CN107221129B - It is a kind of for early warning system on the line of geological disaster and weather warning - Google Patents
It is a kind of for early warning system on the line of geological disaster and weather warning Download PDFInfo
- Publication number
- CN107221129B CN107221129B CN201710597327.5A CN201710597327A CN107221129B CN 107221129 B CN107221129 B CN 107221129B CN 201710597327 A CN201710597327 A CN 201710597327A CN 107221129 B CN107221129 B CN 107221129B
- Authority
- CN
- China
- Prior art keywords
- warning information
- warning
- terminal
- monitoring data
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/02—Alarms for ensuring the safety of persons
- G08B21/10—Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
Abstract
The present invention relates to disaster alarm technical fields, disclose a kind of for early warning system on the line of geological disaster and weather warning.Pass through early warning system on the line, Internet technology be can use to realize that mechanism is conutersigned in the multi-section door linkage early warning of geological disaster and weather warning, so as to quickly and easily complete the countersign process of entire warning information, realize geological disaster and meteorological emergency event warning information by all kinds of means with the quick publication of all standing, greatly promote the timeliness of warning information, reliability and professional, early warning/recover opportunity is caught conducive to wrecker, reduces and is lost brought by lives and properties of the Disaster Event to people.Furthermore, technology of Internet of things can also be utilized, enable staff and audits that responsible person easily obtains monitoring data about geological disaster and weather warning or risk is settled in an area the information such as figure, the content of abundant warning information, the reliability of warning information and professional is further promoted, practical promotion and application are convenient for.
Description
Technical field
The present invention relates to Risk-warning technical fields, and in particular, to a kind of for geological disaster and the line of weather warning
Upper early warning system.
Background technique
Special production geological disaster and/or city waterlogging gas are equipped in the provincial of China, ground level and district grade at present
As the unit of Risk-warning, wherein the unit of high-level can also make risk and settle in an area figure, so as to intuitive ground-to-ground matter disaster
And/or city waterlogging carries out risk assessment.But if the early warning between carrying out the superior and the subordinate's unit or between sane level cooperation unit is believed
Breath holds a conference or consultation and signs and issues (hereinafter referred countersign), is substantially held a conference or consultation by the means such as phone or QQ chat, then pass through biography
Really realize signing and issuing for warning information, after all audit responsible persons confirm and sign, just can be carried out warning information to outgoing
Cloth.
Existing countersign mode tradition above-mentioned falls behind, and can not only make the time for entirely conutersigning process longer, be also less prone to carry out
Modification, and then easily cause temporal waste and miss optimal early warning opportunity, or even bring can not to the lives and properties of people
The loss of appraisal.Such as required according to administrative instrument, the staff of weather bureau is according to weather forecast or live monitoring number
After making warning information, needs to first pass through fax for the text comprising warning information and be sent to Land and Resources Bureau (Bureau of Water Resources) progress
The text of signature is sent back to weather bureau again by fax after Land and Resources Bureau (Bureau of Water Resources) responsible person audit is errorless by signature confirmation,
And if the interior of warning information has modification, the text then needs to remodify signature confirmation again;In Land and Resources Bureau's (water utilities
Office) return to fax after, also need to issue after weather bureau responsible person signs confirmation, so primary in this way countersign process is near
20 minutes or more are needed less, are easily missed an opportunity because of a delay.
Summary of the invention
Fall behind for aforementioned existing warning information countersign mode tradition, easily causes temporal waste and miss optimal early warning
The problem of opportunity, the present invention provides a kind of for early warning system on the line of geological disaster and weather warning.
The technical solution adopted by the present invention, provide it is a kind of for early warning system on the line of geological disaster and weather warning,
Subsystem is issued on subsystem and warning information line including conutersigning on warning information line, wherein is conutersigned on the warning information line
Subsystem includes warning information initiating terminal, warning information countersign terminal and warning information management server, the warning information
Management server communicates to connect the warning information initiating terminal and several described warning information meetings by the Internet network respectively
Sign terminal;
The warning information initiating terminal is generated for editing about geological disaster and the warning information of weather warning, and will
The warning information is uploaded to the warning information management server, wherein the warning information includes early warning number, early warning class
Type, early warning object and warning level;
The warning information countersign terminal is used for after receiving the warning information from the warning information management server,
It shows the warning information, and direct confirmation or the warning information confirmed through revision is fed back into the warning information management service
Device;
The warning information management server is for successively pushing to warning information respectively according to preset countersign process
A warning information conutersigns terminal, and will be sent to the early warning by the warning information of most end warning information countersign terminal feedback
Subsystem is issued on information wire;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through
After crossing the warning information of all warning information countersign terminal checks, the warning information is issued on line.
Optimization, the warning information management server is also used to receiving by the early warning of warning information countersign terminal feedback
After information, the IP address of the warning information countersign terminal and the countersign timestamp to the warning information are recorded.
Optimization, the warning information management server is issuing subsystem transmission early warning letter on the warning information line
Before breath, it is added to signing electronically correspondingly with each warning information countersign terminal in the warning information.
Optimization, further include monitoring data acquisition subsystem, wherein the monitoring data acquisition subsystem includes monitoring number
According to acquisition terminal and monitoring data storage server, the monitoring data storage server is communicated to connect respectively by internet of things
Several described monitoring data acquisition terminals, the monitoring data storage server also pass through the Internet network and communicate to connect institute respectively
State warning information initiating terminal and each warning information countersign terminal;
The monitoring data acquisition terminal is used for collection in worksite about geological disaster and the monitoring data of weather warning, and will
The monitoring data are uploaded to the monitoring data storage server;
The monitoring data storage server is used to store the monitoring data from each monitoring data acquisition terminal,
And when receiving the warning information initiating terminal or warning information countersign terminal access, the monitoring data are sent to
Counterpart terminal.
It advanced optimizes, further includes that risk is settled in an area figure rendering server, wherein the risk is settled in an area figure rendering server
Communicate to connect the monitoring data storage server, the warning information initiating terminal and each described respectively by the Internet network
Warning information conutersigns terminal;The risk settles in an area figure rendering server for receiving from the monitoring data storage server
Monitoring data after, draw risk according to the monitoring data and settle in an area figure, and receiving the warning information initiating terminal or institute
When stating warning information countersign terminal access, risk figure of settling in an area is sent to counterpart terminal.In detail specifically, the risk is fallen
Area's figure includes hyetograph.
Advanced optimize, the monitoring data acquisition terminal be temperature sensor, humidity sensor, anerovane or
Rainfall gauge.
It advanced optimizes, the monitoring data storage server stores the prison using mysql relevant database
Measured data.
Optimization, it is Web server that subsystem is issued on the warning information line.
To sum up, using provided by the present invention a kind of for early warning system on the line of geological disaster and weather warning, have
As follows the utility model has the advantages that (1) can use Internet technology by early warning system on the line to realize geological disaster and weather warning
Multi-section door linkage early warning conutersign mechanism, so as to quickly and easily complete entire warning information countersign process (pass through
The time of entire countersign process can be compressed within 5 minutes by test), realize geological disaster and meteorological emergency event early warning letter
Breath by all kinds of means with the quick publication of all standing, the timeliness of warning information, reliability and professional are greatly promoted, conducive to recovering
Personnel catch early warning/recover opportunity, reduce and lose brought by lives and properties of the Disaster Event to people;It (2) can be to entire
Countersign process carries out trace record, facilitates and carries out history retrospect and summary of experience;(3) technology of Internet of things can also be utilized, work is made
Make personnel or audits that responsible person can easily obtain monitoring data about geological disaster and weather warning or risk is settled in an area
The information such as figure, enrich the content of warning information, further promote the reliability of warning information and professional, promote convenient for practical and
Using.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the system structure signal provided by the present invention for early warning system on the line of geological disaster and weather warning
Figure.
Specific embodiment
Hereinafter reference will be made to the drawings, is described in detail by way of example provided by the present invention for geological disaster and meteorology
Early warning system on the line of early warning.It should be noted that being used to help understand this hair for the explanation of these way of example
It is bright, but and do not constitute a limitation of the invention.
The terms "and/or", only a kind of incidence relation for describing affiliated partner, indicates that there may be three kinds of passes
System, for example, A and/or B, can indicate: individualism A, individualism B exist simultaneously tri- kinds of situations of A and B, the terms
"/and " it is to describe another affiliated partner relationship, indicate may exist two kinds of relationships, for example, A/ and B, can indicate: individually depositing
In A, two kinds of situations of individualism A and B, in addition, character "/" herein, typicallying represent forward-backward correlation object is a kind of "or" pass
System.
Embodiment one
Fig. 1 shows the system structure provided by the present invention for early warning system on the line of geological disaster and weather warning and shows
It is intended to.
It is provided in this embodiment described for early warning system on the line of geological disaster and weather warning, including warning information line
Subsystem is issued on upper countersign subsystem and warning information line, wherein it includes early warning that subsystem is conutersigned on the warning information line
Information initiating terminal, warning information countersign terminal and warning information management server, the warning information management server pass through
The Internet network communicates to connect the warning information initiating terminal and several described warning information countersign terminals respectively;
The warning information initiating terminal is generated for editing about geological disaster and the warning information of weather warning, and will
The warning information is uploaded to the warning information management server, wherein the warning information includes early warning number, early warning class
Type, early warning object and warning level;
The warning information countersign terminal is used for after receiving the warning information from the warning information management server,
It shows the warning information, and direct confirmation or the warning information confirmed through revision is fed back into the warning information management service
Device;
The warning information management server is for successively pushing to warning information respectively according to preset countersign process
A warning information conutersigns terminal, and will be sent to the early warning by the warning information of most end warning information countersign terminal feedback
Subsystem is issued on information wire;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through
After crossing the warning information of all warning information countersign terminal checks, the warning information is issued on line.
As shown in Figure 1, the warning information initiating terminal can be, but not limited on the line in the structure of early warning system
For the computer or smart phone held by weather bureau staff, staff is using the warning information initiating terminal
When, can first click to enter warning information and generate the page (early warning number can automatically generate at this moment), then according to weather forecast or
Person's fact monitoring data, using the human-computer interaction interface of the warning information initiating terminal, be manually entered comprising early warning type (such as
" geological disaster early warning " or " waterlogging early warning "), early warning object (such as specific small towns unit) and warning level (such as blue four
Grade early warning, the early warning of yellow three-level, orange second level early warning and red level-one early warning etc.) etc. word contents, thus program generation about
The warning information of geological disaster and weather warning, and after directly confirmation or modified confirmation, it clicks and uploads the warning information.
The warning information countersign terminal can be, but not limited to be held to audit responsible person by Land and Resources Bureau audit responsible person or weather bureau
Computer or smart phone, corresponding audit responsible person can first click display and receive when using warning information countersign terminal
Warning information, then warning information described in manual reviews clicks feedback and passes through finally in confirmation or after revision confirmation
Confirmation or the warning information confirmed through revision.
The warning information management server is network side equipment, for believing according to preset countersign process to each early warning
Breath countersign terminal sends warning information, and recycles the warning information by confirmation, can be, but not limited to as APP server or
Web server.In addition, the preset countersign process is the single branch line process for being required and being formulated according to administrative instrument, such as
Externally publication warning information before, need first by the warning information be sent to Land and Resources Bureau audit responsible person carry out audit confirmation, so
The warning information is sent to weather bureau audit responsible person again afterwards and carries out audit confirmation.Subsystem is issued on the warning information line
System is similarly network side equipment, for externally issuing the warning information by multiple confirmation, can be, but not limited to as Web service
Device can safeguard that the Website page can be, but not limited to include following plate using Web server to Website page: first
Page board block, emergency measure plate, geological disaster distribution plate, geological disaster early warning plate and waterlogging early warning plate.
From there through early warning system on aforementioned line, Internet technology can use to realize geological disaster and weather warning
Mechanism is conutersigned in multi-section door linkage early warning, so as to quickly and easily complete the countersign process of entire warning information (by surveying
The time of entire countersign process can be compressed within 5 minutes by examination), realize geological disaster and meteorological emergency event warning information
By all kinds of means with the quick publication of all standing, the timeliness of warning information, reliability and professional are greatly promoted, conducive to the people that recovers
Member catches early warning/recover opportunity, reduces and loses brought by lives and properties of the Disaster Event to people.
Optimization, the warning information management server is also used to receiving by the early warning of warning information countersign terminal feedback
After information, the IP address of the warning information countersign terminal and the countersign timestamp to the warning information are recorded.By aforementioned
Function can also carry out trace record to entire countersign process, facilitate and carry out history retrospect and summary of experience.In addition, described pre-
Alert information management server is also used to be stored in these generated correlations during countersign using mysql relevant database
Data.
Optimization, the warning information management server is issuing subsystem transmission early warning letter on the warning information line
Before breath, it is added to signing electronically correspondingly with each warning information countersign terminal in the warning information.By aforementioned
Function can promote the reliability of warning information, further to attract people's attention.In addition, the warning information management
Server is also used to the warning information being converted to Word text, and gives local preservation.
Optimization, further include monitoring data acquisition subsystem, wherein the monitoring data acquisition subsystem includes monitoring number
According to acquisition terminal and monitoring data storage server, the monitoring data storage server is communicated to connect respectively by internet of things
Several described monitoring data acquisition terminals, the monitoring data storage server also pass through the Internet network and communicate to connect institute respectively
State warning information initiating terminal and each warning information countersign terminal;The monitoring data acquisition terminal is used for collection in worksite
The monitoring data storage service is uploaded to about geological disaster and the monitoring data of weather warning, and by the monitoring data
Device;The monitoring data storage server for storing the monitoring data from each monitoring data acquisition terminal, and
When receiving the warning information initiating terminal or warning information countersign terminal access, the monitoring data are sent to correspondence
Terminal.As shown in Figure 1, the monitoring data acquisition terminal can be, but not limited to as temperature sensor, humidity sensor, wind direction wind
The acquisition terminals such as fast instrument or rainfall gauge, the corresponding monitoring data can be, but not limited to include temperature, relative humidity, wind direction wind
Speed and rainfall value etc..The monitoring data storage server is network side equipment, be can be, but not limited to using mysql relationship type
Database stores the monitoring data, thus can also utilize technology of Internet of things, enable staff and audit responsible person
It easily obtains about information such as the monitoring data of geological disaster and weather warning, enriches the content of warning information, further
Promote the reliability of warning information and professional.
It advanced optimizes, further includes that risk is settled in an area figure rendering server, wherein the risk is settled in an area figure rendering server
Communicate to connect the monitoring data storage server, the warning information initiating terminal and each described respectively by the Internet network
Warning information conutersigns terminal;The risk settles in an area figure rendering server for receiving from the monitoring data storage server
Monitoring data after, draw risk according to the monitoring data and settle in an area figure, and receiving the warning information initiating terminal or institute
When stating warning information countersign terminal access, risk figure of settling in an area is sent to counterpart terminal.As shown in Figure 1, the risk is fallen
Area's figure rendering server is similarly network side equipment, draws risk automatically according to monitoring data and settles in an area the data processing method of figure
For active computer program or the computer program write in a manner of non-creative according to existing drafting mode.Likewise, can
So that staff and audit responsible person can easily obtain and settle in an area figure etc. about the risk of geological disaster and weather warning
Information, enriches the content of warning information, further promotes the reliability of warning information and professional.In detail specifically, the wind
Figure of nearly settling in an area can be, but not limited to include hyetograph.The hyetograph needs the rainfall Value Data using each weather station
To be drawn.
To sum up, for early warning system on the line of geological disaster and weather warning provided by the present embodiment, have has as follows
Beneficial effect: (1) by the line on early warning system, it can use Internet technology to realize the multi-section of geological disaster and weather warning
Door linkage early warning conutersign mechanism, so as to quickly and easily complete entire warning information countersign process (by test, can
The time of entire countersign process was compressed within 5 minutes), realize more canals of geological disaster and meteorological emergency event warning information
The quick publication in road and all standing greatly promotes the timeliness of warning information, reliability and professional, catches conducive to wrecker
Early warning/recover opportunity is reduced and is lost brought by lives and properties of the Disaster Event to people;It (2) can be to entire countersign process
Trace record is carried out, facilitates and carries out history retrospect and summary of experience;(3) can also utilize technology of Internet of things, make staff or
The information such as figure that audit responsible person can easily obtain monitoring data about geological disaster and weather warning or risk is settled in an area,
The content of abundant warning information further promotes the reliability of warning information and professional, is convenient for practical promotion and application.
As described above, the present invention can be realized preferably.For a person skilled in the art, religion according to the present invention
It leads, designs early warning system on various forms of lines for being used for geological disaster and weather warning and do not need creative labor.
These embodiments are changed without departing from the principles and spirit of the present invention, are modified, are replaced, are integrated and modification still
It falls within the scope of protection of the present invention.
Claims (8)
1. a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that including meeting on warning information line
Subsystem and monitoring data acquisition subsystem are issued in bamboo slips used for divination or drawing lots system, warning information line, wherein conutersign on the warning information line
Subsystem includes warning information initiating terminal, warning information countersign terminal and warning information management server, the warning information
Management server communicates to connect the warning information initiating terminal and several described warning information meetings by the Internet network respectively
Sign terminal;
The warning information initiating terminal is generated for editing about geological disaster and the warning information of weather warning, and will be described
Warning information is uploaded to the warning information management server, wherein the warning information include early warning number, early warning type,
Early warning object and warning level;
The warning information countersign terminal is used for after receiving the warning information from the warning information management server, is shown
The warning information, and direct confirmation or the warning information confirmed through revision are fed back into the warning information management server;
The warning information management server is used to that warning information successively to be pushed to each institute according to preset countersign process
Warning information countersign terminal is stated, and the warning information will be sent to by the warning information of most end warning information countersign terminal feedback
Subsystem is issued on line;
Subsystem is issued on the warning information line to be used to receive from the warning information management server and pass through institute
After the warning information for having warning information countersign terminal check, the warning information is issued on line;
The monitoring data acquisition subsystem includes monitoring data acquisition terminal and monitoring data storage server, the monitoring number
Several monitoring data acquisition terminals are communicated to connect by internet of things respectively according to storage server, the monitoring data are deposited
Storage server also passes through the Internet network and communicates to connect the warning information initiating terminal and each warning information countersign respectively
Terminal;
The monitoring data acquisition terminal is used for collection in worksite about geological disaster and the monitoring data of weather warning, and will be described
Monitoring data are uploaded to the monitoring data storage server;
The monitoring data storage server for storing the monitoring data from each monitoring data acquisition terminal, and
When receiving the warning information initiating terminal or warning information countersign terminal access, the monitoring data are sent to correspondence
Terminal.
2. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that institute
It states warning information management server to be also used to after receiving the warning information by warning information countersign terminal feedback, record described pre-
Alert information conutersigns the IP address of terminal and the countersign timestamp to the warning information.
3. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that institute
Warning information management server is stated before issuing subsystem transmission warning information on the warning information line, it will be with each early warning
Information countersign terminal signs electronically correspondingly to be added in the warning information.
4. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that also
It settles in an area figure rendering server including risk, wherein risk figure rendering server of settling in an area by the Internet network distinguishes communication link
Connect the monitoring data storage server, the warning information initiating terminal and each warning information countersign terminal;
The risk settles in an area figure rendering server for after receiving the monitoring data from the monitoring data storage server,
Risk is drawn according to the monitoring data to settle in an area figure, and is receiving the warning information initiating terminal or warning information countersign
When terminal access, risk figure of settling in an area is sent to counterpart terminal.
5. as claimed in claim 4 a kind of for early warning system on the line of geological disaster and weather warning, the risk is settled in an area
Figure includes hyetograph.
6. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that institute
Stating monitoring data acquisition terminal is temperature sensor, humidity sensor, anerovane or rainfall gauge.
7. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that institute
It states monitoring data storage server and stores the monitoring data using mysql relevant database.
8. as described in claim 1 a kind of for early warning system on the line of geological disaster and weather warning, which is characterized in that institute
Stating and issuing subsystem on warning information line is Web server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710597327.5A CN107221129B (en) | 2017-07-20 | 2017-07-20 | It is a kind of for early warning system on the line of geological disaster and weather warning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710597327.5A CN107221129B (en) | 2017-07-20 | 2017-07-20 | It is a kind of for early warning system on the line of geological disaster and weather warning |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107221129A CN107221129A (en) | 2017-09-29 |
CN107221129B true CN107221129B (en) | 2019-03-26 |
Family
ID=59953292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710597327.5A Active CN107221129B (en) | 2017-07-20 | 2017-07-20 | It is a kind of for early warning system on the line of geological disaster and weather warning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107221129B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108010275A (en) * | 2017-10-25 | 2018-05-08 | 胡毅 | A kind of mountain flood and geological disaster monitoring and warning is registered one's residence to people's feedback response system |
CN108333598A (en) * | 2017-12-31 | 2018-07-27 | 广州中海达定位技术有限公司 | A kind of geological disaster monitoring system and method |
CN108961688B (en) * | 2018-07-13 | 2020-11-03 | 特力惠信息科技股份有限公司 | Geological disaster monitoring and early warning method under support of big data |
CN111341072A (en) * | 2020-02-21 | 2020-06-26 | 广州欢网科技有限责任公司 | Accurate and rapid weather early warning analysis pushing reminding system and method |
CN111862536A (en) * | 2020-06-26 | 2020-10-30 | 武汉北斗星度科技有限公司 | Automatic monitoring and early warning system for geological disasters |
CN116882765B (en) * | 2023-09-07 | 2024-01-02 | 北京国信华源科技有限公司 | Disaster risk management and control method based on intelligent label |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4164801B2 (en) * | 2002-12-26 | 2008-10-15 | 国土交通省九州地方整備局長 | Debris flow detection device and detection system |
CN101131787A (en) * | 2006-08-24 | 2008-02-27 | 北京燕禹水务科技有限公司 | Real-time hydrology information automatic monitoring and disaster situation alerting system |
CN102044022A (en) * | 2010-12-24 | 2011-05-04 | 中国科学院合肥物质科学研究院 | Emergency rescue decision making system aiming at natural disasters and method thereof |
CN103778499A (en) * | 2012-10-26 | 2014-05-07 | 重庆沃尔德科技有限公司 | Early warning information issuing platform |
CN103700054B (en) * | 2013-12-10 | 2017-08-25 | 中国地质大学武汉 | A kind of Sudden Geological Hazards emergency preplan digitization system |
CN105741498A (en) * | 2016-04-28 | 2016-07-06 | 成都理工大学 | Method and device for monitoring and performing early warning on geological hazards |
-
2017
- 2017-07-20 CN CN201710597327.5A patent/CN107221129B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107221129A (en) | 2017-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107221129B (en) | It is a kind of for early warning system on the line of geological disaster and weather warning | |
CN105023188B (en) | Digital city management data sharing system based on cloud data | |
CN105260857A (en) | Intelligent management system and method thereof for rural migrant workers | |
CN104362757B (en) | Transformer substation on-line monitoring system based on IEC61850 | |
CN104216989A (en) | Method for storing transmission line integrated data based on HBase | |
CN113487251B (en) | Natural disaster early warning and emergency response method and system based on one-key type remote sensing | |
CN103366311A (en) | Data fusion processing method based on transformer substation multi-system | |
JP4627719B2 (en) | Disaster prevention information sharing system | |
CN111949638A (en) | Data management system, method and storage medium | |
CN109636560A (en) | A kind of source of tax revenue Study on Trend system | |
CN113704567A (en) | Internet of things data management method and device, Internet of things data resource pool and equipment | |
Power et al. | Comparing web feeds and tweets for emergency management | |
CN108197240B (en) | Administrative service wechat public number management system | |
CN112053533B (en) | Intelligent safety control method, device and computer storage medium | |
CN113888126A (en) | Oil gas pipeline inspection management system | |
CN205941952U (en) | Weather information early warning system | |
CN108876687A (en) | A kind of system and method marked on the electronic map and recall community policy event | |
CN108876445A (en) | A kind of data interoperation application based on battalion's distribution end-equipment common information model | |
CN107563671A (en) | A kind of enterprise's test and appraisal planning service system based on internet | |
CN106843656A (en) | A kind of data display and the method for interaction | |
CN110377757A (en) | A kind of real time knowledge map construction system | |
CN103377421A (en) | Method and system for data interaction control of meshed cell | |
CN101123533A (en) | Operation and maintenance device for communication power supply | |
CN112699451B (en) | Community real-time twin system based on combination of community service middlebox and data middlebox with BIM | |
CN104219293A (en) | Police three-emergency-in-one cloud computing receiving-and-handling command and dispatch system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |