CN107221129A - Early warning system on a kind of line for geological disaster and weather warning - Google Patents

Early warning system on a kind of line for geological disaster and weather warning Download PDF

Info

Publication number
CN107221129A
CN107221129A CN201710597327.5A CN201710597327A CN107221129A CN 107221129 A CN107221129 A CN 107221129A CN 201710597327 A CN201710597327 A CN 201710597327A CN 107221129 A CN107221129 A CN 107221129A
Authority
CN
China
Prior art keywords
warning information
warning
monitoring data
terminal
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710597327.5A
Other languages
Chinese (zh)
Other versions
CN107221129B (en
Inventor
杨柳
钟林家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710597327.5A priority Critical patent/CN107221129B/en
Publication of CN107221129A publication Critical patent/CN107221129A/en
Application granted granted Critical
Publication of CN107221129B publication Critical patent/CN107221129B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/28Databases characterised by their database models, e.g. relational or object models
    • G06F16/284Relational databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Abstract

The present invention relates to disaster alarm technical field, early warning system on a kind of line for geological disaster and weather warning is disclosed.Pass through early warning system on the line, geological disaster and the multi-section door linkage early warning of weather warning countersign mechanism can be realized using Internet technology, so as to quickly and easily complete the countersign process of whole warning information, realize geological disaster and the quick issue by all kinds of means with all standing of meteorological accident warning information, greatly promote the ageing of warning information, reliability and professional, early warning/recover opportunity, the loss that the lives and properties that reduction Disaster Event gives people are brought are caught beneficial to wrecker.In addition, technology of Internet of things can also be utilized, staff and examination & verification the director Monitoring Data or risk that easily obtain on geological disaster and weather warning is set to settle in an area the information such as figure, the content of abundant warning information, further the lifting reliability of warning information and professional, is easy to actual promotion and application.

Description

Early warning system on a kind of line for geological disaster and weather warning
Technical field
The present invention relates to Risk-warning technical field, in particular it relates to which a kind of be used for the line of geological disaster and weather warning Upper early warning system.
Background technology
It is equipped with specially making geological disaster and/or city waterlogging gas in the provincial of China, region and district level at present As the unit of Risk-warning, wherein, the unit of high-level can also make risk and settle in an area figure, so as to ground-to-ground matter disaster directly perceived And/or city waterlogging carries out risk assessment.But if the early warning between carrying out the superior and the subordinate's unit or between sane level cooperation unit is believed Breath is held a conference or consultation and signs and issues (hereinafter referred countersign), is substantially held a conference or consultation by the means such as phone or QQ chats, then pass through biography Really realize signing and issuing for warning information, after all examination & verification directors confirm and sign, could carry out warning information to outgoing Cloth.
Foregoing existing countersign mode tradition falls behind, and can not only make the time of whole countersign process longer, be also less prone to carry out Modification, and then easily cause temporal waste and miss optimal early warning opportunity, or even bring can not for the lives and properties given people The loss of appraisal.For example required according to administrative instrument, the staff of weather bureau is according to weather forecast or live monitoring number Carried out according to making after warning information, it is necessary to first pass through fax and the text comprising warning information is sent into Land and Resources Bureau (Bureau of Water Resources) Signature confirms, after Land and Resources Bureau (Bureau of Water Resources) director examination & verification is errorless, the text of signature is beamed back into weather bureau again by fax, And if the interior of warning information has modification, then the text then needs to remodify signature again and confirmed;In Land and Resources Bureau's (water utilities Office) return after fax, also need to issue after through weather bureau director signature confirming, so so once conutersign process, it is near More than 20 minutes are needed less, are easily missed an opportunity because of a delay.
The content of the invention
Fall behind for foregoing existing warning information countersign mode tradition, easily cause temporal waste and miss optimal early warning The problem of opportunity, the invention provides early warning system on a kind of line for geological disaster and weather warning.
The technical solution adopted by the present invention is used for early warning system on the line of geological disaster and weather warning there is provided a kind of, Subsystem is issued on subsystem and warning information line including being conutersigned on warning information line, wherein, conutersigned on the warning information line Subsystem includes warning information initiating terminal, warning information countersign terminal and warning information management server, the warning information Management server communicates to connect the warning information initiating terminal and several described warning information meetings by the Internet network respectively Sign terminal;
The warning information initiating terminal is used to edit generation on geological disaster and the warning information of weather warning, and will be described Warning information is uploaded to the warning information management server, wherein, the warning information include early warning numbering, early warning type, Early warning object and warning level;
The warning information countersign terminal is used for after the warning information from the warning information management server is received, displaying The warning information, and the direct warning information for confirming or confirming through revision is fed back into the warning information management server;
The warning information management server is used to warning information successively is pushed into each institute according to default countersign flow Warning information countersign terminal is stated, and the warning information that terminal feedback is conutersigned by most end warning information is sent to the warning information Subsystem is issued on line;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through institute There is warning information to conutersign after the warning information of terminal check, the warning information is issued on line.
Optimization, the warning information management server is additionally operable to receiving by the early warning of warning information countersign terminal feedback After information, the IP address and the countersign timestamp to the warning information of the warning information countersign terminal are recorded.
Optimization, the warning information management server is believed to issue subsystem transmission early warning on the warning information line Before breath, by terminal is conutersigned with each warning information, electronic signature is added in the warning information correspondingly.
Optimization, in addition to Monitoring Data acquisition subsystem, wherein, the Monitoring Data acquisition subsystem includes monitoring number According to acquisition terminal and Monitoring Data storage server, the Monitoring Data storage server is communicated to connect respectively by internet of things Several described Monitoring Data acquisition terminals, the Monitoring Data storage server also communicates to connect institute respectively by the Internet network State warning information initiating terminal and each described warning information countersign terminal;
The Monitoring Data acquisition terminal is used for collection in worksite on geological disaster and the Monitoring Data of weather warning, and will be described Monitoring Data is uploaded to the Monitoring Data storage server;
The Monitoring Data storage server be used for store the Monitoring Data from Monitoring Data acquisition terminal each described, and When receiving the warning information initiating terminal or warning information countersign terminal access, the Monitoring Data is sent to correspondence Terminal.
Further optimize, in addition to risk is settled in an area figure rendering server, wherein, the risk is settled in an area figure rendering server Communicated to connect respectively by the Internet network the Monitoring Data storage server, the warning information initiating terminal and each described in Warning information conutersigns terminal;The risk settles in an area figure rendering server for receiving from the Monitoring Data storage server Monitoring Data after, risk is drawn according to the Monitoring Data and settled in an area figure, and is receiving the warning information initiating terminal or institute When stating warning information countersign terminal access, risk figure of settling in an area is sent to counterpart terminal.In detail specifically, the risk falls Area's figure includes hyetograph.
Further optimize, the Monitoring Data acquisition terminal be temperature sensor, humidity sensor, anerovane or Rainfall gauge.
Further optimize, the Monitoring Data storage server stores the prison using mysql relevant databases Survey data.
Optimization, it is Web server that subsystem is issued on the warning information line.
To sum up, using early warning system on a kind of line for geological disaster and weather warning provided by the present invention, have Following beneficial effect:(1) early warning system on the line is passed through, it is possible to use Internet technology realizes geological disaster and weather warning The early warning of multi-section door linkage countersign mechanism, so as to quickly and easily complete whole warning information countersign process (pass through The time of whole countersign process, can be compressed within 5 minutes by test), realize geological disaster and meteorological accident early warning letter The quick issue by all kinds of means with all standing of breath, greatly promotes the ageing of warning information, reliability and professional, beneficial to recovering Personnel catch early warning/recover opportunity, the loss that the lives and properties that reduction Disaster Event gives people are brought;(2) can be to whole Countersign process carries out trace record, and the convenient history that carries out is reviewed and summarized the experience;(3) technology of Internet of things can also be utilized, makes work The Monitoring Data or risk that making personnel or examination & verification director can easily obtain on geological disaster and weather warning are settled in an area The information such as figure, enrich the content of warning information, further the lifting reliability of warning information and professional, be easy to actual popularization with Using.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the system architecture signal of early warning system on the line provided by the present invention for geological disaster and weather warning Figure.
Embodiment
Hereinafter with reference to accompanying drawing, described in detail by way of example provided by the present invention for geological disaster and meteorology Early warning system on the line of early warning.Herein it should be noted that the explanation for these way of example is used to help understand this hair It is bright, but do not constitute limitation of the invention.
The terms "and/or", only a kind of incidence relation for describing affiliated partner, represents there may be three kinds of passes System, for example, A and/or B, can be represented:Individualism A, individualism B, while there are tri- kinds of situations of A and B, the terms "/and " it is another affiliated partner relation of description, expression may have two kinds of relations, for example, A/ and B, can be represented:Individually deposit In A, two kinds of situations of individualism A and B, in addition, character "/" herein, it is that a kind of "or" is closed to typically represent forward-backward correlation object System.
Embodiment one
Fig. 1 shows that the system architecture of early warning system on the line provided by the present invention for geological disaster and weather warning is shown It is intended to.
Early warning system on the line for geological disaster and weather warning that the present embodiment is provided, including warning information line Subsystem is issued on upper countersign subsystem and warning information line, wherein, subsystem is conutersigned on the warning information line includes early warning Information initiating terminal, warning information countersign terminal and warning information management server, the warning information management server pass through The Internet network communicates to connect the warning information initiating terminal and several described warning information countersign terminals respectively;
The warning information initiating terminal is used to edit generation on geological disaster and the warning information of weather warning, and will be described Warning information is uploaded to the warning information management server, wherein, the warning information include early warning numbering, early warning type, Early warning object and warning level;
The warning information countersign terminal is used for after the warning information from the warning information management server is received, displaying The warning information, and the direct warning information for confirming or confirming through revision is fed back into the warning information management server;
The warning information management server is used to warning information successively is pushed into each institute according to default countersign flow Warning information countersign terminal is stated, and the warning information that terminal feedback is conutersigned by most end warning information is sent to the warning information Subsystem is issued on line;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through institute There is warning information to conutersign after the warning information of terminal check, the warning information is issued on line.
As shown in figure 1, on the line in the structure of early warning system, the warning information initiating terminal can be, but not limited to For the computer or smart mobile phone held by weather bureau staff, staff is using the warning information initiating terminal When, can first click to enter the warning information generation page (early warning numbering can automatically generate at this moment), then according to weather forecast or Person's fact Monitoring Data, using the human-computer interaction interface of the warning information initiating terminal, is manually entered comprising early warning type (for example " geological disaster early warning " or " waterlogging early warning "), early warning object (such as specific small towns unit) and warning level (such as blueness four Level early warning, the early warning of yellow three-level, orange two grades of early warning and red one-level early warning etc.) etc. word content so that program generation on Geological disaster and the warning information of weather warning, and after directly confirmation or modified confirmation, click on and upload the warning information. The warning information countersign terminal can be, but not limited to be held by Land and Resources Bureau examination & verification director or weather bureau examination & verification director Computer or smart mobile phone, correspondence examination & verification director using the warning information conutersign terminal when, can first click on display and receive Warning information, then warning information described in manual reviews finally confirming or after revision confirms, clicking on feedback and pass through The warning information for confirming or confirming through revision.
The warning information management server is network side equipment, for believing according to default countersign flow to each early warning Breath countersign terminal sends warning information, and reclaims the warning information by confirmation, its can be, but not limited to as APP servers or Web server.In addition, the default countersign flow is the single branch line flow formulated according to administrative instrument requirement, for example, exist Externally, it is necessary to which the warning information first is sent into Land and Resources Bureau examination & verification director carries out examination & verification confirmation, so before issue warning information The warning information is sent to weather bureau examination & verification director again afterwards and carries out examination & verification confirmation.Subsystem is issued on the warning information line System is similarly network side equipment, and for externally issuing the warning information Jing Guo multiple confirmation, it can be, but not limited to as Web service Device, can be safeguarded using Web server to Website page, and the Website page can be, but not limited to include following plate:It is first Page plate, emergency measure plate, geological disaster distribution plate, geological disaster early warning plate and waterlogging early warning plate.
From there through early warning system on foregoing line, it is possible to use Internet technology realizes geological disaster and weather warning Mechanism is conutersigned in the early warning of multi-section door linkage, so as to quickly and easily complete the countersign process of whole warning information (by surveying The time of whole countersign process, can be compressed within 5 minutes by examination), realize geological disaster and meteorological accident warning information Quick issue by all kinds of means with all standing, the ageing of warning information, reliability and professional are greatly promoted, beneficial to the people that recovers Member catches early warning/recover opportunity, the loss that the lives and properties that reduction Disaster Event gives people are brought.
Optimization, the warning information management server is additionally operable to receiving by the early warning of warning information countersign terminal feedback After information, the IP address and the countersign timestamp to the warning information of the warning information countersign terminal are recorded.By foregoing Function, can also carry out trace record to whole countersign process, and the convenient history that carries out is reviewed and summarized the experience.In addition, described pre- Alert information management server be additionally operable to be stored in using mysql relevant databases during countersign produced by these correlations Data.
Optimization, the warning information management server is believed to issue subsystem transmission early warning on the warning information line Before breath, by terminal is conutersigned with each warning information, electronic signature is added in the warning information correspondingly.By foregoing Function, can further lift the reliability of warning information, to cause the attention of people.In addition, the warning information management Server is additionally operable to the warning information being converted to Word texts, and locally preserves.
Optimization, in addition to Monitoring Data acquisition subsystem, wherein, the Monitoring Data acquisition subsystem includes monitoring number According to acquisition terminal and Monitoring Data storage server, the Monitoring Data storage server is communicated to connect respectively by internet of things Several described Monitoring Data acquisition terminals, the Monitoring Data storage server also communicates to connect institute respectively by the Internet network State warning information initiating terminal and each described warning information countersign terminal;The Monitoring Data acquisition terminal is used for collection in worksite The Monitoring Data storage service is uploaded on geological disaster and the Monitoring Data of weather warning, and by the Monitoring Data Device;The Monitoring Data storage server be used for store the Monitoring Data from Monitoring Data acquisition terminal each described, and When receiving the warning information initiating terminal or warning information countersign terminal access, the Monitoring Data is sent to correspondence Terminal.As shown in figure 1, the Monitoring Data acquisition terminal can be, but not limited to as temperature sensor, humidity sensor, wind direction wind The acquisition terminals such as fast instrument or rainfall gauge, the corresponding Monitoring Data can be, but not limited to include temperature, relative humidity, wind direction wind Speed and rainfall value etc..The Monitoring Data storage server is network side equipment, and it can be, but not limited to use mysql relationship types Database stores the Monitoring Data, thus can also utilize technology of Internet of things, enable staff and examination & verification director Easily obtain on information such as the Monitoring Datas of geological disaster and weather warning, enrich the content of warning information, further Lift the reliability of warning information and professional.
Further optimize, in addition to risk is settled in an area figure rendering server, wherein, the risk is settled in an area figure rendering server Communicated to connect respectively by the Internet network the Monitoring Data storage server, the warning information initiating terminal and each described in Warning information conutersigns terminal;The risk settles in an area figure rendering server for receiving from the Monitoring Data storage server Monitoring Data after, risk is drawn according to the Monitoring Data and settled in an area figure, and is receiving the warning information initiating terminal or institute When stating warning information countersign terminal access, risk figure of settling in an area is sent to counterpart terminal.As shown in figure 1, the risk falls Area's figure rendering server is similarly network side equipment, and it draws risk according to Monitoring Data and settled in an area the data processing method of figure automatically The computer program write for active computer program or according to existing drafting mode in non-creativeness mode.Likewise, can So that staff and examination & verification director can easily obtain and be settled in an area figure etc. on the risk of geological disaster and weather warning Information, enriches the content of warning information, further the lifting reliability of warning information and professional.In detail specifically, the wind Figure of nearly settling in an area can be, but not limited to include hyetograph.The hyetograph needs the rainfall Value Data using each weather station To be drawn.
To sum up, what the present embodiment was provided is used for early warning system on the line of geological disaster and weather warning, with having as follows Beneficial effect:(1) early warning system on the line is passed through, it is possible to use Internet technology realizes the multi-section of geological disaster and weather warning Door linkage early warning conutersign mechanism, so as to quickly and easily complete whole warning information countersign process (by test, can The time of whole countersign process was compressed within 5 minutes), realize many canals of geological disaster and meteorological accident warning information Road and the quick issue of all standing, greatly promote the ageing of warning information, reliability and professional, are caught beneficial to wrecker Early warning/recover opportunity, the loss that the lives and properties that reduction Disaster Event gives people are brought;(2) can be to whole countersign process Trace record is carried out, the convenient history that carries out is reviewed and summarized the experience;(3) can also utilize technology of Internet of things, make staff or Examination & verification the director Monitoring Data or risk that can easily obtain on geological disaster and weather warning are settled in an area the information such as figure, The content of abundant warning information, further the reliability of lifting warning information and professional, is easy to actual promotion and application.
As described above, the present invention can be realized preferably.For a person skilled in the art, according to the religion of the present invention Lead, design on various forms of lines for geological disaster and weather warning early warning system and do not need performing creative labour. These embodiments are changed without departing from the principles and spirit of the present invention, changed, are replaced, are integrated and modification still Fall within the scope of protection of the present invention.

Claims (9)

1. early warning system on a kind of line for geological disaster and weather warning, it is characterised in that including meeting on warning information line Subsystem is issued on bamboo slips used for divination or drawing lots system and warning information line, wherein, subsystem is conutersigned on the warning information line includes warning information Initiating terminal, warning information countersign terminal and warning information management server, the warning information management server pass through because of spy Network communicates to connect the warning information initiating terminal and several described warning information countersign terminals respectively;
The warning information initiating terminal is used to edit generation on geological disaster and the warning information of weather warning, and will be described Warning information is uploaded to the warning information management server, wherein, the warning information include early warning numbering, early warning type, Early warning object and warning level;
The warning information countersign terminal is used for after the warning information from the warning information management server is received, displaying The warning information, and the direct warning information for confirming or confirming through revision is fed back into the warning information management server;
The warning information management server is used to warning information successively is pushed into each institute according to default countersign flow Warning information countersign terminal is stated, and the warning information that terminal feedback is conutersigned by most end warning information is sent to the warning information Subsystem is issued on line;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through institute There is warning information to conutersign after the warning information of terminal check, the warning information is issued on line.
2. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 1, it is characterised in that institute State warning information management server to be additionally operable to after the warning information for conutersigning terminal feedback by warning information is received, record described pre- The IP address and the countersign timestamp to the warning information of alert information countersign terminal.
3. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 1, it is characterised in that institute Warning information management server is stated before subsystem transmission warning information is issued on the warning information line, will be with each early warning The electronic signature correspondingly of information countersign terminal is added in the warning information.
4. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 1, it is characterised in that also Including Monitoring Data acquisition subsystem, wherein, the Monitoring Data acquisition subsystem includes Monitoring Data acquisition terminal and monitoring Data storage server, the Monitoring Data storage server communicates to connect several monitoring numbers by internet of things respectively According to acquisition terminal, the Monitoring Data storage server is also communicated to connect the warning information and initiated eventually respectively by the Internet network End and each described warning information countersign terminal;
The Monitoring Data acquisition terminal is used for collection in worksite on geological disaster and the Monitoring Data of weather warning, and will be described Monitoring Data is uploaded to the Monitoring Data storage server;
The Monitoring Data storage server be used for store the Monitoring Data from Monitoring Data acquisition terminal each described, and When receiving the warning information initiating terminal or warning information countersign terminal access, the Monitoring Data is sent to correspondence Terminal.
5. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 4, it is characterised in that also Settled in an area figure rendering server including risk, wherein, risk figure rendering server of settling in an area distinguishes communication link by the Internet network Connect the Monitoring Data storage server, the warning information initiating terminal and each described warning information countersign terminal;
The risk settle in an area figure rendering server be used for after the Monitoring Data from the Monitoring Data storage server is received, Risk is drawn according to the Monitoring Data to settle in an area figure, and is receiving the warning information initiating terminal or warning information countersign During terminal access, risk figure of settling in an area is sent to counterpart terminal.
6. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 5, the risk is settled in an area Figure includes hyetograph.
7. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 4, it is characterised in that institute Monitoring Data acquisition terminal is stated for temperature sensor, humidity sensor, anerovane or rainfall gauge.
8. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 4, it is characterised in that institute State Monitoring Data storage server and the Monitoring Data is stored using mysql relevant databases.
9. early warning system on a kind of line for geological disaster and weather warning as claimed in claim 1, it is characterised in that institute It is Web server to state and subsystem is issued on warning information line.
CN201710597327.5A 2017-07-20 2017-07-20 It is a kind of for early warning system on the line of geological disaster and weather warning Active CN107221129B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710597327.5A CN107221129B (en) 2017-07-20 2017-07-20 It is a kind of for early warning system on the line of geological disaster and weather warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710597327.5A CN107221129B (en) 2017-07-20 2017-07-20 It is a kind of for early warning system on the line of geological disaster and weather warning

Publications (2)

Publication Number Publication Date
CN107221129A true CN107221129A (en) 2017-09-29
CN107221129B CN107221129B (en) 2019-03-26

Family

ID=59953292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710597327.5A Active CN107221129B (en) 2017-07-20 2017-07-20 It is a kind of for early warning system on the line of geological disaster and weather warning

Country Status (1)

Country Link
CN (1) CN107221129B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108010275A (en) * 2017-10-25 2018-05-08 胡毅 A kind of mountain flood and geological disaster monitoring and warning is registered one's residence to people's feedback response system
CN108333598A (en) * 2017-12-31 2018-07-27 广州中海达定位技术有限公司 A kind of geological disaster monitoring system and method
CN108961688A (en) * 2018-07-13 2018-12-07 福建特力惠信息科技股份有限公司 A kind of big data support under Geological Hazards Monitoring and method for early warning
CN111341072A (en) * 2020-02-21 2020-06-26 广州欢网科技有限责任公司 Accurate and rapid weather early warning analysis pushing reminding system and method
CN111862536A (en) * 2020-06-26 2020-10-30 武汉北斗星度科技有限公司 Automatic monitoring and early warning system for geological disasters
CN116882765A (en) * 2023-09-07 2023-10-13 北京国信华源科技有限公司 Disaster risk management and control method based on intelligent label

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004205433A (en) * 2002-12-26 2004-07-22 Kyushu Regional Development Bureau Ministry Of Land Infrastructure & Transport Debris flow detecting device and detection system
CN101131787A (en) * 2006-08-24 2008-02-27 北京燕禹水务科技有限公司 Real-time hydrology information automatic monitoring and disaster situation alerting system
CN102044022A (en) * 2010-12-24 2011-05-04 中国科学院合肥物质科学研究院 Emergency rescue decision making system aiming at natural disasters and method thereof
CN103700054A (en) * 2013-12-10 2014-04-02 中国地质大学武汉 Sudden-onset geological disaster emergency plan digitization system
CN103778499A (en) * 2012-10-26 2014-05-07 重庆沃尔德科技有限公司 Early warning information issuing platform
CN105741498A (en) * 2016-04-28 2016-07-06 成都理工大学 Method and device for monitoring and performing early warning on geological hazards

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004205433A (en) * 2002-12-26 2004-07-22 Kyushu Regional Development Bureau Ministry Of Land Infrastructure & Transport Debris flow detecting device and detection system
CN101131787A (en) * 2006-08-24 2008-02-27 北京燕禹水务科技有限公司 Real-time hydrology information automatic monitoring and disaster situation alerting system
CN102044022A (en) * 2010-12-24 2011-05-04 中国科学院合肥物质科学研究院 Emergency rescue decision making system aiming at natural disasters and method thereof
CN103778499A (en) * 2012-10-26 2014-05-07 重庆沃尔德科技有限公司 Early warning information issuing platform
CN103700054A (en) * 2013-12-10 2014-04-02 中国地质大学武汉 Sudden-onset geological disaster emergency plan digitization system
CN105741498A (en) * 2016-04-28 2016-07-06 成都理工大学 Method and device for monitoring and performing early warning on geological hazards

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108010275A (en) * 2017-10-25 2018-05-08 胡毅 A kind of mountain flood and geological disaster monitoring and warning is registered one's residence to people's feedback response system
CN108333598A (en) * 2017-12-31 2018-07-27 广州中海达定位技术有限公司 A kind of geological disaster monitoring system and method
CN108961688A (en) * 2018-07-13 2018-12-07 福建特力惠信息科技股份有限公司 A kind of big data support under Geological Hazards Monitoring and method for early warning
CN108961688B (en) * 2018-07-13 2020-11-03 特力惠信息科技股份有限公司 Geological disaster monitoring and early warning method under support of big data
CN111341072A (en) * 2020-02-21 2020-06-26 广州欢网科技有限责任公司 Accurate and rapid weather early warning analysis pushing reminding system and method
CN111862536A (en) * 2020-06-26 2020-10-30 武汉北斗星度科技有限公司 Automatic monitoring and early warning system for geological disasters
CN116882765A (en) * 2023-09-07 2023-10-13 北京国信华源科技有限公司 Disaster risk management and control method based on intelligent label
CN116882765B (en) * 2023-09-07 2024-01-02 北京国信华源科技有限公司 Disaster risk management and control method based on intelligent label

Also Published As

Publication number Publication date
CN107221129B (en) 2019-03-26

Similar Documents

Publication Publication Date Title
CN107221129A (en) Early warning system on a kind of line for geological disaster and weather warning
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN113487251B (en) Natural disaster early warning and emergency response method and system based on one-key type remote sensing
CN113011959A (en) Seven-expense intelligent auditing system and use method thereof
CN104794624A (en) Anti-counterfeiting system and anti-counterfeiting method based on random anti-counterfeiting marks
JP4627719B2 (en) Disaster prevention information sharing system
CN112734171A (en) Technical service integrated management system
CA2648611C (en) Data management system
CN111062799A (en) Method and device for managing family client, electronic equipment and storage medium
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
CN110428513B (en) Attendance processing method and device, electronic equipment and storage medium
CN111966746A (en) Meteorological disaster prevention and reduction flow monitoring system and monitoring method thereof
CN114511296A (en) High-standard farmland construction project management platform
KR101415003B1 (en) Remote management system for electronic display based on web
CN111813834A (en) Data mining system and data mining method
CN113111089A (en) Information acquisition management system and method
CN113077063A (en) Power transformation equipment defect management method and equipment based on voice and image identification
CN112561355A (en) Emergency comprehensive command management platform
CN114139840A (en) Data center access compliance verification method and system
TWM592573U (en) Online management engineering assessment system
CN105303502A (en) Mobile communication data acquisition alarm device based on LED display screen and application method thereof
CN104992272A (en) Method for obtaining real-time image of location of electronic label
TWI838002B (en) Customizable case creation and management system
JP7354397B1 (en) Disaster resilience expense insurance contract system and disaster resilience expense insurance contract management system
Fadrinaldi et al. Application of microservice architecture in the development of website-based drainage system for Rumbai Area (Case Study: PUPR Service Pekanbaru)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant