CN107192923A CN201710521942.8A CN201710521942A CN107192923A CN 107192923 A CN107192923 A CN 107192923A CN 201710521942 A CN201710521942 A CN 201710521942A CN 107192923 A CN107192923 A CN 107192923A
Authority
CN
China
Prior art keywords
data
protective unit
control protective
wave
recording device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710521942.8A
Other languages
Chinese (zh)
Inventor
朱宁辉
李甲飞
肖逾男
赵波
王海龙
詹雄
刘慧文
郑博文
喻劲松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nanjing NARI Group Corp
China EPRI Science and Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Nanjing NARI Group Corp
China EPRI Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nanjing NARI Group Corp, China EPRI Science and Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710521942.8A priority Critical patent/CN107192923A/en
Publication of CN107192923A publication Critical patent/CN107192923A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/085Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead

Abstract

It is used for independent recording system and its Wave record method that string mends equipment the present invention relates to a kind of, system includes platform measuring case, for the transformer data of collection to be AD converted, and is handed down to control protective unit and wave recording device respectively by ST optical fiber interfaces;Control protective unit, for sending three-phase synchronous signal to platform measuring case, and sends GOOSE on-off models to wave recording device;Wave recording device, the SV signals that GOOSE on-off models and platform measuring case are sent are sent for recording control protective unit.The technical scheme that the present invention is provided improves the reliability and objectivity of serial connection capacitor compensating device recording mode comprehensively, and important evidence is provided for analysis system failure.Security and stability and reliability are high, and the independent recording mode, which is mended the influence of data with existing acquisition system to string and changed, requires minimum, and these links are reduced to greatest extent and obtain uncertain factor.

Description

It is a kind of to be used for independent recording system and its Wave record method that string mends equipment
Technical field
The present invention relates to the transient fault recorder technology of serial connection capacitor compensating device, and in particular to one kind, which is used to going here and there benefit, to be set Standby independent recording system and its Wave record method.
Background technology
As serial connection capacitor compensating device (referred to as string is mended) expands day by day in super, extra-high voltage grid application scale, at it While playing great economic benefit and social benefit, higher requirement is proposed to its stability and reliability.Therefore need A set of fault wave recording device independently of outside protection of FSC and automatic safety device, before it is able to record that electric network fault occurs Electrical quantity and state change process information afterwards, the intactly instantaneous variation after faults and the action behavior of relay protection, and There is the ability that archives data and data are analyzed again.Row fault component diagnosis, accident are covered to string so as to objective, accurate Data analysis, protection act behavior evaluation etc. afterwards.
Because serial connection capacitor compensating device is series in circuit, its special high voltage platform structure so that electric current is mutual Sensor (CT) is mountable on platform, and its secondary side current is directly inputted in the platform measuring case being similarly positioned on platform, Completed in platform measuring case modulus (A/D), after electro-optic conversion by optical fiber by measurement data be sent to protection of FSC and Automatic safety device, then realizes transient state by protection of FSC and automatic safety device while control defencive function is realized Failure wave-recording function.However, fault oscillograph is the basic tool for carrying out power system fault analysis as previously described, for analyzing Judge relay protection and automatic safety device action behavior, determine failure cause, fix a breakdown early, recovery system is normally transported It is OK, current that this integrate referee and sportsman is irrational.Therefore by it with protection of FSC and safety from Dynamic device is separated, independent operating, is more beneficial for the correctness and objectivity of its wave recording.
Series compensation is that capacitor bank is series in transmission line of alternation current, the electrical equipment for compensating transmission line of alternation current. Immobilizing and can adjust according to compensating impedance, series compensation device can be divided into fixed series compensation (FSC) and controlled series compensation (TCSC). Controlled series compensation is the control to series impedance by the means realization of power electronics, and making the parameter of whole power transmission line can dynamically adjust Section.The line power limit and stability of power system can be improved, the characteristics of its is maximum is exactly by being installed additional on power network line Related device, improves the conveying capacity of power network.
The effect of fault wave recording device is exactly that, when power system is broken down, self registering can be opened by failure amount It is dynamic, the change procedure of a period of time interior electrical quantity and non-electric quantity before and after failure is recorded, and recorded wave file is generated, reach association Failure is helped to recollect the purpose of analysis.Its basic functional principle is that, in normal operation, fault wave recording device is constantly to access Simulation electrical quantity (electric current, voltage, power) be acquired, when an error occurs, according to advance definite value, fault wave recording device (being usually 3 seconds) simulates electrical quantity and switching value data in the several seconds before and after failure under action record, and generates failure wave-recording file.
Current serial connection capacitor compensating device recording mode is mainly comprised the following steps:Current transformer on platform (CT), platform measuring case modulus and electrooptic conversion module, optical fiber insulated column, ground optical fiber transfer box, protection of FSC and peace Data summarization plate, backboard, telecommunication management plate in full-automatic device, and netting twine and industrial computer.By the various numbers gathered Recording is carried out again according to after protection of FSC and automatic safety device processing, does not meet the requirement of independent recording.
The content of the invention
To solve above-mentioned deficiency of the prior art, it is used for the independent record that string mends equipment it is an object of the invention to provide a kind of Wave system is united and its Wave record method, and the present invention improves the reliability of serial connection capacitor compensating device recording mode and objective comprehensively Property, provide important evidence for analysis system failure.
The purpose of the present invention is realized using following technical proposals:
The present invention provides a kind of independent recording system that equipment is mended for going here and there, and it is theed improvement is that, including:
Platform measuring case, for the transformer data of collection to be AD converted, and is issued respectively by ST optical fiber interfaces To control protective unit and wave recording device;
Control protective unit, for sending three-phase synchronous signal to platform measuring case, and sends GOOSE to wave recording device On-off model;
Wave recording device, sends what GOOSE on-off models and platform measuring case were sent for recording control protective unit SV signals.
Further, the independent recording system also includes some optical fiber circuits, and every optical fiber circuit is by setting UNICOM is carried out in ST optical fiber interfaces thereon with platform measuring case, control protective unit and wave recording device respectively.
Further, the platform measuring case includes analog-to-digital conversion AD plates;
The analog-to-digital conversion AD plates are used to carry out the transformer data of collection analog-to-digital conversion, and will by ST optical fiber interfaces Transformer data after conversion are handed down to control protective unit and wave recording device simultaneously.
Further, the transformer data after the conversion use the data of FT3 communication protocol forms.
Further, the platform measuring case also includes electro-optic conversion plate, and the electro-optic conversion plate is used for the mutual of collection Sensor data carry out analog-to-digital conversion, and with analog-to-digital conversion AD plate Redundancy Designs.
Further, the electro-optic conversion plate includes luminiferous ether network interface.
Further, the control protective unit includes data summarization plate, and the data summarization plate, which is used to receive, passes through ST Optical fiber interface sends three-phase synchronous signal by the transformer data after conversion, and by data summarization plate to analog-to-digital conversion AD plates, GOOSE on-off models are transmitted to wave recording device by luminiferous ether network interface.
Further, the transformer data are sampled value SV signals.
The present invention also provides a kind of Wave record method for the independent recording system for being used for string benefit equipment, and it is theed improvement is that:
The transformer data of collection are AD converted by platform measuring case, and are handed down to control respectively by ST optical fiber interfaces Protection device and wave recording device;
Control protective unit sends three-phase synchronous signal to platform measuring case, and sends GOOSE switches to wave recording device Measure signal;
Wave recording device record control protective unit sends the SV letters that GOOSE on-off models and platform measuring case are sent Number.
Further, the platform measuring case is used to the transformer data of collection being AD converted, and passes through ST optical fiber Interface is handed down to control protective unit and wave recording device respectively, including:
The transformer data of the analog-to-digital conversion AD plates collection of platform measuring case are AD converted;
Transformer data after AD conversion are handed down to control protective unit and wave recording device respectively.
Further, the control protective unit sends three-phase synchronous signal to platform measuring case, and to wave recording device GOOSE on-off models are sent, including:
The data summarization plate of control protective unit, which is received, passes through ST optical fiber interfaces by the transformer data after conversion;
The data summarization plate of control protective unit sends three-phase synchronous signal to analog-to-digital conversion AD plates;
The data summarization plate of control protective unit transmits GOOSE on-off models by luminiferous ether network interface to wave recording device.
Compared with immediate prior art, the excellent effect that the technical scheme that the present invention is provided has is:
A) technical scheme that the present invention is provided uses platform measuring case, turns for the transformer data of collection to be carried out into AD Change, and control protective unit and wave recording device are handed down to by ST optical fiber interfaces respectively;Control protective unit, for being surveyed to platform Measuring tank sends three-phase synchronous signal, and sends GOOSE on-off models to wave recording device;Wave recording device, for recording control Protection device sends the SV signals that GOOSE on-off models and platform measuring case are sent, system it is simple in construction, and realize Recording function, improves the reliability and objectivity of serial connection capacitor compensating device recording mode comprehensively, be analysis system therefore Barrier provides important evidence, overcomes by the various data gathered are after protection of FSC and automatic safety device processing Recording is carried out again, does not meet the defect of the requirement of independent recording.
B) the low engineering adaptability of technical scheme cost that the present invention is provided is strong, and string can be made full use of to mend data with existing collection system System, research and development and manufacturing cost are greatly reduced.
C the technical scheme security and stability and reliability that) present invention is provided are high, and the independent recording mode is mended several to string Require minimum according to the influence and change of acquisition system, these links are reduced to greatest extent and obtain uncertain factor.
D) the technical scheme implementation that the present invention is provided is simple, reliable, therefore is especially suitable for a wide range of popularization and application.Especially It is applied to the upgrading to the series compensation device that put into operation.
Brief description of the drawings
Fig. 1 is a kind of flow chart for independent Wave record method for being used for string benefit equipment that the present invention is provided;
Fig. 2 is a kind of schematic diagram for independent Wave record method for being used for string benefit equipment that the present invention is provided.
Embodiment
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings.
The following description and drawings fully show specific embodiments of the present invention, to enable those skilled in the art to Put into practice them.Other embodiments can include structure, logic, electric, process and other changes.Embodiment Only represent possible change.Unless explicitly requested, otherwise single component and function are optional, and the order operated can be with Change.The part of some embodiments and feature can be included in or replace part and the feature of other embodiments.This hair The scope of bright embodiment includes the gamut of claims, and claims is all obtainable equivalent Thing.Herein, these embodiments of the invention can individually or generally be represented that this is only with term " invention " For convenience, and if in fact disclosing the invention more than one, it is not meant to automatically limit the scope of the application to appoint What single invention or inventive concept.
A kind of independent failure recording system and method based on data merging device that the present invention is provided.Independent recording system Primary demand includes:Physical quantity needed for relay protection and automatic safety device and independent wave recording device should come from same collection Or data processing equipment, relevant communication protocol must be consistent.It is mutual that part of data acquisition is not only suitable for conventional electromagnetic current/voltage Sensor, can be with multiple producer's wave recording device interfaces.
The present invention provides a kind of independent recording system that equipment is mended for going here and there, as shown in figure 1, the system is surveyed including platform Measuring tank, control protective unit and wave recording device, the platform measuring case and control protective unit data interaction, the platform measuring Case transmits data to wave recording device, and the control protective unit transmits data to wave recording device.
Platform measuring case, for the transformer data of collection to be AD converted, and is issued respectively by ST optical fiber interfaces To control protective unit and wave recording device;
Control protective unit, for sending three-phase synchronous signal to platform measuring case, and sends GOOSE to wave recording device On-off model;
Wave recording device, sends what GOOSE on-off models and platform measuring case were sent for recording control protective unit SV signals.
It is preferred that, the independent recording system also includes some optical fiber circuits, and every optical fiber circuit is by being arranged on ST optical fiber interfaces thereon carry out UNICOM with platform measuring case, control protective unit and wave recording device respectively.
It is preferred that, the platform measuring case includes analog-to-digital conversion AD plates;
The analog-to-digital conversion AD plates are used to carry out the transformer data of collection analog-to-digital conversion, and will by ST optical fiber interfaces Transformer data after conversion are handed down to control protective unit and wave recording device simultaneously.
It is preferred that, the transformer data after the conversion use the data of FT3 communication protocol forms.
It is preferred that, the platform measuring case also includes electro-optic conversion plate, and the electro-optic conversion plate is used for the mutual inductance of collection Device data carry out analog-to-digital conversion, and with analog-to-digital conversion AD plate Redundancy Designs.
It is preferred that, the electro-optic conversion plate includes luminiferous ether network interface.
It is preferred that, the control protective unit includes data summarization plate, and the data summarization plate, which is used to receive, passes through ST light Fine interface sends three-phase synchronous signal by the transformer data after conversion, and by data summarization plate to analog-to-digital conversion AD plates, leads to Cross luminiferous ether network interface and transmit GOOSE on-off models to wave recording device.
The present invention also provides a kind of independent recording system work process, including:
1) existing analog data collection system on existing serial connection capacitor compensating device high voltage platform is utilized.By right Platform measuring case analog-to-digital conversion AD plates carry out the optimization of functional performance, and minimum change is carried out to existing system, reach that satisfaction string is mended The requirement of engineering independence recording.Data are issued so as to net FT3 forms using state by analog-to-digital conversion AD plates,
2) data of protection of FSC and automatic safety device (control protective unit) are issued simultaneously by optical fiber interface Collect plate and independent failure wave recording device.
Wave recording device record control protective unit sends the SV letters that GOOSE on-off models and platform measuring case are sent Number.
3) data that control protective unit gathers data summarization plate, are transmitted by luminiferous ether network interface to wave recording device GOOSE on-off models, meet IEC61850 standard agreements.
Fig. 2 gives the implementation of independent recording, is gathered by platform measuring case after all transformer data, by flat Platform measurement case analog-to-digital conversion AD plates are AD converted and electro-optic conversion, are then divided electric measurement amount by different optical fiber circuits The protection of FSC and automatic safety device (control protective unit) that are not transferred under platform and independent wave recording device.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the application can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is the flow with reference to method, equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, although with reference to above-described embodiment pair The present invention is described in detail, and those of ordinary skill in the art can still enter to the embodiment of the present invention Row modification or equivalent substitution, these any modifications or equivalent substitution without departing from spirit and scope of the invention, in application Within pending claims of the invention.

Claims (11)

1. a kind of be used for the independent recording system that string mends equipment, it is characterised in that including:
Platform measuring case, for the transformer data of collection to be AD converted, and is handed down to control respectively by ST optical fiber interfaces Protection device processed and wave recording device;
Control protective unit, for sending three-phase synchronous signal to platform measuring case, and sends GOOSE switches to wave recording device Measure signal;
Wave recording device, the SV letters that GOOSE on-off models and platform measuring case are sent are sent for recording control protective unit Number.
2. as claimed in claim 1 be used for the independent recording system that string mends equipment, it is characterised in that the independent recording system Also include some optical fiber circuits, every optical fiber circuit by the ST optical fiber interfaces that are disposed thereon respectively with platform measuring Case, control protective unit and wave recording device carry out UNICOM.
3. as claimed in claim 2 be used for the independent recording system that string mends equipment, it is characterised in that the platform measuring case and bag Include analog-to-digital conversion AD plates;
The analog-to-digital conversion AD plates are used to carry out the transformer data of collection analog-to-digital conversion, and will be changed by ST optical fiber interfaces Transformer data afterwards are handed down to control protective unit and wave recording device simultaneously.
4. as claimed in claim 3 be used for the independent recording system that string mends equipment, it is characterised in that the mutual inductance after the conversion Device data use the data of FT3 communication protocol forms.
5. as claimed in claim 3 be used for the independent recording system that string mends equipment, it is characterised in that the platform measuring case is also Including electro-optic conversion plate, the electro-optic conversion plate is used to the transformer data of collection carrying out analog-to-digital conversion, and and analog-to-digital conversion AD plate Redundancy Designs.
6. as claimed in claim 5 be used for the independent recording system that string mends equipment, it is characterised in that the electro-optic conversion plate bag Include luminiferous ether network interface.
7. as claimed in claim 1 be used for the independent recording system that string mends equipment, it is characterised in that the control protective unit Including data summarization plate, the data summarization plate is used to receive by ST optical fiber interfaces by the transformer data after conversion, and leads to Cross data summarization plate and send three-phase synchronous signal to analog-to-digital conversion AD plates, GOOSE is transmitted to wave recording device by luminiferous ether network interface On-off model.
8. it is used for the independent recording system that string mends equipment as described in claim 1 or 7, it is characterised in that the transformer number According to for sampled value SV signals.
9. a kind of be used for the Wave record method that string mends the independent recording system of equipment, it is characterised in that:
The transformer data of collection are AD converted by platform measuring case, and are handed down to control protection respectively by ST optical fiber interfaces Device and wave recording device;
Control protective unit sends three-phase synchronous signal to platform measuring case, and sends GOOSE switching values letter to wave recording device Number;
Record control protective unit sends the sampled value SV signals that GOOSE on-off models and platform measuring case are sent.
10. Wave record method as claimed in claim 9, it is characterised in that the platform measuring case is used for the transformer of collection Data are AD converted, and are handed down to control protective unit and wave recording device respectively by ST optical fiber interfaces, including:
The transformer data of the analog-to-digital conversion AD plates collection of platform measuring case are AD converted;
Transformer data after AD conversion are handed down to control protective unit and wave recording device respectively.
11. Wave record method as claimed in claim 9, it is characterised in that the control protective unit is sent to platform measuring case Three-phase synchronous signal, and GOOSE on-off models are sent to wave recording device, including:
The data summarization plate of control protective unit, which is received, passes through ST optical fiber interfaces by the transformer data after conversion;
The data summarization plate of control protective unit sends three-phase synchronous signal to analog-to-digital conversion AD plates;
The data summarization plate of control protective unit transmits GOOSE on-off models by luminiferous ether network interface to wave recording device.
CN201710521942.8A 2017-06-30 2017-06-30 It is a kind of to be used for independent recording system and its Wave record method that string mends equipment Pending CN107192923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710521942.8A CN107192923A (en) 2017-06-30 2017-06-30 It is a kind of to be used for independent recording system and its Wave record method that string mends equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710521942.8A CN107192923A (en) 2017-06-30 2017-06-30 It is a kind of to be used for independent recording system and its Wave record method that string mends equipment

Publications (1)

Publication Number Publication Date
CN107192923A true CN107192923A (en) 2017-09-22

Family

ID=59881274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710521942.8A Pending CN107192923A (en) 2017-06-30 2017-06-30 It is a kind of to be used for independent recording system and its Wave record method that string mends equipment

Country Status (1)

Country Link
CN (1) CN107192923A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109449927A (en) * 2018-11-14 2019-03-08 国网青海省电力公司检修公司 In-situ protection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109449927A (en) * 2018-11-14 2019-03-08 国网青海省电力公司检修公司 In-situ protection device

Similar Documents

Publication Publication Date Title
CN103529377B (en) The Auto-Test System of intelligent transformer substation digital protection device and method
CN109103880A (en) The emulation of intelligent substation panorama and test macro
CN103675526B (en) Prudential sub-station test system
CN103885438B (en) The Auto-Test System of a kind of transformer station measuring and controlling equipment and method
CN103631255B (en) For the Fault Insertion Equipment of avionics system Gernral Check-up
CN109541353A (en) Power distribution automation detection system
CN104935079A (en) Station-domain protection system of intelligent transformer station and function debugging method of system
CN105606920A (en) System and method for determining the current and future state of health of a power transformer
CN102142291B (en) Method and system for displaying monitoring parameters after nuclear power station accident
CN102298979A (en) Signal default value verification method for digital instrument control system of nuclear power plant and system
CN102879661A (en) Method and system for detecting distribution network automatic terminal
CN105158718B (en) A kind of fault detector integrated test facility and test system
CN107085156A (en) Microcomputer type relay protection and automatic test instrument automatic checkout system
CN107064693B (en) Relay protection device outlet matrix test device and test method
CN104898638A (en) Periodic test device for pressurized water reactor nuclear power plant protection system
CN110579658B (en) Automatic test system and test method for intelligent substation protection device
CN108306753A (en) Simulator, test method and the system of a kind of Ith area data communication network shutdown
CN104076807B (en) The adjustment method of the automated system of intelligent substation
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN205608171U (en) Digital electric energy measurement system's testing arrangement
CN107192923A (en) It is a kind of to be used for independent recording system and its Wave record method that string mends equipment
CN104765024A (en) Onboard radar jamming automatic detection system
CN203164360U (en) Transformer device insulation online monitoring system
Kezunovic et al. Substation data integration for automated data analysis systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination