pressure-bearing property, and the permeable accident for gushing blowout mud collapsing easily occurs when shield machine passes through the location.
Currently used drainage measure is to take unimpeded combination method, according to the size of leak location water leakage, to part
Leakage point and the small location of water leakage are done diversion pipe and are drained, and lead to and are then exhausted from tunnel in the catch basin of tunnel floor.To leakage
It takes segmentation turk conduit to infuse special slurries and reinforces to form water blockoff area in the location that water is big and area is big.However this method
It can be due to the asynchronous initiation sediment failure of the work progress of slip casting, draining.And slip casting and draining are separately laid, and are constructed more multiple
It is miscellaneous.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of osmotic groutings suitable for shield tunnel to integrate stick,
While slip casting, the moisture in the tunnel surrounding formation soil body can be discharged, Super-void Water Pressure caused by effective dissipation shield-tunneling construction
Power, fast lifting layer soil body effective stress, slip casting and draining together as one, structure is simple, easy to use.
To achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of integrated stick of the osmotic grouting suitable for shield tunnel, the infiltration stick and Grouting Pipe of slip casting stick, tubulose including tubulose,
The head end of slip casting stick is fixed with plug, and the head end sealing of the tail end and infiltration stick of slip casting stick is connected, and the head end for permeating stick is fixed with
Partition, the tail end for permeating stick are fixed with end plate, are evenly equipped with slurry outlet on the peripheral wall of slip casting stick, permeate on the peripheral wall of stick and be evenly equipped with infiltration
Water hole, the Grouting Pipe protrude into slip casting stick after sequentially passing through end plate and partition, and outlet pipe, outlet pipe are fixed on the end plate
It is connected to across end plate with infiltration stick.
Filled with filtering sponge in the infiltration stick, Grouting Pipe is passed through out of filtering sponge.
Rubber check valve is installed at slurry outlet, Grouting Pipe is two way seal slip casting core on the periphery wall of the slip casting stick
Pipe structure.
The plug is taper.
The head end of the slip casting stick is connected through a screw thread with plug, and wherein the head end periphery wall of slip casting stick is equipped with outside first
Screw thread, the tail end of plug open up fluted, and the internal perisporium of groove is equipped with the first internal screw thread cooperated with the first external screw thread.
The tail end of the slip casting stick and the head end of infiltration stick are connected by screw thread, wherein setting on the head end periphery wall of infiltration stick
There is the second external screw thread, the tail end internal perisporium of slip casting stick is equipped with the second internal screw thread cooperated with the second external screw thread.
The length of the slip casting stick is 300cm-500cm, and the length of plug is 12cm, and the length for permeating stick is 300cm-
500cm, the aperture of slurry outlet are 0.5cm, and the aperture of water seepage hole is 0.5cm.
The first perforation corresponding with Grouting Pipe is offered on the end plate, is equipped with and is covered in Grouting Pipe week in the first perforation
The first sealing shroud on wall offers the second perforation corresponding with Grouting Pipe on partition, is equipped with to cover in the second perforation and infuse
Starch the second sealing shroud on pipe peripheral wall.
A kind of osmotic grouting suitable for shield tunnel integrates the construction method of stick, including following construction procedure:
(1) injected hole cleared up on section of jurisdiction: wire brushing injected hole and neighbouring section of jurisdiction guarantee the protrusion of not concrete
Object;
(2) sleeve shell material is perfused into injected hole;
(3) installation osmotic grouting integrates stick, and specific installation process is as follows:
(a) it is pressed into slip casting section: after integrated stick slip casting section and plug seal with screwed joint, being pressed into the soil body, and retain slip casting section
Tail end is outside injected hole;
(b) connection slip casting section and permeate section: by permeate section in slip casting core pipe be uniformly inserted into slip casting section, will infiltration section top with
Slip casting section tail end is threadedly coupled and seals;
(c) indentation infiltration section: end plate is installed in infiltration section tail end, and smears expanded rubber, the infiltration in slip casting section tail end will be connect
Saturating section indentation is shaken into the soil body, until osmotic grouting integrates stick tail end and submerges in injected hole;
(d) be sealed to injected hole aperture: the watertight rubber for guaranteeing that osmotic grouting integrates on the end plate of stick bears certain pressure
After power, little water is spread on watertight rubber, it is allowed to expand, and then aperture is blocked with cement mortar;
(4) slip casting and water plug are connected: water plug is connect with the outlet pipe that osmotic grouting integrates stick, by grouting device and
Osmotic grouting integrates the tail end connection of the slip casting core pipe of stick;
(5) delamination pour slurry drains: realizing Stratification split grouting by twitching slip casting core pipe, while being filled and being made using the diffusion of slurries
It is gradually discharged with by the moisture in soil body hole by permeating section.
The grouting device and water plug are opened simultaneously, to realize that the synchronous of slip casting draining carries out.
The head end of the tail end of slip casting stick and infiltration stick is sealed and is connected by the present invention, after Grouting Pipe sequentially passes through end plate and partition
It protrudes into slip casting stick, while slip casting, the water in surrounding soil can be entered in infiltration stick Grouting Pipe by water seepage hole, then
It is discharged by outlet pipe, the present invention has both the effect of slip casting and draining, can quickly and effectively dissipate caused by shield-tunneling construction in this way
Excess pore water pressure, fast lifting layer soil body effective stress, while improve secondary grouting and operation during grouting and reinforcing imitate
Fruit, and slip casting stick and infiltration stick together as one, are easily installed, easy to use, can also be generalized to applying for other stabilization by drainage
It is applied widely during work, it is practical.Osmotic grouting of the invention integrates in the stick segmentation insertion soil body, facilitates operation, and
And the super gap hydraulic pressure that can dissipate, fast lifting layer soil body effective stress.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
As shown in Figure 1, a kind of osmotic grouting suitable for shield tunnel integrates stick, including slip casting stick 1, infiltration stick 2 and note
Pipe 3 is starched, slip casting stick 1 and infiltration stick 2 are tubular structure, and the head end of slip casting stick 1 is fixed with plug 4, the tail end and infiltration of slip casting stick 1
The head end sealing of saturating stick 2 is connected.The head end of infiltration stick 2 is fixed with partition 5, and slip casting stick 1 and infiltration stick 2 are divided into two by partition 5
A chamber, the tail end of infiltration stick 2 are fixed with end plate 6, and end plate 6 will permeate the tail end sealing of stick 2.It is uniformly distributed on the peripheral wall of slip casting stick 1
There is slurry outlet 7, permeates on the peripheral wall of stick 2 and be evenly equipped with water seepage hole 8, Grouting Pipe protrudes into slip casting stick after sequentially passing through end plate 6 and partition 5
In 1.Outlet pipe 9 is fixed on end plate, outlet pipe 9 passes through end plate and is connected to the inner cavity for permeating stick, and outlet pipe 9 and water plug connect
It connects.
It permeates filled with filtering sponge 10 in stick, Grouting Pipe is passed through out of filtering sponge, and filtering sponge can avoid extraneous thin
Small sand influences infiltration stick proper drainage into permeating in stick from permeability hole.
Rubber check valve 12 is installed at slurry outlet on the periphery wall of slip casting stick, slurries is can avoid and flows backwards, Grouting Pipe
For two way seal slip casting core pipe structure, two way seal slip casting core pipe structure is the prior art, and slip casting stick uses two way seal slip casting
Core pipe carries out slip casting, can reduce interfering with each other between different slip casting sections, realizes layering orientation slip casting.
Plug 4 is taper, is facilitated in the plug wedging soil body.
The head end of slip casting stick 1 is connected through a screw thread with plug 4, and wherein the head end periphery wall of slip casting stick 1 is equipped with outside first
Screw thread, the tail end of plug open up fluted, and the internal perisporium of groove is equipped with the first internal screw thread cooperated with the first external screw thread, in this way
Slip casting stick and plug are easy to loading and unloading, replacement easy to repair.
The tail end of slip casting stick 1 and the head end of infiltration stick 2 are connected by screw thread, wherein setting on the head end periphery wall of infiltration stick 2
There is the second external screw thread, the tail end internal perisporium of slip casting stick 1 is equipped with the second internal screw thread cooperated with the second external screw thread, such slip casting stick
Easy to loading and unloading, the replacement easy to repair with infiltration stick.
The length of slip casting stick is 300cm-500cm, can be 300cm, 350cm or 500cm etc., the length of slip casting stick can root
Selection adjustment is carried out according to tunnel internal diameter and slip casting depth, the length of plug is 12cm, and the length for permeating stick is 300cm-500cm,
It can be 300cm, 350cm or 500cm etc., the length for permeating stick can carry out selection adjustment according to tunnel internal diameter and draining depth,
The aperture of slurry outlet 7 is 0.5cm, and the aperture of water seepage hole 8 is 0.5cm.
First perforation corresponding with Grouting Pipe 3 is offered on end plate 6, is equipped with and is covered in Grouting Pipe peripheral wall in the first perforation
On the first sealing shroud, in this way can avoid slurries from infiltration stick in by first perforation outflow.It is offered on partition 5 and Grouting Pipe
Corresponding second perforates, and is equipped with the second sealing shroud covered on Grouting Pipe peripheral wall in the second perforation, can avoid slurries in this way
It is flowed into infiltration stick from slip casting stick by the second perforation.
A kind of osmotic grouting suitable for shield tunnel integrates the construction method of stick, including following construction procedure: (1) clearing up
Injected hole on section of jurisdiction: wire brushing injected hole and neighbouring section of jurisdiction guarantee the protrusion of not concrete;
(2) sleeve shell material is perfused into injected hole;
(3) installation osmotic grouting integrates stick, and specific installation process is as follows:
(a) it is pressed into slip casting section: by integrated stick slip casting section 1 with after 4 seal with screwed joint of taper plug, being pressed into the soil body, and retain note
The tail end of section 1 is starched outside injected hole;
(b) connection slip casting section and infiltration section: it will permeate in the uniform insertion slip casting section 1 of the slip casting core pipe 3 in section 2, infiltration section 2 will be pushed up
End is threadedly coupled and seals with 1 tail end of slip casting section;
(c) indentation infiltration section: end plate 6 is installed in infiltration 2 tail end of section, and smears expanded rubber 11, will be connect in 1 tail end of slip casting section
Infiltration section 2 indentation or shake into the soil body, until osmotic grouting integrate stick tail end submerge in injected hole;
(d) be sealed to injected hole aperture: the watertight rubber for guaranteeing that osmotic grouting integrates on the end plate 6 of stick bears certain pressure
After power, little water is spread on watertight rubber, it is allowed to expand, and then aperture is blocked with cement mortar;
(4) slip casting and water plug are connected: water plug being connect with the outlet pipe 9 that osmotic grouting integrates stick, by grouting device
The tail end for integrating the slip casting core pipe 3 of stick with osmotic grouting is connect;
(5) delamination pour slurry drains: realizing Stratification split grouting by twitching slip casting core pipe 3, while being filled using the diffusion of slurries
Moisture in soil body hole is gradually discharged by permeating section 2 for effect, and grouting device and water plug are opened simultaneously, to realize note
The synchronous of slurry draining carries out.
Claims (10)
1. a kind of osmotic grouting suitable for shield tunnel integrates stick, it is characterised in that: the infiltration of slip casting stick, tubulose including tubulose
Saturating stick and Grouting Pipe, the head end of slip casting stick are fixed with plug, and the head end sealing of the tail end and infiltration stick of slip casting stick is connected, and permeate stick
Head end be fixed with partition, the tail end for permeating stick is fixed with end plate, is evenly equipped with slurry outlet on the peripheral wall of slip casting stick, permeates the week of stick
Water seepage hole is evenly equipped on wall, the Grouting Pipe is protruded into slip casting stick after sequentially passing through end plate and partition, is fixed on the end plate
Outlet pipe, outlet pipe pass through end plate and are connected to infiltration stick.
2. the osmotic grouting according to claim 1 suitable for shield tunnel integrates stick, it is characterised in that: the infiltration stick
Interior to be filled with filtering sponge, Grouting Pipe is passed through out of filtering sponge.
3. the osmotic grouting according to claim 2 suitable for shield tunnel integrates stick, it is characterised in that: the slip casting stick
Periphery wall on rubber check valve is installed at slurry outlet, Grouting Pipe is two way seal slip casting core pipe structure.
4. the osmotic grouting according to claim 3 suitable for shield tunnel integrates stick, it is characterised in that: the plug is
Taper.
5. the osmotic grouting according to claim 4 suitable for shield tunnel integrates stick, it is characterised in that: the slip casting stick
Head end be connected through a screw thread with plug, wherein the head end periphery wall of slip casting stick is equipped with the first external screw thread, and the tail end of plug opens
Equipped with groove, the internal perisporium of groove is equipped with the first internal screw thread cooperated with the first external screw thread.
6. the osmotic grouting according to claim 5 suitable for shield tunnel integrates stick, it is characterised in that: the slip casting stick
Tail end and infiltration stick head end by screw thread be connected, wherein infiltration stick head end periphery wall be equipped with the second external screw thread, slip casting
The tail end internal perisporium of stick is equipped with the second internal screw thread cooperated with the second external screw thread.
7. the osmotic grouting according to claim 6 suitable for shield tunnel integrates stick, it is characterised in that: the slip casting stick
Length be 300cm-500cm, the length of plug is 12cm, and the length for permeating stick is 300cm-500cm, and the aperture of slurry outlet is
0.5cm, the aperture of water seepage hole are 0.5cm.
8. the osmotic grouting according to claim 7 suitable for shield tunnel integrates stick, it is characterised in that: on the end plate
The first perforation corresponding with Grouting Pipe is offered, the first sealing shroud covered on Grouting Pipe peripheral wall is installed in the first perforation,
The second perforation corresponding with Grouting Pipe is offered on partition, be equipped in the second perforation cover it is second close on Grouting Pipe peripheral wall
Big envelope.
9. according to claim 1 in -8 any integrated stick of the osmotic grouting suitable for shield tunnel construction method,
It is characterized in that: including following construction procedure:
The injected hole on section of jurisdiction: wire brushing injected hole and neighbouring section of jurisdiction is cleared up, guarantees the protrusion of not concrete;
Sleeve shell material is perfused into injected hole;
Osmotic grouting is installed and integrates stick, specific installation process is as follows:
(a) it is pressed into slip casting section: after integrated stick slip casting section and plug seal with screwed joint, being pressed into the soil body, and retain slip casting section
Tail end is outside injected hole;
(b) connection slip casting section and permeate section: by permeate section in slip casting core pipe be uniformly inserted into slip casting section, will infiltration section top with
Slip casting section tail end is threadedly coupled and seals;
(c) indentation infiltration section: end plate is installed in infiltration section tail end, and smears expanded rubber, the infiltration in slip casting section tail end will be connect
Saturating section indentation is shaken into the soil body, until osmotic grouting integrates stick tail end and submerges in injected hole;
(d) be sealed to injected hole aperture: the watertight rubber for guaranteeing that osmotic grouting integrates on the end plate of stick bears certain pressure
After power, little water is spread on watertight rubber, it is allowed to expand, and then aperture is blocked with cement mortar;
(4) slip casting and water plug are connected: water plug is connect with the outlet pipe that osmotic grouting integrates stick, by grouting device and
Osmotic grouting integrates the tail end connection of the slip casting core pipe of stick;
(5) delamination pour slurry drains: realizing Stratification split grouting by twitching slip casting core pipe, while being filled and being made using the diffusion of slurries
It is gradually discharged with by the moisture in soil body hole by permeating section.
10. the osmotic grouting according to claim 9 suitable for shield tunnel integrates the construction method of stick, feature exists
In: the grouting device and water plug are opened simultaneously, to realize that the synchronous of slip casting draining carries out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811353463.0A CN109139059A (en) | 2018-11-14 | 2018-11-14 | A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811353463.0A CN109139059A (en) | 2018-11-14 | 2018-11-14 | A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109139059A true CN109139059A (en) | 2019-01-04 |
Family
ID=64805927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811353463.0A Pending CN109139059A (en) | 2018-11-14 | 2018-11-14 | A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109139059A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881666A (en) * | 2019-04-15 | 2019-06-14 | 河北省水利水电勘测设计研究院 | A kind of core drilling multifunctional rotary preventing slurry injection device |
CN111396065A (en) * | 2020-03-25 | 2020-07-10 | 中铁上海工程局集团有限公司 | Replacement type grouting forming duct piece plugging method for high-pressure punching |
CN111945735A (en) * | 2020-08-21 | 2020-11-17 | 西南石油大学 | Microorganism alternate grouting device for soft soil solidification and use method |
CN112031812A (en) * | 2020-08-28 | 2020-12-04 | 浙大城市学院 | Drainage positioning grouting pipe piece and construction method thereof |
CN114033428A (en) * | 2021-11-05 | 2022-02-11 | 郑州大学 | Shield tunnel micro-disturbance grouting and pore pressure dissipation integrated device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030034629A (en) * | 2001-10-26 | 2003-05-09 | 김정윤 | method and device and structure tunnel formation tunnel construction spacetime |
CN103422868A (en) * | 2013-08-06 | 2013-12-04 | 同济大学 | Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body |
KR20150014221A (en) * | 2013-07-29 | 2015-02-06 | 한국팽이건설 주식회사 | Micropile of pressure injection and it's construction method |
CN106284339A (en) * | 2016-08-11 | 2017-01-04 | 重庆大学 | A kind of sleeve valve barrel grouting draining soil nailing props up latch device and construction method thereof |
CN208950609U (en) * | 2018-11-14 | 2019-06-07 | 郑州大学 | A kind of integrated stick of the osmotic grouting suitable for shield tunnel |
-
2018
- 2018-11-14 CN CN201811353463.0A patent/CN109139059A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030034629A (en) * | 2001-10-26 | 2003-05-09 | 김정윤 | method and device and structure tunnel formation tunnel construction spacetime |
KR20150014221A (en) * | 2013-07-29 | 2015-02-06 | 한국팽이건설 주식회사 | Micropile of pressure injection and it's construction method |
CN103422868A (en) * | 2013-08-06 | 2013-12-04 | 同济大学 | Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body |
CN106284339A (en) * | 2016-08-11 | 2017-01-04 | 重庆大学 | A kind of sleeve valve barrel grouting draining soil nailing props up latch device and construction method thereof |
CN208950609U (en) * | 2018-11-14 | 2019-06-07 | 郑州大学 | A kind of integrated stick of the osmotic grouting suitable for shield tunnel |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881666A (en) * | 2019-04-15 | 2019-06-14 | 河北省水利水电勘测设计研究院 | A kind of core drilling multifunctional rotary preventing slurry injection device |
CN109881666B (en) * | 2019-04-15 | 2023-11-24 | 河北省水利水电勘测设计研究院 | Multifunctional rotary jetting injector for core drilling |
CN111396065A (en) * | 2020-03-25 | 2020-07-10 | 中铁上海工程局集团有限公司 | Replacement type grouting forming duct piece plugging method for high-pressure punching |
CN111396065B (en) * | 2020-03-25 | 2022-06-14 | 中铁上海工程局集团有限公司 | Replacement type grouting forming duct piece plugging method for high-pressure punching |
CN111945735A (en) * | 2020-08-21 | 2020-11-17 | 西南石油大学 | Microorganism alternate grouting device for soft soil solidification and use method |
CN111945735B (en) * | 2020-08-21 | 2021-11-30 | 西南石油大学 | Microorganism alternate grouting device for soft soil solidification and use method |
CN112031812A (en) * | 2020-08-28 | 2020-12-04 | 浙大城市学院 | Drainage positioning grouting pipe piece and construction method thereof |
CN114033428A (en) * | 2021-11-05 | 2022-02-11 | 郑州大学 | Shield tunnel micro-disturbance grouting and pore pressure dissipation integrated device |
CN114033428B (en) * | 2021-11-05 | 2024-02-27 | 郑州大学 | Micro-disturbance grouting and hole pressure dissipation integrated device for shield tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109139059A (en) | A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method | |
CN107761753B (en) | A kind of foundation pit water burst rapid rescue slip casting method for blocking | |
CN105927231B (en) | Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method | |
CN107620312A (en) | High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation | |
CN106014201B (en) | A kind of outer release hole safe construction technique of tunnel grouting curtain | |
CN109881694A (en) | A kind of constructing structure blocked for foundation pit substrate Sand and method | |
CN103410175B (en) | A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN207739264U (en) | A kind of Grouting Pipe | |
CN103866762A (en) | Pile body longitudinal multipoint grouting device | |
CN107513995A (en) | A kind of bridge struction pile post grouting construction method | |
CN207193996U (en) | A kind of precipitation pipe well well-sealing device | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN104847365B (en) | A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method | |
CN105952473B (en) | Sluice the pipe-plate lining structure being depressured | |
CN105781586B (en) | A kind of solid pipe method for blocking of gushing water borehole wall filter stream pressure relief vent inner sleeve | |
CN208950609U (en) | A kind of integrated stick of the osmotic grouting suitable for shield tunnel | |
CN106869154A (en) | The flow control system and method for the dynamic water karst of closure high speed, big flow | |
CN107700440A (en) | A kind of diversion tunnel concrete plug and its construction method | |
CN109853477A (en) | Change the concentrative seepage plugging structure and method that dynamic water is hydrostatic in gallery | |
CN110130324A (en) | A kind of micro-steel pile and its construction method | |
CN109339215A (en) | Replacement of not cutting off the water supply passes in and out the device and method of sluice gate | |
CN209603062U (en) | Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery | |
CN206844136U (en) | Closure high speed, big flow move the flow control system of water karst | |
CN109555140A (en) | Foundation pit and Tunnel Base spring pump drainage method for blocking and device | |
CN107574792A (en) | Contain high water head plugging structure and its construction method in a kind of dam foundation water delivery bottom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |